    PROJECT SPECIFIC RISK ASSESSMENT AND MANAGEMENT PLAN

    Risk Assessment for :-TESTING & COMMISSIONING OF CHILLERS Risk Assessment Ref.: MS-040/01 Rev 0Project :- DUCAB HV & EHV FACILITYClient :- DUCAB

    Ref. Activity Element/

    Description

    Significant PotentialHazards/Risks Involved

    Populationat Risk

    Risk Classification RiskLevel

    Low /Medium /

    High

    Action to be Taken to Reduce Risk ResidualRisks

    Likelihood(L)

    Severity(S) RiskRating (R)

    1

    Testing andcommissioning ofChillers

    Access control toChillers area

    Using testingEquipments

    Checking theelectrical

    panel.

    Alignment of chillers

    Trench crossing and Poor access tothe Chillers area leads to slip, tripand fall to the operatives causeminor injury. Unauthorised entry tothe area leads to accident, damageof equipment.

    Unsafe and un calibratedinstruments leads to electrical shockor mechanical hazard which leads toelectrical shock injury, impact andproperty damage.

    Electrical shock hazard leads toburn injury and adversely cause tripand falls lead to major injury.

    Poor alignment or balancing of thechillers in the foundation leads tovibration and noise cause irritation tothe workers in and around.

    Poor method of balancing the plantleads to minor cut injuries to theoperatives.

    1-6

    Operatives,

    1-6

    3

    2

    2

    2

    6

    3

    8

    8

    18(R3)

    6(R6)

    16(R3)

    16(R3)

    M

    L

    M

    M

    Prevent unauthorised entry to chillers area

    Ensure trenches are closed around the chillersarea or provided appropriate trench crossingbridge.

    Ensure that all the testing equipments arecalibrated, certified and safe to use for theintended purpose.

    Ensure that all the operatives are competent to

    handle the system. Having proper PPE.

    Ensure that all the operatives, engaged in the job

    activities are briefed about the Job Specific Riskand the required precautionary measures that tobe adhere prior commencement of the job.

    Ensure that all the operatives are competent to

    handle electrical supply and work with the

    electrical DBs.

    Ensure that the competent electrical supervisor

    shall be closely monitoring.

    Ensure appropriate tools and methods are used

    for alignment. All the operatives are provided earplug or ear muff.

    HumanError.

    RequireClose

    Supervision

    Page 1 of 2

  • 7/28/2019 Chiller Plant RA

    2/2

    PROJECT SPECIFIC RISK ASSESSMENT AND MANAGEMENT PLAN

    Risk Assessment for :-TESTING & COMMISSIONING OF CHILLERS Risk Assessment Ref.: MS-040/01 Rev 0Project :- DUCAB HV & EHV FACILITYClient :- DUCAB

    Ref. Activity Element/

    Description

    Significant PotentialHazards/Risks Involved

    Populationat Risk

    Risk Classification RiskLevel

    Low /Medium /

    High

    Action to be Taken to Reduce Risk ResidualRisks

    Likelihood(L)

    Severity(S) RiskRating (R)

    Hand tools

    Personal protectiveequipments.

    Non insulated tools for electricalwork leads to shock and minor injuryto the operatives.

    Absence of PPE may leads to head,foot, and hand injury in work place.

    Noise pollution leads to restlessnessand irritation to the operatives in

    short term.

    Operatives,

    Visitors/othercontractorworkingaround

    3

    3

    2

    3

    6(R6)

    9(R5)

    L

    L

    Ensure that all the tools are appropriate andinsulated.

    Ensure ear plug/muff used by the operatives

    Ensure that required Personal Protective

    Equipment like Helmets, Shoes, coveralls, Hand

    Gloves and goggles.

    Failure touse PPE

    L-RequireClose

    Supervision

    Risk Classification

    Likelihood (L) : Time:Continuous 5 hrs. plus 2 to 4 hrs. .25 to 1 hr. 10 min. or less

    No. Exposed:

    100 plus 6 6 5 4 3

    50 to 100 6 5 4 3 325 to 50 6 4 3 2 2

    15 to 25 6 3 3 2 1

    5 to 15 6 3 2 1 1

    1 to 5 6 2 1 1 1

    Severity (S): Not Harmful (NH) = 1; Slightly Harmful (SH) = 2; Harmful (H) = 3; Extremely Harmful (EH) = 4; Multiple Casualties (M) = 5; Catastrophic (C) = 6Risk Rating: Determined as Likelihood x Severity