chiel boonstra an office building project tax office extension, enschede environmental design in...
TRANSCRIPT
Chiel Boonstra
An Office Building ProjectTax Office extension, Enschede
Environmental design in practice
Tax Office Enschede
““One of the first real cases of One of the first real cases of
integrated passive design andintegrated passive design and
active occupant control”active occupant control”
Energy Comfort 2000
European Thermie demonstration project
Building as an energy systemIntegrated passive design + active control strategiesImproved indoor environmentHigher productivity
Key issues Tax Office
Site locationSite locationFlexibilityLow primary energy use
Passive ventilationPassive ventilation Daylighting conceptDaylighting concept Photovoltaic-cells
Occupant controlOccupant controlSustainable materials / water systems
Site location
Former railway-areaClose to railway, regional and local bus stationClose to enschede city centre
Existing building retained through extension and renovation
Passive ventilation-concept
Natural supplyNatural supplyVia wind-pressure independent vents in facades
Natural extractionNatural extractionVia chimneys on atrium
Mechanical extractionMechanical extractionUnder extreme low wind conditions and high temperatures
Daylighting concept
High daylight windowHigh daylight windowSolar reflecting, light admitting glazing
LightshelfLightshelfEqual light distribution over office rooms
Low vision windowLow vision windowClear glazing + light regulation + solar shading
Control strategies
Manual:Manual:Windows, air supply
Both:Both:Night ventilation, lighting, heating, shading
Automatic:Automatic:Exhaust
EC 2000 monitoring programme
Breakdown of energy flowsLong term monitoring in typical roomsShort term monitoring, e.G. Airtightness
Occupant questionnaire according to format european AUDIT study in 50 buildings
Conclusions monitoring
High user satisfaction: reduced absenceDaylighting and control appreciatedSummer temperature requirements are met
High reduction of electricity useHeating is 70% of total energy demand