chicagosystem - sweetssweets.construction.com/swts_content_files/3163/9773... · interior...

16
05 73 00/PPA BuyLine 9773 Modesto System Craftsmanship Seamless Handrail No Visible Joints Double Baluster System 700 Creel Drive, Wood Dale, IL 60191 Tel: 800-927-7346 • Fax: 630-860-5913 Web site: http://www.artec-rail.com Chicago System

Upload: others

Post on 31-Dec-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ChicagoSystem - Sweetssweets.construction.com/swts_content_files/3163/9773... · Interior Architect: Barber Architecture General Contractor: The Weitz Company “We selected this

05 73 00/PPABuyLine 9773

Modesto System

Craftsmanship

Seamless Handrail No Visible Joints

Double Baluster System

700 Creel Drive, Wood Dale, IL 60191Tel: 800-927-7346 • Fax: 630-860-5913Web site: http://www.artec-rail.com

Chicago System

9773_01.qxd:Sweets P&P 16 pgr 7/7/05.qxd 8/25/08 12:52 PM Page 1

Page 2: ChicagoSystem - Sweetssweets.construction.com/swts_content_files/3163/9773... · Interior Architect: Barber Architecture General Contractor: The Weitz Company “We selected this

Project: C & A INDUSTRIES

Architect: Gensler

General Contractor: Weitz

Chicago SystemArtec 2

www.artec-rail.com Fax 630-860-5913 800 927-7346

C r a f t s m a n s h i p • S e a m l e s s H a n d r a i l • N o V i s i b l e J o i n t s

photo by Tom Kessler/Kessler Photography

9773_02.qxd:Sweets P&P 16 pgr 7/7/05.qxd 8/25/08 12:48 PM Page 2

Page 3: ChicagoSystem - Sweetssweets.construction.com/swts_content_files/3163/9773... · Interior Architect: Barber Architecture General Contractor: The Weitz Company “We selected this

“Artec gave us a turnkey solution with a custom-designed look that really complementsour building design. From product specification to installation, Artec delivered a highquality product backed by great service.”

Brad J. VanArsdale, AIA – Gensler Denver

photo by Tom Kessler/Kessler Photography

05 73 00/PPABuyLine 9773Artec 3Chicago System

www.artec-rail.com Fax 630-860-5913 800 927-7346

C r a f t s m a n s h i p • S e a m l e s s H a n d r a i l • N o V i s i b l e J o i n t s

9773_03.qxd:Sweets P&P 16 pgr 7/7/05.qxd 8/25/08 12:58 PM Page 3

Page 4: ChicagoSystem - Sweetssweets.construction.com/swts_content_files/3163/9773... · Interior Architect: Barber Architecture General Contractor: The Weitz Company “We selected this

Project: OFFICE HEADQUARTERS IN MARLBOROUGH

Architect: Margulies & Associates

“As part of the design of the Office Headquarters project in Marlborough, Massachu-setts, we wanted a railing system that had a minimalist aesthetic; something cleanand simple with a high-tech look to contrast with the dark wood trim and ceilingpanels,” explained Project Architect Kim Smith. “In addition, we liked the interestingside-mounting detail of the Artec rail, which allowed us to make the floor constructionless noticeable.”

Kim Smith – Margulies & Associates

Chicago SystemArtec 4

photo by Warren Patterson Photography

www.artec-rail.com Fax 630-860-5913 800 927-7346

C r a f t s m a n s h i p • S e a m l e s s H a n d r a i l • N o V i s i b l e J o i n t s

9773_04.qxd:Sweets P&P 16 pgr 7/7/05.qxd 8/25/08 1:16 PM Page 4

Page 5: ChicagoSystem - Sweetssweets.construction.com/swts_content_files/3163/9773... · Interior Architect: Barber Architecture General Contractor: The Weitz Company “We selected this

05 73 00/PPABuyLine 9773Artec 5Double Baluster System

www.artec-rail.com Fax 630-860-5913 800 927-7346

C r a f t s m a n s h i p • S e a m l e s s H a n d r a i l • N o V i s i b l e J o i n t s

Project: AURORA MUNICIPAL CENTER

Interior Architect: Barber Architecture

General Contractor: The Weitz Company

“We selected this railing system for the Municipal Center because the simple elegance,durability, and easy maintenance suited the building interior.”

Deborah Barber – Barber Architecture

photo by Michael Peck

9773_05.qxd 8/20/07 12:52 AM Page 5

Page 6: ChicagoSystem - Sweetssweets.construction.com/swts_content_files/3163/9773... · Interior Architect: Barber Architecture General Contractor: The Weitz Company “We selected this

Double Baluster SystemArtec 6

www.artec-rail.com Fax 630-860-5913 800 927-7346

C r a f t s m a n s h i p • S e a m l e s s H a n d r a i l • N o V i s i b l e J o i n t s

Project: KENTUCKY TRANSPORTATION CABINET

Architect: Ekhoff, Ochenkoski & Polk Architects, Lexington, Kentucky

Interior Architect: NBBJ, Columbus Ohio

General Contractor: Messer Construction Company

photo by Feinknopf Photography

9773_06.qxd 8/20/07 12:53 AM Page 6

Page 7: ChicagoSystem - Sweetssweets.construction.com/swts_content_files/3163/9773... · Interior Architect: Barber Architecture General Contractor: The Weitz Company “We selected this

05 73 00/PPABuyLine 9773Artec 7Double Baluster System

“Originally our intent was to design custom railings, but instead we specified the P&PArtec products because they met our design concept and desired aesthetic with theproven quality and craftsmanship of an existing product line that could be guaranteed.”

NBBJ

photo by Feinknopf Photography

www.artec-rail.com Fax 630-860-5913 800 927-7346

C r a f t s m a n s h i p • S e a m l e s s H a n d r a i l • N o V i s i b l e J o i n t s

9773_07.qxd 8/20/07 12:54 AM Page 7

Page 8: ChicagoSystem - Sweetssweets.construction.com/swts_content_files/3163/9773... · Interior Architect: Barber Architecture General Contractor: The Weitz Company “We selected this

Project: ROGER W. FOLLETT HALL - MORRISVILLE STATE COLLEGE NORWICH

CAMPUS, NORWICH, NEW YORK

Architect: QPK Design Architecture, Engineering Site & Planning

General Contractor: William H. Lane, Inc.

Double Baluster SystemArtec 8

photo by ©Tom Watson Photographer

www.artec-rail.com Fax 630-860-5913 800 927-7346

C r a f t s m a n s h i p • S e a m l e s s H a n d r a i l • N o V i s i b l e J o i n t s

9773_08.qxd 8/20/07 12:54 AM Page 8

Page 9: ChicagoSystem - Sweetssweets.construction.com/swts_content_files/3163/9773... · Interior Architect: Barber Architecture General Contractor: The Weitz Company “We selected this

05 73 00/PPABuyLine 9773Artec 9Double Baluster System

“The Building reflected a formal academic character while symbolizing the use of tech-nology in education. The sleek and graceful lines of the Artec railing system enhancethis imagery with its highly machines fit and finish.”

Robert Young – QPK Design

photo by ©Tom Watson Photographer

www.artec-rail.com Fax 630-860-5913 800 927-7346

C r a f t s m a n s h i p • S e a m l e s s H a n d r a i l • N o V i s i b l e J o i n t s

9773_09.qxd 8/20/07 12:55 AM Page 9

Page 10: ChicagoSystem - Sweetssweets.construction.com/swts_content_files/3163/9773... · Interior Architect: Barber Architecture General Contractor: The Weitz Company “We selected this

Project: MEMPHIS • SHELBY COUNTY CENTRAL LIBRARY

Architect: Looney Ricks Kiss

Library Planning & Design Consultant: Shepley Bulfinch Richardson + Abbott

General Contractor: Hunt Construction Group

“The Design of the P&P Artec Railing System is not only elegant, complementing thetranslucency of the open stairway, but it also enhances the passage of the naturallight throughout the library’s main lobby atrium and the adjacent reading rooms.”

Thomas C. Sutton, AIA—Senior Project Manager-Looney Ricks Kiss

Double Baluster SystemArtec 10

photo by Timothy Hursley/Arkansas Office Photographer

Sculpture by Ed Carpenter

www.artec-rail.com Fax 630-860-5913 800 927-7346

C r a f t s m a n s h i p • S e a m l e s s H a n d r a i l • N o V i s i b l e J o i n t s

9773_10.qxd 8/20/07 12:56 AM Page 10

Page 11: ChicagoSystem - Sweetssweets.construction.com/swts_content_files/3163/9773... · Interior Architect: Barber Architecture General Contractor: The Weitz Company “We selected this

05 73 00/PPABuyLine 9773Artec 11Modesto System

Project: BELTONE

Architect: Wright Architects

General Contractor: KCC Group Design + Build, Inc.

“The clean lines and simple elegance of this railing system complemented WrightArchitect’s design of the building’s lobby. With P&P Artec’s Modesto system, we wereable to economically achieve the look of a fully customized railing system.”

Aaron Ebent, Wright Architects

photo by © 2005 David Clifton

www.artec-rail.com Fax 630-860-5913 800 927-7346

C r a f t s m a n s h i p • S e a m l e s s H a n d r a i l • N o V i s i b l e J o i n t s

9773_11.qxd 8/20/07 12:57 AM Page 11

Page 12: ChicagoSystem - Sweetssweets.construction.com/swts_content_files/3163/9773... · Interior Architect: Barber Architecture General Contractor: The Weitz Company “We selected this

Project: REYNOLDS & REYNOLDS PHASE II

Architects: BHDP Architecture

C.M. – Danis Building Construction

Modesto SystemArtec 12

photo copyright © 2003 Michael Krekeler

© 2003 Hedrich Blessing Photography

www.artec-rail.com Fax 630-860-5913 800 927-7346

C r a f t s m a n s h i p • S e a m l e s s H a n d r a i l • N o V i s i b l e J o i n t s

9773_12.qxd 8/20/07 12:58 AM Page 12

Page 13: ChicagoSystem - Sweetssweets.construction.com/swts_content_files/3163/9773... · Interior Architect: Barber Architecture General Contractor: The Weitz Company “We selected this

05 73 00/PPABuyLine 9773Artec 13

Project: REYNOLDS & REYNOLDS PHASE II

Architects: BHDP Architecture

C.M. – Danis Building Construction

photo copyright © 2003 Michael Krekeler© 2003 Hedrich Blessing Photography

www.artec-rail.com Fax 630-860-5913 800 927-7346

Modesto System

C r a f t s m a n s h i p • S e a m l e s s H a n d r a i l • N o V i s i b l e J o i n t s

9773_13.qxd 8/20/07 12:59 AM Page 13

Page 14: ChicagoSystem - Sweetssweets.construction.com/swts_content_files/3163/9773... · Interior Architect: Barber Architecture General Contractor: The Weitz Company “We selected this

Project: MOUNT CLEMENS GENERAL HOSPITAL

Design Architect: HOK North Central — Chicago

Architect of Record: SSOE

Construction Manager: Roncelli

Modesto SystemArtec 14

photo by © Paul Rivera/archphoto

www.artec-rail.com Fax 630-860-5913 800 927-7346

C r a f t s m a n s h i p • S e a m l e s s H a n d r a i l • N o V i s i b l e J o i n t s

9773_14.qxd 8/20/07 12:59 AM Page 14

Page 15: ChicagoSystem - Sweetssweets.construction.com/swts_content_files/3163/9773... · Interior Architect: Barber Architecture General Contractor: The Weitz Company “We selected this

05 73 00/PPABuyLine 9773Artec 15Modesto System

“We selected an Artec railing system because it complemented the clean moderndesign of the space. The Artec system provided the flexibility to accommodate andaesthetically coordinate the different handrail, guardrail and cane rail requirements ofthe project.”

Erik Anderson – AIA Design Prinicipal – Vice President

photo by © Paul Rivera/archphoto

www.artec-rail.com Fax 630-860-5913 800 927-7346

C r a f t s m a n s h i p • S e a m l e s s H a n d r a i l • N o V i s i b l e J o i n t s

9773_15.qxd 8/20/07 1:01 AM Page 15

Page 16: ChicagoSystem - Sweetssweets.construction.com/swts_content_files/3163/9773... · Interior Architect: Barber Architecture General Contractor: The Weitz Company “We selected this

Modesto SystemArtec 16

www.artec-rail.com Fax 630-860-5913 800 927-7346

C r a f t s m a n s h i p • S e a m l e s s H a n d r a i l • N o V i s i b l e J o i n t s

Project: ANIXTER CORPORATE HEADQUARTERS

Architect: Wright Architects

General Contractor: ECI

“One of the main organizing elements of the building is the central stair connectingthe three floors of the building. The Modesto System is a perfect complement to theclean lines and contemporary feel of the building.”

William Gamble, AIA – Wright Architects

photo by Mark A. Samuels — SamuelsArchitectural Photography

9773_16.qxd 8/20/07 1:02 AM Page 16