chicago - addendum no. 3 for various furniture, … · 2020. 3. 10. · various furniture,...
TRANSCRIPT
1 Specification: 134471, Various Furniture, Accessories And Related Furniture Reconfiguration, Repair And Storage Services – Addendum No. 3
APRIL 22, 2016
ADDENDUM NO. 3 FOR
VARIOUS FURNITURE, ACCESSORIES AND RELATED FURNITURE RECONFIGURATION, REPAIR AND STORAGE SERVICES
SPECIFICATION NO. 134471
For which bids are scheduled to open in the Bid & Bond Room 103, City Hall, 121 N. LaSalle Street Chicago, Illinois 60602, at 11:00 a.m. Central Time, on April 28, 2016. BIDDERS MUST ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED ON THE BID EXECUTION PAGE
1. Revision No. 1. BID OPENING DATE POSTPONEMENT.
Bid Postponement, Bids which were scheduled to open April 28, 2016 is hereby postponed. The new bid opening date is scheduled for May 19, 2016 at 11:00 a.m.
2. Revision No. 2.
Remove Article 5, Scope of Work and Detailed Specifications and Replace with Article 5, Scope of Work and Detailed Specifications, Pages 60 through 69 – Addendum No. 3 – issued April 22, 2016. Notable changes: Sections 5.4.2, 5.4.3, 5.4.5, and 5.4.6 have been revised.
3. Revision No. 3
Remove Section 1.9, Bid Prices Must Incorporate All Costs, page 4, and Replace with Section 1.9, Bid Pricing and Incorporated
Costs, pages 4 – Addendum No. 3 – issued April 22, 2016.
4. Revision No. 4 Remove Article 4.2.1., Delivery, page 54, and Replace with Article 4.2.1., Delivery, page 55 – Addendum No. 3 – issued April
22, 2016.
5. Revision No. 5 Remove Proposal Pages –and Replace with the attached Proposal Pages – Addendum No. 3 – Issued April 22, 2016. Notable changes: All groups have been modified.
6. Revision No. 6
Exhibit 2, Appendix has been added to the Specification.
7. Revision No.7 Add the attached Proposal Page Summary Sheet, Page 106 – Addendum No. 3 – issued April 22, 2016.
Questions & Answers: Question No. 1. Paragraph 1.9 of the bid document states the bid pricing must incorporate all costs. 2FM made it clear in the pre-bid
conference that Article 5.4.2 takes precedence. Could you please confirm. Answer: See Revision No. 2. Question No. 2. Please confirm that the manufacturer’s list price in effect at the time of order entry applies. Answer: Yes, the manufacturer’s list price in effect at the time of order entry will apply. Question No. 3. Since dealers receive a variety of discounts based on the type of product the manufacturer is offering, it would be in
the City’s best interest to break down the all-inclusive Hon catalog into the following different groups. 1) Systems; 2) Files and Storage; 3) Laminate Casegoods; 4) Veneer Casegoods; 5) Steel Seating; 6) Wood Seating and 7) Tables. This breakdown guarantees that the City will get the most competitive Hon pricing from the dealer who is awarded this group. Answer: Vendor should provide a percentage discount based on the existing item description. Question No. 4. Chicago Department of Aviation had a policy in effect with the previous furniture contract where the dealer providing
the quotation to the City also includes a copy of the manufacturer’s list price page(s). This allows the DOA to be sure that catalog numbers and list prices are correct and when the appropriate discount is applied, the City is getting the proper net price. I do not believe this is an important issue for the bid, but could be a directive to the dealers after the bid award. Answer: Please refer to Section 3.2.1.2. Invoices.
Question No. 5. If you have an EDS on file, can this certificate be submitted with this bid? Answer: EDS must be specific to this bid. Question No. 6. Inwood Office Environment is no longer open for business. How shall we note that on the bid? Answer: The Inwood Office Environment has been removed from the Specification.
2 Specification: 134471, Various Furniture, Accessories And Related Furniture Reconfiguration, Repair And Storage Services – Addendum No. 3
Question No. 7. Upon review of SPECIFICATION 5039, we have found some disparity with the product pricing request for the
Brodart product. The referenced SPECIFICATION website references a retail Brodart site. It is our understanding that a Brodart reseller Perk Products holds the contract #28820 for Consumable Library Supplies which has a limited Brodart furniture offering. We are requesting that line 448 in the City of Chicago, Catalog SPECIFICATION – Lines by Group section, page 36 or 42, be changed to Brodart Contract Furniture, Brodart Contract Library Furniture List Price. Answer: The Brodart group will be removed from the Specification. Question No. 8. Are there any exclusions or catalog restrictions within the individual line items for the catalogs on line 87, line 287,
line 440, line 441 or line 448, 517 or 518 or can any item within the catalogs and on their websites be purchased by the City and sold by the awardee? Answer: The catalog lines for Gaylord, Made Rite, Demo, Brodart, and Global Industrial will be removed from the Specification.
Question No. 9. Are there any exclusions or catalog restrictions within any group or can any item within the catalogs and or websites
be purchased by the City and sold by the awardee? Answer: The catalog lines for Gaylord, Made Rite, Demo, Brodart, and Global Industrial will be removed from the Specification.
Question No. 10. Section 5.4.2 states that the discount from price list is not inclusive of …delivery…”Section 5.4.8 (Labor) states that
it will be at the City’s discretion if the furniture is delivered to the loading dock, the contractor will be compensated for the labor to relocate the furniture from the loading dock to the designated spot of installation within the facility. Section 5.4.9 requires that delivery to be F.O B. destination, City of Chicago. F.O.B. refers to freight prepaid to a standard height dock at the end user’s facility. Within this section, the City reserves the right to determine the destination point (which may be inside the facility or to a combination of destination points within the facility.) Additional transportation charges are incurred when the freight is shipped F.O.B. Destination, inside delivery required. Typically a lift gate is required, product must be offloaded and brought inside the first door of the building. There is a discrepancy between FOB Destination, inside delivery and inside delivery anywhere within the building as the City requests. Will the City modify the wording within this section and or be pay extra fee’s on the labor line due to additional transportation services being requested? Answer: Initial delivery of furniture to dock is F.O.B. The vendor will be compensated under Labor if it is required that the vendor removes and delivers furniture from initial delivery location at different point in time from the initial delivery. Question No. 11. Why is the City reserving the right to use 1,000 square feet of vendor’s fully insured and bonded warehouse space
for up to two months with no compensation to the vendor on any group line? Answer: The storage is required in the rare event there is a delay in the completion date of a City project/construction in accordance with the specified requirements and basis of payment. Question No. 12. Why is Global Industrial- www.globalindustrial.com being included in this furniture contract? Answer: Global Industrial Group will be removed from the Specification. Question No. 13. Can you explain the basis of payment under Section 5.4.6 Furniture Refurbishment/Repair. It states that the
contractor will be compensated for the actual hours that repair services were performed but that is not inclusive of travel time. The next sentence reads the hourly rate for furniture Refurbishment/repair is inclusive of “all ..costs including..transportation and overhead.” Multiple trips will have to be made when a City department wants their furniture refurbished or repaired. The initial assessment site visits, return round trips to pick up the furniture (removal of City Property) followed by the return delivery of the furniture. Once the furniture is either refurbished or repaired, will the vendor be compensated for the delivery and if required, setting up the furniture in the original City location and if so, will this be under labor or repair lines? Answer: The City will not compensate the Contractor for travel time for service and/or delivery with the exception of premium delivery as specified in Section 5.4.10. Travel time is an overhead cost to be incurred by the Contractor. Question No. 14. The number of labor hours, the furniture repair hours and the furniture reconfigurations lines within each group are
subjective. By including an estimated usage for these lines, you eliminate the proper baseline for the bid. Instead of listing the estimated hour usage, why not just ask vendors to bid a flat hourly rate for the individual line items that pertain to labor hours, the furniture repair, and the furniture reconfigurations in accordance with the specifications, within each group? Answer: Please reference Section 1.15. – Estimated Quantities. Question No. 15. Can you explain why the insurance requirements within Article 7. Sections 7.1-7.1.3 are far lower than the
requirements of the City Departments Building Management Companies? For example, prior to doing ANY type of work within the Harold Washington Library Center a certificate of insurance is required with limits that are almost 500% higher than the limits specified within this bid. The same is true for the 30 North LaSalle Building, City Hall, and many other buildings that house City departments. It is of note that CBRE has an additional requirement of a $1,000,000 professional liability limit listed yet any reference to professional liability has been omitted within the furniture bid. Will the bid be modified to include these requirements? Will you be requiring that appropriate levels of insurance for the vendor and for any outsourced installation companies be submitted with the bid proposal? Answer: See Revision No. 2 and Revision No. 4. An appendix has been added for insurance requirements for buildings that require $5,000,000.00 in liability. Question No. 16. Why are there 3,000 hours of labor within Group 37, line #443? This represents an almost 20,000% increase over
the average 10-20 hours Estimated Usage in labor hours found in other groups.
3 Specification: 134471, Various Furniture, Accessories And Related Furniture Reconfiguration, Repair And Storage Services – Addendum No. 3
Answer: Group 37, Demco will be removed from the Specification. Question No. 17. There are two different names listed as contacts for this bid. Will both contacts be involved in the administration of
this bid and future awards within this bid and do you want correspondence pertaining to the bid to be addressed to both people? Answer: Gary Bell is the point of contact for this Specification. Question No. 18. Will a mark-up on List price be acceptable on catalog items not within those mentioned the basis of payment line
items under section 5.4.2 Discount from Price Lists, Basis of payment? Answer: Per Section 5.4.2. Discounts From Price Lists-Bidders are requested to provide the City of Chicago a discount off Manufacturer’s wholesale price list for each proposed group. A mark-up on list price will not be acceptable. Question No. 19. The City of Chicago recently awarded a contract (#32050) that covers the purchase of Made-Rite mattresses and
coverings. Group 22, specifies the Catalog Made Rite in line item #287. Will Made-Rite Mattresses and Made-Rite Mattress coverings be allowed to be purchased by and sold to the City Departments? Question #12A) Will a current City of Chicago contract in which there are duplicative items have precedent over this bid? Answer: Made-Rite Group will be removed from the Specification. Question No. 20. Some furniture (i.e. chairs), due to the size of the packing material, is more cost efficient to be assembled in the
vendor’s warehouse and then further delivered to the end user’s location, bagged and ready for use. Will the vendor be compensated on the labor line for any Vendor’s in-house assembly services? Answer: Vendor must include assembly labor costs in its proposal, if applicable. Vendor must provide verification that the furniture was assembled by contractor personnel and time sheets to verify the quantity of labor hours required. Question No. 21. Is it the City’s intention within this bid to have all furniture assembled onsite with no exceptions? Answer: No Question No. 22. Will the City be removing line items 87, line 440, line 441 and line 448 and the respective catalog or website
address? Answer: The furniture groups for Demco, Brodart and Gaylord will be removed from the Specification. Question No. 23. Will the City include exclusionary language within the Terms and Conditions of the bid’s documents that would
prohibit any sale of product within the Brodart Supplies and Furnishings Catalog? Answer: The Brodart group will be removed from the Specification. Question No. 24. Will the City include exclusionary language within the Terms and Conditions of the bid’s documents that would
prohibit any sale of product within the Demco, School Supplies, Furniture and Equipment Catalog? Answer: The Demco group will be removed from the Specification. Question No. 25. Will the City include exclusionary language within the Terms and Conditions of the bid’s documents that would
prohibit any sale of product within the Gaylord Full Line or Gaylord Archival Catalog? Answer: The Gaylord group will be removed from the Specification. Question No. 26. Has the City of Chicago or The Chicago Public Library engaged in any direct conversations, initiated any direct
negotiations or conversations, or discussed suggestions of contract modifications with any manufacturer listed within any group line? Answer: 2FM has not had any communications with the listed manufacturers in this Specification.
END OF ADDENDUM NO. 3
ALL REVISIONS INSCRIBED HEREIN WILL BE INCORPORATED INTO THE BID SPECIFICATION PER ADDENDUM NO. 3
CITY OF CHICAGO JAMIE L. RHEE DEPARTMENT OF PROCUREMENT SERVICES CHIEF PROCUREMENT OFFICER
ARTICLE 5, SCOPE OF WORK AND DETAILED SPECIFICATIONS
[Various Fum¡turc, Accessories ond Reloted Fumiture Reconfigurotion, Repøh ond Storage Services],
ICity Of Chícogo Deportment Of Fleet & Focility Monagement], Specification Number 734477Com m od iti es F orm Controct 09. 1 2. 2075
ARTICTE 5. SCOPE OF WORK AND DETAILED SPECIFICATIONS
5.1. GeneralThe Contractor must furnish and del¡ver Various Furniture, Accessories and Related FurnitureReconfiguration, Repair and Storage Services F.O.B., City of Chicago, various Using Departments, includinglocations under construction, as an addition to exist¡ng furnishings. Delivery and lnstallation of VariousFurniture and Accessories and Related Furniture Reconfiguration, Repair and Storage Services as describedherein and on the Proposal Pages, and as manufactured by the manufacturers listed on the proposal pages,
are all in accordance with the terms and conditions of this specification.
5.2. Basis of AwardThe Chief Procurement Officer reserves the right to award contract(s), based on the lowest price per Groupto the responsive and responsible bidder(s) meeting the terms and conditions of the specification.
Bidders must quote all items within each Group but are not required to bid all Groups. Bids submitted to thecontrary will be considered incomplete, and as a result, will be rejected as being non-responsive to thisrequirement.
Contractor may be awarded one (1) or more Groups. The Contractor's bid pricing must incorporate any/allperipheral cost including, but not limited to the costs of the vehicles/equipment, delivery/transportationcharges, taxes, insurance, training, warranties, profit and/or overhead, etc., required by the specification.
5.3. FundingThe source of funds for payments under this Contract is Fund number 015-0100-038-2126-340-220340 .
Funding for this Contract is subject to the availability of funds and their appropriation by the City Council ofthe City.
5.4. Technical Requirements5.4.1. Trade Namesln cases where an item is identified by a manufacturers name, trade name, catalog number, orreference, it is understood that the bidder proposes to furnish the item so identified and does notpropose to furnish an "equal" unless the proposed "equal" is definitely indicated therein by the bidder.
Reference to a specific manufacturer, trade name or catalog is intended to be descriptive but notrestrictive and only to indicate to the prospective bidder articles that will be satisfactory. Bids on othermakes and catalogs will be considered, provided each bidder clearly states on the face of the proposalexactly what it proposes to furnish, or forwards w¡th the bid, a cut, illustration, or other descriptivematter which will clearly indicate the character of the article covered by the bid.
The Chief Procurement Officer hereby reserves the right to approve as an equal, or to reject as not beingan equal, any article the bidder proposes to furnish which contains major or minor variations fromspecification requirements but which may comply substantially therewith.
5.4.2. Discount From Price ListsBidders are requested to provide the City of Chicago a discount off Manufacturer's wholesale Price Lists,which can be found on the websites listed below, for each proposed group. A mark-up on List Price willnot be acceptable. All discounts do not include the cost of furniture drawings, furniture layout design,set-up, assembly, installation, clean up, debris removal, removal of manufacturer's tags, and any otheritems or tasks necessary to complete the installation.
Basis of Pavment (Line ltems 1,9-42,50,57, 64,7I-73,80, 95-100, LL5-L23,130, 1-37-155 , t62-164,L79-t81, L88,208-216-23L,238,245-273,28O,294,3OL-302,3L0-311, 3tg-32!,329, 335, 342,349-359,365,372-405, 4L2, 4tg, 426, 433,455-460, 474, 4gI,4gg, 495, 502, 509-510 ,5L7 ,525,5331
Scope of Work & Detoiled SpecificotionsAddendum No. 3, issued April 22,2016
60
[Vorious Furniture, Accessories ond Reløted Fumiture Reconfigurut¡on, Repo¡t dnd Storcge Setv¡ces],
[C¡ty Of Chicoqo Deportment OÍ Fleet & Focility Monogement], Specificotion Number 7i4477Com mod i ties F orm Controct 09. 1 2. 20 1 5
IIST OF WHOTESALE MANUFACTURERS AND RETAIT BRANDS
Wholesale Manufacturers with onl¡ne catalogues
Agati-www.agati.com Kimball-www.kimballoffice.com
Andreau World-www.andreauworld.com Knoll-www.knoll.com
Allsteel-www.allsteeloffice.com Knoll Studio-www.knoll.com
Aurora Shelving-www.aurorastorage.com Lincora Group-www.lincoragroup.com
Boss Chairs-www.bosschair.com Magnuson Group-www.magnusongroup.com
Community-www.communityfurniture.com Maxon Furniture lnc.-www.maxonfurniture.com
Displays2Go-www.displays2go.com Officescapes-www.officescapes.com
Domore-www.domoreseating.com OFS-www.ofs.com
ERG lnternational-www.erginternational.com Peter Pepper Products-www.peterpepper.com
Foundations lnc.-www.foundations Sitonit-www.sitonit.net
Geiger-www.geigerfurniture.com Sixinch-www.sixinch.us
Global Furniture Group-www.globalfurnituregroup.com Steffy Wood Products-www.stefñTwood.com
Gunlocke-www.gunlocke.com Steelcase-www.steelcase.com
Halewood-www.halemfg.com Tayco-www.tayco.com
Haworth-www.haworth.com Teknion-www.teknion.com
Herman Miller-www.hermanmiller.com Teknion Studio-www.teknion.com
HBF-www.hbf.com The Hon Company-www.hon.com
lzzy-www.izzyplus.com TMC-www.tmcfurniture.com
JS|-www.jsifurniture.com United Chair-www.groupelacasse.com
Kl-www.ki.com Vitra-www.vitra.com
RETAIT BRANDS
Anderson Hickey
Best Rite
5.4.3. Storage of FurnitureFrom time to time the City may be unable to take delivery of furniture immediately upon vendor'sreceipt of same due to planned instances (phasing) or unforeseen situations. The City will then requestthe vendor to "hold" the furniture and store it at their vendor facility until such time that delivery can
be made. The furniture must be stored in a fully insured and bonded facility and in the original cartonsor packaging unless the City determines otherwise. Storage charges-The first two (2) months (60
calendar days) of storage will be at no charge to the City of Chicago. lf storage is required after the 2ndmonth (61st calendar day), then the Contractor may charge furniture storage fees for the additionalcalendar days, weeks or months of storage. For example, if furniture is in storage for three (3) months,the Contractor may charge the City for only one (1) month of storage.
Should it be necessary to charge the City for storage of furniture, the following also applies:
The first one thousand (L,000) square feet of space will be at no charge to the City. The Contractor maycharge the City for any storage space used in excess of one thousand (1000) square feet. For example, if
Scope of Work & Detoiled SpecificotionsAddendum No. 3, issued April 22,2076
6L
[Vorious Furnìture, Accessories ønd Reloted Furniture Reconfìgurction, Repoh and Storage Services],
[City Of Chicogo Deportment Of Fleet & FãciliW Monøgement], Specificotion Number L34477Commodities Form Controct 09.L2.2075
the furniture to be stored requires four thousand (4,000) square feet, then the Contractor must onlycharge the City for three thousand (3,000) square feet.
Basis of Pavment (Line ltems 5-7,46-48,54-56, 61-63, 68-70,77-79,84-86, L04-I06,I27-!29, t34-t36,159-16r, L68-170,185-187, 212-2L4,235-237,242-244,277-279,284-286,298-300, 307-309, 316-318,325-327,332-334,339-34L,346-348, 362-364,369-37L, 409-4Lt, 4L6-4L8,423-425, 430-432, 436-438,463-465,477-479,484-486,491-493,498-500, 505-507, 513-515, 521-533, 529-531,537-539 )
The Contractor will be compensated for storagê of furniture in excess of 1,000 square feet in accordancewith the proposal page pricing multipl¡ed by the total square feet of storage space utilized over 1,000square feet. The following line items will be used to calculate the basis of payment:
Day 1 through Day 6 and each day after a full week or month - Calendar Day
Day 7, 14,2L and 28 - Week replaces calendar day
After 30 Consecutive Days - Month
Example:
Contractor must charge the City for additional storage according to the following schedule. For example,if the additional storage time is ten (10) days, then the charge must be for 1 week and 3 days. lfadditional storage is forty-five (45) days, which includes the month of April, the charge must be for L
month (30 days), 2 weeks and 1 day.
1 DaY = Calendar DaY
1 Week = 7 consecutive days
1 Month = 30 Days
5.4.4. Environmentally Preferable PurchasingThe City of Chicago is committed to procuring and repairing furniture in accordance with and meetingthe goals included in the City's Sustainable Operations Plan and Sustainable Purchasing Policy. As such,factors such as but not limited to recycled content and recyclability, life-cycle impacts, and the presence
of toxic materials in the products will be considered when selecting products.
When feasible, it is the intention of the City to purchase products with at least one (1) of the followingstandards:
¡ GREENGUARD ofGREENGUARD GoId
o SCS lndoor Air Advantage or SCS lndoor Air Advantage Gold
. Cradle to Cradle (certified at Basic, Bronze, Silver, Gold, or Platinum)
o BIFMA Level (certified at Level 1,2, or 3), with scorecard provided that shows at least one pointfor credit 7.6, Low-emitting Furniture
Other criteria that will be used to select furniture include:
. Contains at least L0% post-consumer and/or 20% post-industrial material
o Contains at leastT0% salvaged material from off-site or outside the organization
. Contains at least 70% salvaged material from on-site through an internal materials andequipment reuse program
. Contains at least 50% rapidly renewable material (bamboo, cotton, cork, wool)
¡ Contains at least 50% materials harvested, extracted and processed within 500 miles of thefacility/site
. consists of at least 50% Forest Stewardship Council (FSC) certified wood
62Scope of Work & Detailed SpecificotionsAddendum No. 3, issued April 22,20L6
a
a
a
[Votious Furn¡turc, Accessor¡es and Related Fum¡turc Reconfigutation, Repdh ond Storage Services],
[City Of Chicogo Deportment Of Fleet & Focíl¡ty Monogement], Specificotion Number L3447LCom mod iti es F orm Controct 09. L2. 20 L5
The Contractor must assist the City with identifying products that meet the above standards or criteriafor every applicable order.
5.4.5. Furniture Refurbishment/ Repa¡r
Repair of furniture - furniture over time may experience wear and tear, components may be damagedor lost, or break due to repeated use. The vendor should be able to make the necessary repairs torestore the furniture to a good condition.
Vendor must repair, or cause to be repaired, damaged or broken furniture in lieu of discarding orreplacing item. The Commissioner will determine whether the furniture is irreparable or not worth thecost of refurbishment or repair.
lf furniture refurbishment/repair includes cleaning of upholstery, in accordance with the City's GreenCleaning Policy and Program Plan, products must meet one or more of the following standards:
Ecologo UL2795 for Carpet and upholstery Cleaners (formerly EnvironmentalChoice CCD-148)
Green Seal G-37
USEPA Safer Choice
Basis of Pavment (Line ltems 3,44,52,59, 66, 75,82, tO2, t25, L32, 157,166, 183, 2L0,233,240,275,282,296,304, 31.3, 323,330,337,344,360,367,407,4t4, 42L,428,519, 527, 535)
The Contractor will be compensated for Furniture Refurbishment/Repair in accordance w¡th line itempricing in the proposal pages of this contract multiplied by the quantity of man hours that actualFurniture Refurbishment and Repair services were performed, not inclusive of travel time to and/orfrom the worksite. The hourly rate for Furniture Refurbishment/Repair is inclusive of all anticipated andunanticipated Contractor costs including, but not limited to, transportation, fuel, equipment, suppliessupervision and overhead.
5.4.6. Furniture ReconfigurationAs an operation changes or evolves, so do your office furniture requirements and the physical layout ofyour space. Reconfiguration can promote efficiencies within the operation. The vendor should workfrom an existing layout and remove, change, install, and move any cubicle or furniture set-up to meetthe current space needs.
Vendor must dismantle existing furniture panel systems for reuse in new configurations and/or changenewly installed furniture to better meet requirements or changes in requirements for any City ofChicago Using Department. Reconfiguration services will include the following components:
7. Pre-Desían Revìew and Analvsís
a. By the use of existing as-built drawings, bills of lading and field surveys, the Contractor willassist the City to plan and establish furniture layouts and installation plans as required to perform therequired services.
b. Review existing layouts and/or propose changes to provide the City with an optimal use ofspace. Pre-design review and analysis will consist of traditional office spaces, as well as multi-purposerooms at facilities such as Senior Centers and Community Service Centers.
2. Plonnina Seruíces
a. The Contractor must be familiar with existing building conditions and installed system furniture,fixtures and equipment to maximize re-use of existing material and utility locations. This includes thereview existing furniture inventory as needed.
b. Assist the City to prepare system furniture, fixtures and equipment layout plans and coordinatedetailed bills of lading identifying existing and/or additional systems furniture material, required toimplement layouts.
Scope of Work & Detaíled SpecificotionsAddendum No. 3, issued April 22, 20L6
63
[Vorious Fumiture, Accessories ond Relqted Furnìture ReconJigurotion, Repoir ønd Sioroge Services],
fcity Of Ch¡cøgo Department OÍ Fleet & Focil¡ty Monagement], Specificotion Number 734471Com mod iti es F o r m Contrøct 09. 7 2. 20 1 5
c. Prepare and submit estimates of labor for reconfiguration and cleaning of existing furniture andmaterials when requested.
d. Obtain written approval of design layout(s) as directed by the authorized Project Manager.
Basis of Pavment (Line ltems 2, 43,5I,58, 65, 74,8I, tlL, I24, t3'J., t56, L65, L82,209,232,239,274,281,295,3O3,312,322,329,336,343,359, 366, 406, 4r3, 420, 427, 434, 46L, 475, 482,489, 496, 503,511, 518, 526,534 |
The Contractor will be compensated for Furniture Reconfiguration in accordance with line item pricing in
the proposal pages of this contract multiplied by the quantity of man hours that actual FurnitureReconfiguration was performed, not inclusive of travel time to and/or from the worksite. The hourlyrate for Furniture Reconfiguration is inclusive of all anticipated and unanticipated Contractor costsincluding, but not limited to, transportation, fuel, equipment, supplies supervision and overhead.
The contractor will provide Pre-Design Review and Analysis and Planning Services at no charge.
5.4.7. Special RequirementsJob Conditions - The Contactor will be responsible for making certain that furniture is not delivered tonew construction or remodeled areas until the building and storage areas are sufficiently dry so that thefurniture will not be damaged by excessive changes in moisture.
Delivery, Storage and Handling - The Contractor must furnish such delivery schedules, as may berequired, for the proper delivery ofthe Various Furniture and Accessories for review and approval by theUsing Departments. The Using Department will assist in coordinating a project schedule for furnituredelivery. The Contractor must make any corrections if errors are found and submit revised schedulesprior to delivery of any Furniture and Accessories and related services
Field Measurements -The Contractor or installer must verify all dimensions and take suchmeasurements as are required for proper fabrication and erection of the work before proceeding withfurnishing and installation of the furniture.
Delivery, Storage and Handling
The Contractor must furnish such delivery schedules, as may be required, for the proper delivery of theVarious Furniture and Accessories for review and approval by the Using Departments. The Contractormust make any corrections if errors are found and submit revised schedules prior to delivery of anyFurniture and Accessories and related services.
Materials must be delivered to the sites in sealed containers bearing manufacturer's name and materialidentification. Materials must be stored in strict accordance with the manufacturer's printed directions,copies of which must be furnished to the Using Departments.
It will be the responsibility of the Contractor to insure that all delivery personnel are aware of anyunloading instructions. All furniture and materials must be unloaded by the Contractor (or otherrespective carrier) and installed (as required) at the requested location.
The City encourages the Contractor to select packaging, when practicable, that minimizes or eliminatesthe use ofdisposable containers and/or incorporates recycled content, such as using reusable crates orreusable pallets instead of boxed packaging.
For corrugated cardboard packaging, the City encourages the Contractor to use versions that contain atleast the minimum criteria listed under "Paperboard and Packaging Products" in the US General ServicesAdministration (GSA) Sustainable Facilities Tool at http://sftool.gov/GreenProcurement.
Vendors are encouraged to use packaging that does not contain packaging inks, dyes, pigments,adhesives, stabilizers, and additives with levels of lead, cadmium, mercury or hexavalent chromium inpackaging inks, dyes, pigments, adhesives, stabilizers, and additives equal to or greater than 100 partsper million, which is consistent with packaging statutes adopted by several U.S. states. For a full
64Scope of Work & Detoiled SpecificotionsAddendum No. 3, issued April 22,2076
[Vorious Furniture, Accessot¡es and Reloted Furniture Reconfigutøtion, Repoir and Storoge Services],
ICity Of Chicogo Depørtment Of Fleet & Focil¡ty Monogement], Specificotion Number 134477Com mod iti es F orm Controct 09. 1. 2. 20 75
explanat¡on of the limits and exceptions (such as packaging made from recycled mater¡al), see
http://toxicsi n packagi ng.orgl
Protection - Contractor must protect materials against damage from mechanical abuse, plaster, salts,acids, staining and other foreign matter by an approved means during transportation, storage anderection until completion the of work. All unsatisfactory materials/furniture must be removed from thepremises, and all damaged materials must be replaced with new materials, at no additional cost to theCity of Chicago.
Furniture Drawings - The Contractor must furnish such drawings for the proper instruction of theinstallation in auto cad format or any other approved means as may be required for review and approvalby the Using Departments. Contractor must make any corrections and submit revised prints of thefurniture drawings and obtain final approval prior to the fabrication or installation of any Furniture orAccessories.
Site Visits - The Contractor is responsible for observing the conditions at a location that may affectdelivery and the Contractor must also coordinate deliveries and receipt of deliveries with a Using
Department representative and the building management.
Changes in Work - The City reserves the right to modify quantities or delivery instructions for specificorders up to four (4) weeks prior to scheduled delivery date.
Installation -The Contractor must level, align, bolt, and provide all services necessary for completeinstallation of all Furniture and Accessories. lf Contractor must relocate furniture to allow other tradesto complete their work and/or relocate newly installed furniture due to the City's change inrequirements or scheduling, installation charges will be incurred to the City through the applicable laborline items in the proposal pages.
Reports - Quarterly or as requested, the Contractor shall submit to 2FM a report providing how theproducts supplied comply with the City's environmental criteria. The following information shall beincluded in the report:
a. Contractor name
b. Contract award date
Contract #
PO#
Product description - manufacturer description of product
Sku
Number of units sold
Price per unit
Total cost
j. Compliance with 2FM environmental criteria - lndicate whether or not and how each productpurchased is compliant with environmental requirements included in these specifications or referencedplans and policies (ex. Green Seal certification).
Furniture refurbishment/repair information should also be included in the report, including how manyandthetypesof furniturewererepairedandwhenapplicable,adescriptionof whichcleaningchemicalswere used and how they are compliant with the environmental requirements included in thesespecifications or referenced plans and policies (ex. Green Seal certification).
Tags -The Contractor must provide adhesive identification tags to be affixed to the various Furnitureand Accessories provided. The tag size and font size will be determined at the time of order placement.
c.
d
e,
f.
dÞ'
h.
Scope of Work & Detoiled SpecificationsAddendum No.3, issued April 22,2076
65
[Vorious Furniture, Accessories and Reloted Furniture Reconfigurotion, Repoir ond Storage Services],
[City Of Chicogo Deportment OÍ Fleet & Foc¡l¡ty Monagement], Specificotion Number 734477Com m od it¡ es F orm Controct 09. 1 2. 20 75
The following block text must be printed on the tag:
PROPERTY OF
CITY OF CHICAGO
NAME OF USING DEPARTMENT
tD#
5.4.8. [aborLabor shall include installation and/or set up at the designated area or room determined by theparticipating City department. Labor and installation services shall include, but not be limited touncrating all products, assembly if required, removal of debris, wipe down of surfaces and productorientationandnewusertraining. AttheCity'sdiscretion,iffurnitureisdeliveredandstoredatafacilityloading dock or a storage area, the Contractor will also be compensated for the labor to relocate thefurniture from the loading dock or storage area to the designated spot of installation within the facility.The Contractor will also be compensated for any additional labor required as a result of schedulingissues that are outside of the Contractor's control, as determined by the City.
The Trade Contractor's Project Manager and/or Superintendent will be qualified and be able to makedecisions on items that have contractual implications that may occur so as not to delay the progress ofthe project. The Project Manager and/or Superintendent will oversee the delivery and installation of allfurniture, verify order fulfillment and ensure installation is in accordance with approved installation floorplans and the manufacturer's guidelines and specifications. The Project Manager and/orSuperintendent will be provided by the Contractor as a non-billable management fee at no additionalcost to the City. The Contractor will be responsible for the conduct and appearance of alllabor/installation personnel.
Basisof Pavment (Line ltems 4,45,53,60,67,76,83,L03,L26,133, L58,'J.67,184,2L1,234,24!,276,283,297,305,314,324,33L,338, 345, 361, 368, 4O8, 4L5, 422, 429, 435, 462, 476,483, 490,497,5O4,5L2,520,528, 536)
The Contractor will be compensated for Labor in accordance with line item pricing in the proposal pages
of this contract multiplied by the quantity of man hours that actual Labor was performed, not inclusiveoftravel timetoand/orfromtheworksite. ThehourlyrateforLaborisinclusiveofall anticipatedandunanticipated Contractor costs including, but not limited to, transportatíon, fuel, equipment, suppliessupervision and overhead. Labor charges begin to incur at the start of delivery from dock and ordesignated storage/delivery area.
5.4.9. DeliveryDeliveries must be made at no charge (F.O.B.), City of Chicago, to any point within the City, regardless ofthe purchase order release amount. The City will determine the final destination point of delivery, whichmay include a facility loading dock, a facility storage area, the designated spot of furniture installationandloracombinationofdestinationpointswithinthefacility. However,ifthecitychoosestohavefurniture delivered to a point within the facility other than the spot of installation, the Contractor will becompensated for the labor to deliver the furniture from the temporary storage area to the spot ofinstallation within the facility.
Deliveries of Various Furniture and Accessories must be made within fourteen (14) calendar days afterreceipt of purchase order releases from the Department of Fleet and Facility Management or UsingDepartment. Furniture and Accessories that are custom or require special configuration, must bedelivered within four to six (4 -6) calendar weeks after receipt of purchase order releases from theDepartment of Fleet and Facility Management or Using Department.
Prior to any delivery, the Contractor must visit the site of the proposed delivery and installation andbecome thoroughly familiarized with the location and conditions that will be encountered and that will
Scope of Work & Detailed SpecificotionsAddendum No. 3, issued April 22, 2o76
66
[Vorious Furnìture, Accessories snd Related Furn¡turc Reconfigurution, Repø¡r and Storoge Services],
ICity Of Chicogo Department Of Fleet & Focility Monogement], Specificotion Number 734477Com m od iti es F orm Controct 09. 7 2. 2075
affect the proposed work. No additional allowance will be granted because of lack of knowledge of suchconditions.
It will be the Contractor's responsibility to insure that the delivery location is secured for materialacceptance. Contractor must contact the appropriate Department of Fleet and Facility Management orUsing Department personnel prior to delivery. Any material loss or damage result¡ng in financial outlay,due to negligence on the part of the supplier or manufacturer will be the sole responsibility of theContractor. All replacements will be the responsibility of the Contractor.
Delivery times will be as directed by the authorized City personnel and will occur during any of the timeslisted below:
Monday through Friday- 6:00 a.m. to 4:00 p.m.; or 6:00 p.m. to 11:59 p.m
Saturday and Sunday- 7:00 a.m. to 4:00 p.m.
Deliveries for the Chicago Public Library must take place during the various library locations' servicehours.
The City reserves the right to add or delete delivery locations as required during the Contract period.
5.4.10. Premium DeliveryTimeThe City, at its sole discretion, will determine whether premium delivery time is required. The premiumdelivery time costs can only be invoiced for Saturday and Sunday deliveries between the hours of 7:00a.m. through 4:00 p.m. and will require cert¡fied payrolls.
Basis of Payment (Line ltems 8, 49,I7I,275,309,318, 439, 466, 480, 487, 494, 497 ,50L,508, 516, 524,532, 540)
The Contractor will be compensated for premium delivery in accordance with line item pricing in theproposal pages of this contract multiplied by the quantity of premium delivery hours that actualpremium delivery was performed, not inclusive of travel time to and/from the worksite. The hourly ratefor premium delivery is inclusive of all anticipated and unanticipated Contractor costs including, but notlimited to, transportation, fuel, equipment, supplies supervision and overhead. Premium deliverycharges begin to incur at the start of delivery from dock and or designated storage/delivery area.
5.4.11. DelayedDeliveryThe City reserves the right to request a delayed delivery offurniture. ln the event that unforeseencircumstances arise, the City may, within five (5) calendar days of a scheduled delivery, send writtennotification to the Contractor by fax or electronic email that the delivery be delayed. The RequestingUsing Department will also submit written notification of the rescheduled delivery date. The City willincur no additional costs for delayed delivery of furniture.
5.4.L2. GuaranteeAt a minimum, the Contractor hereby guarantees for a period of one (1) year from the date of finalacceptance by the City, that it will, at its own expense and without any cost to the City, replace all
defective parts and make any repairs that may be required or made necessary by reason of defectivedesign, material or workmanship, or by reason of non-compliance with these specifications ormanufacturer's specifications. The guarantee period will commence on the first day the Furniture andAccessories are placed in service by the City. lf a longer guarantee can be furnished, at no additional costto the City, the longer period will prevail.
All warranty booklets for products purchased must be delivered with the product at the time of deliveryand installation. The products must comply with the manufacturer's specifications for the guarantee.
5.4.13. Customer References
Scope of Work & Detøiled SpecificotionsAddendum No. 3, issued April 22, 201,6
67
[Vorious Furniture, Accessories ond Related Furniture Reconfigurotìon, Repo¡r ond Storage Services],
ICity Of Chicaqo Deportment Of Fleet & Foc¡lity Mdnogement], Specificat¡on Number 734477Com mod ¡ti es F or m Contr oct 09. 1 2. 207 5
Bidder must include as part of the Proposal, references from clients who have been serviced for newconstruction projects that include shop drawings, assembly, etc. A minimum of three (3) references is
required to be submitted with the Proposal.
5.4.L4. ExceptionsAny deviations from these specifications must be noted on the Proposal Page or Pages attached thereto,with the exact nature of the change outlined in sufficient detail. The reason for which deviations weremade should also follow if not self-explanatory. Failure of a bidder to comply with the terms of thisparagraph may be cause for rejection.
The City reserves the right to disqualify bids which do not completely meet outlined specifications. The
impact of exceptions to the specification will be evaluated by the City in determining its need.
5.4.15. BackordersElectronic or written notification of backordered items must be sent immediately to the ChicagoDepartment of Fleet and Facility Management. For any back orders that cannot be filled within fourteen(14) business days, the Department will have the option of accepting or canceling the backorder or theDepartment may submit a request for a substitute item. The City is not to be charged for expensesincurred due to the cancellation of backorders.
5.4.16. lncorrectly Shipped, Damaged Or Defective MerchandiseThe Contractor will be responsible for any incorrect or damaged shipments or defective merchandise.
The Contractor must make arrangements with its carrier or company personnel to pick-up unacceptablefurniture within forty-eight (48) hours of notification.
The Contractor must replace the incorrect, damaged or defective merchandise or issue a credit withinseven (7) business days of the return. lf the replacement product or a credit is not received within seven(7) business days, the City will deduct the amount of the return from any outstanding invoice at the timeof payment. lf merchandise is to be replaced, the Contractor must coordinate with the City the logistics
and scheduling of delivery if the furniture is to be delivered to an occupied building or office space.
The City of Chicago will not be subject to restocking charges due to Contractor error.
5.5. Additional Requirements5.5.1. Contract Term
5.5.1.1. Initial TermThe lnitial Term for this Contract will be sixty months, unless terminated earlier or extendedpursuant to the terms of this contract.
The City will establish the start and expiration dates at the time of formal award and release of thiscontract.
The start date will be no later than the first day of the succeeding month from the date shown as
the Contract Award and Release Date on the Proposal Acceptance Page.
5.5.1.2. Term ExtensionThe City has the opt¡on to unilaterally extend the term of this Contract following the expiration ofthe lnitial Term, for up to thirty-six (36) months, subject to acceptable performance by theContractor and contingent upon the appropriation of sufficient funds. The option may be exercised
as a single thirty-six month extension or as up to three separate extensions, each with a term no
less than twelve months.
No less than sixty (60) calendar days before the expiration of the lnitial Term, or if previouslyextended, the expiration of the term as extended, the Chief Procurement Officer will give theContractornoticeoftheCity'sintenttoexerciseitsoptiontorenewtheContract. Thedateonwhich the Chief Procurement Officer gives notice is the date the notice is mailed, if it is mailed, orthe date the notice is delivered, if sent by courier or messenger servrce.
Scope of Work & Detoiled SpecificationsAddendum No. 3, issued April 22, 20L6
68
[Vorious Furniture, Accessories ond Reldted Fumiture Reconlìguration, Repdî and Storcge Services],
[City Of Chicogo Deportment Of Fleet & Facil¡ty Manogement], Specification Number 734477Commodities Form Controct 09.72.2015
With the same amount of notice as for'options, the City reserves the right to extend the contractperiod for a period of no more than one hundred eighty-one (181) calendar days, either in lieu ofexercising an option period or following the exhaustion of all option periods, for the purpose ofproviding continuity of supply while procuring a replacement contract.
Scope of Work & Detoiled Spec¡ÍicotionsAddendum No. 3, issued April 22, 2076
69
SECTION 1.9, BID PRICES MUST INCORPORATE ALL COSTS
[Vorious Furniture, Accessories ond Reloted Futnitute Reconfìgutot¡on, Repo¡r and Stotøge Services],
[City Of Chicogo Deportment Of Fleet & Føcil¡ty Manogement], Specit'ication Number 73447LCommodities Form Controct 09.72.2075
lf a Bidder takes exception to or deviates from any provision or requirement, the Chief Procurement Officershall reject the Bid as non-responsive in the event that the Chief Procurement Officer, in his or her soleopinion, determines such exception(s) or deviations to be material.
1.8. Taxes lncluded in Bid PricesWith few exceptions, materials purchased by the City of Chicago are not subject to the Federal Excise Tax.The lllinois Retailers' Occupation Tax, Use Tax, and Municipal Retailers' Occupation Tax do not apply tomaterials or services purchased by the City of Chicago.
Bidders shall include all other applicable federal, state and local taxes, direct or indirect, in their Bid Prices.
1.9. B¡d Pricing and lncorporated CostsSection 5.4.2 Discount from List Price for all manufacturers included in the scope of this specification will beinclusive of any costs (materials, delivery costs, training, insurance, warranty, overhead, profit and any otheranticipated or unanticipated costs) incurred by the Contractor to provide the furniture and one-time initialdelivery to the ship to location as determined by the city.
Sections 5.4.3. Storage of Furniture,5.4.5. Furniture Refurbishment/Repair, 5.4.6. Furniture Reconfigurationwill be inclusive of all costs (labor, materials, training, insurance, warranty, overhead, profit and any otheranticipated or unanticipated costs) incurred by the Contractor to provide the specified services upon requestfrom the City.
Section 5.4.8. Labor will be inclusive of all costs (materials, training, insurance, warranty, overhead, profitand any other anticipated or unanticipated costs) incurred by the Contractor to provide the servicesdescribed in Section 5.4.8 upon request from the City. However, Labor required for the initial one-timedelivery as specified in Section 5.4.9 will be provided by the Contractor at no additional cost to the City.
1.10.5.4.10. Premium Delivery will be inclusive of all costs (materials, delivery, training, insurance,warranty, overhead, profit and any other anticipated or unanticipated costs) incurred bytheContractor to provide the Premium Delivery services upon request from the City Completion of theBid Documents
Each Bidder must complete all of the forms listed on the Bid Submittal Checklist, if a Checklist is provided.The forms, including the Bid Proposal Pages, must be completed in ink, or typewritten. Bidders may notchange any of the Bid Documents. Any changes made by a Bidder to the Bid Documents may result inrejection of the Bid, and will not be binding upon the City.
Bidders must use the Bid Execution Page that is appropriate for their form of business organization (e.g., soleproprietorship,corporation,partnership,orjointventure). Theindividual(s) thatsigntheBidExecutionPageon behalf of the Bidder, by their signature, represents and warrants to the City that such individual is
authorized to execute bids and contracts on behalfofthe Bidder, and thatthe Bidder agrees and shall bebound to all of the terms and conditions of the Bid Documents and, upon execution by the City, the ContractDocuments. Signatures must be sworn before a Notary Public.
1.11. Confl¡cts of lnterestlf any Bidder (or any partner in a joint venture or partnership or any member of the limited liability companyif the Bidder is a joint venture, partnership, LLP, or LLC) has assisted the City in the preparation of theseBidding Documents such that provision of such assistance would give Bidder an unfair advantage orotherwise impair the integrity of the procurement process, or if Bidder has an organizational conflict ofinterest that might compromise Bidder's ability to perform the contract, that Bidder may be disqualifiedfrom bidding. lf applicable, Bidder must provide a statement and information disclosing its participation withrespect to the Bid Documents and/or potential organizational conflicts of interest.
1.12. Required Forms and Fees
L.Lz.t. Certificate of Filing for Online EDS
Bidders must complete an online EDS prior to the bid due date. A Bidder who does not file an electronicEDS prior to the bid due date may be found non-responsive and its bid rejected. lf you are unable tocomplete the EDS online and print a Certificate of Filing prior to the response due date, the City will
City-Funded: Requirements for Bidding ond lnstructions for Bidders (non-construction) 09,12.20L5 4Addendum No.3, April 22,2076
SECTION 4.2.1. - DELIVERY
IVørious Fun¡tute, Accessories ond Reloted FuÌniturc Reconfigutotion, Repoir ond Storage Servìces],
ICity Of Chicogo Deportment Of Fleet & Focility Monogement], Specificotion Number 134477
Com m odi ti es F or m Controct 09. 7 2. 2O7 5
ARTICTE 4. TERMS FOR SUPPTY CONTRACTS
4.1. Blanket Releases / Purchase OrdersUnless otherwise provided in the Scope of Work and Detailed Specifications, orders for products to be
provided under this Contract will be in the form of a written City of Chicago Blanket Release (a.k.a. purchase
order, purchase order release, sub-order, or sub-order release) that will be issued by the Department and
sent to the Contractor. Blanket Releases will indicate the specification number, Contract/purchase ordernumber, product description, quantities ordered for each line item, unit cost, total cost, shipping address,
delivery date, fund chargeable information and other pertinent instructions regarding delivery.
For Blanket Releases issued before a price increase effective date, if this Contract provides for price
increases, Contractor must honor Contract prices listed on the Blanket Release, even if the Blanket Release
specifies multiple shipments with delivery dates that are scheduled after the effective date of the price
increase.
The Contractor must not honor any verbal order(s) or make any deliveries without receipt of a writtenBlanket Release issued by the Department. Any items provided by the Contractor without a written Blanket
Release are made at the Contractor's risk. Consequently, in the event a written Blanket Release is notprovided by the City, the Contractor releases the City form any liability whatsoever to pay for any itemsprovided without a written Blanket Release.
4.2. Delivery and Acceptance4.2.1. DeliveryAs stated above, Contractor must not make any deliveries without a written City of Chicago Blanket
Release issued by the appropriate department. Upon receipt of a Blanket Release, deliveries must be
made to the location(s) listed in the Scope and Detailed Specifications or other location specified by theCommissioner or CPO in the written purchase order. Unless otherw¡se clearly and specifically provided
in the Detailed Specifications or the written purchase order, all deliveries will be F.O.B. destination (City
of Chicago).
Contractor understands and agrees that the initial acceptance of any delivery will not be considered as a
waiver of any provision of this Contract and will not relieve the Contractor of its obligation to supply
satisfactory goods which conform to the Contract.
NOTE: The Contractor must be familiar with and comply with delivery requirements for all facilities and
is directed to Exhibits 2 - Appendix for existing specific requirements, subject to change, for deliveries
at the following facilities:
. city Hall / Daley Center Dock - 50 West Washington
. 30 North LaSalle Street
Harold Washington Library Center - 400 South State St.
4.2.2. lnspection and Defects
The City will have the right to inspect any products to be provided by Contractor under this Contract.
Upon delivery of the products, the City will conduct an in-depth initial visual examination solely for thepurpose of identifying gross and obvious damage, defects or non-conformance with specifications. The
Contractor's representative may be present for the initial examinations. This does not limit the City's
right to conduct subsequent inspection of the products delivered.
lf defects or omissions are discovered in the initial or subsequent inspections, the City may exercise any
or all of the following remedies, in addition to any other remedies specified in this agreement:
. Refuse acceptance of any/all units.
o Require the Contractor to make corrections at Contractor's expense, either on-site or at
Contractor's place of business, whether or not the term of the Contract has expired.
Terms for Supply Contrdcts, 05,30.2014
Addendum No. 3 - lssued April 22, 20L6
55
PROPOSAL PAGES
City of GhicagoGatalog RFQ - Lines by Group
PU085C
Spec# 134471Page 1 of 39
Bid/Proposal pricing for all.co.mmo.dity and/or service line items must be based on the standard unit of measure indicated below. pricing on alternate units ofmeasure may n_ot be accepted. Unit costs must be limited to three decimal places. Each quote must be signed anJ unit pricé, extenOãO-pr¡;;ñel;ãffiiã" ¡nu"tbe typed or written in ink.
O must be identified.as "alternate" to.specified item on the comment line. lf quoting an alternate, indicate manufacturer name,m and attach descriptive literature. Alternate items may not be accepted. Anf exceþtions to items specitieJ or other terms must becl
RFQ Header lnformation
Please Respond By 412812O16
RFQ Number 5039
Ship To Location 038-0030
For More lnformation Please Contact STACY STEWART
312-744-2681
RFQ Header Details
Contract Type COMMODITIES
Tarqet Market NO
Advertise Date 21 1812016
WEB BID Edit Rules ALL
Compliance Officer
Compliance Type Description
VARIOUS FURNITURE, ACCESSORIES ANDRELATED FURNITURE RECONFIGURATION,
RFQ Description REPAIR AND STORAGE SERVTCES
Special lnstructions
Your Quote is Effective as oi 412812016
RFQ Status ln Process
Specification 134471
Procurement Type BID
Bid Deposit Required NO
Required %Percentage Type Desc
25.OO%
5.00 %
Target Percentage Rate
Target Percentage Rate
Minority Owned Business Enterprise
Women Owned Business Enterprise
Run Time: 04115116'16'.29.'24 ADDENDUM NO. 3 - 04t22t2016
Gity of GhicagoGatalog RFQ - Lines by Group
PU085C
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
ù
$
$
$
$
$
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
o
ü
ü
ü
$
$ 175000
170
50
365
1500
1500
1500
10
USD
Hour
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
Hour
GROUP 01
GROUP 01
GROUP 0.1
GROUP 01
GROUP 0.1
GROUP 0.1
GROUP 01
GROUP 01
catalos Line
1425s7 l'"' lå3år
DISCOUNT FROM CURRENTLIST AND PRODUCT GUIDE.
.01,01
1s314s01101 1e3145 l[HRUI¿H3?å591Èlflu*''o'
WorkServices
WorkServices
l"' l*'IFURNTTURE SERVTCES- AGATT -
IFURNITURE REPAIR FEE
4655101 46
l*' l*'"4701300Work
Services
WorkServices
19314701140 193147 IFURNTTURE SERVTCE - AcATt -
I I IDA|LY SToRAGE oF FURN|TURE
WorkServices
19314701143 193147 IFURNTTURE SERVTCE - AGATT -
I I IWEEKLY sToRAcE oF FURN|TURE
Work 19314701142193147 IFURNITURE SERVICE - AGATT -Services
I I IMoNTHLY SToRAGE oF =URN|TURE
WorkServices
I
e31 4701 193147 IFURNTTURESERVTCE-LABOR
I lr*EMruM DEL|VERY T|ME
120
I
2
J
4
5
6
7
o
LineTvoe ltem Categorv Gommoditv Desc Group lD UOMEstimated
Price
Total Grouo Extended Price
Extended Price Catalog # / lD. Date and Mfr Comments
Grouo GROUP 01 $
$
$
$
e
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$ 425000
$ 240000
$ 100000
$ 20000
$ 20000
USD
USD
USD
USD
USD
GROUP 02
GROUP 02
GROUP 02
GROUP 02
GROUP 02
ALLSTEEL: OPTIMIZE ANDCONCENSYS SYSTEMSSPECIFICATION AND PRI]E LIST2015. DISCOUNT FROM CURRENTPRICE LIST AND PRODUCT GUIDE,
ALLSTEEL: SEATING,COLLABORATION AND TABLESPRICE LIST 2015 - DISCOJNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
ALLSTEEL: STRIDE AND TERRACEDNA SYSTEMS SPECIFICATION ANDPRICE LIST 2015 - DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
ALLSTEEL FURNITURE, ALLSTEEL"GATHER" COLLECTION - DISCOUNTOFF FROM ALLSTEEL BASE PRICELIST
ALLSTEEL FURNITURE, ALLSTEEL"AWARE" COLLECTION - DISCOUNTOFF FROM ALLSTEEL BASE PRICELIST
42599.01
42599.02
42599.03
42557.36
42597.37
42599.01
42599.02
42599.03
42597.36
42597.37
Catalog Line
Catalog Line
Catalog Line
0atalog Line
Catalog Line
I
10
11
12
13
Spec# 134471Page 2 of 39
Run Time: 04115116 16:29:24 ADDENDUM NO. 3 .0412212016
LineNo
LineType ltem Category Commodity Desc Group lD UOM
City of GhicagoCatalog RFQ - Lines by Group
PU085C
Discount or-|üãfkuD%--- EXIenOeo PflCe Catalog # / lD. Date and Mfr CommentsEstimated
UsaoePrice
$
$
$
$
$
$
ü
$
$
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$ 20000
$ 440000
$ 38250
$ 334000
$ 29700
$ 44000
$ 584500
$ 16500
$ 16500
$ 12375
USD
USD
USD
USD
USD
USD
USD
USD
USD
USD
GROUP 02
GROUP 02
GROUP 02
GROUP 02
GROUP 02
GROUP 02
GROUP 02
GROUP 02
GROUP 02
GROUP 02
ALLSTEEL FURNITURE, ¡^LLSTEEL'BEYOND WALLS" COLLECTION -DISCOUNT OFF FROM ALLSTEELBASE PRICE LIST
ALLS I EEL FURNITURE, P.LLSTEELSEATING "NIMBLE CHAIR" ANDACCESSORIES - DISCOUNT OFFFROM ALLSTEEL BASE PRICE LIST
ALLSTEEL FURNITURE, ¡.LLSTEELSEATING "STACKING CHÂIR CART"AND ACCESSORIES - DISCOUNTOFF FROM ALLSTEEL BASE PRICELIST
ALLSTEEL FURNITURE, A.LLSTEELSEATING "SCOUT CHAIRS" ANDACCESSORIES - DISCOU\T OFFFROM ALLSTEEL BASE PRICE LIST
ALLSTEEL FURNITURE, A.LLSTEELSEATING "SCOUT STOOLS" ANDACCESSORIES. DISCOU\T OFFFROMALLSTEEL BASE PRICE LIST
ALLSTEEL FURNITURE, A.LLSTEELSEATING "TOLLESON CHAIRS" ANDACCESSORIES - DISCOU\T OFFFROM ALLSTEEL BASE PRICE LIST
ALLSTEEL FURNITURE, A.LLSTEELSEATING "RELATE STOOLS" ANDACCESSORIES - DISCOU\T OFFFROM ALLSTEEL BASE PRICE LIST
ALLSTEEL FURNITURE, A.LLSTEELWORKSTATION "FREE STANDINGENDPANELSUPPORT" ANDACCESSORIES - DISCOU\T OFFFROM ALLSTEEL BASE PRICE LIST
ALLSTEEL FURNITURE, ¡.LLSTEELWORSTATION "MERGEN/lULTI-PURPOSE FLAT EDGE" ANDACCESSORIES - DISCOU\T OFFFROM MFG BASE PRICE -IST
ALLSTEEL FURNITURE, ALLSTEELWORSTATION "MODESTY PANELS"AND ACCESSORIES. DISCOUNTOFF FROM ALLSTEEL BASE PRICELtsï
42557.38
42597.39
42597
42597.41
42597.42
+2597.43
42597.M
42597.45
42597.46
42597.47
42597.38
42597.39
42557
42591.41
42597.42
+2591.43
42597.44
42591.45
42597.46
42597.47
Catalog Line
Catjalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
14
15
16
17
18
19
20
21
22
23
Spec# 134471Page 3 of 39
Run Time: 041'15116 16:29:24 ADDENDUM NO. 3 -04t22t2016
Gity of ChicagoCatalog RFQ - Lines by Group
PU085C
$
ö
ü
$
$
$
$
q
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$ 12375
ï 12375
41250
$ 9900
1 980
$ 49500
$ 130000
s 164000
$ 49500
USD
USD
USD
USD
USD
USD
USD
USD
USD
GROUP 02
GROUP 02
GROUP 02
GROUP 02
GROUP 02
GROUP 02
GROUP 02
GROUP 02
GROUP 02
ALLSTEEL FURNITURE, ÁLLSTEELWORSTATION'CPU HOL]ERUNDERMOUNT" AND ACCESSORIES. DISCOUNT OFF FROM ALLSTEELBASE PRICE LIST
ALLSTEEL FURNITURE, ALLSTEELSTORAGE "5900 SERIESPEDESTALS" AND ACCESSORIES.DISCOUNT OFF FROM ALLSTEELBASE PRICE LIST
ALLSTEEL FURNITURE, ALLSTEELSTORAGE "PERSONA SUPPORTPEDESTALS" AND ACCESSORIES -DISCOUNT OFF FROM ALLSTEELBASE PRICE LIST
ALLSTEEL FURNITURE, ÅLLSTEELSTORAGE "METAL CENTRALDRAWER WITH LOCK ANDACCESSORIES. DISCOUNT OFFFROM ALLSTEEL BASE PRICE LIST
ALLSTEEL FURNITURE, ALLSTEELSTORAGE "LOCK COREREPI.ACEMENT KIT" ANDACCESSORIES - DISCOUNT OFFFROM ALLSTEEL BASE PRICE LIST
ALLSTEEL FURNITURE, ALLSTEELSTORAGE "INDEPENDENT FILE/FILEPEDESTALS" AND ACCESSORIES.DISCOUNT OFF FROM ALLSTEELBASE PRICE LIST
ALLSTEEL FURNITURE, ALLSTEELSTORAGE "WARDROBE CABINET" -DISCOUNT OFF FROM ALLSTEELBASE PRICE LIST
ALLSTEEL FURNITURE, ALLSTEELSTORAGE "FILE AND STORAGEUNIT" ANDACCESSORIES.DISCOUNT OFF FROM ALLSTEELBASE PRICE LIST
ALLSTEEL FURNITURE, ALLSTEELSTORAGE "MOBILE PEDESTAL' -DISCOUNT OFF FROM ALLSTEELBASE PRICE LIST
42597.48
42597.49
42591.50
42597.51
42597.52
42597.53
42597.54
42597.55
42597.56
42597.48
4259t.49
42597.50
42597.51
42597.52
42557.53
42597.54
4259t.55
42597.56
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
24
25
26
21
28
29
30
31
32
# LineType Item Cateqorv Commoditv Desc Group lD UOM Price Discount orMarkuo %
Efended Price Catalog # / lD. Date and Mfr Comments
Speú 134471Page 4 of 39
Run Time: 04115116 16t29:24 ADDENDUM NO. 3 -04t22t2016
LineNo
LineTyoe ltem Categorv Commoditv Desc Group lD UOM
Gity of GhicagoCatalog RFQ - Lines by Group
PU085C
Extended P¡ice Catalog # / lD. Date and Mfr CommentsEstimated
UsaoeDiscount orMarkuo %
Price
(N/A)
$
$
$
$
$
ö
$
o
$
$(N/A)
(N/A)
IN/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$ 15000
$ 20000
$ 15000
$ 15000
$ 20000
$ 15000
$ 15000
$ 15000
$ 20000
$ 15000
',l500
USD
USD
USD
USD
USD
USD
USD
USD
USD
USD
Hour
GROUP 02
GROUP 02
GROUP 02
GROUP 02
GROUP 02
GROUP 02
GROUP 02
GROUP 02
GROUP 02
GROUP 02
GROUP 02
ALLSTEEL FURNITURE, ALLSTEEL"MOVABLE WALLS" OTHER THANTHE "BEYOND COLLECTION" -DISCOUNT OFF FROM ALLSTEELBASE PRICE LIST
ALLSTEEL FURNITURE, ¡.LLSTEEL'SYSTEMS" - DISCOUNT OFF FROMALLSTEEL BASE PRICE IIST
ALLSTEEL FURNITURE, ¡.LLSTEEL'DESKING" OTHER THAN SPECIFIED- DISCOUNT OFF FROM ALLSTEELBASE PRICE LIST
ALLSTEEL FURNITURE, A.LLSTEEL'BENCHING" OTHER THANSPECIFIED - DISCOUNT OFF FROMALLSTEEL BASE PRICE UST
ALLSTEEL FURNITURE, A.LLSTEEL'COLLABORATIVE COLLECTION'OTHER THAN THE "AWARE'AND'GATHER" COLLECTIONS SPECIFIED.DISCOUNT OFF FROM ALLSTEELBASE PRICE LIST
ALLSTEEL FURNITURE, ALLSTEEL"SEATING" OTHER THAN SPECIFIED- DISCOUNT OFF FROM A^LLSTEELBASE PRICE LIST
ALLSTEEL FURNITURE, ALLSTEEL"STORAGE' OTHER THANSPECIFIED - DISCOUNT OFF FROMALLSTEEL BASE PRICE LIST
ALLSTEEL FURNITURE, ALLSTEEL"WORKSTATIONSIÍABLES" OTHERTHAN SPECIFIED. DISCOUNT OFFFROM ALLSTEEL BASE PRICE LIST
ALLSTEEL FURNITURE, ALLSTEEL"CONFERENCING" OTHER THANSPECIFIED - DISCOUNT OFF FROMALLSTEEL BASE PRICE LIST
ALLSTEEL FURNITURE, ALLSTEEL"E}'TENSIONS ACCESSORIES'OTHER THAN SPECIFIED.DISCOUNT OFF FROM ALLSTEELBASE PRICE LIST
FURNITURE RECONFIGURATIONSERVICES FEE - ALLSTEEL
4259t.57
42597.58
4259/.59
42591
42597.61
42597.62
42597.63
42597.64
42597.65
42597.66
93145
42597.57
42597.58
42597.59
42597
42597.61
42597.62
42597.63
42591.64
4259t.65
42597.66
931450'1102
Catalog Line
Catalog Line
Catalog Line
Catalog L¡ne
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
WorkServices
33
u
35
36
37
38
39
40
41
42
43
Spec# 134471Page 5 of 39
Run Time: 04115116 16:29.,24 ADDENDUM NO. 3 .0412212016
LineNo
LineType ltem Category Commoditv Desc Group lD UOM
City of GhicagoCatalog RFQ - Lines by Group
PU085C
Extended Price Gatalog # / lD. Date and Mfr CommentsEstimated
UsageDiscount orMarkuo %
Price
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
I'(N/A)
I'(N/A)
I'(N/A)
I'(N/A)
I'(N/A)
l-
$
$
a
$
$
$
1500
3500
1 0000
10000
10000
10
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
Hour
GROUP 02
GROUP 02
GROUP 02
GROUP 02
GROUP 02
GROUP 02
FURNITURE SERVICES- ÀLLSTEEL .FURNITURE REPAIR FEE
FURNITURE SERVICE - ALLSTEEL.LABOR
FURNITURE SERVICE - ALLSTEEL .DAILY STORAGE OF FURNITURE
FURNITURE SERVICE. ATTSTEEL -WEEKLY STORAGE OF FJRNITURE
FURNITURE SERVICE - ALLSTEEL.MONTHLY STORAGE OF FURNITURE
FURNITURE SERVICE - LqBORPREMIUM DELIVERY TIME
93146
J3147
c3147
93147
93147
93141
93146551 02
9314701301
9314701145
9314701 148
9314701147
9314701120
WorkServices
WorkServicæ
WorkServices
WorkServices
WorkServices
WorkServices
44
45
46
47
48
49
Grouo GROUP 02 Total Groun Extended Price (
IN/A)
IN/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
ü
$
$
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
o
a
$
ü 20000
150
150
350
'1000
1 000
1 000
USD
Hour
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
GROUP 03
GROUP 03
tiR0uP 03
GROUP 03
GROUP 03
GROUP 03
GROUP 03
ANDERSON HICKEY: DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
FURNITURE RECONFIGI.,RATIONSERVICES FEE - ANDERSONHICKEY
FURNITURE SERVICES- ANDERSONHICKEY - FURNITURE REPAIR FEE
FURNITURE SERVICE - ANDERSONHICHEY - L\BOR
FURNITURE SERVICE - ANDERSONHICKEY - DAILY STOMGE OFFURNITURE
FURNITURE SERVICE - ANDERSONHICKEY. WEEKTY STORÀGE OFFURNITURE
I-URNITURE SERVICE - ANDERSONHICKEY - MONTHLY STORAGE OFFURNITURE
42597.03
9314501 1 03 45
46
4701302
4701 1 50
931 4701 1 53
9314701152
Catalog Line
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
50
51
52
53
54
55
56LL
Grouo GROUP 03 Total Grouo Extended Price (
Run Time: 041'15116 16:29:24 ADDENDUM NO. 3 -04t22t2016
I'
(NiA)USD
I'75000GROUP 04AURORA SHELVING: DISCOUNT
FROM CURRENT PRICE LIST ANDPRODUCT GUIDE.lo'*'
.04Catalog Line
lo'*'
.0457
Spec# 134471Page 6 of 39
LineNo
LineType ltem Cateoorv Commodig Desc Group lD UOM
Gity of GhicagoGatalog RFQ - Lines by Group
PU085C
Extended Price Catalog # / lD. Date and Mfr CommentsEstimated
UsageDiscount orMarkuo %
P¡ice
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
$
(N/A)
IN/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
ü
$
$
150
150
350
1000
'1000
1000
Hour
HOUr
Hour
SquareFoot
SquareFoot
SquareFoot
GROUP 04
GROUP 04
GROUP 04
GROUP M
GROUP 04
GROUP 04
WorkServices
1s314501104 1e3145
IFURNTTURE RECONFTGLRATTON
lsERVlcEs FEE - AURORA
WorkServices
1s3146551041s314ô IFU[ili+UãEREFX|SÐ'-.d-WorkServices
1s3147013031e3147 I|XSP--WorkServices
1e314701155 1e3147 lSTi$'lYã'-iEE JP?¡åHIîR|
Work 19314701158 193147 IFURNTTURE SERVTCE - AURORA _
I I IWEEKLYSToRAGE oFFURN|TUREServicæ
Work 19314701 1 57 193147 | FURNTTURE SERVTCE - AURORA -
I I IMoNTHLY sroRAGE oF FURNITUREServices
5E
59
60
ô1
62
ti3
Group GROUP 04 Total Group Extended Price a
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
tN/A)
$
ü
ö
$
$
$
$
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
a
e
$
$ 1 0000
'150
150
150
1 000
1 000
1 000
USD
Hou¡
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
COMMUNITY: DISCOUNT FROMCOMMUNITY PRODUCT CATALOG'111/06.
lGRouP
05
FURNITURE RECONFIGURATIONSERVICES FEE. COMMUNITY
lGRouP
0s
FURNITURE SERVICES-COMMUNITY. FURNITURE REPAIRFEE
lGRouP
05
FURNITURE SERVICE - COMMUNITY- LABOR
lGRouP
05
FURNITURE SERVICE - COMMUNITY- DAILY STORAGE OF FURNITURE
lGRouP
05
FURNITURE SERVICE - COMMUNITY- WEEKLY STORAGE OF =URNITURE
lGRouP
05
FURNITURE SERVICE - COMMUNITY- MONTHLY STORAGE OFFURNITURE
lGRouP
05
42597.12
93145
93146
93147
93147
93147
93147
42597.12
931450 1 105
9314ti55105
931470't304
9314701 160
9314701 1 63
9314701162
Catalog L¡ne
Wort<Services
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
64
65
66
67
68
69
70
Grouo GROUP 05 Total Group Extended Price
Run Time: 04115116 16:29:24 ADDENDUM NO. 3 .0412212016
$
$
e
IN/A)
(N/A)
$ 10000
$ 10000
USD
USD
GROUP 06
GROUP 06
cataros Line
1425es.04 l4r5rr.04 I *lCatalog Line 142599.05 142599.05 IDOMORE: COMTRAC - DTSCOUNT
I I IFRBYT%T3,=,["PR,.EL'''AND
71
72
Spec# 134471Page 7 of 39
City of GhicagoGatalog RFQ - Lines by Group
PU085C
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
I'
I'(N/A)
(NiA)
$
$
$
$
$
$
$ 10000
150
150
350
'1000
1000
1000
USD
Hour
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
GROUP 06
GROUP 06
GROUP 06
GROUP 06
GROUP 06
GROUP 06
GROUP 06
DOMORE: LUXSTEELEXECUTIVE.DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
FURNITURE RECONFIGURATIONSERVICES FEE - DOMORE
FURNITURE SERVICES. DOMORE -FURNITURE REPAIR FEE
FURNITURE SERVICE - DOMORE.LABOR
FURNITURE SERVICE. DOMORE -DAILY STORAGE OF FURNITURE
FURNITURE SERVICE - DOMORE -WEEKLY STORAGE OF FJRNITURE
FURNITURE SERVICE - DOMORE -MONTHLY STORAGE OF FURNITURE
42599.06
93145
93140
93147
93147
93147
93147
06WorkServ ces
166
I
e31 470rWorkServices
Catalog L¡ne
l4r5ee.06
106
I
s314501WoftServices
WorkServices
WorkServices
167
1s314701
WorkServices
aa
t4
75
76
77
78
79
LLLLL
LineNo
LineTyoe ltem Cateoorv Gommodity Desc Group lD UOM
Grouo GROUP 06
Price Discount orMarkup %
Extended P¡ice Cataloo # / lD. Date and Mfr Comments
Total Grouo Extended Price
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
$
$
$
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
ü
$
$
$ 50000
150
150
350
1000
1000
1000
USD
Hour
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
ERG INTERNATIONAL: DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
lGRouP
0?
FURNITURE RECONFIGURATIONSERVICES FEE - ERGINTERNATIONAL
lGRouP
0?
FURNITURE SERVICES- ERGINTERNATIONAL - FURNITUREREPAIR FEE
lGRouP
07
FURNITURE SERVICE - ERGINTERNATIONAL - LABOR
lGRouP
07
FURNITURE SERVICE - ERGINTERNATIONAL - DAILY STORAGEOF FURNITURE
lGRouP
0?
FURNITURE SERVICE. ERGINTERNATIONAL - WEEKLYSTORAGE OF FURNITURE
lGRouP
0?
FURNITURE SERVICE - ERGINTERNATIONAL. MONTHLYSTORAGE OF FURNITUR=
lGRouP
o?
42597.05
93145
93146
93147
93147
93147
93147
42597.05
931 4501 1 07
931 4655 1 07
9314701306
9314701 168
9314701171
9314701 170
Catalog Line
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
80
81
82
83
M
85
86
Grouo GROUP 07 Total Grouo Extended Price $
Spec# 134471Page 8 of 39
Run Time: 04115116 16:29:24 ADDENDUM NO. 3 -04t22t2016
Gity of GhicagoCatalog RFQ - Lines by Group
PU085C
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
$
$
$
$
$
Qu
$
$
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
tN/A)
IN/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
$
$
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
150
150
350
1 000
1 000
1000
USD
USD
USD
USD
USD
USD
Hour
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
GROUP 09
GROUP 09
GROUP 09
GROUP 09
GROUP 09
GROUP 09
GROUP 09
GROUP 09
GROUP 09
GROUP 09
GROUP 09
GROUP 09
Catalog Line 142599.07 142599.07 IGEIGER: DTSCOUNT FROM
I I l3H3B5ÈT'.t',B''LrsrAND
142599.08 IGEIGER: CASEGOODSCATALOG-
¡ lDtscouNT FRoM CURRENT PRICE
I lLrsT AND PRoDUCT GU|DE.
142599.09 142599.09 IGEIGER: TABLESCATALOG-
I I lfl3,'î'Vllåã3uc?uåfiE#r
PR,.ECatalog Line
14'z5" 14'z5"
IGEIGER: SEATING CATAIoG.lotscouur rnoM cURRENT pRtcE
lLrsT AND PRODUCT GUtDE.
10Catalog Line l0
I'unn l'*nIGEIGER: COLLECTIONS CATALOG -lDlscouNT FROM CURRENT PRTCE
lLrsT AND PRODUCT GUtDE.
11Catalog Line il
14'zs" l'*nIGEIGER: GEIGER FAST TRACK-lotscourur rnoM cURRENT pRtcE
lLlsT AND PRODUCT GUtDE.
12Catalog Line 12
Worf(Services
l"'193145 IFURNTTURERECONFTcLRATTON
I l**vrcEs FEE - GETGEF
4501 1 08
1e314655108 1s3146 IFUãili+U[EREFXIR?h.''u'*-
WorkServices
3',.1#,", 1s3147013081s3147 l[isùp*
SERVICE. GEIGER -
WorkServices
l*'193147 IFURNITURESERVICE-GEIGER-
I l*rLY sroRAGE oF FUFNTTURE
4701176
WorkServicæ
l*'193147 IFURNTTURE SERVTCE - GEtcER -
I I*TEKLY SToRAGE oF FURNTTURE
4701179
WorkServices
l*'193147 JFURNTTURE SERVTCE - GETGER -
I IMONTHLY STORAGE oF FURNTTURE
4701178
35
36
)7
l8
l9
100
i01
..02
103
104
í05
106
LineI'lo
LineType ltem Cateoorv Commodity Desc Group lD UOM
Group GROUP 09
P¡iceDiscount orMarkuo %
Extended Price Catalog # I lD. Date and Mfr Comments
Total Grouo Extended Price s
(N/A)
(N/A)
$ 10000
$ 10000
USD
USD
GROUP 11
GROUP 1.I
GUNLOCKE: CREDENTIALS PRICEAND SPECIFICATION GUIDE -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
GUNLOOKE: KENNSINGTON PRICEAND SPECIFICATION GU DE -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
42599.15
42599.16
catalos Line
l4r5rr.15catarog Linelt*n.,u
i15
116
Spec# 134471Page 9 of 39
Run Time: 04115116 16:29'.24 ADDENDUM NO. 3 -04t22t2016
LineNo
LineTyoe ltem Category Commodity Desc Group lD UOM
Gity of GhicagoCatalog RFQ - Lines by Group
PU085C
Extended Price Catalog # / lD. Date and Mfr CommentsEstimated
UsaoeDiscount o¡Markup %
P¡ice
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
$
$
$
$
$
$
$
ü
Q
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
IN/A)
IN/A)
(N/A)
$
$
$
$
$
$
$ 63000
$ 10000
$ 10000
$'10000
$ 10000
$ 375000
$ 2500
150
150
350
1 0000
10000
10000
USD
USD
USD
USD
USD
USD
USD
Hour
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
GROUP 11
GROUP 11
GROUP 11
GROUP I1
GROUP 11
GROUP 11
GROUP.ll
GROUP 1,1
GROUP 11
GROUP 11
GROUP 1I
GROUP 11
GROUP 11
GUNLOCKE: MEDLEY PRICE ANDSPECIFICATION GUIDE - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
GUNLOCKE: MENU PRIC= ANDSPECIFICATION GUIDE - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
GUNLOCKE: SILEA OPEN OFFICEPRICE AND SPECIFICATION GUIDE.DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUI]E,
GUNLOCKE: SILEA PRIVATE OFFICEPRICE AND SPECIFICATION GUIDE -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
GUNLOCKE: TRIO PRICE ANDSPECIFICATION GUIDE - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
GUNLOCKE: TABLES PRICE ANDSPECIFICATION GUIDE - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE,
GUNLOCKE: SEATING PRICE ANDSPECIFICATION GUIDE - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
FURNITURE RECONFIGLJ RATIONSERVICES FEE - GUNLOCKE
FURNITURE SERVICES- GUNLOCKE- FURNITURE REPAIR FEE
FURNITURE SERVICE - GUNLOCKE -LABOR
FURNITURE SERVICE - GUNLOCKE.DAILY STORAGE OF FURNITURE
FURNITURE SERVICE. GUNLOCKE -WEEKLY STORAGE OF FURNITURE
FURNITURE SERVICE - GUNLOCKE -MONTHLY STORAGE OF FURNITURE
42599.17
42599.1E
42599.19
42599.20
42599.21
42599.22
42599.23
93145
93146
93147
93147
93147
93147
42599.17
42599. 1 8
42599.19
42599.20
42599.21
+2599.22
42599.23
931450 1 1 10
93146551 10
93 14701310
9314701 1 85
9314701 188
9314f01187
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
117
118
119
120
121
122
123
124
125
126
127
128
129
Grouo GROUP ll Total Grouo Extended Price $
Sped 134471Page10of39
Run Time: 04115116 16:29:24 ADDENDUM NO. 3 - 04t22t2016
Gity of GhicagoGatalog RFQ - Lines by Group
PU085C
LineNo
LineTv¡e ltem Category Commodity Desc Group lD UOM
Grouo GROUP 12
Price Discount o¡Markup %
Extended Price Catalog # I lD. Date and Mf¡ Comments
Total Grouo Extended Price A
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
o
$
ü
$
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
IN/A)
ü
$
$
$
ü
$
$ 5000
150
150
350
1 000
1000
1000
USD
Hour
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
GROUP 12
GROUP 12
GROUP 12
GROUP 12
GROUP 12
GROUP 12
GROUP 12
HALE WOOD: DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
FURNITURE RECONFIGURATIONSERVICES FEE - HALE WOOD
FURNITURE SERVICES- HALEWOOD- FURNITURE REPAIR FEE
FURNITURE SERVICE. hALE WOOD- UBOR GROUP L
FURNITURE SERVICE - HALE WOOD- DAILY STORAGE OF FI.JRNITURE
FURNITURE SERVICE - HALE WOOD- WEEKLY STORAGE OF FURNITURE
FURNITURE SERVICE - HALE WOOD- MONTHLY STORAGE OFFURNITURE
42597.08
l4r5s?.08
45s314501111
ls3193'146551 1 1 46
l*'4701311
1 190
1 193
Catalog Line
WorkServicæ
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
'130
131
132
133
134
'135
136
L
$
$
$
$
s
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$ 10000
s 1 0000
$ 10000
$ 70000
$ 10000
USD
USD
USD
USD
USD
GROUP 13
GROUP 13
GROUP 13
GROUP.l3
GROUP,l3
HAWORTH: HAWORTH COLLECTIONNORTH AMERICAN PRICE LIST -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
HAWORTH: WOOD CASEGOODSNORTH AMERICAN SPECIFICATIONGUIDE/PRICE LIST - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE,
HAWORTH: OPENEST COLLECTIONNORTH AMERICAN PRICE LIST -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
HAWORTH: SEATING NOITHAMERICAN PRICE LIST. ]ISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
HAWORTH: A SERIES STORAGENORTH AMERICAN PRICE LIST.DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
42599.24
42599.25
42598.26
42596.21
42598.28
42599.24
42599.25
42598.26
42598.27
42598.28
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
137
138
139
140
141
Spec# 134471Page 11 of39
Run Time: 04115116 16:29:24 ADDENDUM NO. 3 - 04t22t2016
LineNo
LineTvpe ltem Category Commodity Desc
City of GhicagoCatalog RFQ - Lines by Group
Group lD UOMEstimated
Usaqe P¡ice
PU085C
,a-r***tExtendedp¡ice Catalog # / lD. Date and Mfr Comments
û
$
$
ü
$
Q
$
e
$
tN/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
10000
$ 1 0000
$ 10000
$ 10000
USD
USD
USD
USD
USD
USD
USD
USD
USD
GROUP.I3
GROUP,l3
GROUP 13
GROUP.I3
GROUP 13
GROUP,I3
GROUP 13
GROUP 13
GROUP 13
HAWORTH: BESIDE STORAGENORTH AMERICAN SPECIFICATIONGUIDE/PRICE LIST - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
I-IAWORTH: COMPOSE STORAGENORTH AMERICAN SPECIFICATIONGUIDE/PRICE LIST - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE,
HAWORTH: COMPOSE STORAGENORTH AMERICAN SPECIFICATIONGUIDE/PRICE LIST - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
HAWORTH: STEELCASEGOODS/FILE AND STORAGENORTH AMERICAN SPECIFICATIONGUIDE/PRICE LIST - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
HAWORTH: X SERIESENHANCEMENTS NORTH AMERICANSPECIFICATION GUIDE/PRICE LIST -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
HAWoRTH: COMPOSE NORTHAMERICAN SPECIFICATIONGUIDE/PRICE LIST - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
HAWORTH: INTUITY BENCHINGNORTH AMERICAN PRICE LIST -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
HAWORTH: PATTERNS NORTHAMERICAN SPECIFICATIONGUIDE/PRICE LIST - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
HAWORTH: PREMISE NORTHAMERICAN SPECIFICATIONGUIDE/PRICE LIST - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
42599.29
42599.3u
42599.30
42599.32
42599.33
42599.34
42599.35
42599.36
42599.37
42599.29
42599.30
42599.30
42599.32
42599.33
42s99.34
42599.35
42599.36
42599.37
Catalog L¡ne
Catalog L¡ne
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
142
143
144
145
146
147
148
149
150
Speú 134471Page 12 of39
Run Time: 04115116 16:29.24 ADDENDUM NO. 3 .0412212016
LineNo Ltne tvoe Item Cateoory Commoditv Desc Group lD UOM
Gity of ChicagoCatalog RFQ - Lines by Group
PU085C
Extended P¡ice Cataloo # / lD. Date and Mfr CommentsEstimated
UsageDiscount orMarkup %
Price
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
ü
$
ü
$
ö
Q
$
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
$
$
$ 10000
$ 10000
$ 50000
$ 10000
$ 10000
150
'150
350
1000
1000
1 000
USD
USD
USD
USD
USD
Hour
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
GROUP 13
GROUP 13
GROUP 13
GROUP 13
GROUP 13
GROUP 13
GROUP 13
GROUP 13
GROUP 13
GROUP 13
GROUP I3
HAWORTH: RESIDE DESKINGNORTH AMERICAN SPECIFICATIONGUIDE/PRICE LIST - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
HAWORTH: UNIGROUP TOO,UNIGROP AND PI.ACES NORTHAMERICAN SPECIFICATIONGUIDE/PRICE LIST - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
HAWORTH: TABLES NORTHAMERICAN SPECIFICATIONGUIDgPRICE LIST - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
HAWORTH: X SERIESENHANCEMENTS NORTH AMERICANSPECIFICATION GUIDE. DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
HAWORTH: WORKWARE NORTHAMERICAN SPECIFICATIONGUIDE/PRICE LIST. DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
FURNITURE RECONFIGURATIONSERVICES FEE - HAWORTH
FURNITUREFURNITURE
SERVICES- HAWORTH -REPAIR FEE
FURNITURE SERVICE. HAWORTH -LABOR
FURNITURE SERVICE - HAWORTH -DAILY STORAGE OF FURNITURE
FURNITURE SERVICE - HAWORTH.WEEKLY STORAGE OF FJRNITURE
FURNITURE SERVICE - HAWORTH -MONTHLY STORAGE OF FURNITURE
42599.38
42599.39
42599.40
42599.41
42599.43
93145
93146
93147
93147
93147
93147
42599.3E
42599.39
42599.40
42599.41
42599.43
9314501112
E314655112
9314701312
s314701194
9314701197
9314701 196
Catalog Line
Catalog L¡ne
Catalog Line
Catialog Line
Catalog Line
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
151
152
153
154
155
'156
157
15E
159
160
161
Grouo GROUP 13 Total Grouo Extended Price $
Spec#Page
13447113 of39
Run Time: 04115116'16t29:24 ADDENDUM NO. 3 - 04t22t2016
Gity of GhicagoGatalog RFQ - Lines by Group
PU085C
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
$
$
$
$
$
$
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
ù
ü
$
$ 65000
$ 70000
$ 20000
170
150
360
4000
4000
4000
10
USD
USD
USD
Hour
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
Hour
GROUP 14
GROUP.I4
GROUP 14
GROUP 14
GROUP 14
GROUP 14
GROUP 14
GROUP 14
GROUP 14
GROUP 14
HERMAN MILLER: ACT|Olrl OFFICESYSTEM - DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
HERMAN MILLER: HERMAN MILLERCOLLECTION - DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
HERMAN MILLER FURNITURE,HERMAN MILLER TATO BEAN BAGSAND ACCESSORIES - DISCOUNTOFF FROM HERMAN MIL-ER BASEPRICE LIST
FURNITURE RECONFIGURATIONSERVICES FEE - HERMAN MILLER
FURNITURE SERVICES- HERMANMILLER - FURNITURE REPAIR FEE
FURNITURE SERVICE - HERMANMILLER - LABOR
FURNITURE SERVICE - HERMANMILLER - DAILY STORAGE OFFURNITURE
FURNITURE SERVICE - FERMANMILLER. WEEKLY STORAGE OFFURNITURE
FURNITURE SERVICE - I.'ERMANMILLER - MONTHLY STORAGE OFFURNITURE
FURNITURE SERVICE - LABOR.PREMIUM DELIVERY TIME
42599.M
42599.45
42597.99
93145
93146
9s147
93147
s3147
93147
93147
42599.44
42599.45
42597.99
93145011 13
93146551 13
9314701313
931 4701 1 98
9314701292
9314701200
9314701120
Uatalog Line
L;atalog Line
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
162
163
164
165
166
167
168
169
170
171
LineNo
LineTy¡e ltem Cateqory Commoditv Desc Group lD UOM
Grouo GROUP 14
P¡ice Discount orMarkuo %
Extended Price Catalog # / lD. Date and Mfr Comments
Total Grouo Extended Price $
ö
$
$
IN/A)
(N/A)
(N/A)
$ 15000
$ 65000
$ 15000
USD
USD
USD
GROUP 16
GROUP.l6
GROUP 16
catalog L¡ne 142599.46 142599.46 lJSl: CASEGOODS - DISCOUNT FROM
I I l3H3EE[lå['ß'.rsrANDCatalog L¡ne 142599.47 142599.47 lJSl: SEATING - DISCOUNT FROM
I I |3H3BE[+Ë['ßEL'.rANDcatalog L¡ne 142599.48 142599.48 lJSl: TABLES/CONFERENCE -
I I lfl'3fÎ'V$lFRoMccuRRENrPRrcE
179
'180
1E1
Speú 134471Page 14 of 39
Run Time: 041'15116 16:29:24 ADDENDUM NO. 3 .0412212016
Gity of ChicagoCatalog RFQ - Lines by Group
PU085C
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
$
ü
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
e
ü
$
$
150
'150
350
'1000
'1000
1000
Hour
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
GROUP 16
GROUP 16
GROUP I6
GROUP 16
GROUP 16
GROUP 16
l"'193'145 IFURNITURERECONFTGURATT0N
I |..*vtcEs FEE -JSr
4501117Servicæ
l*'193146 IFURNITURE
I lrunurune
SERVICES- JSI .REPAIR FEE
46551 17Services
IFURNITURE
lenoue e
SERVICE -JSI. LABORServices
Work 19314701214 193147 | FURNITURE SERVICE - JSt - DAtLyservices
I I ISToRAGE oF FURN|TURE
WorkServices
1s314701217 1s3147 1fi,'#Ji3F.'FIJI'5;
JSIFURNITURE
WorkServices
1s314701216 1e3147 lil'$jili.lE %'trå?E-ffi*-*'
182
183
184
185
186
187
LineNo
LineTyoe ltem Category Commodity Desc Group lD UOM
Grouo GROUP'16
P¡ice Discount o¡Markuo %
Extended Price Catalog # / lD. Date and Mfr Comments
Total Grouo Extended Price S
$
$
$
$
$
$
$
$
(N/A)
(N/A)
(N/A)
(N/A)
(NiA)
(NiA)
(N/A)
IN/A)
$ 10000
$ 10000
$ 20000
$ 10000
$ 10000
$ 10000
$ 10000
$'10000
USD
USD
USD
USD
USD
USD
USD
USD
GROUP 17
GROUP 17
GROUP 17
GROUP 17
GROUP 17
GROUP 17
GROUP 17
GROUP 17
Kl:700 SERIES DESKING SYSTEMPRICE LIST - DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
{: ACCESSORIES PRICE LIST -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
Kl:700 SERIES FILES AND STORAGEPRICE LIST. DISCOUNT FROMCURRENT PRICE LIST AI,IDPRODUCT GUIDE.
KI: ALL TERRAIN FILES A.NDSTORAGE PRICE LIST - DISCOUNTFROM CURRENT PRICE -IST ANDPRODUCT GUIDE,
Kl: ARISTOTLE CASEGCODS PRICELIST - DISCOUNT FROM CURRENTPRICE LIST AND PRODUCT GUIDE.
KI: BLUE SKY COLLECTION PRICELIST. DISCOUNT FROM SURRENTPRICE LIST AND PRODUCT GUIDE.
KI: BACKBONE MEDIA PLATFORMPRICE LIST - DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
Kl:AFFINA COLLECTION PRICE LIST- DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
42599.49
42599.50
42599.51
42599.52
42599.53
42599.54
42599.55
42599.56
Catalog Line
l"'**
l''*'1425ee.51
l''*"l4r5ee.53
l4r5ee.54
Line
Catalog Line
Catal0g L¡ne
1425es.56
188
189
190
191
192
193
194
195
IIIISpeú 134471Page 15 of 39
Run Time: 0411511616:29:24 ADDENDUM NO. 3 - 04t22t2016
LineNo
LineTvpe ltem Categorv Commoditv Desc Group lD UOM
Gity of GhicagoCatalog RFQ - Lines by Group
PU085C
Extended P¡ice Catalog # / lD. Date and Mfr CommentsEstimated
UsaoeDiscount orMarkuo %
Price
(N/A)
$
$
ü
$
$
$
$
$
$
$
ù
s
$
$(N/A)
(N/A)
(NiA)
(N/A)
IN/A)
(N/A)
(N/A)
(N/A)
IN/A)
tN/A)
IN/A)
(N/A)
(N/A)
(N/A)
$
$ 10000
$ 10000
$ 80000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 5000
$ 15000
170
USD
USD
USD
USD
USD
USD
USD
USD
USD
USD
USD
USD
USD
Hour
GROUP 17
GROUP 17
GROUP 17
GROUP 17
GROUP 17
GROUP 17
GROUP 17
GROUP.l7
GROUP 17
GROUP 17
GROUP 17
GROUP 17
GROUP 17
GROUP 17
KI: CAFEWAY CAFETERIA TABLESPRICE LIST. DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE,
Kl: ARCHITECTURAL WALL COLORADDENDUM PRICE LIST - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
KI FURNITURE, KI MOVABLE WALL -DISCOUNT OFF FROM KI BASEPRICE LIST
KI FURNITURE, KI BENCHING -DISCOUNT OFF FROM KI BASEPRICE LIST
KI CASEGOODS -FROM KI BASE
KI FURNITURE,DISCOUNT OFFPRICE LIST
KI FURNITURE, KI DESKING -DISCOUNT OFF FROM KI BASEPRICE LIST
KI FURNITURE, KI FILES ANDSTORAGE - DISCOUNT OFF FROM KIBASE PRICE LIST
KI FURNITURE, KI FIXED ANDAUDITORIUM FURNITURE -DISCOUNT OFF FROM KI BASEPRICE LIST
KI FURNITURE, KI PANEL SYSTEMS -DISCOUNT OFF FROM KI BASEPRICE LIST
KI SEATING.FROM KI BASE
KI FURNITURE,DISCOUNT OFFPRICE LIST
KI FURNITURE, KI TABLES -DISCOUNT OFF FROM KI BASEPRICE LIST
KI FURNITURE, KI WASTERECEPTACLES - DISCOUNT OFFFROM KI BASE PRICE LIST
KI FURNITURE, KI "ZONECOLLECTION' . DISCOUI'¡T OFFFROM KI BASE PRICE LIST
FURNITURE RECONFIGURATIONSERVICES FEE - KI
42599.57
42599.56
42597.68
42597.69
42597.70
42597.71
42591.72
42597.73
42597.74
42597.75
42591.16
42597.n
42557.79
93145
Catalog Line
l''**Line
Catalog Line .71
l''"
Catalog Line
l''*"
Catalog Line
Catalog Line .70
I'u"
.72Line
Catalog
Catalog Line
1425e7.75
Catalog Line .76
l''"Catalog Line
Services
196
197
198
't99
200
201
202
203
204
205
206
207
208
209
IIrIIn
IIIIrSpec# 134471Page 16 of 39
Run Time: 04115116 16:29:24 ADDENDUM NO. 3 - 04t22t2016
LineNo
LineTyoe ltem Category Commoditv Desc Group lD UOM
City of ChicagoCatalog RFQ - Lines by Group
PU085C
ffi, Extended p¡ice Catalog # llD. Date and Mfr CommentsEstimated
UsageP¡ice
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
$
$
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
c
$
a
ü
$
$
150
360
3000
3000
3000
10
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
Hour
GROUP 17
GROUP 17
GROUP I7
GROUP 17
GROUP 17
GROUP 17
FURNITURE SERVICES. KI -FURNITURE REPAIR FEE
FURNITURE SERVICE - KI - LABOR
FURNITURE SERVICE - KI - DAILYSTORAGE OF FURNITURE
FURNITURE SERVICE . KI - WEEKLYSTORAGE OF FURNITURE
FURNITURE SERVICE. KI-MONTHLY STORAGE OF FURNITURE
FURNITURE SERVICE - LABOR,PREMIUM DELIVERYTIME
93140
93147
93147
93147
93147
93147
93146551 1E
9314/01316
3314701220
3314701223
9314701222
9314701120
WorkServicæ
WorkServices
WorkServices
WorkServices
WorkServicæ
WorkServices
210
211
212
213
214
215
Group GROUP 17 Total Grouo Extended Price ç
$
$
$
a
ü
$
$
$
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$ 10000
$ 10000
$ 1 0000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
USD
USD
USD
USD
USD
USD
USD
USD
GROUP 18
GROUP 18
I,JROUP 1E
GROUP 18
GROUP .18
GROUP 18
GROUP 18
GROUP 1E
KIMBALL: KIMBALL HEALTH -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
KIMBALL: KIMBALL OFFICECASEGOODS - DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
KIMBALL: KIMBALL OFFICE HUM.MINDS AT WORK. - DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
KIMBALL: KIMBALL OFFICE KWIKOFFICE - DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
KIMBALL: KIMBALL OFFICE METALFILING - DISCOUNT FROI/ CURRENTPRICE LIST AND PRODUCT GUIDE.
KIMBALL: KIMBALL OFFICE PERKS -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
KIMBALL: KIMBALL OFFICE DOCK -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
KIMBALL: KIMBALL OFFICEPRIORITY ENHANCEMENTS .DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
42599.59
42599.60
42599.61
42599.62
42599.63
42599.64
42599.65
42599.ô6
42599.59
42599.ô0
42599.61
42599.62
42599.63
42599.ô4
42599.65
42599.66
Uatalog L¡ne
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
216
217
218
219
220
221
222
223
IIrSpec# 134471Page 17 of 39
Run Time: 04115/16 16:29:24 ADDENDUM NO. 3 - 04t22t2016
LineNo
LineTyoe ltem Cateqorv Commoditv Desc Group lD UOM
Gity of GhicagoGatalog RFQ - Lines by Group
PU085C
Extended P¡ice Cataloq # / lD. Date and Mfr CommentsEstimated
UsaqeDiscount orMarkup %
Price
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
s
$
ü
$
$
$
$
$
$
$
$
a
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
ü
$
$
$
$
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
150
150
350
1 000
000
USD
USD
USD
USD
USD
USD
USD
USD
Hour
Hour
Hour
SquareFoot
SquareFoot
GROUP 18
GROUP 18
GROUP I8
GROUP 1E
GROUP.,I8
GROUP 1E
GROUP 1E
GROUP 18
GROUP 18
GROUP 18
GROUP 18
GROUP 18
GROUP 18
KIMBALL: KIMBALL OFFICEPRIORITY - DISCOUNT FROMCURRENT PRICE LIST AI'JDPRODUCT GUIDE.
KIMBALL: KIMBALL OFFICEPRODUCT MODIFICATIONSSUPPLEMENT - DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE,
KIMBALL: KIMBALL OFFICESEATING - DISCOUNT FROMCURRENT PRICE LIST AI.¡DPRODUCT GUIDE.
KIMBALL: KIMBALLOFFICESYSTEMS - DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
KIMBALL: KIMBALL OFFICE TABLES- DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
KIMBALL: KIMBALL OFFICE TEEMAND STOW. DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
KIMBALL: KIMBALL OFFICEWEIGHTS AND CUBIC FEET -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
KIMBALL: KIMBALL OFFICE XSEDE -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
FURNITURE RECONFIGURATIONSERVICES FEE. KIMBALL
FURNITURE SERVICES- KIMBALL.FURNITURE REPAIR FEE
FURNITURE SERVICE - I{MBALL.LABOR
FURNITURE SERVICE - I.(MBALL -DAILY STORAGE OF FURNITURE
FURNITURE SERVICE - KIMBALL -WEEKLY STORAGE OF FURNITURE
42599.67
42599.6E
42599.69
42599./0
42599.71
42599.12
4259E.13
42596.14
93145
93146
93147
93147
93147
42599.67
42b99.68
42599.69
42599.70
42599.71
42599.t2
42598.73
42598.74
9314s011 '14
93146551 14
9314701317
9314701201
9314701204
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
224
225
226
227
228
229
230
231
232
233
234
235
236
Spec# 134471Page 18 of 39
Run Time: 041151'16 16.,29:24 ADDENDUM NO. 3 .0412212016
LineNo
Line Tvoe ltem Categorv Commoditv Desc Group lD UOM
City of GhicagoCatalog RFQ - Lines by Group
PU085C
ffit Extended price Catalog # / lD. Date and Mfr CommentsEstimated
UsagePrice
(N/A)
I'(N/A)$1 000Square
FootGROUP 18FURNITURE SERVICE - KIMBALL -
MONTHLY STORAGE OF FURNITURE203
Services237
Grouo GROUP 18 Total Grouo Extended Price e
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
$
$
$
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
$
$
$ 15000
150
150
350
1000
1000
1 000
USD
Hour
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
KNOLL STUDIO: DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
lGRouP
rs
FURNITURE RECONFIGURATIONSERVICES FEE - KNOLL STUDIO
lGRouP
1s
FURNITURE SERVICES- KNOLTSTUDIO - FURNITURE REÞAIR}EE
lGRouP
1s
FURNITURE SERVICE - KNOLLSTUDIO - LABOR
lGRouP
1s
FURNITURE SERVICE - KNOLLSTUDIO - DAILY STORAGE OFFURNITURE
lGRouP
1s
FURNITURE SERVICE - KNOLLSTUDIO - WEEKLY STORAGE OFFURNITURE
lGRouP
1e
FURNITURE SERVICE - KNOLLSTUDIO - MONTHLY STORAGE OFFURNITURE
lGRouP
1s
42599.75
93145
93146
93147
93147
93147
93141
42599.75
9314501 1 15
93146551 15
9314701318
931 4701 205
9314701208
9314701207
Catalog Line
WorkServicæ
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
238
239
240
241
242
243
244
Grouo GROUP 19 Total Grouo Extended Price $
$
$
$
$
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$ 10000
$ 10000
$ 10000
$ 10000
$ 50000
USD
USD
USD
USD
USD
GROUP 20
GROUP 20
GROUP 20
GROUP 20
GROUP 20
KNOLL: 24 HOUR RESPONSE PRICELIST - DISCOUNT FROM CURRENTPRICE LIST AND PRODUCT GUIDE.
KNOLL: ANCHOR PRICE LIST -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
KNOLL: ANTENNA WORKSPACESPRICE LIST - DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
KNOLL: AUTOSTRADA PRICE LIST-DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
KNOLL: CALIBRE PRICE -lST -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
4259E.76
42598.n
42598.78
42598.75
42599.80
catalos Line
l4rsr8.?ôcataros Line /425s8.77
cataros Line
lt*r."catalos Line
142518.?,
catalos Line
f425rr.80
245
246
241
248
249
Spec# 134471Page19of39
Run Time: 04115116 16:29:24ADDENDUM NO. 3 - 04t22t2016
# LineTvoe ltem Gategorv Commoditv Desc Group lD UOM
City of GhicagoCatalog RFQ - Lines by Group
PU085C
Extended Price Catalos # / lD. Date and Mfr CommentsEstimated
UsageDiscount orMarkuo %
Price
$
$
$
$
$
$
$
$
$
$
$
$
(N/A)
(N/A)
(NiA)
(N/A)
(N/A)
INiA)
(N/A)
IN/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$'10000
$ 10000
$ 50000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 65000
$ 10000
$ 10000
$ 10000
USD
USD
USD
USD
USD
USD
USD
USD
USD
USD
USD
USD
USD
GROUP 20
GROUP 20
GROUP 20
GROUP 20
GROUP 20
GROUP 20
GROUP 20
GROUP 20
GROUP 20
GROUP 20
GROUP 20
GROUP 20
GROUP 20
KNOLL: CRINION OPEN TABLEPRICE LIST - DISCOUNT FROMCURRENT PRICE LIST ANIDPRODUCT GUIDE.
KNOLL: CURRENTS PRICE LIST -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
KNOLL: DIVIDENDS HORIZON PRICELIST - DISCOUNT FROM CURRENTPRICE LIST AND PRODUCT GUIDE,
KNOLL: INTERACTION PRICE LIST-DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
KNOLL: K. LOUNGE PRICE LIST-DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
KNOLL: KNOLL ESSENTIALS PRICELIST - DISCOUNT FROM CURRENTPRICE LIST AND PRODUCT GUIDE,
KNOLL: KNOLL OFFICE TABLESPRICE LIST. DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
KNoLL: KNOLL SPACE/OUTDooRPRTCE L|ST (US)- DTSCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
KNOLL: KNOLL SPACE PRICE LIST(us) - DtscouNT FRoM cURRENTPRICE LIST AND PRODUCT GUIDE.
KNOLL: KNOLL EI|IRA PRICE LIST -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
KNOLL: KNOLL STUDIOiOUTDOORPRICE LIST. DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE,
KNOLL: KNOLL STUDIO PRICE LIST -
DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
KNOLL: KNOLL TEXIILES PRICELIST. DISCOUNT FROM CURRENTPRICE LIST AND PRODUCT GUIDE.
42599.8 1
42559.82
42599.83
42599.84
42599.85
42599.86
42599.88
42599.90
42599.91
42599.92
42599.93
42599.94
42b99.95
42599.81
42599.82
42599.83
42599.84
42599.85
42599.86
42599.8E
42599.90
42599.91
42599.92
42599.93
42599.94
42s99.9s
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog L¡ne
Catalog Line
Catalog Line
Catalog Line
250
251
252
253
254
255
256
257
258
259
260
261
262
IIIrr
rISpec# 134471Page 20 of 39
Run Time: 04115116 16:29:24 ADDENDUM NO. 3 - 04t22t2016
City of GhicagoCatalog RFQ - Lines by Group
PU085C
(N/A)
(N/A)
(N/A)
$
$
$
$
a
$
$
$
$
$
$
$
$
$
(N/A)
(N/A)
(N/A)
(N/A)
IN/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$ 90000
$ 150000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
1500
1500
3500
USD
USD
USD
USD
USD
USD
USD
USD
USD
USD
USD
Hour
Hour
Hour
GROUP 20
GROUP 20
GROUP 20
GROUP 20
GROUP 20
GROUP 20
GROUP 20
GROUP 20
GROUP 20
GROUP 20
GROUP 20
GROUP 20
GROUP 20
GROUP 20
KNOLL: MORRISON PRICE LIST -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
KNOLL: OFFICE SEATING PRICELIST - DISCOUNT FROM CURRENTPRICE LIST AND PRODUCT GUIDE.
KNOLL: PRICE LISTS (CURRENT) -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
KNoLL: REFF PROFILES PRICE LIST. DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
KNOLL: REFF PROFILES VOL 2PRICE LIST - DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
KNOLL: SERIES 2 PRICE LIST -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
KNOLL: STANDARD SPECIALSOFFICE SEATING PRICE LIST -DISCOUNT FROM CURRENT PRICELISTAND PRODUCT GUIDE.
KNOLL: STANDARD SPECIALSSYSTEMS PRICE LIST - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
KNOLL: TEMPLATE PRICE LIST-DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
KNOLL: THE GRAHAM COLLECTIONPRICE LIST. DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
KNOLL: UPSTART PRICE LIST -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE,
FURNITURE RECONFIGURATIONSERVICES FEE. KNOLL
FURNITURE SERVICES- KNOLL -FURNITURE REPAIR FEE
FURNITURE SERVICE - KNOLL -LABOR
42599.96
42598.57
42598.98
42598.99
42598.'17
42598.18
4259E.19
42598.22
42598.23
42598.24
42598.25
93145
93146
93147
Catalog Line
l4r5ee.e6
Catalog Line 18
I'u*Catalog Line 19
Catalog Line
Catalog Line
Catalog Line
l425s8.ee
Catalog Line 17
l'*'
Catalog Line
Catalog Line
Catalog Line
l"*"-Catalog Line
WorkServices
WorkServices
1e3146551
1s
1s31470131e
WorkServices
263
264
265
266
267
268
269
270
271
272
273
274
215
276
rn IrI
nry
LineNo
LineTvoe ltem Cateoory Commodity Desc Group lD UOM PriceDiscount orMarkuo %
Extended P¡ice Catalog # I lD. Date and Mfr Comments
Spec# 134471Page 21 of 39
Run Time: 04115116 16:29:24 ADDENDUM NO. 3 .0412212016
Gity of ChicagoGatalog RFQ - Lines by Group
PUO85C
LineNo
LineTyoe ltem Category Commodity Desc Group lD UOM
Grouo GROUP 20
EstimatedUsaoe
P¡ice Extended Price Cataloo # / lD. Date and Mfr Comments
Total Grouo Extended Price S
(N/A)
(N/A)
(N/A)
I'(N/A)
I'(N/A)
I'(N/A)
$
$
a
1000
1000
1 000
SquareFoot
SquareFoot
SquareFoot
GROUP 20
GROUP 20
GROUP 20
trURNITURE SERVICE - KNOLL -DAILY STORAGE OF FURNITURE
FURNITURE SERVICE . KNOLL -WEEKLY STORAGE OF FURNITURE
FURNITURE SERVICE - KNOLL -MONTHLY STORAGE OF FURNITURE
$..$.* 1s314701224 !¡s3147
$,'#*. 1e3147012261$147
277
278
279
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
I'
(N/A)
(N/A)
$
$
$
$
$
$
$ 65000
150
150
350
1000
1000
1000
USD
Hour
Hour
Hour
SquarcFoot
SquareFoot
SquareFoot
GROUP 21
GROUP 21
GROUP 21
GROUP 21
GROUP 21
GROUP 21
GROUP 21
LINCORA GROUP: DISCOUNT FROIVCURRENT PRICE LIST ANDPRODUCT GUIDE.
FURNITURE RECONFIGURATIONSERVICES FEE. LINCORA GROUP
GROUP - FURNITURE REPAIR FEEFURNITURE SERVICES- LINCORA
FURNITURE SERVICE. LINCORAGROUP - LABOR GROUP U
FURNITURE SERVICE - LINCORAGROUP. DAILY STORAGE OFFURNITURE
FURNITURE SERVICE - LINCOMGROUP - WEEKLY STORAGE OFFURNITURE
FURNITURE SERVICE . LINCORAGROUP - MONTHTY STORAGE OFFURNITURE
42597.15
93145
93146
93147
93147
93147
93147
15Catalog Line
l''"120
1s314501
WorkServices
1e314655r
20WorkServices
l$r4701320
WorkServices
228Work
le31
4?01Serv ces
231
230
280
261
282
283
284
285
2E6
ryry
Grouo GROUP 21 Total Grouo Extended Price (
(N/A)
(N/A)
(N/A)
I'
I'
I'
(N/A)
s
$
$
$ 5000
150
150
350
USD
Hour
Hour
Hour
GROUP 23
GROUP 23
GROUP 23
GROUP 23
MAGNUSON GROUP: DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
FURNITURE RECONFIGURATIONSERVICES FEE. MAGNUSONGROUP
GROUP - FURNITURE REPAIR FEEFURNITURE SERVICES- IvIAGNUSON
FURNITURE SERVICE - MAGNUSON- LABOR
42597.17
93145
93146
93141
42597.17
9314501122
93146551 22
9314701322
Catalog Line
WorkServices
WorkServices
WorkServices
294
295
29ô
297
ILL5Spec# 134471Page 22 of 39
Run Time: 041'15116 16:29:24 ADDENDUM NO. 3 - 04t22t2016
Gity of GhicagoGatalog RFQ - Lines by Group
PlJ085C
LineNo
LineTvoe ltem Category Commoditv Desc Group lD UOMEstimated
UsaqePrice
Discount o¡@%- trxlenoeo Pnce Catalog # / lD. Date and Mfr Comments
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
'1000
1 000
1 000
SquareFoot
SquareFoot
SquareFoot
GROUP 23
GROUP 23
GROUP 23
Work 19314701236 193147 IFURNITURE SERVTCE - I\,|AGi'ILJSONservicæ
| I l'î*ifuRå'ttsroMGEoFWorkServices
1s314701239 193147 IFURNTTURE SERVTCE _ MAGNUSON
I I 13,î3ñifuff'^LYSToRAGEoF
1e314?01
238 193147 IFURNTTURE SERVTCE - MAGNUSON
I lcRouP - MoNTHLY STORAGE OF
I IFURN|TURE
Services
298
299
300
Grouo GROUP 23 Total Grouo Extended Price S
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
$
$
ü
ü
$
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
a
$
$
b
$
$
$
$ 50000
200
153
150
360
1500
1500
1500
10
USD
Each
Hour
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
Hour
MAXON FURNITURE, INC.:DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
lGRouP
z
GENERAL FURNITURE - I'¡AXON CPUHOLDER WITH CASTERS
lGRouP
24
FURNITURE RECONFIGURATIONSERVICES FEE - MAXONFURNITURE INC
lGRouPzFURNITURE SERVICES.MAXONFURNITURE INC -FURNITURE REPAIR FEE lGRouPzFURNITURE SERVICE - MAXONFURNITURE INC. LABOR
lGRouP
24
FURNITURE SERVICE - MAXON IGROUPFURNITURE, INC - DAILY STORAGE I0F FURNIÚRE
I
24
FURNITURE SERVICE - MAXONFURNITURE, INC - WEEKLYSTORAGE OF FURNITURE
lGRouP
24
FURNITURE SERVICE. MAXONFURNITURE, INC - MONTHLYSTORAGE OF FURNITURE
lGRouPzFURNITURE SERVICE - LABORPREMIUM DELIVERY TIME
lGRouP
24
42557.18
42597
93146
93'146
93147
93147
93147
93147
93147
42557.18
4259735111
9314501'123
931 46551 23
9314701323
9314701240
9314701243
9314701242
9314701120
Catalog Line
WorkServices
WorkServices
Wo¡kServices
WorkSeryices
WorkSeryices
WorkServices
WorkServices
WorkServices
301
302
303
304
305
306
307
308
309
Grouo GROUP 24 Total Groun Extended Price $
Run Time: 04115116 16:29:24 ADDENDUM NO. 3 .0412212016
QusD
lr"o* l^^'PRODUCT GUIDE.
OFFICESCAPES:CURRENT PRICE
DISCOUNT FROMLIST AND
l'ROUP 25.32Catalog L¡ne
1425s7.32 1425s?
310
Spec+ 134471Page 23 of 39
LineNo
LineType ltem Categorv Commoditv Desc Group lD UOM
City of GhicagoGatalog RFQ - Lines by Group
PU085C
Extended Price Cataloo # / lD. Date and Mfr CommentsEstimated
UsaoeDiscount orMarkup %
Price
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
tN/A)
$
$
$
$
$
$
$
$
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
ü
$
$
27500
170
150
365
4000
4000
4000
10
USD
Hour
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
Hour
GROUP 25
GROUP 25
GROUP 25
GROUP 25
GROUP 25
GROUP 25
GROUP 25
GROUP 25
OFFICESCAPES FURNITURE, STAFFLOUNGE TABLES 48" ROUNDPERFORMANCE TABLE WITH 1 1/4"FLAT PVC EDGE - LAMINATE TOP:4876.38 SHEER MESH BYWILSONART, PVC EDGE: GRAPHITE, BASE COLOR GRAPHITE -DISCOUNT OFF FROMOFFICESCAPES BASE PRICE LIST
FURNITURE RECONFIGURATIONSERVICES FEE - OFFICESCAPES
FURNITURE SERVICES-OFFICESCAPES - FURNITUREREPAIR FEE
FURNITURE SERVICE.OFFICESCAPES. LABOR
FURNITURE SERVICE -OFFICESCAPES . DAILY STORAGEOF FURNITURE
FURNITURE SERVICE -OFFICESCAPES - WEEKLYSTORAGE OF FURNITUR=
FURNITURE SERVICE -OFFICESCAPES. MONTHLYSTORAGE OF FURNITUR=
FURNITURE SERVICE - LABOR,PREMIUM DELIVERY TIM=
42597.86
93145
93146
93147
93147
93147
93147
93141
42591.66
9314501124
93146551 24
9314701324
9314701244
9314701247
9314701246
9314701120
Catalog Line
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
311
312
313
314
315
316
311
318
Groun GROUP 25 Total Grouo Extended Price $
(N/A)
(N/A)
$
$
$
$
$
(N/A)
(N/A)
(N/A)
(N/A)
IN/A)
$
$
$ 65000
$ 35000
$ 35000
50
150
USD
USD
USD
Hour
Hour
GROUP 26
GROUP 26
GROUP 26
GROUP 26
GROUP 26
OFS: OFS CASEGOODS - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
OFS: OFS SEATING - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE,
OFS: OFS TABLES - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
FURNITURE RECONFIGURATIONSERVICES FEE - OFS
FURNITURE SERVICES- 3FS -FURNITURE REPAIR FEE
Catalog Line
Servicæ450112s
1s3145
Catalog
cataros Line
l425ee
28
l4rses.ra
WorkServ ces
319
320
321
322
323
IrIryL
rr
Spec# 134471Page 24 of 39
Run Time: 04115116 16:29'.24 ADDENDUM NO. 3 - 04t22t2016
LineNo
LineTvoe ltem Category Commoditv Desc Group lD UOM
Gity of GhicagoCatalog RFQ - Lines by Group
PU085C
Extended Price Catalog # / lD. Date and Mfr CommentsEstimated
UsaqeDiscount orMarkup %
P¡ice
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
a
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
þ
350
1 000
1 000
1000
Hour
SquareFoot
SquareFoot
SquareFoot
FURNTTURE SERVTCE - cFS - LABOR
lcROUp
26
FURNITURE SERVICE - CFS. DAILYSTORAGE OF FURNITURE
lGRouP
26
FURNITURE SERVICE - CFS -WEEKLY STORAGE OF FURNITURE
lGRouP
26
FURNITURE SERVICE. CFS -MONTHLY STORAGE OF FURNITURE
lcRouP
26
93147
93147
93147
93147
9314701325
93 1 4701 250
9314701253
9314701252
WorkServices
WorkServices
WorkServices
WorkServices
324
325
326
327
Grouo GROUP 26 Total Group Extended Price (
(N/A)
(N/A)
lN/A)
IN/A)
IN/A)
(N/A)
s
$
$
$
$
$
$
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$ 25000
l^^'150
150
350
l-'1000
1 0u0
I'1 000
I'
USD
Hour
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
PETER PEPPER PRODUCTS:DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
lGRouP
z
FURNITURE RECONFIGI,IRATIONSERVICES FEE - PETER PEPPERPRODUCTS
lcRouP2?FURNITURE SERVICES. PETERPEPPER PRODUCTS - FURNITUREREPAIR FEE
lGRouP
2'
FURNITURE SERVICE - PETERPEPPER PRODUCTS - LABOR
lGRouP
27
FURNITURE SERVICE - PETERPEPPER PRODUCTS - DAILYSTORAGE OF FURNITUR:
lGRouP
27
FURNITURE SERVICE - PETERPEPPER PRODUCTS - WEEKLYSTORAGE OF FURNITUR=
lGRouPzFURNITURE SERVICE - PETERPEPPER PRODUCTS - MONTHLYSTORAGE OF FURNITUR=
lGRouP2?
42597.21
93145
93146
93147
93147
93147
9314t
42597.21
9314501 1 26
93146551 26
9314701334
9314701254
9314701257
9314701256
Catalog Line
WorkServicæ
WorkServicæ
w0rl(Services
WorkServices
WorkServices
WorkServices
328
329
330
33'1
aaa
334
Grouo GROUP 27 Total Grouo Extended Price $
(N/A)
(N/A)
$
$
$
(N/A)
(N/A)
(N/A)
$
$
$ 80000
150
150
USD
Hour
Hour
GROUP 28
GROUP 28
GROUP 28
Catalog Line142597.22 142597.22 ISITON|ï: DISCOUNTFRoM
I I ISHSBESTåI'ßEr'rANDWorkServices
1s314501127 1e3145
I FURNITURE RECONFIGURATIONlseRvlces FEE - sroNtrI
WorkServices
1e3146551271e3146 IFUFN|TUIE
SERVICES- SITONIT -REPAIR FEE
335
336
337
Spec# 134471Page 25 of 39
Run Time: 04115116 16.29:24 ADDENDUM NO. 3 - 04t22t2016
LineNo
LineTvoe ltem Categorv Commodity Desc Group lD UOM
Gity of GhicagoGatalog RFQ - Lines by Group
PUO85C
Extended Price Cataloq # I lD. Date and Mfr GommenisEstimated
UsaoeDiscount orMarkuo %
Price
$
l''o'$
l(N/A)
$
l'*o'$
l'*n
(N/A)
(N/A)
(N/A)
(N/A)
350
I'1000
I'1000
I'1 000
I'
Hour
SquareFoot
SquareFoot
SquareFoot
FURNITURE SERVICE . SITONIT.LABOR
lGRouP
28
FURNITURE SERVICE - SITONIT -DAILY STORAGE OF FURNITURE
lGRouP
28
FURNITURE SERVICE - SITONIT -WEEKLY STORAGE OF FURNITURE
lGRouP
28
FURNITURE SERVICE - SITONIT. IGROUPMONTHLY STORAGE OF FURNITUREI
28
93147
93147
93147
93147
9314701333
9314701258
9314701261
9314701 260
W0rl(Services
WorkServices
WorkServicæ
WorkServices
aao
339
340
u1
Group GROUP 28 Total Grouo Extended Price s
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
$
$
$
IN/A)
(N/A)
(N/A)
IN/A)
(N/A)
(NiA)
IN/A)
a
a
$
$
$
o
$ 20000
150
150
350
1 000
1 000
1 000
USD
Hour
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
GROUP 29
GROUP 29
GROUP 29
GROUP 29
GROUP 29
GROUP 29
GROUP 29
Catalog Line 142598.29 142598.29 ISTEELCASE: DISCOUNT FROM
I I l8H8SE[lBüßErsrANDWorkServices
l$145011281e3145
I FURNITURE RECONFTcURATTON
lsERVrcES FEE - STEELCASE
WorkServices
19314655128193146 IFURNTTURESERVTCES-STEELCASE
I I l- FURNTTURE REPATR FEE
WorkServices
1s31470132ô 1e3147 lfffiåt_r*
sERVrcE - STEELCASE
WorkServices
1931470126s 193147 IFURNTTURE SERVTCE - STEELCASE
I I l- DATLY SToRAGE oF FURN|TURE
WorkServices
19314701266 193147 IFURNTTURE SERVTCE - STEELCASE
I I l-WEEKLY sroRAGE oF FURN|TURE
Work 19314701265 19s147 IFURNTTURE SERVTCE - STEELCASE
I I liUS'i[ü'."'RAGE oFServicæ
u2
343
u4
345
346
347
Grouo GROUP 29 Total Grouo Extended Price (
I'
I'
(N/A)
(N/A)
(N/A)
$ 10000
$ 60000
$ 10000
USD
USD
USD
GROUP 30
GROUP 30
GROUP 30
Catalog Line 1425s8.30 142598.30 ITAYCO: CoNcoURSE PRICE BooK
I I lißlPîRts[L',ß?,trcuRRENTPRrcECatalog Line
1425e8
31
1425e8
31
| i[ifi.,'cataros Line
142æ8.3, ltt*., I
349
350
351
Spec# 134471Page 26 of 39
Run Time: 04115/16 16:29:24 ADDENDUM NO. 3 - 04t22t2016
Gity of GhicagoCatalog RFQ - Lines by Group
PU085C
LineNo
LineTvpe ltem Categoru Commoditv Desc Group lD UOMEstimated
UsaoePrice ffit ExrendedPrice Catalog # I lD. Date and Mfr Comments
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
$
$
$
$
e
$
$
$
IN/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
IN/A)
IN/A)
IN/A)
(N/A)
(N/A)
$
e
$
$
$
$
$ 10000
$ 10000
$ 10000
$ 10000
$ 30000
$ 10000
$ 10000
150
150
350
1000
1000
1000
USD
USD
USD
USD
USD
USD
USD
Hour
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
GROUP 30
GROUP 30
GROUP 30
GROUP 30
GROUP 30
GROUP 30
GROUP 30
GROUP 30
GROUP 30
GROUP 30
GROUP 30
GROUP 30
GROUP 30
IAYCO: METROPOLISCOLLABORATE PRICE BOOK-DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
TAYCO: METROPOLIS PRICE BOOK- DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
TAYCO: ONE TOUCH TABLE PRICEBOOK- DISCOUNT FROM CURRENTPRICE LIST AND PRODUCT GUIDE.
TAYCO: PANELINK PRICE BOOK -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
TAYCO: TAYCO SEATING PRICEBOOK. DISCOUNT FROM CURRENTPRICE LIST AND PRODUCT GUIDE.
TAYCO: UPPRICEBOOK-DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
TAYCO: VESPRICEBOOK-DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
FURNITURE RECONFIGURATIONSERVICES FEE - TAYCO
FURNITURE SERVICES- TAYCO -FURNITURE REPAIR FEE
FURNITURE SERVICE - TAYCO -LABOR
FURNITURE SERVICE. TAYCO -DAILY STORAGE OF FURNITURE
FURNITURE SERVICE. TAYCO -WEEKIY STORAGE OF FURNITURE
FURNITURE SERVICE . TAYCO -MONTHLY STOMGE OF FURNITURE
42596.33
4259E.:J4
42598.35
42598.36
42598.37
4259E.3E
42598.39
93145
93'146
93147
93147
93141
93147
cataros Line
ltt*."catalos Line
14r5e8.34
catalog Line
14r5e8.35
catalos L¡ne
14r5e8.3ô
catalos Line
14r5e8.3,catalos Line
14r5s8.38
catalos Line
14r5e8.3,
WorkServices
I
ss1 4501 1 2s
Work
1s31465512sServices
WorkServices
l$r470r32iWorft
1s314701
267Services
Work
1s314701270Services
Work
1s3147012æServices
352
353
354
355
356
357
358
359
360
361
362
363
364
Grouo GROUP 30 Total Group Extended Price (
(N/A)
I'(N/A)
l'
(N/A)
$
$ 10000
'150
USD
Hour
GROUP 3.I
GROUP 31
Catalog Line 142598.40 142598.40 ITEKNION STUDIO: DISCOUNT FROM
I I l3H3B5Ë+'.[',BELrsr
AND
WoftServices
1s314501
130 193145 IFURNTTURERECONFTGURATTON
I |..*vrcEs FEE - TEKN|oN sTUDto
365
366
Speú 134471Page 27 of 39
Run Time: 04115116 16'.29:.24 ADDENDUM NO. 3 - 04t22t2016
LineNo
LineTvpe ltem Categorv Commoditv Desc Group lD UOM
City of GhicagoCatalog RFQ - Lines by Group
PU085C
Extended Price Cataloq # / lD. Date and Mfr CommentsEstimated
UsaqeDiscount orMarkup %
Price
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
$
l^^,$
l^,0,$
l'*n$
l^^'$
l^^'
150
350
1000
1 000
1000
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
GROUP 31
GROUP 31
GROUP 31
GROUP 3.I
GROUP 31
WorkServices
1s314655130 1s3146
I FURNTTURE SERVTCES- TEKNTONISTUDIO. FURNITURE REPAIR FEE
IWorkSen¡ices
47013281s3147 ON
WorkSeryices
1s314701271 1|s3147 lÞT[iliÞ:Þ¡i'M*m''
1s314701274 ln.,'Se¡vicæ - WEEKLY STORAGE OF
4701273 193147 IFURNTTURESERVTCE-TEKN|ONI lsTUDto - MoNTHLY STORAGE OF
I IFURN|TURE
Services
367
368
369
370
371
Grouo GROUP 31 Total Grouo Extended Price $
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
USD
USD
USD
USD
USD
USD
USD
GROUP 32
GROUP 32
GROUP 32
GROUP 32
GROUP 32
GROUP 32
GROUP 32
TEKNION: DISCOUNTFROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
IEKNION: ABILITY APPLICATIONAND PRICE GUIDE. DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
IEKNION: AGENDA APPLICATIONAND PRICE GUIDE. DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE,
IEKNION: ALTOS APPLICATIONAND PRICE GUIDE - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
IEKNION: CANA APPLICATION ANDPRICE GUIDE. DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
TEKNION: COMPLEMENTSAPPLICATION AND PRICE GUIDE -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE,
TEKNION: DISTRICT APPLICATIONAND PRICE GUIDE. DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
42591.25
42598.46
42598.47
42598.48
42598.49
42598.50
4259E.51
catalos Line
1425r?.r5
catarog Line
lt*t.*cataros Line
lt*t.tcataros Line
lt*t.*cataros Line
lt*t.*cataros Line
lt"t.tcataros Line
Itu*.t,
372
373
374
375
376
377
378
Spec# 134471Page 28 of 39
Run Time: 04115116 16:29:24 ADDENDUM NO. 3 - 04t22t2016
Gity of GhicagoCatalog RFQ - Lines by Group
PU085C
LineNo
LineTvpe ltem Catedory Commoditv Desc Group lD UOMEstimated
UsaqePrice ffit Extendedp¡ice Cataloq # / lD. Date and Mfr Comments
$
$
$
$
$
$
$
$
ü
$
$
(N/A)
(N/A)
IN/A)
IN/A)
(N/A)
(N/A)
IN/A)
(N/A)
(N/A)
IN/A)
(N/A)
$ 10000
$ 10000
$ 25000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 3U000
USD
USD
USD
USD
USD
USD
USD
USD
USD
USD
USD
GROUP 32
GROUP 32
GROUP 32
GROUP 32
GROUP 32
GÍTOUP 32
GROUP 32
GROUP 32
GROUP 32
GROUP 32
GROUP 32
TEKNION: D0SSIER APP-lCAT|0NAND PRICE GUIDE - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
TEKNION: EXPANSIoNCASEGOODS APPLICATION ANDPRICE GUIDE - DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
TEKNION: EXPANSION DESKINGAPPLICATION AND PRICE GUIDE -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE,
TEKNION: EXPANSION WOODAPPLICATION AND PRICE GUIDE -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
TEKNION: FABRICS AND FINISHESPROGRAM - DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
TEKNION: FILING ANÐ STORAGEAPPLICATION AND PRICE GUIDE -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
TEKNION: GEMINI APPLICATIONAND PRICE GUIDE - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE,
TEKNION: GRAYSON APPLICATIONAND PRICE GUIDE - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE,
TEKNION: lE APPLICATION ANDPRICE GUIDE - DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
TEKNION: INTERPRETAPPLICATION AND PRICE GUIDE.DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
I IKNION: LEVERAGE APPLICATIONAND PRICE GUIDE - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
42598.52
42598.53
4259E.54
4259E.55
4259E.56
42596.5/
42598.58
4259E.59
4259E.60
4259E.61
42598.62
4259E.52
42598.53
42598.54
42598.55
42598.56
42b9E.57'
4259E.5E
42s98.59
42598.60
42598.61
42598.62
Ualalog L¡ne
Uatalog L¡ne
Catalog Line
Catalog Line
Catalog Line
Ca'ralog Line
Calalog Line
Catalog Line
Catalog Line
Catalog Line
Ca:alog Line
379
380
381
382
383
384
38s
386
387
388
389
Spec#Page
13447129 of 39
Run Time: 04115116 16:29:.24 ADDENDUM NO. 3 -04t22t2016
LineNo
Line Twe ltem Cateqorv Commodity Desc Group lD UOM
Gity of ChicagoGatalog RFQ - Lines by Group
PU085C
,a-r*t*tExrendedPrice Catalog # / lD. Date and Mfr CommentsEstimated
UsaoeP¡ice
$
$
$
$
c
$
a
$
$
$
ü
(N/A)
tN/A)
IN/A)
INiA)
IN/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$ 10000
$ 20000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
$ 10000
USD
USD
USD
USD
USD
USD
USD
USD
USD
USD
USD
GROUP 32
GROUP 32
GROUP 32
GROUP 32
GROUP 32
GROUP 32
GROUP 32
GROUP 32
GROUP 32
GROUP 32
GROUP 32
TEKNION: MARKETPLAC=APPLICATION AND PRICE GUIDE -DISCOUNT FROM CURRENT PRICELIST AND PRODUCl GUIDE.
I EKNION: MODULAR CABINETSAPPLICATION AND PRICE GUIDE -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
TEKNION: OPToS APPLICATIONAND PRICE GUIDE - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
ïEKNION: SEATING PRICE ANDUSER GUIDE - DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
ïEKNION: SEATINGCONSTRUCTION NOTES -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
ïEKNION: SIDEWISE APPLICATIONAND PRICE GUIDE. DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
TEKNION: TABLESANDCOLLABORATIVE SPACESAPPLICATION AND PRICE GUIDE -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
TEKNION: THESIS APPLICATIONAND PRICE GUIDE - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
TEKNION: T/O/S APPLICATION ANDPRICE GUIDE - DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
TEKNION: TRANSIT APPLICATIONAND PRICE GUIDE - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
TEKNION: WESTCOASTAPPLICATION AND PRICE GUIDE -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
42598.63
42598.64
42598.65
42598.66
42598.67
42598.68
42598.69
42598.70
42598.71
42558.72
42599.t3
4259E.63
42598.M
42598.65
42598.66
42598.67
42598.68
42598.69
42598.70
42596.71
42598.72
42599.73
ua:alog L'ne
Ca:alog Line
Ca?log Line
Caalog Line
Caalog Line
Caalog Line
Ca:alog L¡ne
Caalog Line
Caalog Line
Caalog Line
Caialog Line
390
391
392
393
394
395
396
397
398
399
400
Spec# 134471Page 30 of 39
Run Time: 04115116 16:29:24 ADDENDUM NO. 3 .0412212016
LineNo
LineType ltem Categorv Gommoditv Desc Group lD UOM
Gity of GhicagoGatalog RFQ - Lines by Group
PU085C
Efended P¡ice Catalog # / lD. Date and Mfr CommentsEstimated
UsageDiscount orMarkup %
Price
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
$
$
e
$
$
$
$
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
$
a
$ 1 0000
10000
$ 10000
$ 10000
$ 10000
50
150
350
1 000
1000
1 000
USD
USD
USD
USD
USD
Hour
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
GROUP 32
GROUP 32
GROUP 32
GROUP 32
GROUP 32
GROUP 32
GROUP 32
GROUP 32
GROUP 32
GROUP 32
GROUP 32
TEKNION: WOOD CASEGOODS:SOLITAR PRICE GUIDE - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
TEKNION: WOOD CASEGOODS:ÏABLES AND CONFERENCINGPRICE GUIDE - DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
rEKNloN: WR/S APPLICATION ANDPRICE GUIDE. DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
TEKNION: XPRESS CDN/INTL -DISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE.
rEKNloN: XPRESS US - DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
FURNITURE RECONFIGURATIONSERVICES FEE - TEKNION
FURNITURE SERVICES. TEKNION .FURNITURE REPAIR FEE
FURNITURE SERVICE - TEKNION .LABOR
FURNITURE SERVICE - lEKNION -DAILY STORAGE OF FURNITURE
FURNITURE SERVICE - TEKNION -WEEKLY STORAGE OF FURNITURE
FURNITURE SERVICE - TEKNION -IVONTHLY STORAGE OF FURNITURE
42599.74
42598.75
42599.76
42599.n
42599.7E
93145
93146
93147
s3147
93147
93147
42599.14
42598. /5
42599.76
42599.77
42599.78
9314501 131
931 46551 3 1
9314701329
9314701275
9314701278
93147U2n
Catalog Line
Catalog Line
Catalog Line
Catalog Line
Catalog Line
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
401
402
403
404
405
406
407
408
409
410
411
Group GROUP 32 Total Grouo Extended Price $
(N/A)
(N/A)
I'(N/A)
(N/A)
I'
(N/A)
$
$
$ 450000
1500
1500
USD
Hour
Hour
GROUP 33
GROUP 33
GROUP 33
THE HON COMPANY: DISCOUNTFROM CURRENT PRICE LIST ANDPRODUCT GUIDE.
FURNITURE RECONFIGURATIONSERVICES FEE - THE HONCOMPANY
FURNITURE SERVICES- THE HONCOMPANY - FURNITURE REPAIRFEE
42597.10
93145
93146
catalos Line
1425e?.10
WorkServices
I
e314s01 1 32
Woft
1e3r46551
32Services
412
413
414
Spec+ 134471Page 31 of 39
Run Time: 04115116 16:29:24 ADDENDUM NO. 3 .0412212016
Gity of Ghicago
Catalog RFQ - Lines by Group
PU085C
LineNo
LineTvpe ltem Cateqorv Commodity Desc Group lD UOMEstimated
UsagePrice Extended Price Catalog # / lD. Date and Mfr Comments
Group GROUP 33 Total Grouo Extended Price t
(N/A)
(N/A)
(N/A)
(N/A)
I'(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
3500
10000
10000
1 0000
Hour
SquareFoot
SquareFoot
SquareFoot
GROUP 33
GROUP 33
GROUP 33
GROUP 33
Work 19314701280 193147 IFURNITURE SERVTCE -THE HONservices
I I 133AliîH;'^TLYSToRÄcEoF19314701283 193147 IFURNTTURE SERVTCE - THE HON
I I lPSAliîuk.'EKLY sroRAGE oF
WorkServices
w0fl(Services
1ss14i01330 1s3147 lEtsHIHi: åHl.E
- rHE HoN
193147 IFURNTTURE SERVTCE -THE HON
I IcoMPANY- MONTHLY STORAGE OF
I IFURN|TURE
282Services
415
416
417
418
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
I'(N/A)
I'(N/A)
I'(N/A)
I'(N/A)
I'(N/A)
I'(N/A)
(N/A)
$
$
$
$
$
$
$ 25000
150
'150
350
1000
'1000
1000
USD
Hour
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
UNITED CHAIR: DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE.
lGRouP
34
FURNITURE RECONFIGURATIONSERVICES FEE. UNITED CHAIR
lGRouP
34
FURNITURE SERVICES- UNITEDCHAIR - FURNITURE REPAIR FEE
lGRouP
34
FURNITURE SERVICE - UNITEDCHAIR - I.ABOR GROUP HH
lGRouP
34
FURNITURE SERVICE - UNITEDCHAIR - DAILY STORAGE OFFURNITURE
lGRouP
34
FURNITURE SERVICE . UNITEDCHAIR - WEEKLY STOMGE OFFURNITURE
lGRouP
34
FURNITURE SERVICE - UNITEDCHAIR - MONTHLY STORAGE OFFURNITURE
lGRouP
34
42597.03
93145
93146
93147
93147
93147
93147
catalos Line
l4r5er.03Work
1e314501
I 33Services
WorkServices
1s314655r
33
Work
1s314701331
Services
Work
1s314701284
Services
Work
1s314701287
Services
Work
I
e314701 286Services
4't9
420
421
422
423
424
425
Grouo GROUP 34 Total Group Extended Price G
(N/A)
(N/A)
ù
$
$
(N/A)
(N/A)
(N/A)
$
$
$ 3500
150
150
USD
Hour
Hour
BOSS CHAIRS: DISCOUNT FROM
lGRouP
35CURRENT PRICE LIST A¡(DPRODUCT GUIDE,
FURNITURE RECONFIGUìATIONSERVICES FEE - BOSS CHAIRS
lGRouP
35
FURNITURE SERVICES- BOSS
lGRouP
35CHAIRS - FURNITURE REPAIR FEE
42599.19
93145
93146
42599.79
9314501 1 34
931 4655 1 34
Catalog Line
WorkServices
WorkServicæ
426
427
428
Spec# 134471Page 32 of 39
Run Time: 04115116 16'.29'.24 ADDENDUM NO. 3 -04t22t2016
City of GhicagoCatalog RFQ - Lines by Group
PU085C
LineNo
LineTyoe ltem Cateoorv Commodity Desc Group lD UOM
Grouo GROUP 35
EstimatedUsagc
Price Extended Pdce Catalog # / lD. Date and Mfr Comments
Total Group Extended Price $
l'*o'
a
l(N/A)
$
l'*o'
$
l'*n
$
(N/A)
(N/A)
(N/A)
(N/A)
I'350
1 000
I'1000
I'1000
Hour
SquareFoot
SquareFoot
SquareFoot
e3147013321s3147
llffiåt_r-r
sERVrcE - Boss cHAtR
lcRoup
35
9314701288 I93147 IFURNITURE SERVICE - BOSS CHAIR IGROUP
I l-*tLYSToMGEoFFURN|TURE I
35
9314701291 193147 IFURNITURE SERVICE. BOSS CHAIR IGROUP
I l-.EEKLY SToRAGE oF FURN|TURE
I
35
9314701290 193147 IFURNITURE SERVICE. BOSS CHAIR IGROUP
| þU8il'lihtsroRAcEoF I
35
WorkServices
Worl(Services
WorkServices
WorkServices
429
430
431
432
(N/A)
(N/A)
IN/A)
IN/A)
IN/A)
IN/A)
$
$
$
$
$
$
$
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$ 20000
l^^10
I'10
I'500
I'500
I'500
I'10
I'
USD
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
Hour
SIXINCH FURNITURE, VARIOUSFURNITURE AND ACCESSORIESSIXINCH - DISCOUNT OFF FROMSIXINCH BASE PRICE LIST ln*0""FURNITURE RECONFIGURATIONSERVICES FEE
lGRouP
36
FURNITURE SERVICE. SIXINCH -LABOR
lGRoUP
36
FURNITURE SERVICE - DAILYSTORAGE OF FURNITURE
lGRouP
36
FURNITURE SERVICE - WEEKLY
lGRouP
36STORAGE OF FURNITURE
FURNITURE SERVICE - MONTHLY
lGRouP
36STORAGE OF FURNITURE
FURNITURE SERVICE - I.ABOR,PREMIUM DELIVERY TIME
lGRouP
36
42598.16
93145
93147
93147
93147
93'.147
93147
42598.1 6
9314501 1 00
9314701335
9314701107
9314701109
931 4701 1 08
9314701 1 20
Catalog Line
WorkServices
WorkServicæ
WorkServices
WorkServices
WorkServicæ
WorkServices
433
434
435
436
437
438
439
Grouo GROUP 36 Total Grouo Extended Price s
$
$
$
ü 15000
l'*o'$ 15000
l^'o'$ 15000
l'*n
USD
USD
USD
GROUP 39
GROUP 39
GROUP 39
IZZY FURNITURE, IZZY SEATING.DISCOUNT OFF FROM IZY BASEPRICE LIST
IZZY FURNITURE, IZZY TABLES -DISCOUNT OFF FROM IZZY BASEPRICE LIST
IZZY FURNITURE, IZZY DESK ANDSTORAGE. DISCOUNT OFF FROMIZZY BASE PRICE LIST
catalos Line
l4r5s?.8? 14'z5'g?
8?
cataros Line
1425er.88 1425e?.88
catalos Line
l4r5r?.æ 14'z5'g?
8'g
455
456
457
Speú 134471Page 33 of 39
Run Time: 04115116 16'.29:24 ADDENDUM NO. 3 -04t22t2016
LineNo
Line Tyoe ltem Cateqorv Commoditv Desc Group lD UOM
Gity of ChicagoGatalog RFQ - Lines by Group
PlJ085C
Extended Price Catalog # I lD, Date and Mfr CommentsEstimated
UsageDiscount orMarkuo %
Price
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
I'(N/A)
I'(N/A)
I'(N/A)
I'(N/A)
I'(N/A)
I'
(N/A)
(N/A)
(N/A)
$
o
$
$
$
$
$ 1s000
$ 15000
$ 15000
20
10
3000
3000
3000
10
USD
USD
USD
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
Hour
GROUP 39
GROUP 39
GROUP 39
GROUP 39
GROUP 39
GROUP 39
GROUP 39
GROUP 39
GROUP 39
IZZY FURNITURE, IZZY MOBILÉIVARKER AND TECHNOLOGYBOARDS. DISCOUNT OF= FROMIZZY BASE PRICE LIST
IZZY FURNITURE, IZZY FURNITURESYSTEMS - DISCOUNT OFF FROMIZZY BASE PRICE LIST
IZZY FURNITURE, IZZYARCHITECTURAL ELEMENTS .DISCOUNT OFF FROM IZZY BASEPRICE LIST
FURNITURE RECONFIGURATIONSERVICES FEE
FURNITURE SERVICE - IZY. LqBOR
FURNITURE SERVICE - DAILYSTORAGE OF FURNITURE
FURNITURE SERVICE. WEEKLYSTORAGE OF FURNITURE
FURNITURE SERVICE. MONTHLYSTORAGE OF FURNITURE
FURNITURE SERVICE. LABORPREMIUM DELIVERY TIME
42597.90
42597.91
42597.92
93145
93147
s3147
93147
93147
93147
catalos Line
lt*tnocatalog Line
1425e?.s1
cataros L¡ne
lt*t."WorkServices
1s314501100
Work
1e314i01
338Services
WorkServices
1s31470110i
WorkServices
1s3147011æ
WorkServices
1s314701
I 08
WorkServices
1s314701
1 20
458
459
460
461
462
463
464
465
466
Grouo GROUP 39 Total Grouo Extended Price s
(N/A)
(N/A)
(N/A)
(N/A)
Q
$
$
$
tN/A)
(N/A)
(N/A)
(N/A)
(NiA)
$
$
$
$ 10000
20
10
3000
3000
USD
Hour
Hour
SquareFoot
SquareFoot
GROUP 41
GROUP 41
GROUP 41
GROUP 41
GROUP 41
DISPLAYzGO FURNITURE,DISPLAY2GO TV STAND WITH .19"
SHELF ANDACCESSORIES-DISCOUNT OFF FROM DISPLAY2GOBASE PRICE LIST
I-URNITURE RECONFIGURATIONSERVICES FEE
FURNIIURE SERVICE. DISPLAY2GO- LABOR
FURNITURE SERVICE - DAILYSTORAGE OF FURNITURE
FURNITURE SERVICE - IA'EEKLYSTORAGE OF FURNITURE
42597.95
93'145
93147
93147
s3147
42597.95
9314s01 1 00
93'14701340
9314701107
9314701 109
Catalog Line
WorkServicæ
WorkServicæ
WorkServices
WorkServices
474
475
476
477
478
Speú 134471Page 34 of 39
Run Time: 04115116 16:29:24 ADDENDUM NO. 3 -O4t22t2016
LineNo Ltne tvDe Item Categorv Commoditv Desc Group lD UOM
City of ChicagoGatalog RFQ - Lines by Group
PU085C
Extended Price Catalog # / lD. Date and Mfr CommentsEstimated
UsageDiscount orMarkuo %
Price
(N/A)
(N/A)
$
l(NiA) I'$
l^'o' I'
3000
'10
SquareFoot
Hour
GROUP 41
GROUP 41
ls31
4701 108 193147 IFURNTTURESERVTCE-MONTHLY
I l.toRAGE oF FURNTTUREServices
WorkServices
1e314?01
120 193147 IFURNTTURESERVTCE-LABOR,
I lr*rMtuM DEL|VERY ÏME
479
480
Grouo GROUP 41 Total Grouo Extended Price $
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
I'(N/A)
I'(N/A)
I'(N/A)
I'
I'
(N/A)
$
$
$
$
$
$
$ 80000
20
10
3000
3000
3000
10
USD
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
Hour
GROUP 42
GROUP 42
GROUP 42
GROUP 42
GROUP 42
GROUP 42
GROUP 42
ANDREU WORLD FURNITURE,ANDREU WORLD SEATING -DISCOUNT OFF FROM ANDREUWORLD BASE PRICE LIST
FURNITURE RECONFIGURATIONSERVICES FEE
FURNITURE SERVICE - ANDREUWORLD. LABOR
FURNITURE SERVICE . DAILYSTORAGE OF FURNITURE
FURNITURE SERVICE - WEEKLYSTORAGE OF FURNITURE
FURNITURE SERVICE - MONTHLYSTORAGE OF FURNITURE
I-URNITURE SERVICE - L,ÀBOR,PREMIUM DELIVERY TIME
42597.96
93145
93147
93147
93147
93147
93147
Catalog Line
l'*'*WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
120WorkServices
481
482
483
484
485
466
487
L
LLG¡ouo GROUP 42 Total Grouo Extended Price $
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
(N/A)
(N/A)
(N/A)
(N/A)
(NiA)
$
e
$
$
$ 15000
20
10
3000
3000
USD
Hour
Hour
SquareFoot
SquareFoot
GROUP 43
GROUP 43
GROUP 43
GROUP 43
GROUP 43
BEST RITE FURNITURE, BEST RITEPORTABLE MARKER BOARD DURARITE ANDACCESSORIES-DISCOUNT OFF FROM BEST RITEBASE PRICE LIST
FURNITURE RECONFIGURATIONSERVICES FEE
FURNITURE SERVICE - B=ST RITE.LABOR
FURNITURE SERVICE - DAILYSTORAGE OF FURNITURE
FURNITURE SERVICE - WEEKLYSTORAGE OF FURNITURE
42597.97
33145
93147
93147
93147
42597.97
9314501 1 00
9314701342
9314701107
9314701 1 09
Catalog Line
WorkServices
WorkServices
WorkServices
WorkServices
488
489
490
491
492
Spec# 134471Page 35 of 39
Run Time: 041'15116 16',29:24 ADDENDUM NO. 3 - 04t22t2016
LineNo
LineType ftem Cateoorv Gommodity Desc Group lD UOM
City of ChicagoCatalog RFQ - Lines by Group
PU085C
ffit Exrendedp¡ice Gatalog # / lD. Date and Mfr CommentsEstimated
UsaoePrice
(N/A)
(N/A)
(N/A)
I'(N/Ð
I'
$
$
3000
10
SquareFoot
lJour
GROUP 43
GROUP 43
FURNITURE SERVICE - MONTHLYSTORAGE OF FURNITURE
FURNITURE SERVICE - I-ABOR,PREMIUM DELIVERY TIME
93147
93147
Work
1s314701108Seryices
Work
1s314701120
Services
493
494
Grouo GROUP 43 Total Group Extended Price s
(N/A)
tN/A)
(N/A)
(N/A)
(N/A)
tN/A)
ö
$
$
$
$
$
ü
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
Q
$
$
$
$
$ 20000
20
10
3000
3000
3000
10
USD
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
Hour
HBF FURNITURE, HBF SEATINGLOUNGE SEAT C COLLECTION ANDACCESSORIES - DISCOUNT OFFFROM HBF BASE PRICE LIST ln*o"*FURNITURE RECONFIGUìATIONSERVICES FEE
lGRouP
44
FURNITURE SERVICE. H3FFURNITURE - LABOR
lGRouP
44
FURNITURE SERVICE . DAILYSTORAGE OF FURNITURE
lGRouP
44
FURNITURE SERVICE . WEEKLY
lGRouP
44STORAGE OF FURNITURE
FURNITURE SERVICE - I!{ONTHLY
lGRouP
44STORAGE OF FURNITURE
FURNITURE SERVICE - LABOR,PREMIUM DELIVERY TIME
lGRouP
44
42597.98
93145
93147
93147
93147
93147
93147
42597.98
9314501 1 00
9314701343
9314701107
9314701 109
9314701 1 08
9314701120
Catalog Line
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
495
496
497
498
499
500
501
Grouo GROUP 44 Total Grouo Extended Price $
(N/A)
(N/A)
(N/A)
(N/A)
o
$
c
$
$
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
$
$
$
$ 15000
20
l0
3000
3000
USD
Hour
Hour
SquareFoot
SquareFoot
GROUP 45
GROUP 45
GROUP 45
GROUP 45
GROUP 45
TMC FURNITURE, TMC SEATINGPLOVER JUVENILE CHAIR WITHOUTARMS ANDACCESSORIES-DISCOUNT OFF FROM TI\IC BASEPRICE LIST
FURNITURE RECONFIGURATIONSERVICES FEE
FURNITURE SERVICE - TMC - LABOR
FURNITURE SERVICE - DAILYSTORAGE OF FURNITURE
FURNITURE SERVICE - WEEKLYSTORAGE OF FURNITURE
4259E.1 3
93145
93147
93147
93147
42598.13
9314501 1 00
93147013M
9314701107
93t4701 109
Calalog Line
WorkServicæ
WorkServices
WorkServices
WorkServices
502
503
504
505
50ô
Speú 134471Page 36 of 39
Run Time: 0411511'6 16:29:24 ADDENDUM NO. 3 -04t22t2016
City of ChicagoCatalog RFQ - Lines by Group
PU085C
LheNo
LineTvoe ltem Category Commoditv Desc Group lD UOM
Group GROUP 45
Price Discount orMarkuo %
Extended Price Cataloo # / lD. Date and Mfr Comments
Total Grouo Extended Price s
(N/A)
(N/A)
$
l(N/A) I'
l-l(N/A)
$
3000
10
SquareFoot
Hour
GROUP 45
GROUP 45
WcrkSeryices
ls31
4701 193147 IFURNTTURE SERVTCE - MONTHLY
I lsroRAGE oF FURN|TURE
108
WcrkSeruices
1s314701
193147 IFURNTTURE SERVTCE - LABOR,
I IPREMTUM
DEL|VERY ïME120
5,17
5D8
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
I'
I'(N/A)
I'(N/A)
I'(N/A)
I'(N/A)
I'(N/A)
I'(N/A)
(N/A)
(N/A)
$
$
U
$
$
$
$ 20000
$ 10000
20
10
3000
3000
3000
10
USD
USD
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
Hour
GROUP 46
GROUP 46
GROUP 46
GROUP 46
GROUP 46
GROUP 46
GROUP 46
GROUP 46
VITRA FURNITURE, VITM SEATINGAND ACCESSORIES . DISCOUNTOFF FROM VITRA BASE FRICE LIST
VITRA FURNITURE, VITRÂWORKSTATIONS ANDACCESSORIES - DISCOUNT OFFFROM VITRA BASE PRICE LIST
FURNITURE RECONFIGURATIONSERVICES FEE
FURNITURE SERVICE. VIIRA -LABOR
FURNITURE SERVICE . DAILYSTORAGE OF FURNITURE
FURNITURE SERVICE. WEEKLYSTORAGE OF FURNITURE
FURNITURE SERVICE. MONTHLYSTORAGE OF FURNITURE
FURNITURE SERVICE. LABOR.PREMIUM DELIVERY TIME
4259E.14
42598.15
93145
93147
93147
93147
s3147
93147
14Caalog Line
15Cazlog Line
100Seruices
345Seruices
107
ls31
4i01WcrkSeruices
4701 1 09
l"'WcrkSeryices
1ss14701108
WcrkSeruices
120
ls31
470rWqkSeruices
509
510
511
512
513
514
515
516
Groun GROUP 46 Total Grouo Extended Price q
(N/A)
(N/A)
(N/A)
a
$
$
$
(N/A)
(N/A)
(N/A)
(N/A)
$
$
a
$ 300000
2UU
200
400
USD
Hour
Hour
Hour
GROUP 47
GROUP 47
GROUP 47
GROUP 47
GLOBAL FURNITURE GROUP:DISCOUNT,FROM CURRENT PRICELIST AND PRODUCT GUIDE
FURNITURE INSTALLATION ANDRECONFIGURATION SERVICES -FURNITURE RECONFIGURATIONSERVICES FEE - GLOBALFURNITURE GROUP
FURNITURE SERVICES. GLOBALFURBITURE GROUP -FURNITUREREPAIR FEE
FURNITURE SERVICE - GLOBALFURNITURE GROUP - LABOR
42598.60
93145
93t46
93147
42598.80
9314501 070
9314655140
s314701111
Caalog Line
WcrkSeruices
WÚKSeryices
WorkServices
517
518
5r9
520
Spec# 134471Page 37 of 39
Run Time: 04115116 16.,29:24 ADDENDUM NO. 3 .0412212016
Gity of ChicagoGatalog RFQ - Lines by Group
PU085C
LineNo
LineTyoe ltem Category Commodity Desc Group lD UOM
Groun GROUP 47
P¡iceDiscount o¡Markup %
Extended Price Cataloo #/ lD. Date and Mfr Comments
Total Grouo Extended Price $
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
I'
(N/A)
I'
(N/A)
I'
(N/A)
$
$
$
$
3000
3000
3000
10
SquareFoot
SquareFoot
SquareFoot
Hour
FURNITURE SERVICE. GLOBALFURNITURE GROUP -DAILYSTORAGE OF FURNITURE
lGRouP
47
FURNITURE SERVICE - GLOBALFURNITURE GROUP -MONTHLYSTORAGE OF FURNITURE
lGRouP
47
FURNITURE SERVICE - GLOBALFURNITURE GROUP -WEEKLYSTORAGE OF FURNITURE
lGRouP
47
FURNITURE SERVICE - GLOBALFURNITURE GROUP. LABOR,PREMIUM DELIVERY TIME
lcRouP
47
93147
93147
93147
93147
9314701114
9314701112
9314701 1 15
9314701 1 13
WorkServices
WorkServices
WorkServices
WorkServices
521
522
523
524
IN/A)
(N/A)
(N/A)
(N/A)
(N/A)
(NiA)
(N/A)
$
$
$
$
$
$
$
$
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
$
e
$
$
$
$
$
$ 750000
5000
1 000
3000
3000
3000
3000
'100
USD
Hour
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
Hour
FOUNDATIONS, INC. INFANTPRODUCTS DISCOUNT FROMCURRENT PRICE LIST ANDPRODUCT GUIDE lu*0"*FURNITURE INSTALLATION ANDRECONFIGURATION SERVICES -FOUNDATIONS, INC INFANTPRODUCTS lu*0"*FURNITURE SERVICES-FOUNDATIONS INC. INFANTPRODUCTS -FURNITURE REPAIRFEE In*0"*FURNITURE SERVICES-FOUNDATIONS INC. INFANTPRODUCTS - LABOR
lGRouP
48
FURNITURE SERVICES.FOUNDATIONS INC. INFANTPRODUCTS - DAILY STORAGE OFFURNITURE lu*0"*FURNITURE SERVICES-FOUNDATIONS INC. INFANTPRODUCTS - WEEKLY STORAGE OFFURNITURE In*ou'*FURNITURE SERVICES-FOUNDATIONS INC. INFANTPRODUCTS. MONTHLY STORAGEOF FURNITURE ln*0"*FURNITITJRE SERVICES-FOUNDATIONS INC. INFANTPRODUCTS . PREMIUM DELIVERYTIME lu*o"*
42598.81
93145
93146
93147
93147
93147
93147
93147
42598.81
9314501 138
931 46551 37
93'14701350
931470135'l
93 1470 1 352
9314701353
9314701354
Catalog Line
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
WorkServices
525
526
527
528
529
530
531
532
Spec# 134471Page 38 of 39
Run Time: 041'15116 16:29:24 ADDENDUM NO. 3 - 04t22t2016
LineNo
Line Type ltem Category Commoditv Desc
Gity of GhicagoCatalog RFQ - Lines by Group
PU085C
Extended Price Catalog # / lD. Date and Mfr Commentsu0M P¡ice
Groun
Group lD
GROUP 48
EstimatedUsaqe
Discount orMarkuo %
Total Grouo Extended Price ê
(N/A)
(N/A)
(N/A)
(N/A)
IN/A)
(N/A)
(N/A)
$
$
$
$
$
$
$
$
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
(N/A)
ü
Q
$
$
$
$
Þ
$ 3000000
15000
1000
3000
3000
3000
3000
100
USD
Hour
Hour
Hour
SquareFoot
SquareFoot
SquareFoot
Hour
STEFFI WOOD PRODUCTSDISCOUNT FROM CURRENT PRICELIST AND PRODUCT GUIDE
lGRouP
4e
FURNITURE INSTALLATION ANDRECONFIGURATION SERVICES.STEFFY WOOD PRODUCTS
lGRouP
4s
FURNITURE SERVICES-STEFFYWOOD PRODUCTS .FURNITUREREPAIR FEE
lGRouP
4s
FURNITURE SERVICES- STEFFYWOOD PRODUCTS - LABOR
lGRouP
4s
FURNITURE SERVICES- STEFFYWOOD PRODUCTS - DAILYSTORAGE OF FURNITURE
lGRouP
4s
FURNITURE SERVICES. STEFFYWOOD PRODUCTS. WEEKLYSTORAGE OF FURNITURE
lGRouP
4s
FURNITURE SERVICES- STEFFIWOOD PRODUCTS - MONTHLYSTORAGE OF FURNITURE
lGRouP
4s
FURNITURE SERVICES- STEFFYWOOD PRODUCTS - DPREMIUMDELIVERY TIME
lGRouP
4e
42599.82
93145
93146
93147
93147
93147
93147
93147
42599.82
931450'1 139
931 46551 38
9314701355
9314701 356
9314701357
9314701 358
9314701359
Catalog L¡ne
WorkServices
WorkServices
WorkServices
WorkServices
WorkServicæ
WorkServices
WorkServicæ
533
534
535
536
537
538
539
540
Grouo GROUP 49 Total Grouo Extended Price
Total Price
C
$
Speú 134471Page 39 of 39
Run Time: 04115/16 16:29:24 ADDENDUM NO. 3 - 04t22t2016
EXHIBIT 2, APPENDIX
PROPOSAL PAGE SUMMARY SHEET
GROUP 0I TOTALS
GROUP 02 TOTALS
GROUP 03 TOTAL S
GROUP 04 TOTAL s
GROUP 0s TOTAL s
GROUP 06 TOTAL
GROUP 07 TOTAL
GROUP 09 TOTAL s
GROUP 11 TOTAL s
GROUP L2 TOTAL s
GROUP L3 TOTAL s
GROUP 14 TOTAL S
GROUP 16 TOTAL S
GROUP L7 TOTAL s
GROUP 18 TOTAL S
GROUP L9 TOTAL s
GROUP 20 TOTAL s
GROUP 21 TOTAL
GROUP 23 TOTAL
Group 24ToÌ.al
GROUP 2s TOTAL s
GROUP 26 TOTAL s
[Vorious Fumiture, Accessor¡es ond Reloted Furniture Reconligurøtion, RepøÍr dnd Storoge Servìces],
ICity Of Chicaqo Deportment Of Fleet & Focility Monoqement], Specificotion Number 734477Com mod iti es F orm Controct 09. 1 2. 20 75
PROPOSAL PAGE SUMMARY SHEET
GROUP 27 TOTAL s
GROUP 28 TOTAL S
GROUP 29 TOTAL S
GROUP 30 TOTAL S
GROUP 3L TOTAL s
GROUP 32 TOTAL s
GROUP 33 TOTAL s
GROUP 34 TOTAL s
GROUP 35 TOTAL S
GROUP 36 TOTAL s
GROUP 39 TOTAL S
GROUP 41 TOTAL s
GROUP 42 TOTAL S
GROUP 43 TOTAL S
GROUP 44 TOTAL S
GROUP 45 TOTAL S
GROUP 46 TOTAL s
GROUP 47 TOTAL S
GROUP 48 TOTAL S
GROUP 49 TOTALS
Proposol Summary Sheet - Addendum No. 3 - April 22, 2016
TOTAL GROUPS
106