KazStroyService Infrastructure India Pvt. Ltd. Madras Cements Ltd - Vizag Cement Grinding Project Sub Contractor Labour Rate RATE ANALYSIS FOR Fixing AC Corrugated Sheet Dismantling of d Details of Cost for 1SqM Materials Cost Sl.No Description Unit Quantity Rate Amount Quantity Rate Amount Area Shed=20.00X1.0=20Sqm Details of Cost 20.00Sqm Nos 36.00 15.00 540.00 36.00 15.00 540.00 Nos 36.00 4.00 144.00 36.00 4.00 144.00 Nos 72.00 1.50 108.00 72.00 1.50 108.00 ls 1.00 30.00 30.00 1.00 30.00 30.00 Labour 1.00 Day 0.40 444.00 177.60 - 2.00 Day 0.45 361.00 162.45 - 3.00 Day 3.10 333.00 1,032.30 - 4.00 Extra labour element required for lifting of Day 4.80 278.00 1,334.40 - Cast per 20.00SqM 3,528.75 822.00 Add 15% for Contractor's Profits and Overheads Cost 529.31 123.30 Cost of 20.00SqM 4,058.06 945.30 Cost of 1.0SqM 202.90 47.25 A Actual Cost of Labour G.I. J or L hooks with nuts and bolts 8 mm dia G.I plain washer thick Bitumen washers Carriage of hooks, nuts, washers and curves Mistry Carpenter 2nd class Beldar

Upload: ravikumar

Post on 02-Dec-2015

2 views

Category:

Documents


1 download

DESCRIPTION

Reabar chemical anchor rate analysis

TRANSCRIPT

Page 1: Chemical Rebar

For Petron For MCL

KazStroyService Infrastructure India Pvt. Ltd.Madras Cements Ltd - Vizag Cement Grinding Project

Sub Contractor Labour Rate

RATE ANALYSIS FOR Fixing AC Corrugated Sheet Dismantling of damaged sheeting

Details of Cost for 1SqM Materials Cost Labour Cost

Sl.No Description Unit Quantity Rate Amount Quantity Rate Amount Quantity Rate Amount

Area Shed=20.00X1.0=20Sqm

Details of Cost 20.00Sqm

Nos 36.00 15.00 540.00 36.00 15.00 540.00

Nos 36.00 4.00 144.00 36.00 4.00 144.00

Nos 72.00 1.50 108.00 72.00 1.50 108.00

ls 1.00 30.00 30.00 1.00 30.00 30.00

Labour

1.00 Day 0.40 444.00 177.60 - 0.40 444.00 177.60

2.00 Day 0.45 361.00 162.45 - 0.45 361.00 162.45

3.00 Day 3.10 333.00 1,032.30 - 3.10 333.00 1,032.30

4.00 Extra labour element required for lifting of Materials Day 4.80 278.00 1,334.40 - 4.80 278.00 1,334.40

Cast per 20.00SqM 3,528.75 822.00 2,706.75

Add 15% for Contractor's Profits and Overheads Cost 529.31 123.30 406.01

Cost of 20.00SqM 4,058.06 945.30 3,112.76

Cost of 1.0SqM 202.90 47.25 155.65

A Actual Cost of Labour 156.00

G.I. J or L hooks with nuts and bolts 8 mm dia

G.I plain washer thick

Bitumen washers

Carriage of hooks, nuts, washers and curves

Mistry

Carpenter 2nd class

Beldar

Page 2: Chemical Rebar

For Petron For MCL

KazStroyService Infrastructure India Pvt. Ltd.Madras Cements Ltd - Vizag Cement Grinding Project

Sub Contractor Labour Rate

RATE ANALYSIS FOR Fixing AC Corrugated sheet (Ridges& Flashes) Dismantling of damaged sheeting

Details of Cost for 1Rmt Materials Cost Labour Cost

Sl.No Description Unit Quantity Rate Amount Quantity Rate Amount Quantity Rate Amount

Shed =20.00=20Rmt

Details of Cost 20.00Rmt

Nos 30.00 30.00 900.00 30.00 30.00 900.00

Nos 30.00 4.00 120.00 30.00 4.00 120.00

Nos 60.00 1.50 90.00 60.00 1.50 90.00

ls 1.00 25.00 25.00 1.00 25.00 25.00

Labour

1.00 Day 0.40 444.00 177.60 - 0.40 444.00 177.60

2.00 Day 0.45 361.00 162.45 - 0.45 361.00 162.45

3.00 Day 4.50 333.00 1,498.50 - 4.50 333.00 1,498.50

4.00 Extra labour element required for lifting of Materials Day 7.20 278.00 2,001.60 - 7.20 278.00 2,001.60

Cast per 20.00Rmt 4,975.15 1,135.00 3,840.15

Add 15% for Contractor's Profits and Overheads Cost 746.27 170.25 576.02

Cost of 20.00Rmt 5,721.42 1,305.25 4,416.17

Cost of 1.0Rmt 286.07 65.25 220.80

A Actual Cost of Labour 221.00

G.I. J or L hooks with nuts and bolts 8 mm dia

G.I plain washer thick

Bitumen washers

Carriage of hooks, nuts, washers and curves

Mistry

Carpenter 2nd class

Beldar

Page 3: Chemical Rebar

For Petron For MCL

KazStroyService Infrastructure India Pvt. Ltd.Madras Cements Ltd - Vizag Cement Grinding Project

Sub Contractor Labour Rate

RATE ANALYSIS FOR Fixing galvanised /CGI sheet roofing Dismantling of damaged sheeting

Details of Cost for 1SqM Materials Cost Labour Cost

Sl.No Description Unit Quantity Rate Amount Quantity Rate Amount Quantity Rate Amount

Area Shed=20.00X1.0=20Sqm

Details of Cost 20.00Sqm

Nos 36.00 30.00 1,080.00 36.00 30.00 1,080.00

Nos 36.00 4.00 144.00 36.00 4.00 144.00

Nos 72.00 1.50 108.00 72.00 1.50 108.00

ls 1.00 30.00 30.00 1.00 30.00 30.00

Labour

1.00 Day 0.40 444.00 177.60 - 0.40 444.00 177.60

2.00 Day 0.45 361.00 162.45 - 0.45 361.00 162.45

3.00 Day 3.10 333.00 1,032.30 - 3.10 333.00 1,032.30

4.00 Extra labour element required for lifting of Materials Day 4.80 278.00 1,334.40 - 4.80 278.00 1,334.40

Cast per 20.00SqM 4,068.75 1,362.00 2,706.75

Add 15% for Contractor's Profits and Overheads Cost 610.31 204.30 406.01

Cost of 20.00SqM 4,679.06 1,566.30 3,112.76

Cost of 1.0SqM 233.95 78.30 155.65

A Actual Cost of Labour 156.00

G.I. J or L hooks with nuts and bolts 8 mm dia

G.I plain washer thick

Bitumen washers

Carriage of hooks, nuts, washers and curves

Mistry

Carpenter 2nd class

Beldar

Page 4: Chemical Rebar

For Petron For MCL

KazStroyService Infrastructure India Pvt. Ltd.Madras Cements Ltd - Vizag Cement Grinding Project

Sub Contractor Labour Rate

RATE ANALYSIS FOR Fixing galvanised /CGI sheet (Ridges& Flashes) Dismantling of damaged sheeting

Details of Cost for 1Rmt Materials Cost Labour Cost

Sl.No Description Unit Quantity Rate Amount Quantity Rate Amount Quantity Rate Amount

Shed =20.00=20Rmt

Details of Cost 20.00Rmt

Nos 30.00 30.00 900.00 30.00 30.00 900.00

Nos 30.00 4.00 120.00 30.00 4.00 120.00

Nos 60.00 1.50 90.00 60.00 1.50 90.00

ls 1.00 25.00 25.00 1.00 25.00 25.00

Labour

1.00 Day 0.40 444.00 177.60 - 0.40 444.00 177.60

2.00 Day 0.45 361.00 162.45 - 0.45 361.00 162.45

3.00 Day 4.50 333.00 1,498.50 - 4.50 333.00 1,498.50

4.00 Extra labour element required for lifting of Materials Day 6.20 278.00 1,723.60 - 6.20 278.00 1,723.60

Cast per 20.00Rmt 4,697.15 1,135.00 3,562.15

Add 15% for Contractor's Profits and Overheads Cost 704.57 170.25 534.32

Cost of 20.00Rmt 5,401.72 1,305.25 4,096.47

Cost of 1.0Rmt 270.09 65.25 204.80

A Actual Cost of Labour 205.00

G.I. J or L hooks with nuts and bolts 8 mm dia

G.I plain washer thick

Bitumen washers

Carriage of hooks, nuts, washers and curves

Mistry

Carpenter 2nd class

Beldar

Page 5: Chemical Rebar

For Petron For MCL

KazStroyService Infrastructure India Pvt. Ltd.Madras Cements Ltd - Vizag Cement Grinding Project

Sub Contractor Labour Rate

RATE ANALYSIS FOR fabrication & fixing of 40 x6mm angle wind ties for all hieght

Details of Cost for 1Rmt

Sl.No Description Unit Quantity Rate Amount

Details of Cost 1Rmt

Nos 1.00 15.00 15.00

Nos 1.00 4.00 4.00

Nos 1.00 1.50 1.50

ls 1.00 2.50 2.50

Labour

40x40x6 per Rmt unit weight=3.5Kgs Rmt 3.50 25.34 88.67

Cast per 1.00Mts 111.67

Add 15% for Contractor's Profits and Overheads Cost 16.75

Cost of 1.0SqM 128.42

A Actual Cost of Labour 128.00

G.I. J or L hooks with nuts and bolts

G.I plain washer thick

Bitumen washers

Carriage of hooks, nuts, washers and curves

Receiving the str. steel from MCL stores , fabricating, placing and fixing in concrete like inserts, sleeves, frames, edge and anchor plates, anchor beams, inserts etc.

Page 6: Chemical Rebar

For Petron For MCL

KazStroyService Infrastructure India Pvt. Ltd.Madras Cements Ltd - Vizag Cement Grinding Project

Sub Contractor Labour Rate

Page 7: Chemical Rebar

KazStroyService Infrastructure India Pvt. Ltd.Madras Cements Ltd - Vizag Cement Grinding Project

Sub Contractor Labour Rate

Rate analysis of Drilling & Fixind of Rebar Chemical

Details of Cost for 1Nos

Sl.No Description Unit Quantity Rate

Details of Cost 1Nos

Nos 1.00 2,353.00 Scaffolding charge of avg height -10Mts Sqm 4.00 59.00

Ls 1.00 58.00

Cast per 1 Nos

Add 20% for Contractor's Profits and Overheads Cost

Cost of 1Nos

Actual Cost of 1nos hilti

Rate analysis of Drilling & Fixind of Rebar Chemical Details of Cost for 1Nos

Sl.No Description Unit Quantity Rate Details of Cost 1Nos

Nos 1.00 825.00 Scaffolding charge of avg height -10Mts Sqm 4.00 59.00

Ls 1.00 58.00

Cast per 1 Nos Add 20% for Contractor's Profits and Overheads Cost Cost of 1Nos Actual Cost of 1nos hilti

Charges for drilling of 32MM dia up to 250MM depth and rebar fixing of 25MM dia including chemical

Food & accommodation for per labour (Consider fixing of hitli rebar per day 5Nos )

Charges for drilling of 20MM dia up to 200MM depth and rebar fixing of 16MM dia including chemical

Food & accommodation for per labour (Consider fixing of hitli rebar per day 5Nos )

Page 8: Chemical Rebar

KazStroyService Infrastructure India Pvt. Ltd.Madras Cements Ltd - Vizag Cement Grinding Project

Sub Contractor Labour Rate

Rate analysis of Drilling & Fixind of Rebar Chemical

Details of Cost for 1Nos

Amount

2,353.00 236.00

58.00 5000 1,250.00 41.67 8.33 250.00 50.00

2,647.00

529.40 58.33

3,176.40

3,176.00

Rate analysis of Drilling & Fixind of Rebar Chemical Details of Cost for 1Nos

Amount

825.00 236.00

58.00

1,119.00 223.80 1,342.80 1,343.00