KazStroyService Infrastructure India Pvt. Ltd.Madras Cements Ltd - Vizag Cement Grinding Project
Sub Contractor Labour Rate
RATE ANALYSIS FOR Fixing AC Corrugated Sheet Dismantling of damaged sheeting
Details of Cost for 1SqM Materials Cost Labour Cost
Sl.No Description Unit Quantity Rate Amount Quantity Rate Amount Quantity Rate Amount
Area Shed=20.00X1.0=20Sqm
Details of Cost 20.00Sqm
Nos 36.00 15.00 540.00 36.00 15.00 540.00
Nos 36.00 4.00 144.00 36.00 4.00 144.00
Nos 72.00 1.50 108.00 72.00 1.50 108.00
ls 1.00 30.00 30.00 1.00 30.00 30.00
Labour
1.00 Day 0.40 444.00 177.60 - 0.40 444.00 177.60
2.00 Day 0.45 361.00 162.45 - 0.45 361.00 162.45
3.00 Day 3.10 333.00 1,032.30 - 3.10 333.00 1,032.30
4.00 Extra labour element required for lifting of Materials Day 4.80 278.00 1,334.40 - 4.80 278.00 1,334.40
Cast per 20.00SqM 3,528.75 822.00 2,706.75
Add 15% for Contractor's Profits and Overheads Cost 529.31 123.30 406.01
Cost of 20.00SqM 4,058.06 945.30 3,112.76
Cost of 1.0SqM 202.90 47.25 155.65
A Actual Cost of Labour 156.00
G.I. J or L hooks with nuts and bolts 8 mm dia
G.I plain washer thick
Bitumen washers
Carriage of hooks, nuts, washers and curves
Mistry
Carpenter 2nd class
Beldar
For Petron For MCL
KazStroyService Infrastructure India Pvt. Ltd.Madras Cements Ltd - Vizag Cement Grinding Project
Sub Contractor Labour Rate
RATE ANALYSIS FOR Fixing AC Corrugated sheet (Ridges& Flashes) Dismantling of damaged sheeting
Details of Cost for 1Rmt Materials Cost Labour Cost
Sl.No Description Unit Quantity Rate Amount Quantity Rate Amount Quantity Rate Amount
Shed =20.00=20Rmt
Details of Cost 20.00Rmt
Nos 30.00 30.00 900.00 30.00 30.00 900.00
Nos 30.00 4.00 120.00 30.00 4.00 120.00
Nos 60.00 1.50 90.00 60.00 1.50 90.00
ls 1.00 25.00 25.00 1.00 25.00 25.00
Labour
1.00 Day 0.40 444.00 177.60 - 0.40 444.00 177.60
2.00 Day 0.45 361.00 162.45 - 0.45 361.00 162.45
3.00 Day 4.50 333.00 1,498.50 - 4.50 333.00 1,498.50
4.00 Extra labour element required for lifting of Materials Day 7.20 278.00 2,001.60 - 7.20 278.00 2,001.60
Cast per 20.00Rmt 4,975.15 1,135.00 3,840.15
Add 15% for Contractor's Profits and Overheads Cost 746.27 170.25 576.02
Cost of 20.00Rmt 5,721.42 1,305.25 4,416.17
Cost of 1.0Rmt 286.07 65.25 220.80
A Actual Cost of Labour 221.00
G.I. J or L hooks with nuts and bolts 8 mm dia
G.I plain washer thick
Bitumen washers
Carriage of hooks, nuts, washers and curves
Mistry
Carpenter 2nd class
Beldar
For Petron For MCL
KazStroyService Infrastructure India Pvt. Ltd.Madras Cements Ltd - Vizag Cement Grinding Project
Sub Contractor Labour Rate
RATE ANALYSIS FOR Fixing galvanised /CGI sheet roofing Dismantling of damaged sheeting
Details of Cost for 1SqM Materials Cost Labour Cost
Sl.No Description Unit Quantity Rate Amount Quantity Rate Amount Quantity Rate Amount
Area Shed=20.00X1.0=20Sqm
Details of Cost 20.00Sqm
Nos 36.00 30.00 1,080.00 36.00 30.00 1,080.00
Nos 36.00 4.00 144.00 36.00 4.00 144.00
Nos 72.00 1.50 108.00 72.00 1.50 108.00
ls 1.00 30.00 30.00 1.00 30.00 30.00
Labour
1.00 Day 0.40 444.00 177.60 - 0.40 444.00 177.60
2.00 Day 0.45 361.00 162.45 - 0.45 361.00 162.45
3.00 Day 3.10 333.00 1,032.30 - 3.10 333.00 1,032.30
4.00 Extra labour element required for lifting of Materials Day 4.80 278.00 1,334.40 - 4.80 278.00 1,334.40
Cast per 20.00SqM 4,068.75 1,362.00 2,706.75
Add 15% for Contractor's Profits and Overheads Cost 610.31 204.30 406.01
Cost of 20.00SqM 4,679.06 1,566.30 3,112.76
Cost of 1.0SqM 233.95 78.30 155.65
A Actual Cost of Labour 156.00
G.I. J or L hooks with nuts and bolts 8 mm dia
G.I plain washer thick
Bitumen washers
Carriage of hooks, nuts, washers and curves
Mistry
Carpenter 2nd class
Beldar
For Petron For MCL
KazStroyService Infrastructure India Pvt. Ltd.Madras Cements Ltd - Vizag Cement Grinding Project
Sub Contractor Labour Rate
RATE ANALYSIS FOR Fixing galvanised /CGI sheet (Ridges& Flashes) Dismantling of damaged sheeting
Details of Cost for 1Rmt Materials Cost Labour Cost
Sl.No Description Unit Quantity Rate Amount Quantity Rate Amount Quantity Rate Amount
Shed =20.00=20Rmt
Details of Cost 20.00Rmt
Nos 30.00 30.00 900.00 30.00 30.00 900.00
Nos 30.00 4.00 120.00 30.00 4.00 120.00
Nos 60.00 1.50 90.00 60.00 1.50 90.00
ls 1.00 25.00 25.00 1.00 25.00 25.00
Labour
1.00 Day 0.40 444.00 177.60 - 0.40 444.00 177.60
2.00 Day 0.45 361.00 162.45 - 0.45 361.00 162.45
3.00 Day 4.50 333.00 1,498.50 - 4.50 333.00 1,498.50
4.00 Extra labour element required for lifting of Materials Day 6.20 278.00 1,723.60 - 6.20 278.00 1,723.60
Cast per 20.00Rmt 4,697.15 1,135.00 3,562.15
Add 15% for Contractor's Profits and Overheads Cost 704.57 170.25 534.32
Cost of 20.00Rmt 5,401.72 1,305.25 4,096.47
Cost of 1.0Rmt 270.09 65.25 204.80
A Actual Cost of Labour 205.00
G.I. J or L hooks with nuts and bolts 8 mm dia
G.I plain washer thick
Bitumen washers
Carriage of hooks, nuts, washers and curves
Mistry
Carpenter 2nd class
Beldar
For Petron For MCL
KazStroyService Infrastructure India Pvt. Ltd.Madras Cements Ltd - Vizag Cement Grinding Project
Sub Contractor Labour Rate
RATE ANALYSIS FOR fabrication & fixing of 40 x6mm angle wind ties for all hieght
Details of Cost for 1Rmt
Sl.No Description Unit Quantity Rate Amount
Details of Cost 1Rmt
Nos 1.00 15.00 15.00
Nos 1.00 4.00 4.00
Nos 1.00 1.50 1.50
ls 1.00 2.50 2.50
Labour
40x40x6 per Rmt unit weight=3.5Kgs Rmt 3.50 25.34 88.67
Cast per 1.00Mts 111.67
Add 15% for Contractor's Profits and Overheads Cost 16.75
Cost of 1.0SqM 128.42
A Actual Cost of Labour 128.00
G.I. J or L hooks with nuts and bolts
G.I plain washer thick
Bitumen washers
Carriage of hooks, nuts, washers and curves
Receiving the str. steel from MCL stores , fabricating, placing and fixing in concrete like inserts, sleeves, frames, edge and anchor plates, anchor beams, inserts etc.
For Petron For MCL
KazStroyService Infrastructure India Pvt. Ltd.Madras Cements Ltd - Vizag Cement Grinding Project
Sub Contractor Labour Rate
KazStroyService Infrastructure India Pvt. Ltd.Madras Cements Ltd - Vizag Cement Grinding Project
Sub Contractor Labour Rate
Rate analysis of Drilling & Fixind of Rebar Chemical
Details of Cost for 1Nos
Sl.No Description Unit Quantity Rate
Details of Cost 1Nos
Nos 1.00 2,353.00 Scaffolding charge of avg height -10Mts Sqm 4.00 59.00
Ls 1.00 58.00
Cast per 1 Nos
Add 20% for Contractor's Profits and Overheads Cost
Cost of 1Nos
Actual Cost of 1nos hilti
Rate analysis of Drilling & Fixind of Rebar Chemical Details of Cost for 1Nos
Sl.No Description Unit Quantity Rate Details of Cost 1Nos
Nos 1.00 825.00 Scaffolding charge of avg height -10Mts Sqm 4.00 59.00
Ls 1.00 58.00
Cast per 1 Nos Add 20% for Contractor's Profits and Overheads Cost Cost of 1Nos Actual Cost of 1nos hilti
Charges for drilling of 32MM dia up to 250MM depth and rebar fixing of 25MM dia including chemical
Food & accommodation for per labour (Consider fixing of hitli rebar per day 5Nos )
Charges for drilling of 20MM dia up to 200MM depth and rebar fixing of 16MM dia including chemical
Food & accommodation for per labour (Consider fixing of hitli rebar per day 5Nos )
KazStroyService Infrastructure India Pvt. Ltd.Madras Cements Ltd - Vizag Cement Grinding Project
Sub Contractor Labour Rate
Rate analysis of Drilling & Fixind of Rebar Chemical
Details of Cost for 1Nos
Amount
2,353.00 236.00
58.00 5000 1,250.00 41.67 8.33 250.00 50.00
2,647.00
529.40 58.33
3,176.40
3,176.00
Rate analysis of Drilling & Fixind of Rebar Chemical Details of Cost for 1Nos
Amount
825.00 236.00
58.00
1,119.00 223.80 1,342.80 1,343.00