Chemical Industry

Page 2: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

KAZPEROXID LLP

SALE OF HYDROGEN PEROXIDE

Page 3: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

3

Location: Almaty, The Republic of Kazakhstan,

Participants: JSC «NAC «Kazatomprom» – 50%, Solvay Chemicals Int. SA – 50%

Project description:Company sells 60% of hydrogen peroxide produced by Solvay Chemicals Int. in two ways: 1)

specialized vat containers and 2) specialized ISO containers.

Product supply market JSC «NAC «Kazatomprom» Group of companies: Inkai LLP, Betpak Dala LLP, Baiken-U LLP,

Appak LLP, TTK LLP (delivery to Karatau LLP), Semizbay-U LLP. Also Company sells to gold

mining companies as Varvarinskoe JSC and one-time delivery to other interested third parties as

Altyntau Kokshetau LLP and Reactivesnab LLP.

Storages:

Serviced by 3 storage terminals:

1. Tobol settl., Kostanay region,

2. Shiyeli settl., Kyzylorda region,

3. Stepnogorsk settl., Akmolinsk region.

Project general informationSale of hydrogen peroxide

Page 4: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

4

Project advantagesSale of hydrogen peroxide

Project importance:

Developing chemical market in Kazakhstan by guaranteed

delivery of the hydrogen peroxide to the mining enterprises,

adapted towards climatic conditions of the country.

«Kazperoksid» LLP is a supplier of the hydrogen peroxide by

Solvay Chemicals Int. SA (Belgium) to the Kazakhstan market

and provides peroxide to all companies of Kazatomprom

Group which use hydrogen peroxide for uranium deposition

and leaching

Project uniqueness:

Possibility to adopt uranium in-situ leaching using the

hydrogen peroxide which allows to replace sulfuric acid used

at the current.

In-situ leaching using hydrogen peroxide allows to decrease

uranium mining costs and intensify production processes of

Kazatomprom Group.

Project feature:

Solvay Chemicals Int. SA is planning to built and operate

hydrogen peroxide storages in Kazakhstan for permanent

storage of a certain reserves of hydrogen peroxide and its

emergency delivery to consumer as required.

All supplied hydrogen peroxide in Kazakhstan is foreign.

Solvay Chemicals Int. SA is interested in localization of

hydrogen peroxide production (plant construction). Plant is

going to be the first of its kind in Kazakhstan with new

proprietary technology (feasibility study is available).

Page 5: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

KAZATOMPROM-SORBENT LLP

SALE OF ION EXCHANGE RESIN

Page 6: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

6

Location: Almaty, TheRepublic of Kazakhstan

Participants: JSC «NAC «Kazatomprom» – 51%, Purolite International AG– 49%

Project description:

• Existing business with accumulated consumers database

• Has its own laboratory for testing with access to international database

Product supply market:

• metallurgical enterprises (gold, nonferrous and ferrous industry);

• medicine and pharmaceuticals industry;

• food industry (production of alcoholic beverages, oil manufacture, manufacture of

dining/drinking mineral water, soft drinks and juices);

• oil and gas industry;

• energy industries ( power plants )

Project general informationSale of ion exchange resin

Page 7: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

7

Project advantagesSale of ion exchange resin

Project importance:

Kazatomprom-Sorbent LLP is a supplier of ion exchangeresin by Purolite Int. AG (England) to the Kazakhstanmarket and provides with ion exchange resin allcompanies of Kazatomprom group for sorbing mineduranium.

Project uniqueness:

The presence of modern specific equipment and newtechniques in the study of physical and mechanicalcharacteristics of ion exchange resins and other materials.There are no analogs of this equipment which allows tomake a wide range of analyzes such as: optical emission,atomic absorption, spectrophotometric, conduct-metric ,titration , extraction and etc.

Project feature:

At the moment, the demand on resin in the Kazakhstanmarket exceeds the supply. All resin supplied toKazakhstan is foreign.Purolite Int. AG is interested in construction of the plant(localization of ion exchange resin production) which willbe the first of its kind in Kazakhstan (pre-feasibility studyis under development).

Page 8: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

«CAUSTIC» JSC

PRODUCTION OF CHLORINE

AND CAUSTIC SODA

Page 9: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

9

Location: The Republic of Kazakhstan, Pavlodar region, Pavlodar in the FEZ «Pavlodar»

Participants: NAC Kazatomprom JSC - 40% CAPEC JSC - 60%

Project description:

Plant for the production of chlorine and caustic soda by membrane method, a capacity of 30 000 tonnes

per year in the Pavlodar using equipment manufactured by Uhdenora (Milan, Italy) - a subsidiary of

Uhde GmbH (Germany), belonging to the concern ThyssenKrupp AG (Germany). The designed

capacity of the plant is:

• Caustic soda - 30 thousand tons / year;

• Liquid chlorine - 26 250 tons / year;

• Hydrochloric acid - 45 000 tons / year;

• Sodium hypochlorite - 6600 tons / year

Commissioning: in 2011, with the release of its full capacity in 2014 and 20 years continuous production cycle of the

plant

Commodity markets of

production:

Kazakhstan market with 100% import substitution products to major consumers such as mining

companies group NAC Kazatomprom JSC, Aluminium of Kazakhstan JSC, NC KMG-PM JSC, UK-

TMC, CNPC AMG (AktobeMunayGas), Arcelor Mittal Temirtau, regional water utilities and CHP plants,

the Omsk refinery, ILIM, VSMPO-AVISMA Corporation, the oil and gas producing companies and other,

neighboring countries

Infrastructure:The company has the necessary manufacturing base with areas of energy, heat and water supply and

sanitation, as well as railway lines, puffins, roads, water systems, interconnecting piperack

Public information on the projectProduction of chlorine and caustic soda

Page 10: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

Advantages of the projectProduction of chlorine and caustic soda

10

Caustic JSC is implementing a project of development of innovative production of

caustic soda, chlorine and other products based on chlorine, in accordance with the

"Programme for the development of the chemical industry of the Republic of

Kazakhstan for 2010-2014" adopted by the Government Resolution №1001 of

September 30, 2010. The project is included in the Republican map SPAIID 2010-

2014.

Until 2011, Kazakhstan is a 100% importer of caustic soda and chlorine, in the

absence of corresponding production in the country. In 2011, Caustic JSC realized the

first stage of program development, by building and putting into operation a plant for

the production of caustic soda capacity of 30 000 tonnes per year.

Manufacture of is located on the former industrial site of the Pavlodar chemical plant

in the special economic zone "Pavlodar". In the future, increasing the capacity of

existing production of caustic soda and chlorine to 60 000 tonnes per year. Caustic

JSC has considerable potential for further development of the chemical park located

on the territory of FEZ "Pavlodar“

Page 11: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

Fixed assets and infrastructureProduction of chlorine and caustic soda

11

Infrastructure: At the disposal of Caustic JSC there is sufficient for the further

development of infrastructure, including: roads and railways at

the site; electricity (power supply 285 megawatts); software

process water (reserve power over 2,200 m3 / hour); process

air their own production (supply of power over 4,000 m3 /

hour); steam line from CHP-3 (power reserve of more than 400

t / h); availability of landfill of industrial solid waste and

wastewater storage pond

Raw material and energy

security:

Uninterrupted electricity supply (the main item of expenditure

of the company) provides direct current lead Pavlodar CHP-3,

located 1 kilometer from the production site of Caustic JSC.

Extraction of salt (the main process raw materials) is carried

out by a subsidiary Solhimprom LLP

Transport: Tank park of Caustic JSC is over 200 specialized tanks. There

is access to railways and highways. Proximity to customers - a

profitable enterprise location and proximity to major customers

reduces transportation costs and ensures security of supply

Page 12: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

LLP «SKZ-U»

SULFURUIC ACID AND ELECTRICITY

PRODUCTION

Page 13: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

Project general informationSulfuric acid and electricity production

13

Location: Republic of Kazakhstan, Kyzylorda region, 8 km from Zhanakorgan

Participants: АО «НАК «Казатомпром» - 49%, SAP-Japan Corporation- 32%, Uranium One Inc. – 19%

Project description:

Plant capacity is 500 K Tons/year of sulfuric acid production (93%) and additional electricity generation

(18 MW/year) using Desmet Ballestra SpA (Italy), General Electric (France) equipment.

Date of start up: Company registration and the beginning of the project – 2007, start up - 2011. Project maturity date - 25

years.

Product supply market:RK market. 100% sales of products ensuring mining companies of JSC "NAC" Kazatomprom“ group

such as "Kyzyl Kum“ LLP, "Biken-U” LLP, "RU-6“ LLP and “The trade-transport company“ LLP

Infrastructure

The area of industrial buildings - 33, 7 thousand square meters, land - 14.25 ha.

Motorway 9.2 km from the plant to the Shymkent-Samara highway.

Railway driveways - 1.47 km (from the deadlock to the highway - №26 patrol).

Page 14: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

Project advantagesSulfuric acid and electricity production

14

“SKZ-U” LLP built in December 2011 as a part of the program “Forced industrial -

innovative development of Kazakhstan for 2010-2014 years”. For the production of

products, “SKZ-U” LLP uses Kazakhstani lump sulfur as a raw materials, supplying JSC

"NAC"Kazatomprom“ enterprises with sulfuric acid. Sulfuric acid is the main agent in

the process of producing uranium by in situ leach on Khorasan 1, Khorasan 2, North

and South Karamurun mines.

Gas turbine electric power station is built with capacity of 18 MW in order to meet

the needs of “SKZ-U” LLP in electricity. This power station allows to provide electricity

to the plant and also to the regional district networks of Kyzylorda region, that

subsequently will reduce the cost of electric power in the region.

Electricity is selling at cost price, and part of the electricity is sold at 70 tenge/

kWh which is produced by the solar power station in accordance with the Government

Resolution № 644 dated 12.06.2014, determined fixed tariff of 70 tenge/kWh for Solar

power projects using PV modules on the bases of Kazakhstani silicon (KazPV).

Page 15: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

Availabilities of raw materials Sulfuric acid and electricity production

15

Infrastructure:

The area of industrial buildings - 33, 7 thousand square meters,

land - 14.25 ha.

Motorway 9.2 km from the plant to the Shymkent-Samara highway.

Railway driveways - 1.47 km (from the deadlock to the highway -

№26 patrol).

Raw material and energy

security:

100% raw material dependence on lump sulfur (granulated)

produced by “Chevroil Tengiz” LLP provided by "OHK" LLP.

Besides sulfur in the process is used chemicals from foreign

suppliers, water from underground sources.

Production activity is supplied with 100% of its electricity and the

surplus is sold on the side.

Transport:

Supplies of raw materials are carried out on railway. Delivery of

the finished products carried by railway, acid wire and trucks

provided by “Zhanakorgan Transit“ LLP. Own trucks to transport

the finished products are not available.

Page 16: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

LLP «JV «SKZ-KAZATOMPROM»

SALE SULFURIC ACID

Page 17: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

Public information on the projectSulfuric acid production

17

Location: Akmolinsk region, Stepnogorsk settlement, The Republic of Kazakhstan

Participants: The «United Chemical Company» LLP – 90,11%

JSC «NAC «Kazatomprom» – 9,89%

Project description: Sulfur acid plant (from lump/granulated sulfur), based on technology of dry double

absorption/double conversion.

The design capacity is 180 thousand tons / year.

Commodity markets of

production:Group of mining companies of JSC «NAC «Kazatomprom» enterprises of the mining industry and

other

Infrastructure:

The company is fully provided with the necessary infrastructure, including: energy, technical

utilities, access road and railway way, administrative buildings and a dining room.

The area of the industrial complex is 13 731 sq.m.

Page 18: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

Advantages of the projectSulfuric acid production

18

As a result sulfur acid production start-up, for the first time in Kazakhstan production of

the ferric sulphide was transferred to production of lump sulfur (the Kazakhstan raw

material by «Tengizchevroil» LLP). One of the main missions was achieved – ensuring

the Enterprise’s demand as well as demand from companies of JSC NAC

«Kazatomprom» group.

Solving the sulfur processing problem, which has adverse impact on ecological

situation in Caspian region (at the present time there are 8 million tons of sulfur in the

sulfur pads of the TCO company).

Demand from Kazatomprom companies side for sulfuric acid is permanently

growing up. In 2006 for production needs was needed only 448,993 thousand tons, but

in 2016 the demand on sulfur acid is around 1 934,074 thousand tons .

Page 19: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

Metallurgy

Page 20: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

MC KazSilicon LLP

PRODUCTION OF METALLURGICAL SILICON

AND QUARTZ MINING

Page 21: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

General informationProduction of metallurgical silicon and quartz mining

21

Location: Ushtobe city, Almaty region, Republic of Kazakhstan

Participants: NAC Kazatomprom JSC - 100%

Project description:MC KazSilicon LLP is Kazakhstan’s first plant producing metallurgical silicon of 99,9% purity and

higher. The enterprise conducts production and processing of vein quartz of the Sarykulsky field with

the confirmed stock of 1,74 million tons which is in property of MK KazSilicon LLP. Vein quartz of this

field is unique in it’s chemical composition: the content of silicon dioxide is 98,5 - 99,5%.

Plant’s designed capacity is:

• Gangue quartz output – 10,000 tons/year

• Production of metallurgical silicon – 2,800 tons/year

Commissioning: January 14, 2006 – registration

May 21, 2013 – re-registration

Product market outlets: Domestic markets of: the Republic of Kazakhstan, Russian Federation, Germany, Netherlands, France,

Poland, Norway, Japan, South Korea, Uzbekistan, Tadzhikistan.

Infrastructure:

The enterprise is fully equipped with necessary infrastructure, including: energy supply, vehicle access

routes, railway line; provision of processed water (with 4 times increase possibility); available area for

installation of the second ore-thermal furnace; storage facilities for raw materials and end products;

materials storage with capacity for 2 furnaces.

Page 22: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

Projects benefitsProduction of metallurgical silicon and quartz mining

22

MK KazSilicon LLP is implemented in accordance with the Appendix 4 "The list of the

affiliated, dependent companies of JSC "National Welfare Fund "Samruk-Kazyna",

Offered to Transfer into Competitive Environment“ of approved decree of the

government of Republic of Kazakhstan No. 1141 of December 30, 2015 "About somequestions on privatization for 2016 - 2020".

MK KazSilicon LLP is the first plant in Kazakhstan on production of metallurgical

silicon of 99,9% purity and higher. The enterprise conducts production and processing

of vein quartz of the Sarykulsky field with the confirmed stock of 1,74 million tons

located in Almaty region. Vein quartz of this field is unique in it’s chemical composition:

the content of silicon dioxide is 98,5 - 99,5%.

The core metallurgical equipment is made in China applying German technologies.

An automated control system of technological process production of metallurgical

silicon has been developed and implemented.

An automated system of purification of flue gases provides a dust removal up to 99%,

which allows to not only meet environmental requirements, but also output extra 2 000

tons/year of microsilica, which is of high demand abroad.

Page 23: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

Raw materials provisionProspects of increase in production of metallurgical

silicon and quartz mining

23

Metallurgical

silicon:

Quartz:

Macadam:

Electric power:

Equipment and

machinery:

Infrastructure:

MK KazSilicon LLP has an opportunity to increase production of metallurgical silicon

(there is available installation area for the second ore-thermal furnace).

Raw material for manufacturing metallurgical silicon is the quartz crumb made from

quartz vein of the Sarykulsky field which is in property of MK KazSilicon LLP.

The enterprise has an opportunity to increase the volume of vein quartz mining from

10 000 to 100 000 tons per year.

MK KazSilicon LLP, from dumps of quartz mining, has an opportunity to organize

production of macadam from dense solid rocks for a ballast layer of railway tracks in

volume of 100 000 tons per year.

Continuous electrical supply (the main item of expenditure of the company) directly

with Uzen LLP (KazZink LLP subsidiary) on networks of transfer and transportation of

the electric power of JSC KEGOK.

Necessary equipment for production of metallurgical silicon (MG and UMG) is present

at MK KazSilicon LLP. Also present are: quarry and other types of equipment for the

quartz field development (drilling-and-blasting works are performed by the third-party

companies) and production of macadam.

MK KazSilicon LLP has sufficient enough infrastructure for increase in production of

metallurgical silicon and quartz mining, which includes: vehicle access routes, railway

line, provision of processed water (with 4 times increase possibility), warehouses for

storage of end product, raw materials and auxiliary materials.

Page 24: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

Service Companies

Page 25: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

«Kyzyltu» LLP

Extraction, storage, transportation and

processing of molybdenum - copper ores

Page 26: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

Place: Aqmola region, Ereimentau district, Kyzyltu village

Members: «National atomic company «Kazatomprom» JSC - 76%;

«Stepnogorsk mining and chemical combine» LLP - 24%

Project description:

• Production capacity

2015: 2016: 2017 and on:

600 thousands tons of sulphide ore 780 thous. tons of ores 1000 thous. tons of ores

Year of formation: 14 March 2006

Sales market: The Republic of Kazakhstan, neighboring countries

General information Extraction, storage, transportation and processing of molybdenum –

copper ores

26

Page 27: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

The significance of the project

«Kyzyltu» LLP has the right for extraction molybdenum-copper ores and other associated

components in Kyzylltu deposit. The project allows to load the idle capacity of the hydro-

metallurgical plant of Stepnogorsk Mining and Chemical Combine (SMCC) as well as to form

additional jobs in Stepnogorsk town and Ereimentau district of Akmola region

The uniqueness of the project

The field emits oxidation zones which are developed in fragments which and fixed until the

depth of 20-30 meters. Ore minerals of the oxidatied zone presents malachite, lapis lazuli,

chrysocolla and few cuprites. The main ore minerals of sulfide ores are bornite, chalcocite,

chalcopyrite, to a lesser extent pyrite, magnetite, gray ores.

Advantages

27

Page 28: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

«Rusburmash-Kazakhstan» JV» LLP

Drilling of exploration and technological wells

Page 29: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

Place: Almaty region, Almaty city

Participants: Uranium One Holding N.V. – 51%;

«Volkovalueology» JSC – 49%.

Description:

• Production capacity

2014: 2015: 2016Plan: 2016Fact (1 half-year):

1,439 wells 1,383 wells 1,404 wells 827 wells

Year of formation: 2007

Consumers: The major part of Company’s sales is connected with the needs of dependent and subsidiary

enterprises of Kazatomprom and Rosatom

Park equipment: Drilling parks of aggregates composed of 23 own technique items.

General informationDrilling of exploration and technological wells

29

Page 30: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

«RBM-Kazakhstan» JV» LLP – Russian-Kazakhstani enterprise was formed on the basis of

intergovernmental agreement signed in May 2007. The joint venture contributes to the

implementation of the Comprehensive Program of Russian-Kazakh cooperation in the field of

nuclear energy usage for peaceful purposes.

In 18 October 2007 the State license for the construction of objects for atomic energy usage is

obtained (ecological-monitoring wells with kern selection, hydrogeology, parametric,

technological stored pressure and pumping wells)

Company’s main advantage is constant work volumes coming from the subsidiaries and

dependent organizations of holding companies – Kazatomprom and Rosatom. The stable

demand for the Company’s services enables to generate positive cash flows for servicing

current liabilities and implementation of objectives.

Company’s park for drilling equipment: Drilling setting DMU-1200МК (БПУ-1200МК) – 23

items, cleaning wells setting IWD-700M (УОС-700М) – 3 items, other heavy machinery – 35

items. The wide park allows to implement complex drilling and wells repairing works

qualitatively and on time

Advantages

30

Page 31: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

Traditional & Alternative Source of Energy

Page 32: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

“JV “KT Rare Metals Company”

Wind park «Fort-Shevchenko» 42 MW

Page 33: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

General Project informationConstruction and exploitation of “Fort-Shevchenco” 42 MW

33

Location: Republic of Kazakhstan, Mangystau region, Tupkaraganskiy district, Fort Shevchenco (FS) town.

Members: JSC “NAC “Kazatomprom” - 51%, Toshiba Corporation - 49%

Project description: Construction and operation of a wind power station (WPS) of 42 MW capacity with equipment

manufactured by “VESTAS” in Mangystau region, Western Kazakhstan. The project was developed

by engineering company AECOM (USA).

Unit Capability Factor (UCF) is about 40% and annual power generation is 147 mln. kWh.

Current project stage – ready for construction.

Commissioning of station: In 2017, continuous production cycle of the plant for 20 years

End market There are measures of state support to the project in accordance with the law “About Support of

RES”. The generated electricity will be purchased by the state for 15 years at a fixed "green" tariff.

Infrastructure: Location – on-shore, 8 km to the sea port. Average annual temperature is near 10℃, wind speed at

the height of 80 m is more than 8 m/s.

Page 34: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

Project AdvantagesConstruction and exploitation of “Fort-Shevchenco” 42 MW

34

• 200 MW of installed capacity in the Mangystau region is expected to outflow

in connection with the elaboration of normative durability in 2015.

• The annual emission reduction into the atmosphere is in equivalent of 146

tons of CO2. The annual reduction of 343 tons of sulfur dioxide. Saving of

855 thousand tons of coal or 2,700 th. barrels of oil over 15 years of WPS

exploitation.

• Project was developed by the engineering company AECOM (USA).

AECOM’s experience is confirmed by 21,500 MW of WPS implemented

projects in the world. The global coverage of AECOM company is measured

by 95 thousand of employees worldwide.

• The supplier of equipment is VESTAS. VESTAS makes the delivery,

installation and after-sales service during 10 years. VESTAS guarantees the

turbine performance at least 97%.

• Creation of additional value of project prior to construction. No additional

funding prior to WPS construction.

Page 35: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

Availability of raw materialsConstruction and exploitation of “Fort-Shevchenco” 42 MW

35

Infrastructure: The technical specifications of Mangystau REK are taken for

connecting WPS FS to the grid connection point with a distance

of 1 km from the WPS.

The technical conditions are approved for the installation of fiber

optic cable to the WPS platform.

Raw material and energy

security:

Annual wind changes were made at the height of 50m in

accordance with the international standards of 2007. The data

verification was carried out with the “PB Power” (Austria)

company participation.

Transport: AECOM developed two delivery routes of WPS equipment to

the platform. This project is one of the most effective projects in

Kazakhstan for WPS construction due to the location near the

seaport of Bautino, accessible terms of connection to the grid,

passing in the vicinity of the construction platform, a small

number of issues related to environmental protection, as well as

due to the high (8.4 m/s) average wind speed and the favorable

climatic conditions.

Page 36: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

“Astana Solar” LLP

PRODUCTION OF PHOTOVOLTAIC MODULES

Page 37: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

General informationProduction of photovoltaic modules

37

Location: Republic of Kazakhstan, Astana, “PV modules plant”, territory of the Special Economic Zone “Zhana

Kala“.

Participants: “NAC” Kazatomprom” JSC - 100%

Project description:Creation of industrial lines for manufacturing photovoltaic modules in Astana using SEMCO

Engineering S.A. company’s equipment (France) of annual capacity at 50 MW.

Commissioning:: 2013

Product market outlets: Domestic markets of: Republic of Kazakhstan and Russian Federation.

Infrastructure:

The enterprise has necessary industrial base with areas supplied with electricity, heat and sewage, as

well as temporary storage warehouses, vehicle access routes, water systems, sewer systems, energy

systems.

Territory: factory area is 9745 square meters and land area is 5.1 hectares. Available for redemption or

purchase for a long-term lease.

Page 38: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

Project benefitsProduction of photovoltaic modules

38

“Astana Solar” LLP is implementing a project of innovative development of

manufacturing photovoltaic modules using Kazakhstani silicon KazPV, in accordance

with the "Programme for accelerated industrial-innovative development of Kazakhstan

for 2010-2014" adopted by the Government Resolution №46 from 13.01.2012. The

project is included in the Republican Map of SPAIID for 2010-2014 years.

The plant was designed and built according to international standards. Its

technology and control systems ensure great care of the environment. The project

«Astana Solar» is designed to produce PV modules of 50 MW with the ability to

increase its output capacity to 100 MW.

State provision measures:

1. By the Government Resolution № 644 dated 12.06.2014, was set a fixed tariff of 70

tenge/kWh for Solar power projects using PV modules on basis of Kazakhstani

silicon (KazPV);

2. By the Government Resolution № 703 dated 26.06.2014, was established a

targeted assistance for up to 50% of the cost of solar power stations that operate on

basis of Kazakhstani silicon (KazPV) at the expense of the state budget for

individual consumers living in areas or settlements without electricity;

3. The law of RK "On supporting the use of renewable energy sources" defines the

possibility of installing a solar power station by individuals with the ability to sell up

to 500 kW/h electric energy per month to the energy network under the current tariff.

“PV modules plant”, located on the Special Economic Zone “Zhana Kala“ territory.

Page 39: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

«Kazakhstan Solar Silicon» LLP

PHOTOVOLTAIC CELLS PRODUCTION

Page 40: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

General informationPhotovoltaic cells production

40

Location: The Republic of Kazakhstan, East Kazakhstan region, Ust-Kamenogorsk

Participants: “NAC” Kazatomprom” JSC - 100%

Project description:LLP "Kazakhstan Solar Silicon" is intended to become a competitive company for production of

photovoltaic cells from silicon (the main component of photovoltaic modules that converts solar energy

into electricity), thereby to contribute to the implementation of the strategy "Kazakhstan 2050" aimed at

entering the 30 most developed countries of the world. The partnership produces multi-crystalline

silicon wafers (156 × 156 mm p-type) and photovoltaic cells with an efficiency of not less than 16%.

Maximum production capacity is 60 MW.

The plant is operational today, with staff count of 351 employee.

Product market outlets:LLP "Astana Solar“ was planned to be the only consumer of photovoltaic cells in the KazPV project.

Page 41: Chemical Industry - · PDF filePurolite Int. AG is interested in construction of ... electricity (power supply 285 megawatts); software process water ... The design capacity is 180

Project benefits Photovoltaic cells production

41

Kazakhstan Solar Silicon LLP operates as a project within the framework of

the state program of development of silicon industry sector in the Republic of

Kazakhstan, which is expected to shift the country’s economy from production

and sale of cheap quartz raw materials to manufacturing of valuable import-

substituting products, i.e. the development of PV modules production based

on Kazakhstan silicon (KazPV Project).

The basis for silicon wafers production is a formation of multi-crystalline ingots

from silicon-melt of solar quality (supplied by "MC" KazSilicon LLP ") by the

vertical directed crystallization. Crystallization of solar silicon is carried out in

quartz crucibles in furnaces with controlled temperature gradient and inert gas

purge.

During photovoltaic cells production the silicon wafers convert into solar cells

(photocells).

The process of photovoltaic cells production includes several consecutive

steps:

˗ texturing and chemical treatment of wafer surface

˗ formation of emitting p-n junction

˗ phosphorus-silicate glass removal and p-n junction isolation

˗ deposition of anti-reflective coating

˗ contact metallization formation

˗ end product testing and distribution