1.Project Background: (Rationale for selectionincluding previous work)
This dissertation deals with various aspects of the supply chainmanagement as well as various activities related to the supplychain management with a special focus on IBM, UK in light ofthe following aspects:
Increased globalization through outsourcing, which
elongates end-to-end supply chains Additional regulatory compliance imposed by
government entities, further complicating internationaltrade
Increased levels of economic uncertainty, which createadditional variability in supply and demand
Shorter product lifecycles and rapid rates of technologychange, which increase inventory obsolescence
Demanding customers who have created additional
time-to-market pressures by requiring better on-timedelivery, order fill rates and overall service levelefficiencies.
2.Objectives: (Intended outcomes/significance andscope of the project)
-
8/4/2019 cheekoti
2/4
The main objective is to find out various aspects of supplychain management such as:
Distribution Network Configuration
Distribution Strategy
Trade-Offs in Logistical Activities
Information
Inventory Management
Cash-Flow
Also find out what all changes IBM has experienced in thepast years and what all changes have impacted theperformance of the IBM. How IBMs ISC aligns and managescore processes, form performance related information andknowledge transfer.
3. Procedures: (Details of techniques, data collection,
data recording, etc.)
Explanatory research will be used and as it is a secondaryresearch all the data will be collected from internet and casestudies. Also various magazines, journals, newspaper articleswill be used as the source of the information. IBM casestudies will be used as the reference to find out the variousfactors which have affected the supply chain performance ofIBM in UK. Various report formats will be studied in order tofind out the structure which will be most suitable for the
report formation.
MBA Dissertation
Key Activities Time-scale Resources
-
8/4/2019 cheekoti
3/4
(Milestones) (Plan of action) required(Equipment, softwar
personnel etc)
Topic selection and
background study
Study of supply chainmanagement
IBM Case studies andvarious journals.
Literature reviewThrough secondary research Internet ,Journals, artic
and website data
MethodologyAll the collected data has to beanalyzed so that it can bealigned with the scope of thestudy
Journals, magazines,newspapers, articles,companys reports etc.
Questionnaire Primary data Primary research withhelp samples approved
Formulation of the report After proper analysis all thedata has to be arranged in the
report form.
Various available reporshould be properly
studied so that report cbe prepared in a betterway.
Conclusion &Recommendations
Supply chain mgmt will bestudied and evaluated.Conclusions will be made aboutthe factors that ensure thecompany's competitiveadvantage over supply chainmgmt and recommendationswill be given
Through the properanalysis of the report,recommendation andconclusion will be draw
Bibliography and referencesAs used and applicable As used and applicable
Total
Supervisor Comments (Any comments or amendments appropriate to the project
should be recorded here)
-
8/4/2019 cheekoti
4/4
References