1 CHECKLIST FOR CONCRETE PRE-CONCRETE Sl.No Description Detail 1 Check and ensure good maintenance of Batching Plant, Transit Mixer, Concrete Pumps, Pipelines are in proper working condition before concreting Yes No 2 Check and Ensure to order for concrete only when the site is ready for concreting in all respect. Yes No 3 Check and ensure the quality of raw materials is good; Suitably adjust the mix design if there is deviation in raw material quality. Yes No 4 Check and ensure that the suitable corrections made for moist aggregates and sprinkle water if aggregates are heated. Yes No 5 Check and ensure that Cover is strong, durable, Impermeable which can with stand the load of concrete, steel & should not deform due to movement of men & materials during concreting. Yes No 6 Check and ensure that Minimum depth of cover should not be less than 20 mm. Yes No 7 Check and ensure that all possible holes and gaps in the shuttering are properly fixed, to see that no slurry Leakage is there. Yes No 8 Check and ensure Form release agent should be Water-resistant, Forms chemical barrier, Clean stripping forms, Does not stains and protects Aluminium. Check and ensure Form releasing agent applied before casting the concrete and immediately after stripping and cleaning the formwork Yes No Site GOLDEN PANORAMA Date 09.10.2014

Upload: subhaschandra

Post on 21-Dec-2015

4 views

Category:

Documents


2 download

DESCRIPTION

checklist

TRANSCRIPT

Page 1: Checklist Gp Concretel

1

CHECKLIST FOR CONCRETE

PRE-CONCRETE

Sl.No Description Detail

1 Check and ensure good maintenance of Batching

Plant, Transit Mixer, Concrete Pumps, Pipelines are

in proper working condition before concreting

Yes No

2 Check and Ensure to order for concrete only when

the site is ready for concreting in all respect.

Yes No

3 Check and ensure the quality of raw materials is

good; Suitably adjust the mix design if there is

deviation in raw material quality.

Yes No

4 Check and ensure that the suitable corrections made

for moist aggregates and sprinkle water if aggregates

are heated.

Yes No

5 Check and ensure that Cover is strong, durable,

Impermeable which can with stand the load of

concrete, steel & should not deform due to

movement of men & materials during concreting.

Yes No

6 Check and ensure that Minimum depth of cover

should not be less than 20 mm.

Yes No

7 Check and ensure that all possible holes and gaps in

the shuttering are properly fixed, to see that no slurry

Leakage is there.

Yes No

8 Check and ensure Form release agent should be

Water-resistant, Forms chemical barrier, Clean

stripping forms, Does not stains and protects

Aluminium.

Check and ensure Form releasing agent applied

before casting the concrete and immediately after

stripping and cleaning the formwork

Yes No

Site GOLDEN PANORAMA

Date 09.10.2014

Page 2: Checklist Gp Concretel

2

DURING CONCRETE

Sl.No Description Detail

1 Check and ensure that proper malleting the sides of

the shuttering while placing the concrete so that

Possible honeycomb is avoided.

Yes No

2 Check and ensure that Concrete is consumed within

the stipulated design time, From the time of Batching.

Yes No

3 Check and ensure Slump-Flow of concrete Should be

in the range of 630m ± 50mm

Yes No

POST CONCRETE

Sl.No Description Detail

1 Check and ensure that De shuttering of the form

should be done only after concrete attains the

required strength.

Yes No

2 Check and ensure that moisture is not allowed to

escape from the concrete till the end of curing

period.

Yes No

Regards

Shreedhar R Revankar

Asst Manager-Technical Services

Phone: +91 80 25634138 Mobile: 09945395623, E-Mail: [email protected]

Postal Address: BASF India Ltd. (Construction Chemical Division) Pvt. Ltd, 29, Krishna Nagar