Instr ument Dept. STEP # 01 Type the After put ORC2 C CHE C C P PRE V V 1: CHECKING TCODE (Tra tting in the c C CKING , , V VENTI V V G PREVENTI ansaction Co code a new p , , R REL E E V VE M M A A VE MAINTEN ode) ip19 in page will ope E EASIN G G A AINTE N N NANCE PLAN the comman en as shown G G AND N NANC E E N NUMBER. nd field as sh n in the figur C CLOS E E O ORD . hown in figu re below Pag ING ERS ure below, e | 1

Upload: maaz-khan

Post on 02-Feb-2016

216 views

Category:

Documents


0 download

DESCRIPTION

Guide to SAP

TRANSCRIPT

Page 1: Checking, Releasing and Closing Preventive Maintenance Orders

Instr

 

ument Dept. 

STEP # 01Type the  

 

 

 

 

 

 

 

 

After put

 

 

 

 

 

 

 

 

 

ORC‐2 

CCHHEECCPPRREEVV1: CHECKING TCODE (Tra

tting in the c

CCKKIINNGG,,VVEENNTTIIVV

G PREVENTIansaction Co

code a new p

,,  RREELLEEVVEE  MMAA

VE MAINTENode) ip19 in 

page will ope

EEAASSIINNGGAAIINNTTEENN

NANCE PLANthe comman

en as shown

GG  AANNDDNNAANNCCEE

N NUMBER.nd field as sh

n in the figur

CCLLOOSSEE  OORRDD.  hown in figu

re below 

P a g

IINNGG  EERRSS  

ure below, 

e  | 1 

Page 2: Checking, Releasing and Closing Preventive Maintenance Orders

Instr

 

ument Dept. 

Click on gbelow. 

 

 

 

 

 

Now perf

1. D2. C

sh

 

 

 

 

 

 

 

Now, in tclicking tshown be

 

 

 

 

 

ORC‐2 

get variant ic

form two ste

Delete TEC_Plick the highhown below

the newly aphe window welow, 

con as highli

eps, 

PM_02 hlighted iconw, 

ppeared winwill disappe

ighted with 

n marked “2”

ndow select tar. This will 

a redbox, a 

”. Clicking th

the variant hselect the va

new window

hat will make

highlighted, ariant. Now 

w will appea

e another wi

and click theclick the exe

P a g

r as shown 

indow appea

e tick icon. Aecution icon

e  | 2 

ar as 

After n as 

Page 3: Checking, Releasing and Closing Preventive Maintenance Orders

Instr

 

ument Dept. 

A new w

  

 

 

 

 

 

 

 

 

 

Clicking toverview(marked 

 

 

 

 

 

 

If Order nhighlightthe back 

 

 

 

ORC‐2 

indow will a

the tick will mw will come a“1”) and the

number is noed with redbicon marke

ppear, click 

make the wias shown beeir Orders (m

ot present mbox marked d “3” in the 

the tick in th

indow disaplow, it has tmarked “2”) 

marked “2”, “1”, then exabove pictu

hat window 

pear and a nhe informatas shown be

Please note xit to Home ure. 

as shown be

new screen hion about thelow, 

down the MScreen by p

elow, 

having the Phe Maintena

Maintenanceressing F12 

P a g

PM plan ance Plans 

e Plan numbor by clickin

e  | 3 

ber g 

Page 4: Checking, Releasing and Closing Preventive Maintenance Orders

Instr

 

ument Dept. 

STEP # 02After rea

 

 

 

 

Typing inpaste, as

 

 

 

 

 

After pre

Highlightpressing generate

 

 

 

 

 

 

 

 

 

ORC‐2 

2: RELEASINaching the Ho

n the code, as shown belo

essing “Enter

t the Job & pthe floppy ded as shown 

NG PM PLANome Screen 

a new screenow 

r” a new scre

press the gredisk icon mabelow, now

N AND GENRtype in the 

n will appear

een will app

een flag iconrked “2” an 

w reach the h

ATING PM PTCODE ip10

r where the

pear (shown 

 marked “1”order no. aghome screen

PLAN ORDER0 in the comm

copied main

below)  

” the order wgainst the mn by pressing

R.  mand field, a

ntenance pla

will be releasaintenance g F12. 

P a g

as shown be

an no. is to b

sed and by plan no. wil

e  | 4 

elow 

be 

l be 

Page 5: Checking, Releasing and Closing Preventive Maintenance Orders

Instr

 

ument Dept. 

In order tOrder nu   

 

 

 

 

 

 

After get

 STEP # 03After perReach th

 

 

 

 

 

And in th

 

 

 

 

 

ORC‐2 

to check theumber is gen

tting the Ord

3: PM ORDErforming thee Home Scre

he new scree

e newly genenerated as sh

der No. ”PE

ER TIME CONe PM it is reqeen and type

en type the o

erated PM ohown in the 

RFORM TH

NFIRMATIONquired to rune in the TCO

order no. as 

order, followbelow pictu

E PREVENT

N.  n the time coODE iw48 in t

shown belo

 the STEP # re. 

TIVE MAINT

onfirmation,the comman

ow 

01 it will be 

TENANCE IN

, to do so fond field, as s

P a g

seen that th

N THE FIELD

llow Step 03hown below

e  | 5 

he 

D”. 

3. w 

Page 6: Checking, Releasing and Closing Preventive Maintenance Orders

Instr

 

ument Dept. 

Pressing 

 

 

 

 

 

 

 

 

 

type in thhighlight

click the particula

 

 

 

 

 

 

 

 

 

 

Once youCtrl+Shif

ORC‐2 

F8 key or cli

he job relateed with redb

icon            , r step param

u have enterft+F2. 

icking the ex

ed details i.ebox in the p

this will selemeters accor

red the para

xecution icon

e. EMP. CODE,icture above

ect all the strding to the 

meters, clic

n             will 

START/END Da

e. Once all th

teps of the PPM. 

k the Check 

make a scre

ate & Time an

he details ar

PM Job as sh

Confirmatio

een appear, 

d STATUS  in tre entered, p

own below. 

on Icon          

P a g

as shown be

the fields press F9 key 

Now edit th

    or press 

e  | 6 

elow 

or  

he 

Page 7: Checking, Releasing and Closing Preventive Maintenance Orders

Instr

 

ument Dept. 

As you clsteps as s 

 

 

 

 

 

 

 

 

Once all tCtrl+S ormessage

 

 

Perform reach the

 STEP # 04Once thethe ordeshown be

 

 

 

 

ORC‐2 

ick the Checshown below

the jobs havr by clicking t at the botto

the above me home scre

4: CLOSING e time confirr, after reacelow. 

ck Confirmatw; this confi

ve been checthe Floppy Icom of the pa

mentioned sten by pressi

THE ORDERrmation is dohing the Hom

tion Icon, a srms that all 

cked, next stcon. As you age as shown

teps for all ting F12. 

R.  one, it is reqme Screen ty

small green the steps ha

tep is to savesave the PMn below. 

he PMs. Afte

uired to closype in the TC

check           ave been che

e the PM; thM SAP will ac

er receiving 

se the OrderCODE iw32 

will appear ecked on SA

his can be docknowledge 

the messag

r. Follow Stein the comm

P a g

in front of thAP.  

one by pressyou with a 

e for the las

ep 04 to closmand field, a

e  | 7 

he 

sing 

t PM 

e s 

Page 8: Checking, Releasing and Closing Preventive Maintenance Orders

Instr

 

ument Dept. 

After pre

 

 

 

 

 

 

Types in new scre

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ORC‐2 

essing Enter 

the Order neen will appe

a new Scree

o. to be closear containin

en will appea

sed on the fing all the inf

ar as shown 

eld highlightformation re

below 

ted with theegarding the

e redbox and PM Order a

P a g

d press Entera shown belo

e  | 8 

r a ow 

Page 9: Checking, Releasing and Closing Preventive Maintenance Orders

Instr

 

ument Dept. 

Type in tby clickinwindow wthe little 

 

 

 

 

 

This will the botto

After thishighlight

 

 

ORC‐2 

he person ang the technwill appear agreen tick, 

complete thom of the pa

s the order’sed with a re

ssigned to thically complasking you to

he Job and Oage as shown

s status will edbox. 

he job in theete icon mao specify the

Order and SAn below. 

be marked a

e field markerked with “2e completion

AP will ackno

as technicall

ed with “1”, 2” or by presn date. Afte

owledge you

y completed

and then cossing (Ctrl + r entering th

 with the co

d as shown b

P a g

omplete the F12). A newhe date click

onfirmation o

below 

e  | 9 

job w k on 

on