SOME CHARTERING ABREVATIONS
Collected by Capt. Jerzy T. Idzikowski – Master Mariner
AA – Always Afloat
AAAA – Always Afloat Always Accessible
a/c - account
AGW – all going well
agw – all going well
amgencon – amended Gencon
APS – Arrival Pilot Station
A.R.A. - Antwerp, Rotterdam and Amsterdam range of ports
A.S.A. – always safely afloat
a.s.a.p. – as soon as possible
asf – as follows
as per nype (New York Produce Exchange Time Charter Party 1946), Clause 6
A.T.A. – Actual Time of Arrival
A.T.D – Actual Time of Departure
ATDNSHINC – Any Time Day/Night Sundays and Holidays Included
A.T. – American Terms (also A/T) (Grain Trade)
ATDNSHINC – Any Time Day/Night Sundays and Holidays Included
Atdnshinc - at day night Sunday holiday included), laycan 15/25 May 2002.
A.T.S.B.E - All Time Saved Both Ends
a.t.s.b.e. - All Time Saved Both Ends
A.T.S.D.O. - All Time Saved Discharging Only
1
a.t.s.d.o. - All Time Saved Discharging Only
A.T.S.L.O. - All Time Saved Loading Only
a.t.s.l.o. - All Time Saved Loading Only
awiwl - always with Insurance Warranty Limits
A.W.T.S.B.E - All Working Time Saved Both Ends
a.w.t.s.b.e - All Working Time Saved Both Ends
A.W.T.S.D.O. - All Working Time Saved Discharging Only
a.w.t.s.d.o. - All Working Time Saved Discharging Only
A.W.T.S.L.O. - All Working Time Saved Loading Only
a.w.t.s.l.o. - All Working Time Saved Loading Only
bb - ballast bonus
B.B. – Bar Bound (Grain Trade)
B.B. – Below Bridges
B.B.B. – Before Breaking Bulk
BDI – Both Dates Inclusive
be – both ends
BENDS – Both Ends (Load and Discharge Ports)
BFI - Biffex Freight Index
B/H – Bill of Health
B/H – Bordeaux, Hamburg range of ports
BI – Both Inclusive
B/L – Bill of Lading
BS/L – Bills of Ladingb.m. – Board Measure (Timber Trade)
B.m. – Board Measure (Timber Trade)
2
B.M. – Board Measure (Timber Trade)
BOB – Bunkers on Board
B.ofL (cl) – Clean Bill of lading
BROB – Bunkers Remaining on Board
bss – basis
BSS – basis
BT – Berth Terms
bw – brackish water (1.014 – 1.015)
BWAD – Brackish Water Arrival Draft
cancl. – cancelled, cancelling
CBM – Cubic Metre
c. & f. – Cost and Freight
C. & F. – Cost and Freight
c.f.i. – Cost, freight and insurance
C.f.o. – Cost for orders
CFT – Cubic Feet
chabe – Charterers agents both ends
CHABE – Charterers agents both ends
chadi – Charteres agents at discharging port
CHADI – Charteres agents at discharging port
chalo – Charterers agents at loading port
CHALO – Charterers agents at loading port
c.i.f. – Cost, insurance and freight
c.i.f. & c. – Cost, insurance, freight and commission
C.I.F. & C. – Cost, insurance, freight and commission
3
c.i.f. - e. – Cost, insurance, freight and exchange
C.I.F. - E. – Cost, insurance, freight and exchange
c.i.f.c. & e. – Cost, insurance, freight, commission and exchange
C.I.F.C. & E. – Cost, insurance, freight, commission and exchange
COA – Contract of Affreightment
COACP – Contract of Affreightment Charter Party
COGSA – Carriage of Goods by Sea Act
COP – Custom of PortC/P (CP) – Charter Party
CQD – Customary Quick Despatch
CROB - Cargo Remaining On Board
CST – Centistroke
CUFT – Cubic Feet
cwt – hundred weight
d/a – days after acceptance
DAP – Days All Purposes (Total days for loading and discharging)
DEM – Demurrage
DESP – Despatch
d.f. – dead freight
dfrt – dead freight
DHDATSBE – Demurrage Half Despatch on all Working Time Saved Both Ends
DHDWTSBE – Demurrage Half Despatch on all Working Time Saved Both Ends
DLOSP – Dropping Last Outward Sea Pilot
dnt – max. draft neap tide
4
DO – Diesel Oil
DOP – Dropping Outward Pilot
DWAT – Deadweight all told
DWCC – Deadweight Cargo Capacityeaon – excepted as otherwise noted
EIU – Even If Used
EAT – earliest arrived Time
ee – errors excepted
eiu – even if used
ETA – Expected Time of Arrival
ETC – Expected Time of Completion
ETS – Expected Time of Sailing
FAC – Fast As Can
F.DESP – Free Despatch
F.DIS (FD) – Free Discharge
FHEX – Fridays Holidays Excluded
FHINC – Fridays Holidays Included
f.i.o. – Free in and out
fioextrim – Free in and out excluding trimming (przewoźnik nie ponosi kosztόw załadunku i wyładunku, a jedynie koszt trymerki w porcie załadunku)
f.i.o.s. – Free in and out and stowed (przewoźnik nie ponosi kosztόw załadunku, sztauerki i wyładunku)
FIOST – Free In and Out Spout Trimmed
f.i.o.t. – Free in and out and trimmed (przewoźnik nie ponosi kosztόw załadunku, trymerki i wyładunku)
FIOT - Free In and Out Trimmed
5
FO – Fuel Oil
f.o. – Full out terms (Grain Trade)
f.o.b. – Free on board
f.ob.s. – free on board and stowed
f.o.b.t. – free on board and trimmed
FOG – For Our Guidance
f.o.s. – Free on ship
fow – frst open water
Frt. – FreightFrt. Fwd. – Freight forward
Frt. Ppd. – Freight prepaid
FW – Fresh Water
FWAD – Fresh Water Arrival Draft
FWDD – Fresh Water Departure Draft
FYG – For Your Guidance
fyi/r – for your information / reference
GA – General Average
GENCON –The Baltic and International Maritime Conference Uniform General Charter – (Revised 1922 and 1976)
G.F. – Government form
G.O. – Gas oil
GTEE – GuaranteeH.E. – High Explosive
H.F.O. – Heavy Fuel Oil
h.g.s.s. – Heavy grain, Soyas, Sorghum
h.h.d.w. – Heavy handy deadweight scrap
6
H.L. – Heavy Lift
H.S.S. – Heavy grain, Soyas, Sorghum
IFO – Intermediate Fuel Oil
IMDG – International Maritime Dangerous Goods Code
IMO - International Maritime Organisation
inclot – including overtime
iutautc – if used, time actually used to count
I.W.L. - Institute Warranty Limits
laycan – lay days cancellation
LAYCAN – Layday Cancelling date
l/h’less cgo – loaded harmless cargo
L.H.A.R. – London, Hull, Antwerp or Rotterdam
L.I.F.O. – Liner in free out
l.i.f.o. – last in first out
L.L.T. – London Landed Terms
L.O. – Lubricant Oil
LOI – Letter of IndemnityL.S. – Lump Sum
L.T. - Liner Terms
LT (LTONS) – Long Tons
M.D.O. – Marine Diesel Oil
MGO – Marine Gas Oil
MIN/MAX – Minimum/Maximum (Cargo Quantity)
Misc. – miscellaneous
MOLCHO – More or Less Charteres Option
7
molco – more or less Charterers option
moloo – more or less Owners option
M.O.L.O.O. – more or less Owners option
MOLOO – More or Less Owners (Master’s) Option
M/R – Mate’s Receipt
MT (MTONS) – Metric Tonnes
nabsa – not always afloat but safe aground
NABSA – Not Always Afloat But Safely Aground
NCB – National Cargo Bureau
n.e.i. – Not elsewhere included
n.e.p. – Not elsewhere provided
n.e.s. – Not elsewhere shown
n.o.p. – Not otherwise providedN.O.R. – Notice of Readiness
NOR – Notice of Readiness
n.o.r. – Not otherwise rated
N.O.R.A. – Notice of Readiness Accepted
N.O.R.T. – Notice of Readiness Tendered
N.O.R.T. & A. - Notice of Readiness Tendered and Accepted
N/R – Notice of Readiness
nype – New York produce exchange time Charter Party 1946
o.a.a.o.o.p. – on arrival at or off the port
p.c. – part cargo
pdpr – per day per rate
phpwwd – per hatch per weather working day
8
p.p. – Picked Ports
ppt - prompt
p.t. – private terms
PUT – Port Utility Taxes
p.w. – per week
pwwd SatPMSHex uu – per weather working day Saturday PM, Sunday and Holiday excepted unless used
PWWDSATPMSHEXUU - per weather working day Saturday PM, Sunday and Holiday excepted unless used
q.c. – Quality at Captain’s optionROB – Remaining On Board
RPM – Revolutions Per Minute
SatPMSHex uu - Saturday PM, Sunday and Holiday excepted unless used
SATPMSHEX UU - Saturday PM, Sunday and Holiday excepted unless Used
SATSHEX – Saturday, Sunday, Holidays Excluded
SATSHINC - Saturday, Sunday, Holidays Included
SB – safe Berth
sb(s), sp(s), sa(s) except nabsa in Brazil / Argentina grain - safe berths, safe ports, safe anchorages, except not always afloat but safely aground in Brazil / Argentina when loading grain).
SHex – Sundays, Holidays excepted
SHEX – Sundays and Holidays Excepted
SHEX - Sundays and Holidays Excluded SHEXEIU – Sundays and Holidays excepted even if used
SHEXUU – Sundays and Holidays excepted unless used
SHin – Sundays, Holidays included
9
SHINC - Sundays, Holidays Included
SOF – Statement of Facts
SOFA – South Of Africa
SP – Safe Ports
ST – Short Tonnes
STEM – Subject To Enough Merchandise
SWAD – Salt Water Arrival Draft
SWDD – Salt water Departure Draft
TBL – Through Bill of Lading
TC – Time Charter
T/C – Time Charter
TCP – Time Charter Party
T.E.U. – Twenty four Equivalent Unit (Container Transport)
UBL – Uniform Bill of Lading
USC – Unless Sooner Commenced
USDA – United States Department of Agriculture
USNH – United States North of Hatteras
uu - unless used
UU - unless used
UUIWCATUTC – Unless Used In Which Case Actual Time Used To Count
USD – Unites States Dollar
USEC – United States East Coast
USNH – United States North of Hatteras
USPAC – United States Pacific CoastUSWC – United States West Coast
10
UTC – Universal Time Co-ordinated
WCCON – Whether Customs Cleared or Not
W.F.A. – With following alternation
wibon – Whether in Berth or Not
WIBON – Whether in Berth or Not
WIFPON – Whether in Free Pratique or NOT
wipon – Whether in Port or Not
WIPON – Whether in Port or Not
WLTHC – Water Line to Top of Hatch Coaming
W.O.G. – With other goods; Without guarantee
WOG – Without Guarantee
WORKING COPY – Copy of Charterparty – not signed and may contain unchecked errors
wp – weather permits
WP – Weather Permitting
w.r. – war risk
WTS – Working Time Saved
W.W.D. – Weather working days
WWD – Weather Working Days
W.W.D.SHEX – Weather working days Sundays and holiday excepted
W.W.D.SHINC - Weather working days Sundays and holiday included
W.W.R – When, where ready
WWR – When, Where Ready
W/O OBSL – without (presentation) original Bills of Lading
Z - GMT
11
Example:
Delivery will take the place on passing Cape Passero westbound atdnshinc(at day night Sunday holiday included), laycan 15/25 May 2002.
Trading always via sb(s), sp(s), sa(s) except nabsa in Brazil / Argentina grain.(Safe berths, safe ports, safe anchorages, except not always afloat but safely aground in Brazil / Argentina when loading grain).
Loading ports only as per nype (New York Produce Exchange Time Charter Party 1946), Clause 6 awiwl (always with Insurance Warranty Limits).
PHRASES
FIXTURE – much-used word for a concluded agreement between the Owners and Charterer for sea transport of cargo or T/C OUT
FIXED – much-used word to describe that a fixture has been made, and/or that a specific vessel is to lift a particular cargo
NOMINATED – much-used word to indicate that a specific vessel is scheduled to lift a particular cargo, often a COA (contact of Affreightment) cargo
ORDER CARGO TO NEAREST xx TONS – when cargo is delivered alongside by railway wagon, the cargo must be loaded to the nearest full wagon
REVERT /REVERING - further information will follow later
STEMMED – much-used word for “ORDERED”
SUB-CHARTERER – a company taking a vessel on T/C from the Charterer
SUBSTEM / SUBJECT STEM – depends upon commodity being available in sufficient quantity on time
T/C IN – vessel on T/C to the Owners
T/C OUT – vessel on T/C from the Owners to another company /Subcharterer
12
13