CHARM Update. J. Mekki. CHARM Update. Goal of the facility : Complex mixed particle field present within the accelerators Simultaneous effect (TID, DD, SEE ) - PowerPoint PPT PresentationTRANSCRIPT
(1/12)22/05/14 – RadWG meetingJ. Mekki
CHARM Update
J. Mekki
(2/12)22/05/14 – RadWG meetingJ. Mekki
CHARM Update
(3/12)22/05/14 – RadWG meetingJ. Mekki
East Area Facilities
24 GeV/c proton beam
(4/12)22/05/14 – RadWG meetingJ. Mekki
East Area Facilities
24 GeV/c proton beam
IRRAD proton facility
PH/DT
24 GeV/c proton beam
LHC experiments
(5/12)22/05/14 – RadWG meetingJ. Mekki
East Area Facilities
24 GeV/c proton beam
CHARMR2E Project
(6/12)22/05/14 – RadWG meetingJ. Mekki
East Area Facilities
24 GeV/c proton beam
Technica
l loca
l
Connection to
the ra
diation are
a
(7/12)22/05/14 – RadWG meetingJ. Mekki
East Area Facilities
24 GeV/c proton beam
Control roomDry run test
(8/12)22/05/14 – RadWG meetingJ. Mekki
East Area Facilities
24 GeV/c proton beam
Platform for the Dry Run test of
heavy equipment e. g. UPS,
Power converters
(9/12)22/05/14 – RadWG meetingJ. Mekki
CHARM
24 GeV/c proton beam
(10/12)22/05/14 – RadWG meetingJ. Mekki
Montrac conveyer
(11/12)22/05/14 – RadWG meetingJ. Mekki
News
(12/12)22/05/14 – RadWG meetingJ. Mekki
Thank you for your attention
(13/12)22/05/14 – RadWG meetingJ. Mekki
Varying Radiation FieldVarying Radiation Field
Lateral Positions
Lo
ng
itud
ina
l
Be
am
Po
s.
Full racks, crates, set of cards, componentsHEH: 107cm-2h-1 – 1010cm-2h-1, TID: 10mGyh-1 – 10Gyh-1
HEH: 108cm-2h-1 – 1011cm-2h-1
TID: 0.1Gyh-1 – 100Gyh-1
(gradients to be considered)
Beam Position
target in:HEH: >1011cm-2h-1 TID: >100 Gyh-1
target out:HEH: >1013cm-2h-1 TID: >10 kGyh-1