CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital cost , rare earths projects 1 For personal use only

Upload: others

Post on 13-Apr-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

CHARLEY CREEK ALLUVIAL REE PROJECT

Mining the Territory, September 2013

Developing one of the world’s largest, lowest capital cost, rare earths projects

1

For

per

sona

l use

onl

y

Page 2: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

Mining the Territory, September 2013 2

This presentation should not be considered as investment advice. Any party to whom this information is made available mustmake their own investment decisions. Any forward-looking statements included in this document involve subjective judgment,and are subject to uncertainties, risks and contingencies, which may be beyond the control or knowledge of Crossland.

Future events may vary materially from the forward-looking statements and the assumptions on which the forward-lookingstatements are based. Attendees at this presentation are cautioned not to place undue reliance on such forward-lookingstatements.

Crossland makes no representation or warranty as to the accuracy, reliability or completeness of information in this document anddoes not take responsibility for updating any information or correcting any error or omission which may become apparent afterthis document has been issued.

JORC Statement. The information in this presentation that relates to Exploration Targets, Exploration Results, or Mineral Resources isbased on information compiled by Geoffrey S Eupene FAusIMM CP, a Competent Person who is a Fellow of the Australasian Institute ofMining and Metallurgy. He is a director of the Company and a full time employee of Eupene Exploration Enterprises Pty Ltd, which isengaged by the Company. He has sufficient experience which is relevant to the styles of mineralisation and types of deposits underconsideration, and to the activity which is being undertaken to qualify as a Competent Person as defined in the 2012 edition of the‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (the JORC Code). Geoffrey S Eupene hasconsented to the inclusion in the report of the matters based on his information in the form and context in which it appears.

ASX Listing Rules Statement re Production Targets. This presentation is based upon a production target and forecast financialinformation derived therefrom that was initially reported in CUX ASX Release of 15th April 2013: “Charley Creek Rare Earth ProjectScoping Study Results”. The assumptions underpinning the production targets therein continue to apply and have not materiallychanged. Some of the production target is based upon an exploration target. The potential quantity and grade of a exploration target isconceptual in nature, there has been insufficient exploration to determine a mineral resource and there is no certainty that furtherexploration work will result in the determination of mineral resources or that the production target itself will be realised.

For

per

sona

l use

onl

y

Page 3: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

3

Working towards production in 2016

Charley Creek REE Project situated in NT

Located 1hr from Alice Springs

Drilling has tested 1% of explorationpotential

Very low risk simple mineral sandsprocess

High proportion of Heavy and CriticalRare Earths

Excellent infrastructure

Favourable regulatory regime

Mining the Territory, September 2013

For

per

sona

l use

onl

y

Page 4: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

4

The Cattle Creek/ Western Dam alluvial fan (350km2) shown by rough outline

The REE bearing minerals are separate mineral grains of monazite & xenotime contained in alluvium

The alluvium is readily mined and upgraded using conventional mineral sands technology.

Average thickness of resource is 15m, commencing from surface (no overburden) with some of the alluvial fans having thicknesses up to 80m

Vast alluvial flats are inexpensive & easy to rehabilitate

Mining the Territory, September 2013

For

per

sona

l use

onl

y

Page 5: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

5

20+ Year Mine Life on Existing Resource

RESOURCE Mass(Mt)

Weighted Average

TREO(ppm)

Contained TREO

(t)

Contained Xenotime

(t)

Contained Monazite

(t)

Contained Zircon

(t)

Cattle Creek Indicated Resource 250 280 69,900 17,600 97,200 124,650

Western Dam Indicated Resource 137 323 44,150 9,675 63,700 70,930

TOTAL INDICATED RESOURCES 387 295 114,050 27,275 160,900 195,580

Cattle Creek Inferred Resource 353 291 102,750 26,450 141,075 183,750

Western Dam Inferred Resource 65 282 18,350 4,240 26,160 36,230

TOTAL INFERRED RESOURCE 418 289 121,100 30,690 167,235 219,980

Mining the Territory, September 2013

For

per

sona

l use

onl

y

Page 6: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

6

Multiple REE Alluvial Fans - Decades of REO Supply?Mining the Territory, September 2013

For

per

sona

l use

onl

y

Page 7: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

7

Experienced Independent Advisor Team

Mineral Sands process experts Specialized in testwork and flowsheet development for mineral

sands project

Resource development consultants Specialist in alluvial processing Expertise in scoping and feasibility studies through to basic and

detailed design, construction and commissioning

GHD is one of the world’s leading engineering, architecture and environmental consulting companies

6500 people across five continents

Mining the Territory, September 2013

For

per

sona

l use

onl

y

Page 8: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

8

PROJECTFINANCIALS

Net Present Value (NPV10)* A$302M

Internal Rate of Return 39.4%

CAPITALEXPENDITURE

Total Capex (including contingency) A$156M

Payback period 2.5 years

REVENUE

Annual revenue (75% off-take terms) A$154M pa“Basket Price” of REO product (Mar 2013) US$57.38/kgOperating Unit Cash Cost A$7.12/t ROM

PRODUCTION

Concentrate annual production (40% REO) 10kt/yrREO Production (as mixed carbonate) 3,645t/yrOverall metallurgical recovery 60.8%

Mining the Territory, September 2013

*An Exploration Target of 60 to 100Mt at grades of 500 to 1,000ppm TREO, that would contain 30,000t to 100,000t TREO is the priority ofthe upcoming Resource drill out program. This target is conceptual in nature, and there has been insufficient exploration to estimate aMineral Resource, and it is uncertain if further exploration will result in the estimation of a Mineral Resource.

For

per

sona

l use

onl

y

Page 9: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

9

Capital Item AUD $

Mining Field Units $9,560,189

Wet Concentrator Plant $55,257,469

Dry Concentrator Plant $12,728,878

REO Refinery $15,799,437

Infrastructure $26,938,914

TOTAL DIRECTS $120,284,887

Indirects $5,672,830

EPCM $17,565,280

Contingency $12,734,166

TOTAL CAPEX $156,257,164

Charley Creek is one of the lowest capital cost undeveloped REE projects globally .

On an annualised basis, its capital cost is equivalent to US$43/kg REO pa.

Capital cost is inclusive of all infrastructure.

Includes contingency allowance ($12.7M)

CUX

Mining the Territory, September 2013

For

per

sona

l use

onl

y

Page 10: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

10

Charley Creek is a high tonnage ‘mineral sands’ style operation.

Total C1 cash costs is $7.12/t ROM or $21.16/kg REO production.

Several areas to reduce costs have been identified:

Higher grade starter pit areas to be drilled in next phase.

Several process improvements expected to increase overall metallurgical recovery.

Potential refinery reagents savings through process improvements.

SCOPING STUDY OPERATING COST ESTIMATE PRESENT OPTIMISATION PHASE

8.68

5.030.92

5.870.67 21.16

15.00

Mining the Territory, September 2013

TARGETING30%SAVING

For

per

sona

l use

onl

y

Page 11: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

11

March 2013 China FOB spot price was assumed for Scoping Study

Charley Creek basket price was US$57.38/kg REO.

TREO composition contains 18.3% HREOs.

US Department of Energy has assessed Nd, Eu, Tb, Dy & Y to be in critical shortage

These five elements are commonly referred to as Critical Rare Earth Elements (CREE)

Charley Creek contains 30% CREEs by weight and they represent approximately 80% of our basket price.

Mining the Territory, September 2013Source: Metal Pages, CUX

Critical

Critical

Critical

Critical

Critical

Pricing Date

For

per

sona

l use

onl

y

Page 12: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

12

Unusual alluvial deposits having a broad spectrum of heavy and critical rare earths from monazite and xenotime

Charley Creek has one of the highest HREE &CREE distributions

Not dependent on LREE metal prices.

CUX

Source: TMR, Metal PagesMining the Territory, September 2013

For

per

sona

l use

onl

y

Page 13: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

13

Low risk mining and processing

Simple gravity spiral plant.

Tailings returned by pumping to pit void.

Wet & Dry Plant flowsheets confirmed via pilot test work.

Final heavy mineral concentrate from Dry Plant contains 40% TREO.

Refinery low capital due to high REO grade.

Feed rate only 1.2 tonne / hr

Excellent extraction using sulphuric acid roast and water leach (>95% REE extraction)

High purity mixed rare earth carbonate produced (97-99% purity RE Carbonate)

Expecting radionuclide free mixed carbonate product

Mining the Territory, September 2013

For

per

sona

l use

onl

y

Page 14: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

Low cost mining – simple excavation

− Does not require costly drilling, blasting and crushing associated with hard rock deposits

Fully liberated monazite and xenotimemineral grains in alluvial sand

Gravity spirals demonstrated good heavy mineral (HM) recoveries to concentrates with 8-12% TREO

Electrostatic and magnetic separation can easily separate rare earth minerals from ilmenite, rutile, zircon and other heavy minerals

Final mineral concentrate contains >40% TREO

14Xenotime

Mining the Territory, September 2013

Monazite

Final Mineral Concentrate (40% TREO)

For

per

sona

l use

onl

y

Page 15: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

15

Mine site located ~100km from Alice Springs.

Fly-in/Fly-out operation with 150 personnel camp and mess facility.

Targeting at least 30% local aboriginal workforce plus contractors

Amadeus Basin Gas Pipeline to provide gas to BOO power station.

Three large borefields targets have been identified and will be drilled in next phase.

REO Refinery may be located 30km from Alice Springs (DIDO).

All reagents to be transported to site (no acid plant: quantities required are too small).

Mining the Territory, September 2013

ALICESPRINGS

25km

For

per

sona

l use

onl

y

Page 16: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

16

Secure funding for DFS (commenced, with securing of investment of HK Rare Earths Sdn Bhd)

Drill high grade zones

Continue optimisation test work to achieve lower operating costs

Undertake pilot beneficiation program

Undertake Refinery pilot program

Complete environmental impact study (EIS)

Undertake detailed engineering

Secure refinery offtake agreement and financing options

Mining the Territory, September 2013

For

per

sona

l use

onl

y

Page 17: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

17

Crossland is currently exploring links with additional potential strategic investors to partner in the development of Charley Creek.

Additional strategic partners might be:

i. Rare earth traders seeking to secure long-term off-take supply.

ii. Rare earth refiner seeking to secure off-take as refinery feedstock.

iii. Rare earth end user seeking to secure long term, stable supply of raw material.

Mining the Territory, September 2013

For

per

sona

l use

onl

y

Page 18: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

18

Ticks these boxesCattle Creek Resource size >230k t of contained TREO (still very much open: from a

small part of one of several large alluvial fans)

Mineralogy Preferred monazite and xenotime

HREE & CREE Composition 18% HREE and 30% CREE by weight80% of $57/kg basket price is CREE

Low capital cost $156 M to produce 3,600tpa high purity REO Carbonate

Low cost mining and processing Proven low risk heavy mineral sand process technology

Scalable Base case on 50% of current resource in part of one alluvial fan; long term concept is to replicate production centres with different investor mixes on different zones

Location Northern Territory , Australia

Infrastructure Road, Rail, Power and People

Regulatory regime 60 year history of mining radioactive materials

Early start-up Pilot plant 2013/14 and full scale production 2016Mining the Territory, September 2013

For

per

sona

l use

onl

y

Page 19: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

CUX DIRECTORSName Position

Bob Richardson Chairman

Geoff Eupene Executive Director

Peter Walker Non-Executive Director

Malcolm Smartt Finance Director

Sia Hok Kiang Non-Executive Director

CORPORATE SUMMARYASX code: CUX

Shares on issue: ~186 million

Options on issue: ~53 million

Total Shares (fully diluted): ~239 million

Market Capitalization $6.0 million

Mining the Territory, September 2013

For

per

sona

l use

onl

y

Page 20: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

20Mining the Territory, September 2013

For

per

sona

l use

onl

y

Page 21: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

21Mining the Territory, September 2013

Low risk mining and processing

Simple gravity spiral plant.

Tailings pumped to pit void.

Wet Plant flowsheet confirmed via full-scale spiral pilot test work.

Wet Plant concentrate 8-12% TREO.

Dry plant fully tested at pilot scale.

Dry Plant concentrate 40% TREO.

Large volume of final dry plant concentrate now available for downstream testwork.

For

per

sona

l use

onl

y

Page 22: CHARLEY CREEK ALLUVIAL REE PROJECT For …2013/09/11  · CHARLEY CREEK ALLUVIAL REE PROJECT Mining the Territory, September 2013 Developing one of the world’s largest, lowest capital

22Mining the Territory, September 2013

Significantly lower capital due to high grade REO concentrate feed (~40% TREO)

Feed rate only 1.2 tonne / hr

Excellent extraction using sulphuric acid roast and water leach (>95% REE extraction)

High purity mixed rare earth carbonate produced (97-99% purity RE Carbonate)

Uranium by-product currently proposed to be sold to local uranium producer

Removal of cerium and possibly La to be examined to further value added mixed carbonate product

Expecting to produce radionuclide free mixed carbonate