charles fay shrp 2 research manager safety training ...sp.research.transportation.org/documents/2016...

18
Charles Fay SHRP 2 Research Manager Safety Training & Analysis Center Turner-Fairbank Highway Research Center FHWA | USDOT

Upload: others

Post on 03-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Charles Fay SHRP 2 Research Manager Safety Training ...sp.research.transportation.org/Documents/2016 RAC...• Expand access to these data, ... o Pending ½ day workshop at TRB 1/2017

Charles FaySHRP 2 Research ManagerSafety Training & Analysis CenterTurner-Fairbank Highway Research CenterFHWA | USDOT

Page 2: Charles Fay SHRP 2 Research Manager Safety Training ...sp.research.transportation.org/Documents/2016 RAC...• Expand access to these data, ... o Pending ½ day workshop at TRB 1/2017

Agenda

• STAC Goals / Actions Overview

• BAAs

• Training

• NDS Pooled fund

Page 3: Charles Fay SHRP 2 Research Manager Safety Training ...sp.research.transportation.org/Documents/2016 RAC...• Expand access to these data, ... o Pending ½ day workshop at TRB 1/2017

STAC NDS/ RID Support

Primary Audiences:

–State DOTs

–U.S. DOT

–Federal Agencies

Page 4: Charles Fay SHRP 2 Research Manager Safety Training ...sp.research.transportation.org/Documents/2016 RAC...• Expand access to these data, ... o Pending ½ day workshop at TRB 1/2017

STAC Goals and Actions

• Expand understanding of the SHRP2 NDS and RID– Training/informational material for a variety of audiences– Executive decision makers, Research Managers, Hands-on

• Expand access to these data, incl. Phase 2– Pilot test secure-remote data access– Secure data enclave

• Expand usability of these data– Data analysis tools and reduced data set development– EAR video analytic tools

• Expand use base– Research opportunities – fellowships, sabbaticals– BAAs, IAPs, Pooled Fund, Technical Assistance for states’ own projects

Page 5: Charles Fay SHRP 2 Research Manager Safety Training ...sp.research.transportation.org/Documents/2016 RAC...• Expand access to these data, ... o Pending ½ day workshop at TRB 1/2017

FHWA BAA (Broad Agency Announcement) Similar Phased Approach as IAPs

Page 6: Charles Fay SHRP 2 Research Manager Safety Training ...sp.research.transportation.org/Documents/2016 RAC...• Expand access to these data, ... o Pending ½ day workshop at TRB 1/2017

FHWA BAA (Broad Agency Announcement) Similar Phased

Page 7: Charles Fay SHRP 2 Research Manager Safety Training ...sp.research.transportation.org/Documents/2016 RAC...• Expand access to these data, ... o Pending ½ day workshop at TRB 1/2017

Training

• STAC developing pilot training (2016 – March 2017)

o CTRE – pilot RID training

o VTTI – pilot NDS training

o CTRE, VTTI: use NDS/ RID together

• Develop as modules that can be combined and tailored to a specific audience

• NHI will use this material to develop coursework (2017— )

Page 8: Charles Fay SHRP 2 Research Manager Safety Training ...sp.research.transportation.org/Documents/2016 RAC...• Expand access to these data, ... o Pending ½ day workshop at TRB 1/2017

Training

• Sr Executive : 30-60 min –TBD• Research Manager: ~ ½ day

o Pending ½ day workshop at TRB 1/2017

o Webinar series (three to four 1-1.5hr sessions)

o Est begin Nov 2016 and may run through Feb 2017

o Will be recorded • Hands-on analyst: ~ 3.5 days

o Week of 9/26/16 at TFHRC, McLean, VA

o Limited spots, if any – TBD; let me know ASAP

• Seeking feedback

Page 9: Charles Fay SHRP 2 Research Manager Safety Training ...sp.research.transportation.org/Documents/2016 RAC...• Expand access to these data, ... o Pending ½ day workshop at TRB 1/2017

48

SHRP2 Naturalistic Driving Study Pooled Fund:

Advancing Implementable Solutions

Page 10: Charles Fay SHRP 2 Research Manager Safety Training ...sp.research.transportation.org/Documents/2016 RAC...• Expand access to these data, ... o Pending ½ day workshop at TRB 1/2017

SHRP 2 Naturalistic Driving Study Pooled Fund: Advancing Implementable Solutions

• STAC – support to State DOTs with SHRP2 NDS/RID

– These data are not only new to DOTs but to researchers as well

– Pooled fund – best overall ‘vehicle’ to support DOTs

• The pooled fund would allow a strategic-coordinated approach – $70M investment for Safety but value extends to Operations, Planning, Design, ….

– Want to extract as much value from these data as possible –

• Address high priority needs, leverage resources (incl. data and data access), support research that builds on itself, avoid duplication of effort, and accelerate ‘sound’- actionable results

– Cross-cutting in nature and focus on advancing development of implementable solutions to support you and your agency now and in the future

Page 11: Charles Fay SHRP 2 Research Manager Safety Training ...sp.research.transportation.org/Documents/2016 RAC...• Expand access to these data, ... o Pending ½ day workshop at TRB 1/2017

SHRP 2 Naturalistic Driving Study Pooled Fund: Advancing Implementable Solutions

Objectives/goals:▪ To conduct groundbreaking research using the SHRP 2 NDS data and RID

that will result in a more efficient, reliable, and inherently safer experience for road users.

▪ To advance the development of implementable solutions that address issues of high-priority to State and Local transportation agencies with an emphasis on the broad areas of Safety, Operations, and Planning. ▫ This could include development and improvement of countermeasures,

development and improvement of predictive models and design guides, policy recommendations, etc …

▪ To create a venue for highway practitioners in the above broad areas to share information and collaborate on research that advances their individual disciplines and addresses cross-cutting areas, including but not limited to, the advancement of a connected-automated highway system.

Page 12: Charles Fay SHRP 2 Research Manager Safety Training ...sp.research.transportation.org/Documents/2016 RAC...• Expand access to these data, ... o Pending ½ day workshop at TRB 1/2017

SHRP 2 Naturalistic Driving Study Pooled Fund: Advancing Implementable Solutions

▪ While this will be an FHWA led pooled fund – very active participation from member State and Local agencies to determine the research that is undertaken.

▪ A Technical Advisory Committee (TAC) with representation from participating members will direct the pooled fund activities.

▪ TAC will define the research needs, determine yearly funding allocations for research, select the projects to be conducted, approve research teams, and oversee the work to ensure the objectives are met.

Page 13: Charles Fay SHRP 2 Research Manager Safety Training ...sp.research.transportation.org/Documents/2016 RAC...• Expand access to these data, ... o Pending ½ day workshop at TRB 1/2017

SHRP 2 Naturalistic Driving Study Pooled Fund: Advancing Implementable Solutions

▪ STAC would not only manage the fund and the finances, but also, with oversight and approval of the TAC, ‘serve the TAC’ (S-TAC) by developing work plans to address the TAC’s research needs, manage research contracting, and each individual project.

▪ When appropriate, other datasets that could supplement SHRP 2 data will be used to meet project objectives.

▪ The pooled fund will communicate and work with others in order to leverage research results and to work toward the common goal of a safer and more reliable experience for the road user.

Page 14: Charles Fay SHRP 2 Research Manager Safety Training ...sp.research.transportation.org/Documents/2016 RAC...• Expand access to these data, ... o Pending ½ day workshop at TRB 1/2017

SHRP 2 Naturalistic Driving Study Pooled Fund: Advancing Implementable Solutions

▪ A minimum contribution of $50,000 per State per year for a 5-year period, or a total of $250,000 per State is suggested. Waiver approved to use 100% State Planning and Research (SP&R) Funds w/out non-Fed match.

▪ While we encourage the suggested minimum contribution based on the cross-cutting scope and potential high impact of this pooled fund, we understand that this may be an issue for some. For those unable to contribute the suggested minimum – please contact Charles Fay - we want to encourage as much participation as possible.

▪ In addition to the waiver, FHWA will contribute $1 Million over the 5 years of the project.

Page 15: Charles Fay SHRP 2 Research Manager Safety Training ...sp.research.transportation.org/Documents/2016 RAC...• Expand access to these data, ... o Pending ½ day workshop at TRB 1/2017

SHRP 2 Naturalistic Driving Study Pooled Fund: Advancing Implementable Solutions

▪ Pooled fund study will not start until 2017

▪ Assume sometime within May – June 2017 timeframe will have first meeting of TAC at Turner Fairbank Highway Research Center in McLean, VA

▪ Pooled fund solicitation # 1427

▪ http://www.pooledfund.org/Details/Solicitation/1427

Page 16: Charles Fay SHRP 2 Research Manager Safety Training ...sp.research.transportation.org/Documents/2016 RAC...• Expand access to these data, ... o Pending ½ day workshop at TRB 1/2017

SHRP 2 Naturalistic Driving Study Pooled Fund: Advancing Implementable Solutions

Webinar series – are all recorded

• 4/5/16: NDS/RID overview; Pooled fund overview; 3 state DOTs (Al, IA, WA)

on value

• 5/17/16: Examples how data being used: 3 IAP projects (FL, MI, WA)

• 6/28/16: Examples how data being used: 2 IAP projects (MN, WY)

• 9/20/16: Examples how data being used (TBD) 1:00PM-2:30PM (ET)

• 11/1/16: Examples how data being used (TBD) 1:00PM-2:30PM (ET)

• Additional dates anticipated

Page 17: Charles Fay SHRP 2 Research Manager Safety Training ...sp.research.transportation.org/Documents/2016 RAC...• Expand access to these data, ... o Pending ½ day workshop at TRB 1/2017

Contact

Safety Training and Analysis Center

Office of Safety Research and Development

Turner-Fairbank Highway Research Center

• Charles FaySHRP2 Research ManagerPhone: 202–493–3336Email: [email protected]: 202–493–3374

• Yusuf MohamedshahSHRP2 Research AnalystPhone: 202-493-3464Email: [email protected]: 202–493–3374

https://www.fhwa.dot.gov/research/resources/stac/

Page 18: Charles Fay SHRP 2 Research Manager Safety Training ...sp.research.transportation.org/Documents/2016 RAC...• Expand access to these data, ... o Pending ½ day workshop at TRB 1/2017

Q & A

Old Marshall Hall Road in Accokeek, MD