JEE 632
1
Project Characteristics and Phrases
![Page 2: Chapter I Project Characteristics](https://reader034.vdocuments.us/reader034/viewer/2022042618/577cc55c1a28aba7119c2161/html5/thumbnails/2.jpg)
JEE 632
2
Project Characteristics
What is a project?
A project is a complex, non-routine, one-time effort limited by time, budget, resources, and performance specifications designed to meet customer needs.
![Page 3: Chapter I Project Characteristics](https://reader034.vdocuments.us/reader034/viewer/2022042618/577cc55c1a28aba7119c2161/html5/thumbnails/3.jpg)
JEE 632
3
Project CharacteristicsMajor characteristics of a project:
1. Established objectives.2. A defined life span with a beginning and an end.3. Involvement of several departments and professionals.4. Something that has never been done before.5. Specific time, cost, and performance requirements.
![Page 4: Chapter I Project Characteristics](https://reader034.vdocuments.us/reader034/viewer/2022042618/577cc55c1a28aba7119c2161/html5/thumbnails/4.jpg)
JEE 632
4
Project Characteristics
A project is a specific, finite task to be accomplished, with some attributes as :-
• purpose one-time activity, well defined objectives
• life cycle slow beginning, size build up, peak, decline, terminate
• interdependencies interact with other projects, or ongoing operations, or other departments of an organization
![Page 5: Chapter I Project Characteristics](https://reader034.vdocuments.us/reader034/viewer/2022042618/577cc55c1a28aba7119c2161/html5/thumbnails/5.jpg)
JEE 632
5
Project Characteristics
• uniquenessno two projects are alike• conflicts clients, parent organization,
project team, and the public
![Page 6: Chapter I Project Characteristics](https://reader034.vdocuments.us/reader034/viewer/2022042618/577cc55c1a28aba7119c2161/html5/thumbnails/6.jpg)
JEE 632
6
Project Characteristics Program
Projects
Tasks
Work packages
Work Units
![Page 7: Chapter I Project Characteristics](https://reader034.vdocuments.us/reader034/viewer/2022042618/577cc55c1a28aba7119c2161/html5/thumbnails/7.jpg)
JEE 632
7
Project CharacteristicsProgram Life Cycle : S-Curve
% C
ompl
etio
n
Time
slow start
slow finish
quick momentum
![Page 8: Chapter I Project Characteristics](https://reader034.vdocuments.us/reader034/viewer/2022042618/577cc55c1a28aba7119c2161/html5/thumbnails/8.jpg)
JEE 632
8
Project CharacteristicsProgram Duration vs Project Cost
Cost
Time
![Page 9: Chapter I Project Characteristics](https://reader034.vdocuments.us/reader034/viewer/2022042618/577cc55c1a28aba7119c2161/html5/thumbnails/9.jpg)
JEE 632
9
Major Project Phases
• Business Planning ..... Initial Project• Screening .... Select Facilities• Definitive Planning ..... Establish Design Bases• Design ..... Define Selected Facilities• Execution ..... Engineering, Proc., Const.• Start-Up .... Commissioning
BusinessPlanning Screening Definitive
Planning Design Execution Start-Up
![Page 10: Chapter I Project Characteristics](https://reader034.vdocuments.us/reader034/viewer/2022042618/577cc55c1a28aba7119c2161/html5/thumbnails/10.jpg)
JEE 632
10
Major Project Phases
Business Planning and Screening
• Reason for Capital Investment• Scope of Facilities Required (Roughed Out)• Philosophy and Project Execution Plan• Class V Cost Estimate• Justification
![Page 11: Chapter I Project Characteristics](https://reader034.vdocuments.us/reader034/viewer/2022042618/577cc55c1a28aba7119c2161/html5/thumbnails/11.jpg)
JEE 632
11
Major Project Phases
Definitive Planning
• Design Bases• Preliminary Milestone Schedule• Site Data• Further Development of Project Execution Plan• Class III Cost Estimate
![Page 12: Chapter I Project Characteristics](https://reader034.vdocuments.us/reader034/viewer/2022042618/577cc55c1a28aba7119c2161/html5/thumbnails/12.jpg)
JEE 632
12
Major Project Phases
Basic Design
• Development of Specification– Owner Basic Practices– Process Design Specifications
• Review of Constructability, Operability, Maintainability• Finalize Initial Issue of Project Execution Plan &
Schedule• Class II Cost Estimate
![Page 13: Chapter I Project Characteristics](https://reader034.vdocuments.us/reader034/viewer/2022042618/577cc55c1a28aba7119c2161/html5/thumbnails/13.jpg)
JEE 632
13
Major Project Phases
Detailed Engineering and Procurement
• Translate Design Specifications, Basic Practices, etc., into :– Construction Drawings– Specifications– Purchase Orders
• Major Effort by :– Contractor– In-House Engineering Group
![Page 14: Chapter I Project Characteristics](https://reader034.vdocuments.us/reader034/viewer/2022042618/577cc55c1a28aba7119c2161/html5/thumbnails/14.jpg)
JEE 632
14
Major Project Phases
Construction
• Translate Detailed Engineering into A Plant• Major Effort by Contractor
![Page 15: Chapter I Project Characteristics](https://reader034.vdocuments.us/reader034/viewer/2022042618/577cc55c1a28aba7119c2161/html5/thumbnails/15.jpg)
JEE 632
15
Major Project Phases
Start-Up and Operation
• Completion and Turn-Over Activities• Start-Up Procedures Preparation and Execution• Contractor’s Specialists Involvement• High Level of Interfaces between Project Team, Owner,
and Contractor
![Page 16: Chapter I Project Characteristics](https://reader034.vdocuments.us/reader034/viewer/2022042618/577cc55c1a28aba7119c2161/html5/thumbnails/16.jpg)
JEE 632
16
Major Project PhasesOpportunity for Optimization
BusinessScoping
ProjectScreening
Definitive Planning
BasicDesign Project Execution Start-Up
OpportunityTo Influence(Changes)
Resource
Expenditures
Influ
ence
Opp
ortu
nity
Project Time Line
Expe
nditu
res
Max. Max.
Min. Min.
![Page 17: Chapter I Project Characteristics](https://reader034.vdocuments.us/reader034/viewer/2022042618/577cc55c1a28aba7119c2161/html5/thumbnails/17.jpg)
JEE 632
17
Major Project Phases
Project Phases for Small Projects
• All These “Front End” Activities may not be necessary for small projects, because– may not be practical– may be done mentally or verbally (not written down)
![Page 18: Chapter I Project Characteristics](https://reader034.vdocuments.us/reader034/viewer/2022042618/577cc55c1a28aba7119c2161/html5/thumbnails/18.jpg)
JEE 632
18
Major Project PhasesExample – A Small ProjectAn inspection finds a boiler safety valve plugged and failed to lift
• Scoping - “Fix it before it blew up the boiler and kill someone....not to mention losing a
lot of money”• Philosophy - Do as soon as possible ... in 1 month
(by Operations)• Screening - Using Rupture Disk ... Don’t study further
(by Technical Dept.)
![Page 19: Chapter I Project Characteristics](https://reader034.vdocuments.us/reader034/viewer/2022042618/577cc55c1a28aba7119c2161/html5/thumbnails/19.jpg)
JEE 632
19
Major Project PhasesExample – Continued
• Planning - Use Same Manufacturer as already on site (by Technical/Maint Dept.)
• Basic Design - Process Design Spec.(by Technical Dept.)
• Execution Plan - Simplified (by Project Engineer)
![Page 20: Chapter I Project Characteristics](https://reader034.vdocuments.us/reader034/viewer/2022042618/577cc55c1a28aba7119c2161/html5/thumbnails/20.jpg)
JEE 632
20
Major Project PhasesSummary
• Typical Phases and Progression of Activities exist for all projects (Simple or Complex)
• Project Personnel must:– Be aware of various stages– understand activities for each stage– initiate action to ensure activity taking place
![Page 21: Chapter I Project Characteristics](https://reader034.vdocuments.us/reader034/viewer/2022042618/577cc55c1a28aba7119c2161/html5/thumbnails/21.jpg)
JEE 632
21
“Quality Management”
• Get It Right The First Time• Customer Satisfaction (know what customer wants)• Continuous Improvement (mechanism to measure and
improve performance)• Zero Defects
![Page 22: Chapter I Project Characteristics](https://reader034.vdocuments.us/reader034/viewer/2022042618/577cc55c1a28aba7119c2161/html5/thumbnails/22.jpg)
JEE 632
22
QUALITY MANAGEMENT
Four Prime Elements :
• Know what is required (Project Objectives)• Develop plan to meet requirements (Project Execution
Plan)• Implement the plan (Execute the plan)• Monitor & Take corrective action (Track/Plan/Action)