EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
10 | P a g e May 2013
CHAPTER 2
SITE AND PROJECT DESCRIPTION
2.1 Project Site Location
The project site is located in the District of Port Louis at a place known as Les
Grandes Salines. The site is found outside the boundary limit of the port area and is
situated between Fort William on its North side, Les Salines Cemetery on its East
side and Bain des Dames Lagoon on its West side. On the Northern side, there is a
water drain leading to the sea and the area to the North of this drain belongs to the
Port Authority. On the Eastern side is the CEB’s wayleave for the existing HFO
pipeline and a plot of private property. There is also a proposed common public road
which has not yet been constructed. Existing access roads pass close to the
southern and north-eastern corners of the site.
A plan showing extent and location of site is enclosed in ANNEX 2.
The setting of the project site is illustrated in the following plates:-
Plate 1a: General view
of site
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
11 | P a g e May 2013
Plate 1b: View of
Coastline in direction of
Fort William
Plate 1c : View of
Coastline in direction of
Fort Victoria
Plate 1d : Bain des
Dames fish landing
station south west to
project site boundary
Figure 3: The setting of the project site
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
12 | P a g e May 2013
2.2 Legal, Regulatory and Administrative Framework
2.2.1 Land Ownership
The site earmarked for the proposed undertaking covers a total extent of 14 A 75 or
62,259.75 m2. It is classified as state lands and will be leased to the proponent. A
copy of the reservation letters from the Ministry of Housing and Lands showing proof
of ownership is enclosed as ANNEX 3 of this report. As far as the routing of the new
pipeline system, which would follow the routing of the existing pipeline, the
proponent has already secured right of way from the relevant authorities. A copy of
the way leave for the existing pipeline is also attached for reference in ANNEX 3.
2.2.2 Legal Requirements, Planning & Policies
The policies aimed at managing development in Mauritius have been structured in
two mainstreams, the macro level and the micro level. The macro level gives the
orientation for development and overall intent for land use at National level while at
the micro level the land use is focused towards specific purposes. The instruments
presently available are the National Development Strategy and the Outline Schemes.
In addition to that the District and Municipal Councils have prepared guidelines that
would regulate in a suitable manner development within their areas of jurisdictions.
The prevailing policies are well supported by pieces of legislations and for which
compliance is mandatory for any development to occur. These pieces of legislations
are correlated intrinsically. The permit system is a legal requirement that sets out the
rule for development to occur and takes on board the whole spectrum from design to
implementation. With respect to some specific development the permit system may
require other licenses that need to be obtained prior to design and implementation
such as EIA license, Government Fire Services Clearance, Building and Land use
permit and the like. Therefore our national policy and administrative framework are
well structured and compliance with their requirements is essential.
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
13 | P a g e May 2013
2.2.2.1 National Development Plan
The present undertaking falls within the overall policy of the National Strategy. The
study and recommendations made in the National Development Plan enhances the
expansion of power productions in line with future demands. The policies for the
energy sector have been summarized below:-
Policy E1 aims at identifying sites for new power stations, recognizing that
land for potential power stations is constrained by such factors as the need to
import fuel and to be reasonably close to major demand centres.
Policy E2 covers the need for service corridors and rights of way for power
cable networks that need to be considered at planning stages.
Policy I5 encourages industry to reduce pollution to meet internationally
acceptable standards.
Policy I7 on the other hand covers the concept of “bad neighbourhood” and to
which the proponent is familiar.
Policy I10 states importance of suitable and safe bulk storage of petroleum
products.
The proposed project for the construction of six HFO storage tanks of 39,000 m3 and
associated pipelines falls within the overall reform of the proponent in the energy
sector, the intent of the National Development Physical Plan and the overall planning
of the Port Area.
2.2.2.2 Environment Protection Act
With respect to the EPA Regulations, Government Notice No. 142, the proposed
undertaking is a scheduled activity that requires the preparation and submission of
an EIA prior to implementation. The Department of Environment has prepared
guidelines for the proper conduct and reporting of the EIA that are comprehensive in
understanding and execution, and due regard has been paid to the guidelines, as
well as provisions laid out in the EPA in preparation of this EIA report.
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
14 | P a g e May 2013
2.2.2.3 National and Port Louis Harbour Oil Spill Contingency
Plan
National Oil Spill Contingency Plan has the main objective of ensuring the constant
readiness of Mauritius to respond to oil spill incidents. This National Oil Spill
Contingency Plan is a live document, which the Ministry of Environment and
Sustainable Development keeps updated on a regular basis, adapting it the realities
of the administrative organisation of Mauritius, the development of maritime traffic,
etc.
It is the policy of the CEB to operate their activities near the Port Area in such a way
as to:
Protect and conserve the marine, terrestrial and air environment by
establishing procedures and promoting good housekeeping practices.
Put in place all necessary measures to preserve health & safety of all
employees.
Comply with requirements of the relevant legislation.
Develop, update and rehearse on-site and off-site contingency arrangements.
With the objective of implementing and operating an HFO tank farm at Les Grandes
Salines, the CEB has caused the preparation of an Oil Spill Contingency Plan, in line
with the National Oil Spill Contingency Plan and the Port-Louis Harbor Oil Spill
Response Plan. Consultation of this report could be made with prior consent and
arrangement made with the proponent.
2.2.2.4 International Conventions
The promoter is well aware of the provisions of the International Conventions
governing bulk storage and handling of petroleum products. The CEB is committed
to implement measures to achieve compliance with goals as laid out by the following
conventions during construction and operational phases:-
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
15 | P a g e May 2013
MARPOL
The International Convention for the Prevention of Pollution from Ships (MARPOL) is
the main international convention covering prevention of pollution of the marine
environment by ships from operational or accidental causes. The Convention
includes regulations aimed at preventing and minimizing pollution from ships - both
accidental pollution and that from routine operations - and currently includes six
technical Annexes. Special Areas with strict controls on operational discharges are
included in most Annexes.
UNCLOS
United Nations Convention on the Law Of the Sea, which promotes peaceful,
equitable and efficient usage of resources of the seas and recognizes the need for
conservation and protection of the marine environment.
OPRC
Parties to the International Convention on Oil Pollution Preparedness, Response and
Co-operation (OPRC) are required to establish measures for dealing with pollution
incidents, either nationally or in co-operation with other countries.
I. Oil pollution emergency plans or similar arrangements must be co-ordinated
with national systems for responding promptly and effectively to oil pollution
incidents.
II. Reporting of incidents of pollution to coastal authorities (the convention details
the actions that are then to be taken).
III. Establishment of stockpiles of oil spill combating equipment, the holding of oil
spill combating exercises and the development of detailed plans for dealing
with pollution incidents.
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
16 | P a g e May 2013
CLC
The 1969 “International Convention on Civil Liability for Oil Pollution Damage”
entered into force in 1975 and lays down the principle of strict liability for tanker
owners and creates a system of compulsory liability insurance. Claims for
compensation for oil pollution damage including clean-up costs may be brought
against the owner of the tanker which caused the damage or directly against the
owner's insurer.
FUND
Under the International Convention on the Establishment of an International Fund for
Compensation for Oil Pollution Damage (FUND), victims of oil pollution damage may
be compensated beyond the level of the shipowner's liability.
2.2.3 Zoning
The site is an extent of land that will be leased to the project promoter. It is found
adjacent to the Port Area and more specifically within the “Central Area Boundary”
zone in accordance to the outline scheme for the city of Port Louis. The project site
is located in a zone compatible for its implementation. It can be accessed from a
track road off the “Bain des Dames Coastal Street”. The shoreline borders the site
along its western boundary. There are no other future developments around the site
that would be implemented, except within the context of the Port Louis Port area
Master Plan.
The site is its context is depicted in Figure 4 below:-
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
17 | P a g e May 2013
Figure 4: Context Plan
SITE
Fort William HFO
Tank Farm
Mauritius Bulk
Sugar Terminal
Cemeteries
Robert Edward
Hart Garden
Neotown project
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
18 | P a g e May 2013
2.3 Site Characteristics
2.3.1 Geological and Topographical characteristics
The geology of Mauritius is dominated by deposits of volcanic origin composed
essentially of basaltic lavas. According to the FAO/ MSIRI Land Resources and
Agricultural Suitability Map of Mauritius, the site falls in an area, which is in a land
complex that forms part of the sand beaches and dunes.
The proponent has commissioned a geotechnical investigation for the site in order to
ascertain that the soil conditions are favourable to support the new structure. A
topographical survey exercise is also in process. Being given that these technical
investigations are currently subject to a tendering exercise, the reports are not
available documents for the time being.
2.3.1.1 Soil type
The soil type is mostly characterized as regosols, which are dark brown sand or
loamy sand on light grey to very pale buvial sand. The project site has been
identified on a soil map in figure 5 below.
2.3.1.2 Landform
The area is mapped as Land Unit No. 13.1, the landform of which is classified as
being almost flat to gently undulating. General gentle slope westwards towards the
sea. The site is fairly flat. The mean height of the site above mean sea level varies
between 1.0m to 2.5m at some places. The site for the proposed undertaking is
located on a geological map in Figure 6 below.
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
19 | P a g e May 2013
Figure 5: Site on soil map
Site location
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
20 | P a g e May 2013
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
21 | P a g e May 2013
Figure 6: Site on geological map
Site location
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
22 | P a g e May 2013
2.3.2 Climate
The Climatic conditions that prevail over the site in question are similar to what exist
over the island of Mauritius as a whole. It is true that there are some micro- climates
but the site under study enjoys a typical coastal plain climatic condition with warm
sunshine days. The Island of Mauritius as a whole may be characterised as having a
moderately tropical climate. The warmer summer season is coincidentally the rainy
season and lasts from November to April, with February as the wettest month. The
summer season is also characterised by tropical cyclones. The winter season, which
is cooler and drier, occurs between May and October, with October being the driest
month.
On account of its relief, the Island is also characterised by a number of distinct
microclimates with varying levels of rainfall, temperature or humidity. The area where
the subject site lies is located at an altitude of about 1.0-2.5 m above mean sea level
and has annual rainfall levels of the order of 600 to 800 mm, as compared with the
maximum of 4,000mm for the island as a whole.
Meteorological conditions for the region of Port Louis harbour is enclosed in ANNEX
4.
2.3.2.1 Site Temperature Regime
The temperature on site is similar to the western coast with a summer temperature
averaging 35°C during daytime, falling to 25oC at night. In winter, temperatures vary
between 18 to 25 oC. The ambient temperature is well below the flash point of the
product and storage in the tanks is not a problem.
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
23 | P a g e May 2013
2.3.2.2 Site Rainfall Regime
The rainfall in Mauritius vary from region to region with highest precipitation on the
Central plateau and lowest on the western and North Western belt. The site lies on
the North West coast and as per the meteorological statistics the mean annual is
about 600mm.
2.3.2.3 Site Wind Regime
The wind regime of the island is mainly governed by the easterlies. The wind speed
averages 20 km/h. The South East Trade Winds blow over Mauritius for the major
part of the year at a speed reaching 50km/h sometimes. However, the island being
tropical is also subject to cyclonic conditions. Fort William receives the highest wind
gusts during cyclonic conditions. The peak cyclonic winds recorded so far is about
250 km/h for a gust speed. The local authorities require that superstructures be
designed to withstand gusts of 280-300 km/h. This criterion will be adopted for any
subsequent detailed design.
2.3.3 Coastal Characteristics
The region of Les Grandes Salines/Bain des Dames includes highly man-modified
coastal facilities. According to the Environmental Sensitivity Map 18 of the Coastal
Sensitivity Atlas of Mauritius for Oil Spill response, the project site borders a
shoreline classified as Sand Beach type.
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
24 | P a g e May 2013
Figure 7: Site on Environmental Sensitivity map
2.3.4 Marine Characteristics
The project site is located at approximately 60m from the high water mark and could
be thus classified as a coastal development. The region of Bain des Dames is a
typical basin type lagoon with a maximum depth of 180cm within 50m from the
shoreline at high tide.
Biota survey carried out in the region of Bain des dames region (refer to ANNEX 5)
revealed that the overall status of the lagoon suggests a low sensitivity region which
can support additional development in its coastline.
Site Location
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
25 | P a g e May 2013
2.3.4.1 Marine Biota, Fauna and Flora
The fauna and flora in the marine environment has been characterised as follows:
o Algae
The area close to the shoreline has a reasonable stand but low diversity of
algae, most abundant species being the Caulerpa sp and Ulva sp. Algae were
rare in the mid lagoon region and fore reef region.
o Fish diversity
The region surveyed had a very low diversity of commonly found fishes in the
shallow lagoons of Mauritius. Low fish count could be partially attributed to
high turbidity near the shore zone. Beyond this zone, few fish individuals were
numbered.
o Benthic organisms
The population of slow moving benthic organisms was quite low. The most
common benthic organisms are the sea urchins Echinometra mathaei and a
long black spined specie. Brown sponge and a few bivalves were also
encountered. However, a fern like polichaete worm was abundant.
o Seagrass diversity
No seagrass were located in the area surveyed.
o Coral diversity
Corals were found mainly in the mid-lagoon and fore reef zones where good
water clarity prevails.
2.3.4.2 Tides and currents
Tides in Mauritius are semi-diurnal and microtidal, with mean spring range being
0.6m. The maximum spring tides are about 0.8m. Moreover, the mean neap tidal
range is 0.24m, whereas the minimum neap tidal range is 0.15m.
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
26 | P a g e May 2013
Mauritius is affected by the south equatorial current flowing in a westerly direction,
although they are generally variable in the quadrants immediately around the island.
Currents within the coral reef lagoon are mainly wind-driven.
The water current in the region of Les Salines has a general movement of water
oblique with the shoreline in the South-West direction. In fact, the sand dike between
the harbor and the lagoon shelter it from the strong water currents. The area is
constantly flushed from water the outer lagoon.
2.3.4.3 Seawater quality
A seawater quality test has been conducted at the lagoon of Bain des Dames to
determine baseline conditions with regard to the pH, temperature and level of oil and
grease of the coastal water. The results as displayed in Table 1 have been
benchmarked against the requirements for coastal water quality regarding industrial
activities (Test reports for seawater monitoring are attached in ANNEX 6).
Table 1: Results of seawater quality for the lagoon of Bain des Dames and
Coastal Water Quality
Sea water
parameters
Seawater quality for the lagoon of
Bain des Dames
Coastal water quality
requirement for
industrial and others Sample ID
539652 539653 539654
pH 8.2 8.2 8.2 7.0-9.0
Temperature 28.2 ºC 28.4 ºC 28.6 ºC ambient
Oil and Grease 2.1 mg/l 2.7 mg/l 3.2 mg/l Not detectable by N-
hexane extraction
method
As shown in Table 1, the pH and temperature of the seawater of Bain des Dames
lagoon comply with the requirement of the coastal water quality for industrial
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
27 | P a g e May 2013
activities. The level of oil and grease detected in the lagoon of Bain des Dames
could be possibly due to fishing motorboats present in that region.
2.3.5 Ecological Sensitivity
2.3.5.1 Fauna and Flora
The site in question does not have flora and fauna that are on the verge of extinction
or that need to be preserved. A low diversity of flora is encountered on site, which is
mainly covered with chiendent grass. Except for passing birds, a few counts of
butterflies and snails as well as stray dogs no other animal were seen on site.
Table 2: List of Fauna and Flora
Common name Scientific name Occurrence
Fauna
Conde bird Red Whiskered bulbul Low
Snail Gastropod family Low
Dog Canis Lupus Familiaris Low
Butterfly Lepidoptera family Very low
Flora
Acacia Mimosoideae family Medium
Batatran Ipomoea pes-caprae High
Bois noir Albizia Lebbeck High
Coqueluche Pongamia pinnata Medium
Lila Meliacees family Very Low
Pied La colle Cordia myxa Low
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
28 | P a g e May 2013
2.3.5.2 Waterbodies & Wetlands
There are no irrigation canals nor open reservoirs on the site. However, marshy
areas can be found near to the shoreline bordering the site. Moreover, a man made
earth lined drain borders the project site boundary along its northern boundary and a
watercourse is located between the project site Eastern boundary and Les Salines
Cemetery. According to the Water Resource Unit, there is no river that falls within
any major catchment area crossing the project site. The sea is within close proximity
of the site as shown in the maps reproduced in this report.
Plate 2a: Watercourse
which borders the
project site along
Eastern boundary
Plate 2b: Marshy areas
near shoreline
Figure 8: Waterbodies present near the site
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
29 | P a g e May 2013
2.3.6 Existing Land use
2.3.6.1 Local environment
The project site is a state land comprising no wall boundaries and infrastructure.
Presently under shrubs, the site consists of a few mature trees as listed in Table 2.
Apart from some construction debris found during the field visit no other important
features were identified on site.
Plate 3a: Debris on site
earmarked for proposed
undertaking
Figure 9: Local environment
2.3.6.2 Surrounding environment
The project site is bordered as follows:
To the North:
Water drain leading to the sea and disused sewerage pipe. Moreover,
adjacent land is under control of the Mauritius Ports Authority.
To the South:
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
30 | P a g e May 2013
Water drain leading to the sea, Bain des Dames Fish Landing Station and
Shiv Sagar Mandir. Two portions of land extent 700m2 and 144m2 is vested in
the Ministry of Fisheries. Another portion of land extent approximately 2160m2
is vested in the Ministry of Local Government and a portion of land 1266m2 is
vested in the PMO.
To the East:
Surface water course, Private property, Cremation ground, Western Cemetery
and State land.
To the West:
“Etoile de la Mer” Grotto, State land vested temporarily in the Ministry of Local
Government as an open space and Bain des Dames lagoon.
Salient infrastructures and land uses present within a radius of 1km from the project
site include the following (approximate distance from project site boundary and
direction are also indicated):
o Al Noor Masjid (440m South)
o Assemble de Dieu (190m South East)
o Bain des Dames Police Station (400m South East)
o Bain des Dames Fish landing station (30m South West)
o Cassis Catholic Church (750m South East)
o Cemeteries (Gebert 270 m East, Western Suburb 50m East, St. Georges
300m East and Nam Shun 170m South East)
o Dr France Bouloux Area Health Centre (500m East)
o Etoile de la mer grotto (10m West)
o Ex-Wastewater Management Authority Fort Victoria Pumping Station (360m
South West)
o Fort Victoria Power Station (490m South West)
o Fort William HFO storage tanks at NCG Headquarters and existing pipeline
system connecting tanks to Fort Victoria (370m North East)
o Freddy Desvaux Stadium (305m South West)
o Hazrat Peer Syed Aboo Bakar Mosque (430m South)
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
31 | P a g e May 2013
o Institute of Islamic and Secular Studies Jamia Al Uloom Al Islamia (465m
South East)
o Kwan Tee Pagoda (830m East)
o Les Salines Cremation Ground (20m East)
o Mauritius Bulk Sugar Terminal Corporation (315m North East) and Quay
(715m North East)
o Mauritius Telecom (745m South)
o Medco Cassis (610m South East)
o Residential dwellings at Bain des Dames (40m South East)
o Robert Edward Hart Garden (200m North East)
o Royal College Port Louis (700m South East)
o R. Seeneevassen Government School (665m East)
o Shiv Sagar Mandir (75m South West)
o Sri Rama Krishna Devalayam (555m East)
A comprehensive land use map showing the location of salient features is enclosed
in ANNEX 7.
2.4 Project description
The Central Electricity Board is proposing to set up a new Heavy Fuel Oil (HFO) tank
farm of total storage capacity 39, 000m3 at Les Grandes Salines. Comprising 6 tanks
of nominal storage capacity 6500m3 each, the proposed project would also include
the installation of a new pipeline system. Additionally, there would be a boiler house
and a superheated water pipeline network connecting Fort Victoria to Les Grandes
Salines Tank Farm and vice versa.
Presently, HFO is pumped at a rate of 600m3/h from offloading vessels and tankers
berthed along the quay of the MCIA, to the existing tank farm at Fort William via a
DN 250 steel pipeline which belongs to the oil companies. An existing DN 200 ductile
iron pipeline conveys the HFO directly from this tank farm to Fort Victoria Thermal
Power Station.
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
32 | P a g e May 2013
In view of improving the HFO conveyance capacity, the CEB is planning to install a
new HFO pipeline from Fort William HFO tank farm that will pass through Les
Grandes Salines HFO tank farm to supply Fort Victoria Thermal Power Station in the
near future. The proposed project also covers the decommissioning of part of the old
steel pipeline of DN 200mm, not in service.
The setting up of the proposed HFO tank farm at Les Grandes Salines would be
carried out in 2 phases under a design and build- turnkey procurement system as
described in the following subsections. The present EIA report encompasses both
phase 1 and phase 2 of the project.
2.4.1 Characteristics of HFO to be stored
The tank farm will be designed for the storage and transportation of HFO having a
maximum viscosity of 380 Centistokes at 54ºC.
At present CEB is making use of HFO of grade 180 cSt that is stored at its Fort
William tank farm. Likewise, CEB intends to store HFO of grade 180 cSt at Les
Grandes Salines tank farm until CEB phases out usage of HFO of viscosity 180 cSt
in favour of HFO 380 cSt.
In order to meet the required temperature, each storage tank will be equipped with a
heating coil equipment to heat the HFO of viscosity 380 cSt.
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
33 | P a g e May 2013
Table 3: Heavy Fuel Oil Specification
Parameter Unit Max/Min Typical specification
Ash %W Max 0.10
Gross Calorific Value MJ/kg Min 42
Net Calorific Value MJ/k Min 40
Carbon Residue, Conradson %W Max 18
Flash point, PMCC oC Min 60
Pour point oC Max 30
Density at 15 oC kg/l Min/Max 0.991
Sodium ppm Max 100
Sulphur %W Min/max 4.5
Vanadium ppm Max 350
Viscosity, Kinematic at 54 oC cSt Min/Max 380
Water %V Max 0.50
Aluminium + Silicon ppm Max 60
Calc. Carbon Aromatic Index Max 870
Total Sediment Potential % (m/m)
Max 0.10
Total Sediment Existent % (m/m)
Max 0.10
(Source: Mott MacDonald, 2013)
A Material Safety Data Sheet for typical HFO 380 cSt is provided in ANNEX 8.
2.4.2 Conceptual design
2.4.2.1 Phase 1 and Phase 2
The proposed project will be implemented in two stages. Phase 1 of the proposed
development will include a new tank farm comprising of three 6500m3 HFO storage
tanks complete with all associated pipelines, accessories, equipment and facilities.
Decommissioning of part of the existing steel pipeline would also be carried out to
enable installation of the new pipeline.
On the other hand, Phase 2 will consist of three further 6500m3 HFO storage tanks
to be installed in the future. It is intended that the new tank farm will be located along
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
34 | P a g e May 2013
the north-east boundary of the site, with Phase 1 being located to the east and
Phase 2 to the West.
As mentioned above the proponent would undertake this project on a turnkey basis
and as such the detailed designs would only be available after the appointing of the
contractor. A general site layout (enclosed in ANNEX 9) is being proposed pending
the availability of the detailed designs.
Each phase will have a separate storage tank bund. The purpose of the bund wall is
to contain the HFO in case there is a tank failure.
2.4.2.2 Proposed tank specifications
Complying with the requirement of BS EN 14015:2004, API 650 or equivalent
international standard, the proposed HFO tanks will be of vertical structure and of
cylindrical mild steel electric arc welded constructions. The tanks will have fixed cone
roofs with weak roof-to-shell seams. In the occurrence of an excessive pressure in
the tank, the roof will lift off rather than causing a rupture of the tank shell, thus
meeting the purpose of the weak roof-to-shell seam. The 6 HFO tanks are of similar
dimensions. Table 4 summaries the dimensions of the tanks:-
Table 4: Tank dimensions
Height of each HFO tank (m) 9.2
Diameter (m) 30
Gross capacity (m3) 6500
Non working height (mm)
(below the level of the outlet and highest filling level)
500
Net Working Capacity of each HFO tank (m3) 6150
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
35 | P a g e May 2013
As shown in Table 4, CEB will not be using very tall tanks so as to moderate the risk
of bund overtopping in case of a catastrophic tank failure and to reduce visual impact
of the tank farm on the surrounding landscape. The maximum tank diameter is
designed at 30m. This dimension takes into consideration the site area available, the
tank spacing and the distance of the four tanks which is in line along the northern
edge of the site. As for the minimum shell to shell spacing between adjacent tanks, it
will follow the NFPA requirement of 10m. A setback of at least 30m between the
proposed HFO tank farm and the water drain will be kept.
The proposed tank farm layout is provided in ANNEX 9.
Secondary containment
As already mentioned, each phase of the proposed project will have a bund wall
containing 3 HFO tanks. A good containment structure should be able to contain at
least 110% of the volume of the largest tank, less the volumes of other tanks in the
same bund up to the height of the bund wall. Based on this fact, the secondary
containment surrounding the 3 tanks of Phase 1 will have the dimension and
capacity as shown in Table 5.
Table 5: Dimension and capacity of secondary containment
Height (m) 2.5
Required volume to be contained in the bund (m3) 7150 (= 6500 * 1.1)
Calculated total plan area of the bund (m2) 3797
Proposed total plan area of the bund (m2) 5971
Plan area of the three HFO tanks (m2) 2121
Volume of containment provided (m3) 9626
% volume of the largest tank that could be contained 135 (> 110%)
As displayed in Table 5, the optimum height for the bund wall is 2.5m. Increasing the
bund height will surely reduce the area of the bund floor required but this would give
rise to difficulties in accessing the bund and would pose problem to escape in case
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
36 | P a g e May 2013
of an accident or emergency. Adequate means of escape would be put in place so
that the designed height does not pose problem in case of accident or emergency.
No ramp for access to the bund by vehicles has been envisaged.
Tertiary containment
In the event of a catastrophic failure of one of the tanks and a sudden rupture of the
tank shell which causes a rush of fuel out of the tank with a velocity sufficient enough
to cause overtopping of the HFO from the bund wall, a tertiary containment has been
catered for.
Experiments have led to the use of formulae of the type shown in Figure 10 to
estimate the following:
Fraction Q = Contents of a tank which will flow over the bund in the case of a
catastrophic failure.
A, B and C = factors based on the experimental results
h = height of the bund wall
H = height of the liquid in the tank
r = distance from the tank centre to the bund wall
Q= A + Bxloge (h/H) + Cxloge (r/H)
(Source: Mott MacDonald, 2013)
Figure10: Bund overtopping formula
Assumptions:
Distance from tank to the bund = 5m
Height of tank (including 0.5m for the tank foundation) =9.2 + 0.5= 9.7m
Diameter of tank = 30m
Height of bund wall = 2.5m
Therefore:
Predicted value of Q = 0.318
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
37 | P a g e May 2013
Expected amount of oil flowing over the top of the bund in the event of a catastrophic
failure = (0.318 x 6500) = 2067m3.
It is proposed to have a rectangular tertiary containment structure surrounding the
tank bund to cater for this potential amount of overtopping.
The specifications of the tertiary containment are shown in Table 6:-
Table 6: Specifications of the tertiary containment
Minimum distance between main bund and wall of tertiary containment (m) 4
For maximum expected overtopping, depth of oil in the tertiary containment
(mm)
750
Height of the wall (mm) 800
Ramps will also be provided to access the tertiary containment by vehicles. The
roadway and access area outside the tertiary containment area for firefighting etc will
be 6m wide.
Tanks accessories
Each tank will be fitted with the following fittings:
- inlet
- outlet
- vents and breather valves with flame arresters
- instrumentation including electronic radar gauging devices, level indication
and high and low level alarm and trips switches
- galvanised steel stairways and handrails
- two manholes, one at ground level and one on top of the roof
- drainage
- decantation pit for drainage system
- pressure relief return
- earthing bosses
- holding down bolts
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
38 | P a g e May 2013
- sounding hole
- sampling valve
- spiral stairway access and platform and handrail at the top
- two spare valved connections of each nominal bore used
- foot-bridges with hand rails connecting the two adjacent pairs of tanks.
- Heating coil
- Outflow heater
Cathodic protection of tank bottoms
Moreover, an impressed-current cathodic protection system will be applied to protect
the storage tank bottoms against corrosion. The installation will be fully instrumented
and will include facilities for routine testing of potentials. Anodes will be of high
silicon iron or equal and will be designed for a life of 5 years at 450g/amp year. They
will be attached to the tanks by thermite welds.
Tank foundations
Tank foundations will comply with API 650 or equivalent standard. They will be
appropriate to the ground conditions encountered and will include:
o At least 450mm thick thoroughly consolidated hardcore,
o A 300mm layer of well compacted sand,
o And a final 40mm layer of sand/bitumen material over the whole area.
The tank foundation formation will be contained within a reinforced concrete ring
beam positioned directly under the tank walls.
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
39 | P a g e May 2013
Earthing and Lightning protection for tanks
The tanks will be earthed to achieve a minimum resistance to earth of 10 ohms and
provided with lightning protection in accordance to the following standards:-
o BS 7430
o BS EN 62305
o IEEE 81
o IP Model Code of Safe Practice in the Petroleum Industry Part 1: Electrical
Safety Code
o IP Model Code of Safe Practice in the Petroleum Industry Part 21: Guidelines
for the Control of Hazards Arising from Static Electricity.
2.4.2.3 Proposed pipeline specifications
As already mentioned the project comprises the installation of new HFO pipelines
from Fort William HFO tank farm connecting Les Grandes Salines proposed tank
farm to supply HFO to Fort Victoria Thermal Power Station. The HFO pumps will be
designed to cater for a maximum flow rate of 600 m3/h for transfer of HFO from Les
Grandes Salines tank farm to tankers at MCIA quay. The flow rate of HFO pumps
will be adjustable to a flow rate of 200m3/h for pumping of HFO to Fort Victoria. The
proposed piping systems, as well as the existing ones, are shown in Figure 11. Table
7 illustrates the various possible pumping scenarios following implementation of the
proposed project. The proposed new pipeline would be able transport HFO of
viscosity 380 cSt at 54 ºC. The routing of the proposed pipelines is also provided in
ANNEX 10.
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
40 | P a g e May 2013
Table 7: Possible pumping scenarios
Pumping scenarios
From Tankers at MCIA to Fort William
1 Existing pipeline DN 250- through pipeline route ABC Pumping rate: 500-600m
3/h
2 New pipeline (first section DN 350, second section DN 400) – through pipeline route abc
Pumping rate: 500-600m
3/h
From Tankers at MCIA to Les Grandes Salines
1 Existing pipeline DN 250- New pipeline from Fort William to Les Grandes Salines DN 400 – through pipeline route ABCcd
Pumping rate: 500-600m
3/h
2 New pipeline (DN 350m/DN 400) – New pipeline from Fort William to Les Grandes Salines DN 400 – through pipeline route abd
Pumping rate: 500-600m
3/h
3 New pipeline (DN 350/DN 400) – existing pipeline DN 200- through pipeline route abcCBED
Reduced flow rate
4 Existing pipeline DN 250- existing pipeline DN 200- through pipeline route ABED
Reduced flow rate
From Les Grandes Salines to Fort Victoria Thermal Power Station
1 Existing pipeline DN 200- through pipeline route DEF Pumping rate: 200m3/h
2 New pipeline DN 250- through pipeline route ef Pumping rate: 200m3/h
From Les Grandes Salines to Quay MCIA
1 New pipeline DN 400- existing pipeline DN 250- through pipeline route dcCBA
Pumping rate: 500-600m
3/h
2 New pipeline DN 400- New pipeline (DN400/DN 350)- through pipeline route dcba
Pumping rate: 500-600m
3/h
3 Existing pipeline DN 200- New pipeline (DN400/DN 350)- through pipeline route DEBCcba
Reduced flow rate
4 Existing pipeline DN 200- Existing pipeline DN 250- through pipeline route DEBA
Reduced flow rate
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
41 | P a g e May 2013
New pipeline network within the context of the present project
Figure 11: Proposed and existing piping system
Les Grandes
Salines proposed
HFO tank farm
DN 400
DN 200
B
b
c
d
DN 350
(350m)
A
a
New pipeline that
CEB is installing
from MCIA quay to
Fort William tank
farm
DN 250
DN 400
(310m)
Fort William tank
farm
C
D
Fort Victoria
Thermal Power
Station
DN 250
e
f
E
F
MCIA Quay
Proposed new
pipeline associated
with Les Grandes
Salines tank farm
Proposed new
pipeline associated
with Les Grandes
Salines tank farm
DN 200
DN 200
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
42 | P a g e May 2013
Pipework
The pipelines will be either buried or above ground. Above ground pipes will be trace
heated, insulated or clad, except where pigging will be carried out. However, the
section of pipe from each tank to the pumps will be equipped with outflow heaters
and will also require heat tracing. Meters and bypasses as well as pressure
transmitters with alarms and pump shutdowns will be provided.
Above ground pipework:
The pipelines will be of mild steel construction meeting the requirements of BS EN
10216, BS EN 10217 and BS EN ISO 16812 and will run on concrete pipe supports.
Above ground HFO steel pipe will be coated with painting and will be heat-traced,
lagged and cladded.
Buried pipework:
The buried fuel pipes will be made of ductile iron pipes with external polyurethane
coating. Bell and spigot joints as well as rubber ring seals will be provided. This type
of piping is currently used by CEB for similar applications.
Pipeline pigging
Provision will be made for pipeline pigging to occur following an inflow or outflow of
HFO in the tank farm. Pig launchers and receivers will be placed at strategic
locations on the pipelines so pigging can be done to make sure that each pipeline
remains empty following transfer of HFO. The pig which will be driven by
compressed air connected to a point on the pig launcher will also comprise a location
verification function to enable tracking of the pig in the pipeline by the operator.
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
43 | P a g e May 2013
2.4.3 HFO pumping station
The new tank farm will consist of a HFO pumping system that would be located
within the tertiary containment area so that any spills or leaks of oil will be controlled.
The fuel pump house will comprise the following equipment:
(a) Two ac motor driven 600 m3/h duty HFO pumps (flow adjustable to 200m3/h)
(b) Inlet strainers
(c) Non- return and isolating valves
(d) Instrumentation
(e) Associated pipework
The design of the suction pipework system will be such that the minimum NPSH of
the system at low oil level in the tanks is always above the minimum NPSH allowed
by the pump design. Moreover, a low suction pressure alarm and trip will be provided
upstream of the pumping station.
2.4.4 HFO heating
2.4.4.1 Storage tank heating coil
Since the tank will be designed for the HFO of viscosity 380 cSt, HFO must be
heated before it can be pumped. Thus, a heating coil meeting requirements of BS
3274 will be provided for each tank to meet the required temperature. The
temperature inside the tanks would be maintained at 40ºC and during pumping the
temperature of HFO would be raised from 40ºC to 50 ºC.
However, the design of the heating coil will be carried out in such a way that the fuel
transfer rate to the power plant is not restricted by the temperature of the HFO in the
storage tank. The heating coil and associated temperature control nozzle will be
positioned below the level of the fuel outflow line so that the coil does not become
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
44 | P a g e May 2013
uncovered during normal operation. Moreover, the nozzle for the temperature
sensitive element of the temperature controller will be situated above and to one side
of the heating coil. The heating coil will be constructed of seamless stainless steel
tube with a minimum number of joints and where they are unavoidable, the joints will
be welded.
The heating coils will be designed to be heated by a high-pressure hot water heating
system.
2.4.4.2 Outflow heater
The tank outflow connection will comprise a suitable tank outflow heater meeting the
requirements of BS 3274. This heater will be heated by high pressure hot water so
that the fuel oil can be heated to a minimum of 50 ºC for subsequent pumping. The
outflow heater which will be of the non-contact type has a capacity of about 200 t/h.
2.4.4.3 Hot water heating system
The heating system will be designed such that hot water is supplied either by
a boiler at Les Grandes Salines or from superheated water conveyed from
Fort Victoria. Flow regulating and change over valves will be used to facilitate
selection of source of hot water.
2.4.4.3.1 High pressure hot water boilers
Two HFO fired shell type (firetube) steam boilers, each of capacity 4.5 MW, will be
provided to supply hot water to heat the HFO, with one as backup. The operating
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
45 | P a g e May 2013
pressure is approximately 10 bars. Each boiler will be capable of increasing and
maintaining the temperature in the HFO tank from 18 oC to 50 oC. As such, the
steam boilers will be capable of supplying the in-line heat exchangers, heat traced
pipelines as well as the HFO storage tank heating coils. A 0.5 oC increase per hour is
recommended. Therefore, heating process will last for 120 hours.
It is estimated that 379kg/hr of HFO will be required to fuel one boiler. Most of the
time, the boilers will be operating on HFO. Nonetheless, they will also be functioning
on diesel oil particularly for flushing prior to stoppage and start up so as avert
clogging of the fuel injection system. The diesel storage tank will be of capacity 10
tonnes based on 1 day fuel requirement of 8.5 tonnes of diesel to heat the HFO
tanks. A conduit will connect the diesel tank to the boiler house. The location of the
diesel tank is shown in the Site layout plan provided in ANNEX 9.
As for the steam boiler, it will be horizontally mounted. It will be adequately insulated
and will be provided with a removable top plate to enable easy maintenance of the
combustion chamber. The boilers will be located in a boiler house as identified in the
site layout provided in ANNEX 9.
2.4.4.3.2 Superheated water heating system
The promoter would also provide for two DN 100 underground pipelines that
would supply superheated water from Fort Victoria Power Station to Les
Grandes Salines tank farm. The pipelines will be clad and lagged to protect
against corrosion and to minimize heat losses. These conduits would follow
the same routing as the alignment of the new DN 250 HFO pipeline
connecting Les Grandes Salines tank farm to Fort Victoria Power Station.
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
46 | P a g e May 2013
2.4.5 Infrastructure
2.4.5.1 Site offices & Amenities
This tank farm would be operated by an operating team. Therefore besides the
construction of the HFO storage tanks and the fuel pump house, the proponent
intends to construct a workshop & store building, electrical room & office building,
steam boiler house, as well as a security guard house which will be equipped with
toilet facilities and a kitchen. Additionally, there is provision for a fire pump house.
The buildings will be constructed of structural concrete, rendered on the outside and
fairfaced on the inside, with blockwork infill which will be rendered on both sides.
Galvanised painted steel doors will be provided with locks. Window frames and
ventilation louvers will be of anodized aluminium.
Building services include wall mounted air conditioning units that shall be provided in
the security guard house, office and electrical room. The proponent would comply
with all the requirements of occupational safety and health conditions. The welfare of
the workers on this tank farm will be maintained. The proponent would cause the
installation of toilet and shower units together with extract fans and water heaters.
There would be a supply of potable water via storage facilities.
Table 8 shows the surface area of the amenities:-
Table 8: Minimum surface area of the amenities
Amenities m2
Electrical room/Office building
Electrical and control room 25
Office (including toilet facilities) 15
Workshop/Store building
Workshop 30
Store 30
Pump houses
HFO Pump house 20
Fire pump house 20
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
47 | P a g e May 2013
2.4.5.2 Access stairways and walkways
Stairways and walkways will be designed as per BS EN 14015. Each tank will be
provided with a spiral stairway access and platform and handrail at the top.
Additionally, foot bridges with hand rails will be provided to connect each adjacent
pair of tanks.
2.4.5.3 Security
Given that the proposed infrastructure is sensitive by nature proper security services
would be provided. The tank farm would be properly secured by means of modern
and reliable technologies. The perimeter of the tank farm would be enclosed by a
security wall topped with barbed wire. Access to and from the tank farm would be
controlled by the security guard at the check post at the main entrance.
Moreover a CCTV system would be installed to record movements.
2.4.5.4 Water storage facility
Water would be mainly used for firefighting and for domestic purposes. The
proponent will follow the recommendation of the NFPA to provide sufficient water
flow for not less than 2 hours in case of a fire outbreak.
In the event of a fire outbreak from one tank;
Assumptions:
Diameter of proposed tank = 30m
Height of tank = 9.2m
Therefore;
Roof area = π r2 = 707 m2
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
48 | P a g e May 2013
Cooling water
Cooling water is required for the tanks adjacent to the tank on fire to prevent spread
of fire from tank to tank (Fire protection measures are further detailed in ANNEX 11).
Rate of application of cooling water to half of the tank facing the fire= 2kg/min/m2
(According to IP Code)
Total cooling water required per tank = 189m3/h
Therefore;
Flow rate of cooling water for two tanks = 2 * 189 = 378 m3/h
The NFPA requires that an allowance of 113m3/h of water should be provided to
cater for hose stream demand.
The required total flow rate of cooling water = 378 + 113 =491 m3/h
The required fire water storage for two hours = 491 * 2 = 982m3
However, the proponent will provide for a dedicated water pipeline and above ground
water reservoir of 1000 m3 to abate any fire outbreak. The piping network would be
linked to a fire fighting water pump house that would boost the water jet to be used
for fire abatement with enough pressure when in operation. Water supply will be met
via the Central Water Authority network distribution.
2.4.6 Wastewater disposal
Wastewater generated from toilet facilities would be disposed into a septic tank and
leaching field. The specifications of the disposal facilities are summarized in Table 9
and their proposed designs are enclosed in ANNEX 12.
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
49 | P a g e May 2013
Table 9: Specification of septic tank and leaching field
Septic tank with seal water system
Dimensions 3.5m x 1.2m x 1.7m
Min no. of compartments 3
Min diameter of vent pipe 75mm
Leaching field
Total surface area of leaching field 90m2
No. of trenches 7
Length of 1 trench 6.5m
(Also refer to site layout plan attached in ANNEX 9).
2.4.7 Electrical
2.4.7.1 Power supply
A suitable three-phase LV power supply connection will be obtained from CEB and
will be connected to a new LV switchboard located in a separate control / electrical
room. Supplies will be taken from this switchboard for the operation of fuel pumps,
fire water pumps and site lighting. Electrical distribution around the site will be done
mainly by means of cable duct banks. Directly buried cables will be used where
unavoidable.
A 22kV switchgear, HT metering, two power transformers 22/0.4 kV and protective
equipment will be provided to connect to HFO tank farm the CEB 22 kV power
distribution line.
2.4.7.2 Site lighting
Areas that will be accessed for operation and maintenance will be provided with
suitable lighting. The lighting in other areas shall be designed so that sufficient light
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
50 | P a g e May 2013
is available for the CCTV system to operate correctly. The lighting provided for the
CCTV system shall be operated by suitable photoelectric switches.
2.4.8 Control and instrumentation
2.4.8.1 Control and remote monitoring of alarms and trips
The new fuel oil pumps will be operated manually by means of local control switches.
A duty/standby selector switch will be provided on the LV switchboard. Moreover, an
indication and alarm panel shall be provided in the control / electrical room. It will
display all of the readings and alarms from the tank instruments.
The following measurements and alarms shall be provided as a minimum:
high level alarm
low level alarm
low level trip (of supply pumps)
level indicator of the ultra sonic sounding device design
2.4.8.2 CCTV
A complete CCTV system will be provided so that the tank farm can be visually
monitored from Fort Victoria. However, a CCTV monitoring screen will also be
provided in the control / electrical room.
2.4.8.3 Remote indication
A fibre optic cable linked to the existing control room at Fort Victoria power station
will be installed so as to relay all instrument readings, alarms, CCTV signals and fire
alarm panel readings. The fibre optic cable will be buried along with the oil delivery
pipe leading to Fort Victoria. Display and alarm panels and screens shall be
duplicated at Fort Victoria.
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
51 | P a g e May 2013
2.4.9 Access to site
Two separate access points to the site will be provided from the eastern side as
shown in the proposed tank farm layout provided in ANNEX 9. Since the proposed
new public road to the east of the site has not yet been built, it will be necessary to
construct a temporary access roadway from the existing track at the north east
corner of the site to give access to the new site entrance. The design and
construction of this access road will be carried out during phase 1 of the project. It
will be a tarred road 5.50m wide.
2.5 Proposed schedule for project implementation
The proposed undertaking would be carried out in two phases. The proponent
intends to commence the implementation of the first phase which comprises the
construction of 3 oil tanks and its associated pipelines in addition to an access road,
as soon as all the relevant clearance and permits have been obtained. In that
respect the CEB has made a general planning on the salient tasks that would be
undertaken to reach the desired goal. These include the study, design and permits
stages. The proponent would not commence any activity before the receipt of
permits and licenses.
The matrices in Tables 10a and 10b give a glimpse of the salient milestones in the
project implementation.
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
52 | P a g e May 2013
Table 10a: Project Implementation Plan for Phase 1
Sr.
No
Short description Proposed start
date
Planned
completion date
Remarks
Phase 1 Phase 1
1 Carry out topographical
survey on planned
alignment of pipe and site
where tank would be
constructed
December 2012 July 2013 Tender
exercise in
process
2 Carry out geotechnical
investigation of site
December 2012 July 2013 Tender
exercise in
process
3 Preparation and
submission of EIA report
November 2012 May 2013
4 Receipt of EIA license - July 2013
5 Permits & Clearances July 2013 August 2013
6 Prequalification of
potential contractors for
the works
September 2013
October 2013
7 Selection of contractor,
negotiation and Award of
contract for works
October 2013
November 2013
8 Construction works and
commissioning of works
December 2013
October 2014
9 Operation October 2014
On-going
EIA Proposed Construction of a new HFO tank farm and Associated Pipeline at Les Grandes Salines by CEB
53 | P a g e May 2013
Table 10b: Project Implementation Plan for Phase 2
Sr.
No
Short description Proposed start
date
Planned
completion date
Remarks
Phase 2 Phase 2
1 Permits & Clearances November 2014 December 2014
2 Prequalification of
potential contractors for
the works
January 2015
February 2015
3 Selection of contractor,
negotiation and Award of
contract for works
March 2015
April 2015
4 Construction works and
commissioning of works
May 2015
January 2016
5 Operation January 2016
On-going