chapter 102
DESCRIPTION
CHAPTER 102. Plain English Guide to the Erosion and Sediment Control (E&S) Regulations Fulton County Conservation District 216 N. Second Street, Suite 15 McConnellsburg, PA 17233 717-485-3547, extension 4. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/1.jpg)
CHAPTER 102
Plain English Guide to the
Erosion and Sediment Control (E&S) Regulations
Fulton County Conservation District
216 N. Second Street, Suite 15
McConnellsburg, PA 17233
717-485-3547, extension 4
![Page 2: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/2.jpg)
The scope: § 102.2 (a).
• Chapter 102 requires persons proposing or conducting earth disturbance activities to develop, implement and maintain Best Management Practices (BMPs) to minimize the potential for accelerated erosion and sedimentation.
![Page 3: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/3.jpg)
What is an earth disturbance activity?
• A construction or other human activity which disturbs the surface of the land.– Clearing and grubbing– Grading– Excavations– Embankments– Land development– Moving, depositing, stockpiling or storing of soil,
rock or earth materials
![Page 4: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/4.jpg)
Chapter 102 regulates:
• Construction activities
• Timber harvesting
• Agricultural plowing and tilling
• Road maintenance activities
![Page 5: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/5.jpg)
Regulating stormwater: during and after construction.
• DURING– Stormwater runoff
can occur during construction activities.
– Regulated by Chapter 102.
– Enforced by DEP and County Conservation Districts.
• AFTER– Stormwater runoff
can also occur after construction has been completed and the site is considered to be permanently stabilized.
– Regulated and enforced by local municipalities.
![Page 6: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/6.jpg)
The purpose: § 102.2 (b).
• The BMPs shall be undertaken to protect, maintain, reclaim and restore water quality and the existing and designated uses of waters of this Commonwealth.
![Page 7: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/7.jpg)
What are BMPs?
• Best Management Practices
• Activities, facilities, measures or procedures used to minimize accelerated erosion and sedimentation.
![Page 8: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/8.jpg)
Rock Construction Entrance
![Page 9: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/9.jpg)
Filter Fabric Fence
![Page 10: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/10.jpg)
Rock Filter
![Page 11: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/11.jpg)
Outlet Protection
![Page 12: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/12.jpg)
Channel
![Page 13: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/13.jpg)
Sediment Trap or Basin
![Page 14: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/14.jpg)
Erosion Control Blanket
![Page 15: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/15.jpg)
Seed and Mulch
![Page 16: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/16.jpg)
BMPs are not perfect.
• Chapter 102 requires persons proposing or conducting earth disturbance activities to minimize the potential for accelerated erosion and sedimentation to occur.
• Erosion and sediment control BMPs do not completely eliminate sediment from stormwater runoff.
• BMPs must be properly installed and maintained.
![Page 17: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/17.jpg)
How do the regulations apply to an earth
disturbance activity?• Two factors must be considered:
– The total amount of earth disturbed over the life of the project.
– The water quality designation of the watershed (drainage area) that the project occurs in.
![Page 18: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/18.jpg)
High Quality (HQ) waters of Fulton County:
• Brush Creek, Brush Creek Township• North Branch, Little Aughwick Creek,
Dublin Township• Roaring Run, Ayr Township• Sideling Hill Creek, Taylor Township• South Branch, Little Aughwick Creek,
Todd/Dublin Townships (from the inlet of Cowans Gap Lake to the confluence with the North Branch)
![Page 19: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/19.jpg)
Exceptional Value (EV) waters of Fulton County:
• Sideling Hill Creek, Union Township • South Branch, Little Aughwick Creek,
Todd Township (from the source to the inlet of Cowans Gap Lake)
![Page 20: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/20.jpg)
NOTE:
• These water quality designations include all waters that drain into these streams.
![Page 21: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/21.jpg)
Chapter 102 minimum requirements:
• Erosion and sediment control BMPs must be implemented and maintained for all earth disturbance activities.
• The extent to what types of BMPs are used depends on the project.
![Page 22: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/22.jpg)
If the project will disturb greater than 5,000 square
feet:• Erosion and sediment control BMPs
must be implemented and maintained.
AND
• A written Erosion and Sediment Control (E&S) Plan must be developed.
![Page 23: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/23.jpg)
If the project is being conducted in a HQ or EV
watershed:• Erosion and sediment control BMPs
must be implemented and maintained.
AND
• A written E&S Plan must be developed.
Regardless of the total amount of earth disturbed over the life of the project.
![Page 24: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/24.jpg)
If the project will disturb 1 acre or more:
• Erosion and sediment control BMPs must be implemented and maintained.
• A written E&S Plan must be developed.
AND
• The project may require a National Pollutant Discharge Elimination System (NPDES) Permit.
![Page 25: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/25.jpg)
What is a NPDES permit?
• A NPDES permit provides permit coverage for the discharge of stormwater runoff from the site to waters of the Commonwealth during construction activities.
• The Fulton County Conservation District must be contacted to discuss the nature of the project and to determine whether or not a permit is required, specifically for projects disturbing 1-5 acres.
• Any project disturbing 5 acres or more automatically requires a NPDES permit.
![Page 26: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/26.jpg)
What is an E&S Plan?
• A written plan detailing how erosion and sedimentation will be minimized through the use of BMPs.
• Typically consists of drawings and a narrative.
• Can be very simple or very complex.• The written E&S Plan must be kept on site at
all times during the earth disturbance activity.
![Page 27: CHAPTER 102](https://reader035.vdocuments.us/reader035/viewer/2022062322/56814736550346895db47579/html5/thumbnails/27.jpg)
E&S Plan content:
• Existing topographic features of the project site
• Soils information• Characteristics of the
earth disturbance activity• Amount of runoff from the
project area• Location of waters of the
Commonwealth which may receive runoff
• Narrative description of the location and type of BMPs used
• Sequence of BMP installation
• Supporting calculations• Plan drawings• Maintenance program• Procedures for the
recycling or disposal of materials