  • Statistical Process Contol (SPC)

    Lec-1

  • Quality and SPCThe concept of quality has been with us since the beginning of time. Typically the quality of products was described by some attribute such as strength, beauty or finish. However, the mass production of products that the reproducibility of the size or shape of a product became a quality issue.

  • Quality and SPCQuality was obtained by inspecting each part and passing only those that met specifications. With SPC, the process is monitored through sampling. Considering the results of the sample, adjustments are made to the process before the process is able to produce defective parts.

  • Process VariabilityThe concept of process variability forms the heart of SPC. For example, if a basketball player shot free throws in practice, and the player shot 100 free throws every day, the player would not get exactly the same number of baskets each day. Some days the player would get 84 of 100, some days 67 of 100, and so on. All processes have this kind of variation or variability.

  • Process VariabilityThe variation can be partitioned into 2 components. Natural process variation (common cause) or system variation. In the case of the basketball player, this variation would fluctuate around the player's long-run percentage of free throws made. Special cause variation is typically caused by some problem or extraordinary occurrence in the system. In the case of the player, a hand injury might cause the player to miss a larger than usual number of free throws on a particular day.

  • Statistical Process Control (SPC)SPC is a methodology for charting the process and quickly determining when a process is "out of control. (e.g., a special cause variation is present because something unusual is occurring in the process). The process is then investigated to determine the root cause of the "out of control" condition. When the root cause of the problem is determined, a strategy is identified to correct it.

  • Statistical Process Control (SPC)The management responsible to reduce common cause or system variation as well as special cause variation. This is done through process improvement techniques, investing in new technology, or reengineering the process to have fewer steps and therefore less variation. Reduced variation makes the process more predictable with process output closer to the desired or nominal value.

  • Statistical Process Control (SPC)The process above is in apparent statistical control. Notice that all points lie within the upper control limits (UCL) and the lower control limits (LCL). CL-centerlineThis process exhibits only common cause variation.

  • The process above is out of statistical control. Notice that a single point can be found outside the control limits (above them). This means that a source of special cause variation is present. Having a point outside the control limits is the most easily detectable out-of-control condition.

  • The graphic above illustrates the typical cycle in SPC. First, the process is highly variable and out of statistical control. Second, as special causes of variation are found, the process comes into statistical control. Finally, through process improvement, variation is reduced. This is seen from the narrowing of the control limits. Eliminating special cause variation keeps the process in control; process improvement reduces the process variation and moves the control limits in toward the centerline of the process.

  • Out-of-Control ConditionsSeveral types of conditions exist that indicate that a process is out of control:Extreme Point Condition: This process is out of control because a point is either above the UCL or below the LCL.

  • Out-of-Control ConditionsControl Chart Zones: Control charts can be broken into 3 zones, a, b, & c on each side of the process center line.A series of rules exist that are used to detect conditions in which the process is behaving abnormally to the extent that an out of control condition is declared.

  • Out-of-Control ConditionsThe probability of having 2 out of 3 consecutive points either in or beyond zone A is an extremely unlikely occurrence when the process mean follows the normal distribution. This criteria applies only to X-bar charts for examining the process mean.X, Y, and Z are all examples of this phenomena.

  • Out-of-Control ConditionsThe probability of 4 out of 5 consecutive points either in or beyond zone B is also an extremely unlikely occurrence when the process mean follows the normal distribution. Applied to X-bar chart when analyzing a process mean.X, Y, and Z are all examples of this phenomena.

  • Out-of-Control ConditionsRuns Above or Below the Centerline: The probability of having long runs (8 or more consecutive points) either above or below the centerline is also an extremely unlikely occurrence when the process follows the normal distribution.Applied to both X-bar and r charts.

  • Out-of-Control ConditionsLinear Trends: The probability of 6 or more consecutive points showing a continuous increase or decrease is also an extremely unlikely occurrence when the process follows the normal distribution. Applied to both X-bar and r charts.

  • Out-of-Control ConditionsOscillatory Trend: The probability of having 14 or more consecutive points oscillating back and forth is also an extremely unlikely occurrence when the process follows the normal distribution. Applied to both X-bar and r charts.

  • Out-of-Control ConditionsAvoidance of Zone C: The probability of having 8 or more consecutive points occurring on either side of the center line and do not enter Zone C.This phenomena occurs when more than one process is being charted on the same chart, the use of improper sampling techniques, or perhaps the process is over controlled.

  • Out-of-Control ConditionsRun in Zone C: The probability of having 15 or more consecutive points occurring the Zone C. This condition can arise from improper sampling, falsification of data, or a decrease in process variability that has not been accounted for when calculating control chart limits, UCL and LCL.

  • The basicsDont inspect the product, inspect the process.

    You cant inspect it in, youve got to build it in.

    If you cant measure it, you cant manage it.

  • The SPC stepsBasic approach:Awareness that a problem exists.Determine the specific problem to be solved.Diagnose the causes of the problem.Determine and implement remedies.Implement controls to hold the gains achieved by solving the problem.

  • SPC requires the use of statisticsQuality improvement efforts have their foundation in statistics.SPC involves thecollectiontabulationanalysisinterpretationpresentation of numerical data.

  • SPC is comprised of 7 tools:Pareto diagramHistogram Cause and Effect DiagramCheck sheetProcess flow diagramScatter diagramControl chart

  • Pareto PrincipleAlfredo Pareto (1848-1923) Italian Economist:Conducted studies of the distribution of wealth in Europe.20% of the population has 80% of the wealthJoseph Juran used the term vital few & trivial many or useful many. He noted that 20% of the quality problems caused 80% of the dollar loss.

  • Pareto diagramPercent from each causeCauses of poor qualityMachine calibrationsDefective partsWrong dimensionsPoor DesignOperator errorsDefective materialsSurface abrasions(64)(13)(10)(6)(3)(2)(2)A pareto diagram is a graph that ranks data classifications in descending order from left to right.

  • Pareto diagram% Complaints

  • Pareto diagramSometimes a pareto diagram has a cumulative line.This line represents the sum of the data as they are added together from left to right.

  • Pareto diagramSometimes a pareto diagram has a cumulative line.This line represents the sum of the data as they are added together from left to right. Above the bars, using the 2nd Y-axis representing the cumulative data, plot the cumulative percentage values in the form of a line.

  • Pareto diagramThe cumulative percentage can be computed (dotted line). On the right, add a vertical percent scale equal in length to the scale on the left. Label this from 0% to 100% .

  • Pareto diagramTable 1. Example of a Tabulation of Causes of Ball Bond Lifting for use in a Pareto Chart

  • Pareto diagramTable 1. Example of a Tabulation of Causes of Ball Bond Lifting for use in a Pareto Chart

  • HistogramThe histogram, graphically shows the process capability and, if desired, the relationship to the specifications and the nominal. It also suggests the shape of the population and indicates if there are any gaps in the data.

  • Histogram

  • Histogram

  • Cause-and-Effect DiagramsShow the relationships between a problem and its possible causes.Developed by Kaoru Ishikawa (1953)Also known as Fishbone diagramsIshikawa diagrams

  • Cause and Effect SkeletonQualityProblemMaterialsEquipmentPeopleProcedures

  • Cause-and-Effect DiagramsAdvantagesmaking the diagram is educational in itselfdiagram demonstrates knowledge of problem solving teamdiagram results in active searches for causesdiagram is a guide for data collection

  • Cause-and-Effect DiagramsTo construct the skeleton, remember:For manufacturing - the 4 Msman, method, machine, materialFor service applicationsequipment, policies, procedures, people

  • ShiftsDefect Type

  • FlowchartsGraphical description of how work is done.Used to describe processes that are to be improved."Draw a flowchart for whatever you do. Until you do, you do not know what you are doing, you just have a job.Dr. W. Edwards Deming.

  • ActivityDecisionYesNoFlowcharts

  • Flowcharts

  • Flow Diagrams

  • Process Chart SymbolsOperationsInspectionTransportationDelayStorage

  • Flow Diagrams

  • Scatter Diagram.(a) Positive correlation(b) No correlation(c) Curvilinear relationshipThe patterns described in (a) and (b) are easy to understand; however, those described in (c) are more difficult.

  • Run ChartsRun Charts (time series plot)Examine the behavior of a variable over time.Basis for Control Charts

  • 181263915212427246810121416Sample numberNumber of defectsUCL = 23.35LCL = 1.99c = 12.67Control Chart

  • 7 Quality ToolsControl Chart

  • SUMMARYSPC using statistical techniques to measure and analyze the variation in processes to monitor product quality and maintain processes to fixed targets. Statistical quality control using statistical techniques for measuring and improving the quality of processes, sampling plans, experimental design, variation reduction, process capability analysis, process improvement plans.

  • SUMMARYA primary tool used for SPC is the control chart, a graphical representation of certain descriptive statistics for specific quantitative measurements of the process. These descriptive statistics are displayed in the control chart in comparison to their "in-control" sampling distributions. The comparison detects any unusual variation in the process, which could indicate a problem with the process.

  • SUMMARY - benefitsProvides surveillance and feedback for keeping processes in controlSignals when a problem with the process has occurredDetects assignable causes of variationReduces need for inspectionMonitors process qualityProvides mechanism to make process changes and track effects of those changesOnce a process is stable, provides process capability analysis with comparison to the product tolerance

    Pareto analysis uses an ordered histogram to highlight the major causes of quality problems.StatisticsHistograms are graphical frequency tables that visually capture and display the variation in a set of data.StatisticsA cause-and-effect diagram, or fishbone diagram, is a chart showing the different categories of problem causes.

    StatisticsA check sheet is a fact-finding tool used to collect data about quality problems. A typical check sheet tallies the number of defects by previously identified categories. The next step is to graph the defects per category in a histogram.StatisticsA flowchart diagrams the steps in a process. Flowcharts help problem solvers better understand the process so they can highlight quality problems.StatisticsStatisticsScatter diagrams and tightness of points plotted on the graph gives an indication of the strength of the relationship. A cluster of points resembling a straight line indicates the strongest correlation between the variables. In this graph, there is a strong positive correlation between x and y.StatisticsProcess control involves monitoring a production process and charting the results on a control chart. If any of the points plotted falls outside the control limits, the process is out-of-control. Statistics