CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT This Annual Performance Report is drafted in terms of Section 46 of the Municipal Systems Act, 32 of 2000. The Annual Performance Report 2018/2019 is based on reported information only, and un-audited. The report is subject to change during and after the audit from the Auditor-General (AG) of South Africa. The Annual Performance Report is hereby submitted to the Govan Mbeki Municipal Council in terms of the Municipal Systems Act (MSA), 32 of 2000, section 46(1) and (2), as well as the MFMA Circular 11 on annual reporting. This report covers the performance information from 01 July 2018 to 30 June 2019 and focuses on the implementation of the Service Delivery and Budget Implementation Plan (SDBIP), in relation to the objectives as encapsulated in the Municipality’s Integrated Development Plan (IDP) for the year under review. The format of the report will reflect on the overall municipal performance as per the Six (6) Municipal Key Performance Areas (KPA’s) as adopted in the Integrated Development Plan (IDP) . 1.1 LEGISLATIVE REQUIREMENTS The constitution of S.A (1996), section 152, dealing with the objectives of local government paves the way for performance management with the requirements for an “accountable government”. The democratic values and principles in terms of section 195 (1) are also linked with the concept of performance management, with reference to the following principles of inter alia:
• the promotion of efficient, economic and effective use of resources, • accountable public administration • to be transparent by providing information, • to be responsive to the needs of the community, • and to facilitate a culture of public service and accountability amongst staff.
This Annual Performance Report has been compiled in compliance with the requirements of section 46 (1) of the Local Government: Municipal Systems Act, 2000; which stipulates as follows: (1) A municipality must prepare for each financial year a performance report reflecting—
In addition, Regulation 7 (1) of the Local Government: Municipal Planning and Performance Management Regulations, 2001 states that “A Municipality’s Performance Management System entails a framework that describes and represents how the municipality’s cycle and processes of performance planning, monitoring, measurement, review, reporting and improvement will be conducted, organised and managed, including determining the roles of the different role players.” Performance management is not only relevant to the organisation as a whole, but also to the individuals employed in the organisation as well as the external service providers and the Municipal Entities.
(a) the performance of the municipality and each external service provider during that financial year; (b) a comparison of the performance referred to in paragraph (a) with targets set for performance in the previous financial year; and (c) measures taken to improve performance.
![Page 3: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/3.jpg)
3
1.2 OVERVIEW OF PERFORMANCE WITHIN THE ORGANISATION The Municipal Systems Act (MSA), 2000 requires municipalities to establish a performance management system. Further, the MSA and the Municipal Finance Management Act (MFMA) requires the Integrated Development Plan (IDP) to be aligned to the municipal budget and be monitored for the performance of the budget against the IDP via the Service Delivery and the Budget Implementation Plan (SDBIP) The Performance Management System implemented at Govan Mbeki Municipality is intended to provide a comprehensive, step by step planning system that helps the municipality to manage the process of performance planning and measurement effectively. The PMS serves as primary mechanism to monitor, review and improve the implementation of the municipal IDP and eventually the budget. The performance management policies, as approved by Council provides for performance implementation, monitoring and evaluation at organisational as well as individual levels. The Executive Mayor in consultation with the Municipal Manager identify and prioritise Key Performance Indicators, which will be monitored during the year and forming part of the Performance Agreements /Departmental SDBIP’s of each Section 56 Manager. For financial year 2018/2019, a total of 53 indicators were identified for the High level Scorecard on which reporting was done. 1.3 PERFORMANCE MANAGEMENT AT ORGANISATIONAL LEVEL
The organisational performance is evaluated by means of a High level Municipal Scorecard (Top Layer SDBIP) at organisational level and through the Departmental Service Delivery Budget and Implementation Plan (SDBIP) at Departmental levels.
The SDBIP is a plan that converts the IDP and Budget into measurable criteria on how, where and when the strategies, objectives and normal business process of the Municipality is implemented. It also allocates responsibility to Departments to deliver the services in terms of the IDP and Budget.
The MFMA Circular No.13 prescribes that:
Ø The IDP and budget must be aligned; Ø The budget must address the strategic priorities; Ø The SDBIP should indicate what the municipality is going to do during next 12 months; and Ø The SDBIP should form the basis for measuring the performance against goals set during the budget
/IDP processes.
The municipal scorecard (High- level SDBIP) consolidate service delivery targets set by Council / senior management and provide an overall picture of performance for the municipality as a whole, reflecting performance on its strategic priorities.
The departmental SDBIP capture the performance of each defined department which reflects on the strategic priorities of the municipality. The SDBIP provides detail of each outcome for which the senior management is responsible for, in other words a comprehensive picture of the performance of that department/sub-section
Unlike the municipal scorecard, which reflects on the strategic performance of the municipality, the departmental SDBIP provide detail of each outcome for which top management are responsible for, in other words a comprehensive picture of the performance of that departments/sub sections.
Departmental scorecards are compiled by senior managers for their directorate and consists of objectives, indicators and targets derived from the approved High-level SDBIP, the approved budget and measurable service delivery indicators related to each functional area.
![Page 4: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/4.jpg)
4
1.4 PERFORMANCE MANAGEMENT AT INDIVIDUAL LEVEL The Municipal Systems Act, 2000 (Act 32 of 2000) prescribes that the municipality must enter into performance based agreements with the all s56-employees and that performance agreements must be reviewed annually. The process and the format are further regulated by Regulation 805 (August 2006).
The Municipal Manager and Managers directly accountable to the Municipal Manager signed performance agreements for the financial year 2018/2019as legislatively required. The signed performance agreements were loaded on the municipal website and also sent to National Treasury and Provincial departments. This has led to a specific focus on service delivery and means that: v Each Sec 56 manager has to develop a performance plan informed by the IDP and the top layer
SDBIP of the organization. v At the beginning of each financial year all the senior managers (Section 56 employees) sign
Performance Agreements. v All managers reporting to Section 56 employees are also reporting on their specific sections and
evaluations are done accordingly on performance per subsection. 1.5 LINK BETWEEN THE ORGANIZATIONAL AND INDIVIDUAL PERFORMANCE The linkage of the organisational and individual performance management is reflected in the diagram below:
![Page 5: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/5.jpg)
5
CHAPTER 2: EXECUTIVE SUMMARY
The Annual Performance report as compiled reflects actual performance of the Municipality as measured against the performance indicators and targets in its Integrated Development Plan (IDP) and Service Delivery and Budget Implementation Plan (SDBIP) for 2018/2019 q The Municipal Scorecard 2018/2019, which consist of a total of 53 indicators were developed and
approved by the Mayor on 20 June 2018. q The Municipal Scorecard indicators are spread and linked across Six (6) Key Performance Areas (KPAs)
for the 2018/2019 financial year. q Performance agreements were signed for section 56 managers as required legislatively. q The signed performance agreements were loaded on the municipal website and also sent to National
treasury. q The First Quarter Performance assessments were conducted for all departments on 30&31 October
2018. q The Second Quarter Performance assessments were conducted on 16 & 17 January 2019. q The Third Quarter Performance assessments were conducted for all departments on 03 May 2019. q The Fourth Quarter and Overall Performance assessments were conducted on 17 July 2019
Detailed performance of the overall the Municipal performance for the financial year 2018/2019 as per the High level SDBIP 2018/2019 are included as APPENDIX A to provide an overall picture of performance in the municipality.
The overall assessment of actual performance against targets set for the Key Performance Indicators as documented in the SDBIP is illustrated in terms of the following assessment methodology:
PERFORMANCE ASSESSMENT LEGEND
COLOR CATEGORY 1 Unacceptable 2 Not Fully Effective
3 Fully Effective 4 Above Expectations 5 Outstanding
N/A Not Applicable
Monitoring and Reporting on the Performance of the Service Delivery Budget Implementation Plan has been done. Quarterly reports and Mid-Year Performance Assessments were submitted to the Audit Committee and Council. These reports were published on the municipal website on a quarterly basis.
![Page 6: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/6.jpg)
6
CHAPTER 3: OVERALL PERFORMANCE HIGHLEVEL SCORECARD SERVICE DELIVERY BUDGET IMPLEMENTATION PLAN (SDBIP) 2018/2019 The Municipal Scorecard consist of a total of 53 indicators spread across Six (6) Key Performance Areas (KPAs) of which 49 indicators were measured for 2018/2019 financial year. This report endeavours to report on the performance assessment status and progress made by Govan Mbeki Municipality in terms of its Performance Management System (PMS) on the 2018/2019 High level Scorecard SDBIP, period 01 July 2018 -30 June 2019. 3.1 SNAPSHOT OF OVERALL PERFORMANCE HIGHLEVEL SCORECARD 2018/2019FINANICIAL YEAR Achievement of targets measured are as follows:
• 41.5 % of targets were fully effective
43.4 % of targets were not fully achieved
• 15.1% were unacceptable GOVAN MBEKI MUNICIPLAITY
PERIOD QUARTER 4 : 01 APRIL 2019-30 JUNE 2019 TOTAL INDICATORS ACHIEVED
3-Fully Effective 20 37.7% 4- Above Expectations 1 1.9% 5- Outstanding 1 1.9% TOTAL INDICATORS ACHIEVED 22 41.5%
GOVAN MBEKI MUNICIPLAITY PERIOD QUARTER 4 : 01 APRIL 2019-30 JUNE 2019
TOTAL INDICATORS NOT ACHIEVED 1- Unacceptable 8 15.1% 2-Not Fully Effective 23 43.4% TOTAL INDICATORS NOT ACHIEVED 31 58.5%
The chart and table below demonstrate the abovementioned achievements as follows:
![Page 7: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/7.jpg)
7
3.2 COMPARISON OF OVERALL PERFORMANCE HIGHLEVEL SCORECARD FOR PAST THREE (3) FINANCIAL YEARS A comparison of the year under review 2018/2019 is reflect as per below table and chart in relation to the previous financial year.
OVERALL PERFORMANCE COMPARISON OF THREE (3) FINANCIAL YEARS
MUNICIPAL PERFORMANCE 2016/2017 2017/2018 2018/2019
OVERALL PERFORMANCE PER FINANCIAL YEAR 52.2% 32.7% 41.5%
INDICATORS 46 49 53
![Page 8: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/8.jpg)
8
3.3 SNAPSHOT OF OVERALL PERFORMANCE CONTRIBUTION PER DEPARTMENT ON HIGHLEVEL SCORECARD PER DEPARTMENT 2018/2019 The following graphs reflect on each departmental contribution towards the performance of the 53 measured indicators contain in the Municipal Scorecard for Financial Year 2018/2019. Office of the Municipal Manager
2018/2019 OVERALL PERFORMANCE MUNICIPAL SCORECARD
PERIOD : 01 JULY 2018- 30 JUNE 2019 PERFORMANCE PER DEPARTMENT:
OFFICE OF THE MUNICIPAL MANAGER 1- Unacceptable 2 18% 2-Not Fully Effective 5 46% 3-Fully Effective 4 36%
4- Above Expectations 0 0%
5- Outstanding 0 0% N/A Not Applicable 0 0%
TOTAL INDICATORS 11 100%
18%
46%
36%
2018/2019OVERALL PERFORMANCE MUNICIPAL SCORECARD
PERIOD : 01 JULY 2018- 30 JUNE 2019 PERFORMANCE CONTRIBUTION HIGHLEVEL:
OFFICE OF THE MUNICIPAL MANAGER
1- Unacceptable
2-Not Fully Effective
3-Fully Effective
4- Above Expectations
5- Outstanding
N/ANot Applicable
![Page 9: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/9.jpg)
9
Department Financial Services
2018/2019 OVERALL PERFORMANCE MUNICIPAL SCORECARD
PERIOD : 01 JULY 2018- 30 JUNE 2019 PERFORMANCE PER DEPARTMENT:
FINANCIAL SERVICES 1- Unacceptable 4 29% 2-Not Fully Effective 7 50% 3-Fully Effective 3 21% 4- Above Expectations 0 0% 5- Outstanding 0 0% N/A Not Applicable 0 0%
TOTAL INDICATORS 14 100%
![Page 10: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/10.jpg)
10
Department Corporate Services
2018/2019 OVERALL PERFORMANCE MUNICIPAL SCORECARD
PERIOD : 01 JULY 2018- 30 JUNE 2019 PERFORMANCE PER DEPARTMENT:
CORPORATE SERVICES 1- Unacceptable 0 0%
2-Not Fully Effective 1 33%
3-Fully Effective 2 67%
4- Above Expectations 0 0%
5- Outstanding 0 0% N/A Not Applicable 0 0%
TOTAL INDICATORS 3 100%
![Page 11: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/11.jpg)
11
Department Planning and Development
2018/2019 OVERALL PERFORMANCE MUNICIPAL SCORECARD
PERIOD : 01 JULY 2018- 30 JUNE 2019 PERFORMANCE PER DEPARTMENT: PLANNING AND DEVELOPMENT
1- Unacceptable 0 0% 2-Not Fully Effective 3 43% 3-Fully Effective 4 57% 4- Above Expectations 0 0% 5- Outstanding 0 0% N/A Not Applicable 0 0% TOTAL INDICATORS 7 100%
![Page 12: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/12.jpg)
12
Department Community Services
2018/2019 OVERALL PERFORMANCE MUNICIPAL SCORECARD
PERIOD : 01 JULY 2018- 30 JUNE 2019 PERFORMANCE PER DEPARTMENT:
COMMUNITY SERVICES 1- Unacceptable 0 0% 2-Not Fully Effective 1 33% 3-Fully Effective 1 33% 4- Above Expectations 1 33% 5- Outstanding 0 0% N/A Not Applicable 0 0%
TOTAL INDICATORS 3 100%
![Page 13: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/13.jpg)
13
Department Technical Services
2018/2019 OVERALL PERFORMANCE MUNICIPAL SCORECARD
PERIOD : 01 JULY 2018- 30 JUNE 2019 PERFORMANCE PER DEPARTMENT:
TECHNICAL SERVICES 1- Unacceptable 2 13% 2-Not Fully Effective 6 40% 3-Fully Effective 6 40% 4- Above Expectations 0 0% 5- Outstanding 1 7% N/A Not Applicable 0 0% TOTAL INDICATORS 15 100%
![Page 14: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/14.jpg)
14
3.4 OVERALL PERFORMANCE HIGHLEVEL SCORECARD PER MUNICIPAL KEY PERFORMANCE AREAS This section of the Annual Performance Report provide for an overview of the performance of each municipal key performance area for the 2018/2019 financial year.
2018/2019 OVERALL PERFORMANCE MUNICIPAL SCORECARD
PERIOD : 01 JULY 2018- 30 JUNE 2019: PERFORMANCE PER MUNICIPAL KEY PEFORMANCE AEAS ( KPA"S)
MUNICIPAL KEY FOCUS AREAS
1- Unacceptable
2-Not Fully Effective
3-Fully Effective
4- Above Expectations 5- Outstanding
N/A Not
Applicable
TOTAL INDICTORS
KPA 1 : FINANCIAL SUSTAINABILITY 4 6 1 0 0 0 11
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
2 7 9 0 1 0 19
KPA 3: ECONOMIC GROWTH AND DEVELOPMENT
0 1 0 0 0 0 1
KPA 4: INSTITUTIONAL TRANSFORMATION 0 1 2 0 0 0 3
KPA 5: SPATIAL INTEGRATION AND SAFE PROTECTED ENVIRONMENT
0 0 0 1 0 0 1
KPA 6: GOVERNANCE AND STAKEHOLDER PARTICIPATION
2 8 8 0 0 0 18
TOTAL INDICATORS 53
![Page 15: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/15.jpg)
15
The percentage achievement of each Municipal Key Performance Area as well as the number of indicators per KPA are illustrated as per following tables and graphs: KPA 1: FINANCIAL SUSTAINABILITY
2018/2019 OVERALL PERFORMANCE MUNICIPAL SCORECARD
PERIOD : 01 JULY 2018- 30 JUNE 2019 KPA 1 : FINANCIAL SUSTAINABILITY
Annual Performance Legend Rating TOTAL INDICATORS Percentage of total indicators
1- Unacceptable 4 36.4% 2-Not Fully Effective 6 54.5% 3-Fully Effective 1 9.1% 4- Above Expectations 0 0.0% 5- Outstanding 0 0.0% N/A Not Applicable 0 0.0%
TOTAL INDICATORS MEASURED 11 TOTAL INDICATORS 11 100%
![Page 16: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/16.jpg)
16
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
2018/2019 OVERALL PERFORMANCE MUNICIPAL SCORECARD
PERIOD : 01 JULY 2018- 30 JUNE 2019 KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
Annual Performance Legend Rating TOTAL INDICATORS Percentage of total indicators
1- Unacceptable 2 10.5%
2-Not Fully Effective 7 36.8% 3-Fully Effective 9 47.4% 4- Above Expectations 0 0.0% 5- Outstanding 1 5.3% N/A Not Applicable 0 0.0%
TOTAL INDICATORS MEASURED 19 TOTAL INDICATORS 19 100%
![Page 17: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/17.jpg)
17
KPA 3: ECONOMIC GROWTH AND DEVELOPMENT
2018/2019 OVERALL PERFORMANCE MUNICIPAL SCORECARD
PERIOD : 01 JULY 2018- 30 JUNE 2019 KPA 3: ECONOMIC GROWTH AND DEVELOPMENT
Annual Performance Legend Rating TOTAL INDICATORS Percentage of total indicators
1- Unacceptable 0 0.0%
2-Not Fully Effective 1 100.0% 3-Fully Effective 0 0.0% 4- Above Expectations 0 0.0% 5- Outstanding 0 0.0% N/A Not Applicable 0 0.0%
TOTAL INDICATORS MEASURED 1 TOTAL INDICATORS 1 100%
![Page 18: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/18.jpg)
18
KPA 4: INSTITUTIONAL TRANSFORMATION
2018/2019 OVERALL PERFORMANCE MUNICIPAL SCORECARD
PERIOD : 01 JULY 2018- 30 JUNE 2019 KPA 4: INSTITUTIONAL TRANSFORMATION
Annual Performance Legend Rating TOTAL INDICATORS Percentage of total indicators
1- Unacceptable 0 0.0% 2-Not Fully Effective 1 33.3% 3-Fully Effective 2 66.7% 4- Above Expectations 0 0.0% 5- Outstanding 0 0.0% N/A Not Applicable 0 0.0% TOTAL INDICATORS MEASURED 3 TOTAL INDICATORS 3 100%
![Page 19: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/19.jpg)
19
KPA 5: SPATIAL INTEGRATION AND SAFE PROTECTED ENVIRONMENT
2018/2019 OVERALL PERFORMANCE MUNICIPAL SCORECARD
PERIOD : 01 JULY 2018- 30 JUNE 2019 KPA 5: SPATIAL INTEGRATION AND SAFE PROTECTED ENVIRONMENT
Annual Performance Legend Rating TOTAL INDICATORS Percentage of total indicators
1- Unacceptable 0 0.0%
2-Not Fully Effective 0 0.0% 3-Fully Effective 0 0.0% 4- Above Expectations 1 100.0% 5- Outstanding 0 0.0% N/A Not Applicable 0 0.0% TOTAL INDICATORS MEASURED 1 TOTAL INDICATORS 1 100%
![Page 20: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/20.jpg)
20
KPA 6: GOVERNANCE AND STAKEHOLDER PARTICIPATION
2018/2019 OVERALL PERFORMANCE MUNICIPAL SCORECARD
PERIOD : 01 JULY 2018- 30 JUNE 2019 KPA 6: GOVERNANCE AND STAKEHOLDER PARTICIPATION
Annual Performance Legend Rating TOTAL INDICATORS Percentage of total indicators
1- Unacceptable 2 11.1% 2-Not Fully Effective 8 44.4% 3-Fully Effective 8 44.4% 4- Above Expectations 0 0.0% 5- Outstanding 0 0.0% N/A Not Applicable 0 0.0% TOTAL INDICATORS MEASURED 18 TOTAL INDICATORS 18 100%
![Page 21: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/21.jpg)
21
CHAPTER4: ACTUAL PERFORMANCE AGAINST THE PLANNED TARGETS AS PER APPROVED HIGHLEVEL MUNICIPAL SCORECARD
SDBIP 2018/2019
4. MUNICIPALITY’S ACTUAL PERFORMANCE AGAINST THE PLANNED TARGETS 2018/2019
This section of the Annual Performance Report provide for reporting on the Municipality’s actual performance against the planned targets as derived from the Municipality’s IDP for the financial year under review 2018/2019 The report also included the also corrective measures that will be implemented accordingly to address the targets not achieved.
![Page 22: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/22.jpg)
22
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
KPA 1 : FINANCIAL SUSTAINABILITY
1
FIN
AN
CE
KPA 1 : FINANCIAL SUSTAINABILITY
To enhance revenue & secure financial sustainability
Fin.
Sust
ain
.
FIN
S8.1
Percentage (%) of Debtors Payment as per Billing
Maintain a 90% Debtors Payment percentage as per Billing
Quarterly Report (Financial Ratios)
All
54% Debtors payment
Op
era
tiona
l Bud
get
Out
com
e % 90 % Debtors payment percentage per quarter as per Billing by 30 June 2019
30-J
un-1
9
66% Debtors payment
Non collection or cutting Bethal/Embalenhle community due to unrest
Intensified the debts collection through cut-offs service from the non go areas including usage of bylaws enforcers
2 2-Not Fully Effective
2
FIN
AN
CE
KPA 1 : FINANCIAL SUSTAINABILITY
To enhance revenue & secure financial sustainability
Fin.
Sust
ain
.
FIN
S8.1
Percentage (%) of Debt book Reduction
Debt book reduction by 30%
Monthly and Quarterly Report Revenue enhancement plan
All
16.25% increase in the debt book O
per
atio
nal
Bud
get
Act
ivity
% 30% reduction of Debt book by 30 June 2019
30-J
un-1
9
29% Increase in the debt book
Non collection or cutting Bethal/Embalenhle community due to unrest
Intensified the debts collection through cut-offs service from the non go areas
1 1-
Unacceptable
3
FIN
AN
CE
KPA 1 : FINANCIAL SUSTAINABILITY
To enhance revenue & secure financial sustainability
Fin.
Sust
ain
.
FIN
S8.1
Percentage (% )Of Operating Service Debtors to Revenue: (Total outstanding services debtors/ Annual service Revenue
Financial Viability measured in terms of OS Service Debtors to Revenue
Quarterly Report (Financial Ratios)
All
35.80% of outstanding service debtors to revenue
Op
era
tiona
l Bud
get
Out
com
e % 95% of outstanding service debtors to revenue by 30 June 2019
30-J
un-1
9
1.32% of outstanding service debtors to revenue
Non collection or cutting Bethal/Embalenhle community due to unrest
Intensified the debts collection through cutoffs service from the non go areas
1 1-
Unacceptable
![Page 23: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/23.jpg)
23
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
received for services x 100).
4
FIN
AN
CE
KPA 1 : FINANCIAL SUSTAINABILITY
To enhance revenue & secure financial sustainability
Fin.
Sust
ain
.
FIN
S8.1
Percentage ( %) Of Debt coverage ratio (Total revenue received - Total grants)/debt service payments due within the year x 100).
Financial Viability measured in terms of debt coverage ratio
Quarterly Report (Financial Ratios)
All
303.5% of Debt coverage calculated as per the ratio determined O
per
atio
nal B
udge
t
Out
com
e % 124% of Debt coverage calculated as per the ratio determined by 30 June 2019 30
-Jun
-19
349.2% of Debt coverage calculated as per the ratio determined
Non collection or cutting Bethal/Embalenhle community due t unrest
Intensified the debts collection through cutoffs service from the non go areas
2 2-Not Fully Effective
5
FIN
AN
CE
KPA 1 : FINANCIAL SUSTAINABILITY
To enhance revenue & secure financial sustainability
Fin.
Sust
ain
.
FIN
S8.1
Cost coverage ratio (Available cash at particular time + investments)/ Monthly fixed operating expenditure x 100).
Financial Viability measured in terms of Cost coverage ratio
Quarterly Report (Financial Ratios)
All
0.55% of cost coverage ratio calculated
Op
era
tiona
l Bud
get
Out
com
e
%/
Mon
ths 3 months of
cost coverage ratio calculated by 30 June 2019
30-J
un-1
9
0 months of cost coverage ratio calculated
0.1% of calculated ratio
The MRFP was developed by GMM/Treasury/Cogta and is still to be signedoff by the MEC Cogta
2 2-Not Fully Effective
6
OFF
ICE
OF
THE
MUN
ICIP
AL
MA
NA
GER
KPA 1 : FINANCIAL SUSTAINABILITY
To enhance revenue & secure financial sustainability
Fin.
Sust
ain
.
FIN
S8.1
Percentage ( % )of the Municipality's capital budget spent on capital projects identified in the IDP, measured as Total Actual Capital Expenditure/Approved Capital
CAPEX:The percentage of a municipality’s capital budget spent on capital projects identified in the IDP for the2018/2019
List of capital projects and report on spending capital budget on capital projects identified
All
20% of capital budget spent
Op
era
tiona
l Bud
get
Out
put
% 100% of
capital budget spent by 30 June 2019
30-J
un-1
9
95.94% of capital budget spent
Cashflow constraints
implemention of FRP & Collection of debts
2 2-Not Fully Effective
![Page 24: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/24.jpg)
24
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
Budget x 100 (All Funding excl. MIG)
financial year
7
OFF
ICE
OF
THE
MUN
ICIP
AL
MA
NA
GER
KPA 1 : FINANCIAL SUSTAINABILITY
To enhance revenue & secure financial sustainability
Fin.
Sust
ain
.
FIN
S8.1
Percentage (%) of approved capital budget spend (MIG)
CAPEX:The percentage of a municipality’s capital budget spent on capital projects identified in the IDP for the 2018/2019 financial year in terms of MIG Funds
Report and proof of MIG funding spent
All
100% of spending on MIG
Op
era
tiona
l Bud
get
Out
put
% 100% of spending on MIG by 30 June 2019
30-J
un-1
9
96% of spending on MIG
Late appointment of Service Providers. Disruptions by community and business forums. Unreasonable demands on subcontracting work.
Adherence to procurement and implementation plan. Set aside scope for sub-contracting work
2 2-Not Fully Effective
8
FIN
AN
CE
KPA 1 : FINANCIAL SUSTAINABILITY
To enhance revenue & secure financial sustainability
Fin.
Sust
ain
.
FIN
S8.1
Percentage (%) of operational budget spent on repairs and maintenance.
Provision for repairs and maintenance
Proof spending on maintenance / reports
All
40.9% of Repairs and maintenance budget spent
Op
era
tiona
l Bu
dge
t
Out
com
e % 100% of Repairs and maintenance budget spent by 30 June 2019 30
-Jun
-19
56% of Repairs and maintenance budget spent
Cashflow constraints
Implemention of FRP & Collection of debts 2 2-Not Fully
Effective
9
FIN
AN
CE
KPA 1 : FINANCIAL SUSTAINABILITY
To enhance revenue & secure financial
Fin.
Sust
ain
.
FIN
S8.1
Annual review of Financial Plan by end of March 2019
Annual review of Financial Plan to be included as part of the
Updated Financial Plan
All
No Updated Financial Plan for the financial
Op
era
tiona
l Bu
dge
t
Act
ivity # 1XAnnual
review of Financial Plan by 31 March 2019 31
-Mar
-19
No review has been done regarding the Financial Plan
The review and re-drafting of the Financial plan was not finalise at the
The review and re-drafting of the Financial plan as per the
1 1-
Unacceptable
![Page 25: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/25.jpg)
25
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
sustainability
draft budget 2019/2020
year ending June 2018
time of the submission of 2019/2020 Budget
assistance provided from Treasury will be finalise during next the 2019/2020 financial year.
10
FIN
AN
CE
KPA 1 : FINANCIAL SUSTAINABILITY
To enhance revenue & secure financial sustainability
Fin.
Sust
ain
.
FIN
S8.1
Approval of Budget (FY2019/2020)
Submit the Final compiled MTREF budget by the end of May 2019 to council for approval
Council resolution/ 1 X Approved draft Budget and 1x Approved budget per annum
All
1X Compilation and Approval of Budget
Op
era
tiona
l Bud
get
Out
put
# 1X Approved Budget 2019/2020 by 31 May 2019
31-M
ay-1
9
1X Budget 2019/2020 approved by Council on 29 May 2019
n/a n/a
3 3-Fully Effective
11
OFF
ICE
OF
THE
MUN
ICIP
AL
MA
NA
GER
KPA 1 : FINANCIAL SUSTAINABILITY
To enhance revenue & secure financial sustainability
Annually review and submit Revenue Enhancement Plan to Council by 31 March
Develop Revenue Enhancement Plan 2019/2020 and submit to council for approval
Revenue Enhancement Plan and Council resolution
All
Revenue Enhancement Plan was not reviewed
Op
era
tiona
l Bud
get
Act
ivity
% 1XAnnually
review and submit Revenue Enhancement Plan to Council by the end of by 31 March 2019
31-M
ar-1
9
No review has been done regarding the Revenue Enhancement Plan
As a result of section 139 , an Integrated Municipal Support Plan and the Municipal Finance Recovery Plan was developed as per the
The Progress on the Integrated Municipal Support Plan and the Municipal Finance Recovery Plan will be monitor through department
1 1-
Unacceptable
![Page 26: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/26.jpg)
26
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
intervention by the National Department of Cooperative Governance.
al reporting as per MFRP interventions drafted.
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
12
TEC
HNIC
AL
SERV
ICES
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
To provide sustainable services, optimise operations and improve customer care
Phys
ic.In
fra.&
Ener
gy. E
ffic.
PI&
EE2.
1
Percentage % compliance to Quality of effluent water ( green) 30 June 2019
Quality of effluent comply 90% with general limit in terms of the Water Act (Act 36 of 1998)
Report form IRIS system by DWS
All
78,27 % compliance to Quality of effluent water
Op
era
tiona
l Bud
get
Out
com
e % 90 % compliance to Quality of effluent water measured quarterly by 30 June 2019
30-J
un-1
9
76.83% compliance to Quality of effluent water
Three WWTW currently under refurbishment
Disinfection of the effluent to resume once the project is completed 2 2-Not Fully
Effective
13
TEC
HNIC
AL
SERV
ICES
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
To provide sustainable services, optimise operations and improve customer care
Phys
ic.In
fra.&
Ener
gy. E
ffic.
PI&
EE2.
1
Percentage % compliance with SANS 241 by 30 June 2019
Quality of potable water comply 99% with SANS 241
Report form IRIS system by DWS
All
91% water compliance with SANS 241
Op
era
tiona
l Bud
get
Out
com
e % 99% water compliance with SANS 241 measured quarterly by 30 June 2019
30-J
un-1
9
86.71% water compliance with SANS 241 measured
Resevoirs are not being cleaned as per the five year cycle
Request budget for maintenance of reservoirs
2 2-Not Fully Effective
![Page 27: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/27.jpg)
27
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
14
TEC
HNIC
AL
SERV
ICES
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
To provide sustainable services, optimise operations and improve customer care
Phys
ic.In
fra.&
Ener
gy. E
ffic.
PI&
EE2.
1
Percentage (%) reduction of energy losses by 30 June 2019
Implementing measures to reduce Energy Losses based on Financial figures
Financial Reports/ Financial year Energy Distribution Losses Report A
ll
0% reduction of energy losses at 30 June 2018
Op
era
tiona
l Bud
get
Out
com
e % Reduction in energy losses by 25% at 30 June 2019
30-J
un-1
9
0% reduction of energy losses
61.80% of energy losses reported at financial year ending June due electricity theft, non-availability of meters, ghost vending, old easily accessible infrastructure & vandalism.
Procure new meters, data cleansing, replacement of old kiosks.
1 1-
Unacceptable
15
TEC
HNIC
AL
SERV
ICES
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
To provide sustainable services, optimise operations and improve customer care
Phys
ic.In
fra.&
Ener
gy. E
ffic.
PI&
EE2.
1
Percentage (%) reduction of water losses by 30 June 2019
Implementing measures to reduce water losses based on financial figures
Invoices from Rand Water and Financial year Water Balance Report
All
16% Reduction of water losses recorded as at 30 June 2018
Op
era
tiona
l Bud
get
Out
com
e % Reduction of water losses by 25% at 30 June 2019
30-J
un-1
9
3.7 % Reduction achieved on water losses recorded
Actual water losses reduced from 27% to 26 %
Procure materials for leak repairs and faulty meter replacements
2 2-Not Fully Effective
16
CO
MM
UNITY
SE
RVIC
ES
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND
To provide sustainable services, optimise operatio Phys
ic.In
fra.&
Ener
PI&
EE2.
1
Number of households receiving a weekly refuse removal services (A household is defined as a
Number of households for which refuse is removed at least once a week
Billing System generated reports by the Finance
All
60100 x households receiving a weekly refuse removal
Op
era
tiona
l Bu
dge
t
Out
com
e # 60100 x households receiving a weekly refuse removal services by 30 June 2019
30-J
un-1
9
60639x households receiving a weekly refuse removal services
n/a n/a
3 3-Fully Effective
![Page 28: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/28.jpg)
28
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
IMPROVE CUSTOMER CARE SERVICES
ns and improve customer care
residential and non residential units billed for the particular service by way of the financial system) by 30 June 2019
Department
services by 30 June 2018
17
TEC
HNIC
AL
SERV
ICES
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
To provide sustainable services, optimise operations and improve customer care Ph
ysic
.Infra
.&En
ergy
. Effi
c.
PI&
EE2.
1
KMs of Paved Road rehabilitated by 30 June 2019
Paved Road rehabilitation
Monthly production report Completion report from the regions Monthly Report
All
2,62km of Paved Roads rehabilitated
Op
era
tiona
l Bud
get
Out
put
# 3 km of Paved Roads rehabilitated by 30 June 2019
31-D
ec-1
8
2.35km of roads rehabilitated
Shortage of material, Hot Asphalt and Re-surfuse tender not finalise resulted intagret not met
A request to be submitted to SCM re-advertise the unfinalise tender 2 2-Not Fully
Effective
18
TEC
HNIC
AL
SERV
ICES
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
To provide sustainable services, optimise operations and improve customer care
Phys
ic.In
fra.&
Ener
gy. E
ffic.
PI&
EE2.
1
m2 of roads maintained by 30 June 2019
Road Maintenance
Montly production report Completion report from the regions Monthly Report
All
20370m² of roads maintained as at 30 June 2018
Op
era
tiona
l Bud
get
Out
put
# 4500m2 of roads maintained by 30 June 2019
30-J
un-1
9
10011.17m2 of roads maintained
n/a n/a
5 5- Outstanding
![Page 29: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/29.jpg)
29
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
19
TEC
HNIC
AL
SERV
ICES
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
To provide sustainable services, optimise operations and improve customer care Ph
ysic
.Infra
.&En
ergy
. Effi
c.
PI&
EE2.
1
KMs of Gravel Roads maintained 30 June 2019
Gravel Road maintenance
Montly production report Completion report from the regions Monthly Report
All
161,44km of Gravel Roads Maintained as at 30 June 2018
Op
era
tiona
l Bud
get
Out
put
# 300 km of Gravel Roads Maintained by 30 June 2019
30-J
un-1
9
311.62 km of Gravel Roads Maintained
n/a n/a
3 3-Fully Effective
20
PLA
NN
ING
AN
D DE
VELO
PMEN
T
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
To provide sustainable services, optimise operations and improve customer care
Phys
ic.In
fra.&
Ener
gy. E
ffic.
PI&
EE2.
1
Percentage (%) of land development applications (land use management and spatial planning) finalised within 3 month
Finalisation of Land development applications as per the SPLUM By-law and Land Use Scheme
Land Development application Register , Buss App reports
All
98% of land development applications finalised in terms of the set service standards
Op
era
tiona
l Bud
get
Act
ivity
% 100% of land development applications (land use management and spatial planning) finalised within 3 months by 30 June 2019
30-J
un-1
9
93% finalisation of land development applications in terms of the set service standards
Comments from service departments still a challenge to process applications in time
Departments will be remind , to submit comments to speed up the processing of applications in time 3 3-Fully
Effective
![Page 30: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/30.jpg)
30
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
21
PLA
NN
ING
AN
D DE
VELO
PMEN
T
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
To provide sustainable services, optimise operations and improve customer care
Phys
ic.In
fra.&
Ener
gy. E
ffic.
PI&
EE2.
1
Percentage (%) of Building Plans finalised within 30 days for Residential submissions and 60 days for Business submissions
Evaluate building plans received in line with the approved service standards i.e. 30 days for residential submissions and 60 days for busienss submissions.
Building Plan application Register, excel spreadsheet printed
All
49% finalisation of Building Plan Applications in terms of the set service standards
Op
era
tiona
l Bud
get
Act
ivity
% 100% Finalisation of Building Plan Applications in terms of the set service standards by 30 June 2019
30-J
un-1
9
88% Finalisation of Building Plan Applications
Achievments : A total of 346 x building plan applications were received of which 306x building plan applications were approved . 40x Building plan applications could be approved due to mistakes on building plan.
Process to be develop for building plan applications
2 2-Not Fully Effective
22
FIN
AN
CE
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
To provide sustainable services, optimise operations and improve customer care
Phys
ic.In
fra.&
Ener
gy. E
ffic.
PI&
EE2.
1
Number of indigent households provided with access to basic services 30 June 2019
Supply free basic services to Indigent households
Indigent Register
All
12819 X Indigents household supply with free basic services
Op
era
tiona
l Bud
get
Out
com
e # 15 000 Indigents household supply with free basic services quarterly 30 June 2019
30-J
un-1
9
12 253x Indigents household supply with free basic services as per the data base
Although households are encourage to apply for indigent, The applications are received and process as per subnissions made. The total
Indigent campaigns schedules areannually developed, media statements release and advertise, to encourage households to apply for indigent .
3 3-Fully Effective
![Page 31: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/31.jpg)
31
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
applicants are based on how many households applied and qualified as per the criteri set out as per the indigent policy
23
TEC
HNIC
AL
SERV
ICES
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
To provide sustainable services, optimise operations and improve customer care
Phys
ic.In
fra.&
Ener
gy. E
ffic.
PI&
EE2.
1
Percentage completion of upgrading of the inlet works and mechanical equipment for Leandra WWTWs 30 June 2019
Capacity of bulk infrastructure developed to secure access to sanitation Refurbishment and Upgrading of Leandra WWTW and sewer pump stations
Monthly Report/ Completion certificates
All
new
1000
0000
Out
com
e % 100% completion of upgrading of the inlet works and mechanical equipment for Leandra WWTWs by 30 June 2019
30-J
un-1
9
100% completion of upgrading of the inlet works and mechanical equipment for Leandra WWTW
Project completed
n/a
3 3-Fully Effective
![Page 32: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/32.jpg)
32
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
24
TEC
HNIC
AL
SERV
ICES
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
To provide sustainable services, optimise operations and improve customer care
Phys
ic.In
fra.&
Ener
gy. E
ffic.
PI&
EE2.
1
Percentage completion of construction of sanitation infrastructure in Kinross Ext 25 by 30 September 2018
Construction of sanitation infrastructure in Kinross Ext 25
Monthly Report/ Completion certificates
All
new
1600
000
Out
com
e % 100% completion of construction of sanitation infrastructure in Kinross Ext 25 by 30 September 2018
30-S
ep-1
8
100% completion of construction of sanitation infrastructure in Kinross Ext 25
Project completed
n/a
3 3-Fully Effective
25
TEC
HNIC
AL
SERV
ICES
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
To provide sustainable services, optimise operations and improve customer care
Phys
ic.In
fra.&
Ener
gy. E
ffic.
PI&
EE2.
1
Percentage completion of upgrading of the inlet works and mechanical equipment of Emzinoni WWTW by 30 September 2018
Completion of Upgrading of the inlet works and mechanical equipment of Emzinoni WWTW
Monthly Report/ Completion certificates
All
new
10
000
000
Out
com
e % 100 % Completion of Upgrading of the inlet works and mechanical equipment of Emzinoni WWTW by 30 September 2018
30-S
ep-1
8
78 % Completion of Upgrading of the inlet works and mechanical equipment of Emzinoni WWTW
Late appointment of service providers. Demand for subcontracting work. Change in specifications. Disruptions by community. Rates not market related.
Revise scope of works. Procure materials for subcontractor. Cession agreement with suppliers 2 2-Not Fully
Effective
![Page 33: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/33.jpg)
33
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
26
TEC
HNIC
AL
SERV
ICES
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
To provide sustainable services, optimise operations and improve customer care
Phys
ic.In
fra.&
Ener
gy. E
ffic.
PI&
EE2.
1
Percentage completion of upgrading of the inlet works and mechanical equipment of Kinross WWTW by 30 September 2018
Completion of Upgrading of the inlet works and mechanical equipment of Kinross WWTW
Monthly Report/ Completion certificates
All
new
10
000
000
Out
com
e % 100 % Completion of Upgrading of the inlet works and mechanical equipment of Kinross WWTW by 30 September 2018
30-S
ep-1
8
80 % Completion of Upgrading of the inlet works and mechanical equipment of Kinross WWTW
Omisssion of items in scope. Disruptions by community and business forum. Rates not market related. Late appointment of service providers
Revise scope of works. Procure materials for subcontractor. Cession agreement with suppliers
2 2-Not Fully Effective
27
TEC
HNIC
AL
SERV
ICES
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
To provide sustainable services, optimise operations and improve customer care
Phys
ic.In
fra.&
Ener
gy. E
ffic.
PI&
EE2.
1
Conversion of VIP to waterborne toilets in Emzinoni Ext 6 & 10 by 31 December 2018
Conversion of VIP toilets
Monthly Report/ Completion certificates
All
498x VIP toilets converted to Waterborne
2000
000
Out
com
e # 400 VIP toilets converted to Waterborne sanitation By 31 December 2018
31-D
ec-1
8
400 X VIP toilets converted to Waterborne sanitation
Project completed
n/a
3 3-Fully Effective
![Page 34: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/34.jpg)
34
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
28
TEC
HNIC
AL
SERV
ICES
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
To provide sustainable services, optimise operations and improve customer care
Phys
ic.In
fra.&
Ener
gy. E
ffic.
PI&
EE2.
1
Percentage completion replacement of AC pipes in Emzinoni by 30 June 2019
Replacement of AC pipes in Emzinoni
Monthly Report/ Completion certificates
All
new
5000
000
Out
com
e % 100 % Completion Replacement of AC pipes in Emzinoni by 30 June 2019
30-J
un-1
9
28 % Completion Replacement of AC pipes in Emzinoni
Demanding of sub-contracting work. Disturbances of briefing meetings. Contract dispute between main contractor and subcontractor.
identified and advertise scope of subcontractor. Main contractor identified subcontractor
1 1-
Unacceptable
29
TEC
HNIC
AL
SERV
ICES
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
To provide sustainable services, optimise operations and improve customer care
Phys
ic.In
fra.&
Ener
gy. E
ffic.
PI&
EE2.
1
Number of high mast lights install by 31 March 2019
Installation of high mast and street lights installation 2 EMZINONI, 3 KINROSS, 2 EMBA, 1 CHARL CILLIERS, 2 LEANDRA
Monthly Report/ Completion certificates
All
new
4 50
0 00
0
Out
com
e # 10Xhigh mast lights install by 31 March 2019
31-M
ar-1
9
10Xhigh mast lights installed
Project completed
n/a
3 3-Fully Effective
![Page 35: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/35.jpg)
35
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
30
TEC
HNIC
AL
SERV
ICES
KPA 2: SUSTAINABLE PHYSICAL INFRASTRUCTURE AND IMPROVE CUSTOMER CARE SERVICES
To provide sustainable services, optimise operations and improve customer care
Phys
ic.In
fra.&
Ener
gy. E
ffic.
PI&
EE2.
1
Number of Retrofit (Energy efficiency) High Mast Lights installed in GMM by 31 March 2019
Installation of Retrofit (Energy efficiency) High Mast Lights for GMM through the INEP – Integrated National Electrification Programme Grant 20 EMZINONI, 44 EMBA, 10 LEANDRA, 1 CHARL CILLIERS
Retrofitting of High Mast Lights GMM
s
new
6,00
0,00
0
cap
ital b
udge
t # 75 X Retrofit (Energy efficiency) High Mast Lights installed in GMM by 31 March 2019
31-M
ar-1
9
72 X Retrofit (Energy efficiency) High Mast Lights installed in GMM through EEDSM Project.
Although the target was set for 75, the total number of High Mast Lights installed in GMM as per the EEDSM Project and allocated budget was 72 .
Additonal high mast retro fitting project was implemented through the Sasol SLP project
3 3-Fully Effective
KPA 3: ECONOMIC GROWTH AND DEVELOPMENT
31
CO
MM
UNITY
SER
VIC
ES
KPA 3: ECONOMIC GROWTH AND DEVELOPMENT
To facilitate and create an enabling environment for diversified local economic Ec
on.G
row
.&D
evel
.
E&D
EV4.
1
Number of job opportunities created through EPWP by 30 June 2019
Recruitment and appointment of beneficiaries through EPWP
List of the participants and contracts of employment A
ll
175 x job opportunities has been created for financial year 2017/2018
Op
era
tiona
l Bud
get
Out
com
e # 140 x jobs to be created by 30 June 2019
30-J
un-1
9
125x jobs to be created
Lack of internal budget
Request Funding
2 2-Not Fully Effective
![Page 36: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/36.jpg)
36
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
development, social cohesion and job creation
KPA 4: INSTITUTIONAL TRANSFORMATION
32
OFF
ICE
OF
THE
MUN
ICIP
AL
MA
NA
GER
KPA 4: INSTITUTIONAL TRANSFORMATION
To enhance the capacity of human capital and deliver institutional transformation
Inst
.Tra
nsfo
rm.
INST
7.1
Percentage (%) of service delivery complaint attended to as per services standards by 30 June 2019
Customer complaints attended to
Complaints managements reports
All
90.68 % of service delivery complaints attended to as per the services standards for the fy 2017/2018 A total of 9790 complaints were lodged and 8878 complaints were attended to for 2017/18
Op
era
tiona
l Bud
get
Out
com
e % 100% of service delivery complaints attended to as per the services standards per Quarter by 30 June 2019
30-J
un-1
9
90% of service delivery complaints attended
Due to the shortage of working equipment, staff as well as equipment breakdowns, the service delivery turnaround time were affected . RM1: A total of 1712 complaints logged, 1660 were attended to and 52 outstanding. RM 2: A total of 2592 complaints logged, 2357
Permanent appointmernt of the RM, and filling of all vacant post especially for W&S and Energy need to be finalise . Scm to speed up processes and payment of service providers
3 3-Fully Effective
![Page 37: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/37.jpg)
37
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
were attended to and 235 outstanding. RM 3 : A total of 2357 complaints logged, 2014 were attended to and 343 outstanding
33
OFF
ICE
OF
THE
MUN
ICIP
AL
MA
NA
GER
KPA 4: INSTITUTIONAL TRANSFORMATION
To enhance the capacity of human capital and deliver institutional transformation
Inst
.Tra
nsfo
rm.
INST
7.1
Percentage (%) Compliance to employment equity targets in the three highest levels of management by 30 June 2019
Appointments made in line with Employment Equity targets
Employement Equity report
All
Zero % compliance of EE Targets on apporved vacancies in terms of EE plan Targets
Op
era
tiona
l Bud
get
Out
com
e % 100 (%) Compliance to employment equity targets in the three highest levels of management by 30 June 2019
30-J
un-1
9
Zero% Compliance to employment equity targets in the three highest levels of management , as a result of non compliance from the municipality with regards to the EE Plan and Employment Equity
Three appointments were made for senior managers sec 54 & sec 56,however the Director Technical Services resigned. Level 2 appointments were 2 and on Level 3 zero appointments made .
Departments to ensure complaince and adherence to EE Plan . Vacancies to be filled n line with EE targets by ensuring equal representation as outline in terms of the Economically Active Population (EAP)
2 2-Not Fully Effective
![Page 38: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/38.jpg)
38
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
34
CO
RPO
RATE
SER
VIC
ES
KPA 4: INSTITUTIONAL TRANSFORMATION
To enhance the capacity of human capital and deliver institutional transformation
INST
7.1
INST
7.1
Submission of Workplace Skills Plan to LGSETA annually by April
WSP submitted to LGSETA by 30 April annually
WSP Acknowledgement Report
All
1 X Workplace Skills Plan submitted to LGSETA on 26 April 2018 O
per
atio
nal B
udge
t
Out
put
% 1 x Workplace Skills Plan submitted to LGSETA by 30 April 2019
30-A
pr-1
9
1 x Workplace Skills Plan submitted to LGSETA by the 30 April 2019
n/a n/a
3 3-Fully Effective
KPA 5: SPATIAL INTEGRATION AND SAFE PROTECTED ENVIRONMENT
35
CO
MM
UNITY
SER
VIC
ES
KPA 5: SPATIAL INTEGRATION AND SAFE PROTECTED ENVIRONMENT
To develop spatially integrated, safe communities and a protected environment
Safe
ty&
Env.
S&EN
V5.
1
Percentage (%) of fire fighting response attended to in compliance to Service Standards response time by 30 June 2019
Attend to fire fighting response in compliance to Service Standards response time
Quarterly report on response to fire fighting response
All
83,3% adherence to fire fighting response
Op
era
tiona
l Bud
get
Out
com
e % 75% Adherence to fire fighting response on a Quarterly basis by 30 June 2019
30-J
un-1
9
80% Adherence to fire fighting response
n/a n/a
4 4- Above Expectations
![Page 39: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/39.jpg)
39
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
KPA 6: GOVERNANCE AND STAKEHOLDER PARTICIPATION
36
FIN
AN
CE
KPA 6: GOVERNANCE AND STAKEHOLDER PARTICIPATION
To ensure good governance and the participation of stakeholders.
Gov
ern.
& S
take
.Pa
rt.
GO
V&
SP1.
1
Unqualified audit opinion on AFS by 30 November 2018
Monthly Reconciliations, Weekly OPCA meetings and Prepared AFS
Auditor General Report 2017/2018
All
1 x Unqualified AFS Opinion for FY 2016/2017 obtained
Op
era
tiona
l Bud
get
Out
com
e # 1x Unqualified AFS Opinion for FY 2017/2018 by 30 November 2018
30-N
ov-1
8
The municipality received a disclaimer opinion in the 2017/18 financial year.
Instability of leadership contributed to the deterioration of the control environment and significant non-compliance.
An action plan has been prepared and will be presented to Council and the Audit Committee to monitor implementation.
1 1-
Unacceptable
37
OFF
ICE
OF
THE
MUN
ICIP
AL
MA
NA
GER
KPA 6: GOVERNANCE AND STAKEHOLDER PARTICIPATION
To ensure good governance and the participation of stakeholders.
Gov
ern.
& S
take
.Pa
rt.
GO
V&
SP1.
1
Percentage (% )of council resolutions implemented by 30 June 2019
Implementation of Council resolutions by Departments
Council resolution register and supporting documents
All
99 % of council resolutions implemented in the specified timeframes O
per
atio
nal B
udge
t
Out
com
e % 100% of council resolutions implemented in the specified timeframes by 30 June 2019
30-J
un-1
9
90% of Council resolutions implemented
A total of 121X Council resolutions were taken for implementation of which : 119 x Reports compiled, 82x Reports discussed and processed , 9x Reports referred back and 26 x Report withdrawn.
Reports that were either referred back or withdrawn will be resubmitted to council for consideration 3 3-Fully
Effective
![Page 40: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/40.jpg)
40
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
38
SPEA
KERS
OFF
ICE
KPA 6: GOVERNANCE AND STAKEHOLDER PARTICIPATION
To ensure good governance and the participation of stakeholders.
Gov
ern.
& S
take
.Pa
rt.
GO
V&
SP1.
1
Number of ward committee meetings held by 30 June 2019
Ward committee support
Agenda, Attendance Register and Minutes of each ward committee meeting held
All
182 x Monthly Ward committee meetings held
Op
era
tiona
l Bud
get
Out
put
# 32 x 10 Monthly Ward committee meetings by 30 June 2019
30-J
un-1
9
232 x Ward Committee Meetings held
Councilors did not adhere to the schedules submitted
Office of the Speaker should remind councillors when meetings are due to sit as ward schedules are with the PPOs
2 2-Not Fully Effective
39
FIN
AN
CE
KPA 6: GOVERNANCE AND STAKEHOLDER PARTICIPATION
To ensure good governance and the participation of stakeholders. G
over
n. &
Sta
ke.P
art.
GO
V&
SP1.
1
Annual review and Updated of the Indigent register by June
Annual review of Update of Indigent Register (FY2019/2020)
Updated Indigent Register and Council resolution A
ll Indigent register 2018/2019 not updated with new applicants O
per
atio
nal B
udge
t
Act
ivity # 1x indigent
register updated by 30 June 2019
30-J
un-1
9
1x Indigent register updated
n/a n/a
3 3-Fully Effective
![Page 41: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/41.jpg)
41
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
40
CO
RPO
RATE
SER
VIC
ES
KPA 6: GOVERNANCE AND STAKEHOLDER PARTICIPATION
To ensure good governance and the participation of stakeholders.
Gov
ern.
& S
take
.Pa
rt.
GO
V&
SP1.
1
Number of ICT Security Policies reviewed annually by April
Review and update ICT policies and submit for approval annually
Council resolutions for approval of ICT policies
5 IC
T Po
licie
s
5X ICT Security Policies reviewed
Op
era
tiona
l Bud
get
Out
put
% 5x ICT security policies reviewed by 30 April 2019
30-A
pr-1
9
5 ICT security policies approved per resolutions A63/07/2018 and A49/05/2019
n/a n/a
3 3-Fully Effective
41
OFF
ICE
OF
THE
MUN
ICIP
AL
MA
NA
GER
KPA 6: GOVERNANCE AND STAKEHOLDER PARTICIPATION
To ensure good governance and the participation of stakeholders.
Gov
ern.
& S
take
.Pa
rt.
GO
V&
SP1.
1
Percentage (%) Implementation of the Audit Plan by 30 June 2019
Execution of Audits as per the Audit plan 2018/2019
Quarterly Internal Audit Report and Minutes of Audit Committee meetings
All
75% Implementation of the Audit Plan
Op
era
tiona
l Bud
get
Out
put
% 100 % Implementation of the Audit Plan by 30 June 2019
30-J
un-1
9
95% Implementation of the Audit Plan completed
The asset audit was replaced with compliance audit which has not been reported to the Committee.
The compliance audit to be reported in the fourth quarter of 2018/19
3 3-Fully Effective
![Page 42: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/42.jpg)
42
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
42
OFF
ICE
OF
THE
MUN
ICIP
AL
MA
NA
GER
KPA 6: GOVERNANCE AND STAKEHOLDER PARTICIPATION
To ensure good governance and the participation of stakeholders. G
over
n. &
Sta
ke.P
art.
GO
V&
SP1.
1
Approved Risk Register for 2019/2020 by 30 June 2019
Review the Risk Register
Approved risk register/RMC minutes indicating recommendation
All
1x Draft Risk Assessment report compiled
Op
era
tiona
l Bud
get
Out
put
# 1X Risk register for 2019/2020 approved by 30 June 2019
30-J
un-1
9
1X Strategic Risk register approved
n/a n/a
3 3-Fully Effective
43
OFF
ICE
OF
THE
MUN
ICIP
AL
MA
NA
GER
KPA 6: GOVERNANCE AND STAKEHOLDER PARTICIPATION
To ensure good governance and the participation of stakeholders. G
over
n. &
Sta
ke.P
art.
GO
V&
SP1.
1
Percentage (%) Mitigation of Strategic Risk register by 30 June 2019
Monitoring Risk Register 2018/2019
Progress report on risk management and Minutes of Risk Commitee
All
25 % of Strategic Risk mitigated
Op
era
tiona
l Bud
get
Out
put
% 80 % of Strategic Risk mitigated by 30 June 2019
30-J
un-1
9
34% of strategic risk were mitigated
Budget constraints and lack of prioritizing risk management within departments
Engage HOD on the importance of risk management 1
1- Unaccepta
ble
44
OFF
ICE
OF
THE
MUN
ICIP
AL
MA
NA
GER
KPA 6: GOVERNANCE AND STAKEHOLDER PARTICIPATION
To ensure good governance and the participation of stakeholders.
Gov
ern.
& S
take
.Pa
rt.
GO
V&
SP1.
1
Percentage (% ) of Audit Committee recommendations implemented by 30 June 2019
Implementation of Audit Committee Recommendations by departments
Minutes of Audit committee meetings, Audit Committee Recommendations register and supporting documents
All
73% of Audit Committee recommendations implemented O
per
atio
nal B
udge
t
Out
put
% 100% of Audit
Committee recommendations implemented by 30 June 2019
30-J
un-1
9
76% of Audit Committee recommendations implemented
Departments not implementing recommendations of the audit committee.
Progress on implementation to be reported to Council quarterly by the Chairperson of the Audit Committee
2 2-Not Fully Effective
![Page 43: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/43.jpg)
43
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
45
PLA
NN
ING
AN
D DE
VELO
PMEN
T
KPA 6: GOVERNANCE AND STAKEHOLDER PARTICIPATION
To ensure good governance and the participation of stakeholders. G
over
n. &
Sta
ke.P
art.
GO
V&
SP1.
1
IDP reviewed and Approved by Council annually by 31 May
Prepare the final IDP 2019/2020 for submission to Council for approval by the end of May
Council resolution/ Approved IDP 2019/2020
All
1X IDP 2018/2019 Reviewed and Approved by Council
Op
era
tiona
l Bud
get
Out
put
# 1X IDP 2019/2020 Reviewed and Approved by Council at 31 May 2019
31-M
ay-1
9
1x Approved IDP 2019/2020 by on 29 May 2019
n/a n/a
3 3-Fully Effective
46
OFF
ICE
OF
THE
MUN
ICIP
AL
MA
NA
GER
KPA 6: GOVERNANCE AND STAKEHOLDER PARTICIPATION
To ensure good governance and the participation of stakeholders.
Gov
ern.
& S
take
.Pa
rt.
GO
V&
SP1.
1
Signed performance agreement 2018/2019 for Section 56 Managers by 31 July 2018
Facilitation and Conclusion of Performance agreements 2018/2019 for S56 managers
Signed performance agreement 2018/2019 for Section 56 Managers
Faci
lita
tion
Con
clus
ion
of 9x
Performance Agreements for sec 56 managers has been signed on 27 & 28 July 2017.
Op
era
tiona
l Bud
get
Out
put
# 9x signed performance agreements 2018/2019 of section 56 managers by 31 July 2018 31
-Jul
-18
5x signed performance agreements 2018/2019 of section 56 managers
Vacancies for Section 56 managers however positions not filled
Advertising of Vacancies for Section 56 Managers
2 2-Not Fully Effective
47
PLA
NN
ING
AN
D DE
VELO
PMEN
T
KPA 6: GOVERNANCE AND STAKEHOLDER PARTICIPATION
To ensure good governance and the participation of stakeholders. G
over
n. &
Sta
ke.P
art.
GO
V&
SP1.
1
Number of performance reviews conducted by 30 June 2019
Quarterly Performance reviews co-ordinated
Council resolution /Performance Report/ Attendance Register A
ll
4X performance reviews conducted
Op
era
tiona
l Bud
get
Act
ivity # 4X
performance reviews conducted by 30 June 2019
30-J
un-1
9
4X performance reviews conducted
n/a n/a
3 3-Fully Effective
![Page 44: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/44.jpg)
44
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
48
PLA
NN
ING
AN
D DE
VELO
PMEN
T
KPA 6: GOVERNANCE AND STAKEHOLDER PARTICIPATION
To ensure good governance and the participation of stakeholders. G
over
n. &
Sta
ke.P
art.
GO
V&
SP1.
1
Top Layer SDBIP 2019/2020 approved by mayor within 28 days after the budget approval
Compilation of SDBIP 2019/2020
Signed SDBIP 2019/2020 by the Mayor
All
1X Top Layer SDBIP 2018/2019 approved by Mayor on 20 June 2018 O
per
atio
nal B
udge
t
Out
put
# 1X Top Layer SDBIP 2019/2020 approved within 28 days after the Budget has been approved
30-J
un-1
9
1X Top Layer SDBIP 2019/2020 approved on 21 June 2019 by the Executive Mayor
n/a n/a
3 3-Fully Effective
49
PLA
NN
ING
AN
D DE
VELO
PMEN
T
KPA 6: GOVERNANCE AND STAKEHOLDER PARTICIPATION
To ensure good governance and the participation of stakeholders.
Gov
ern.
& S
take
.Pa
rt.
GO
V&
SP1.
1
Submission of Section 46 Annual Performance Report submitted to AG by 31st August annually
Submission of the Section 46 Annual Performance Report to the AG by August annually
Acknowledgement Letter by AG on submission of Sec 46 report / Council resolution/ Audit Committee minutes
All
1X Sec 46 Annual Report 2016/2017 has been submitted to the auditor General on 31 Aug 2017.
Op
era
tiona
l Bud
get
Out
put
# 1X Sec 46 Annual Report submitted to the Auditor General by 31 August 2018
31-A
ug-1
8
1X Sec 46 Annual Performance Report submitted to the Auditor General
Sec 46 Annual Performance Report not submitted as per the set date to the Auditor General due to Challenges with system integration to produce statement
n/a
2 2-Not Fully Effective
50
FIN
AN
CE
KPA 6: GOVERNANCE AND STAKEHOLDER
To ensure good governance and the participa G
over
n. &
GO
V&
SP1.
1
Submission of Annual Financial statements ( AFS) submitted to the Auditor-General by 31 August Annually
AFS submitted to AG by 31st August (Section 126 of MFMA)
Acknowledgement Letter by AG on submission of the AFS 2017/2018
All
1X AFS 2016/2017
Op
era
tiona
l Bu
dge
t
Out
put
# 1XAnnual Financial statements ( AFS) submitted to the Auditor 31
-Aug
-18
1XAnnual Financial statements ( AFS) submitted to the Auditor General
Annual Financial statements ( AFS) not submitted as per the set date to the
Ensure timeously submission as per legislative requirements
2 2-Not Fully Effective
![Page 45: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/45.jpg)
45
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
PARTICIPATION
tion of stakeholders.
/ Council resolution/ Audit Committee minutes
General by 31 August 2018
Auditor General due to Challenges with system integration to produce statement
51
FIN
AN
CE
KPA 6: GOVERNANCE AND STAKEHOLDER PARTICIPATION
To ensure good governance and the participation of stakeholders.
Gov
ern.
& S
take
.Pa
rt.
GO
V&
SP1.
1
Submission of Draft Annual Report (Section 121 of MFMA)to AG by 31st August Annually
Submission of Draft Annual Report (Section 121 of MFMA) to AG By August annually
Acknowledgement Letter by AG on submission of Draft Sec 121 report / Council resolution/ Audit Committee minutes
All
S. 121 Draft Annual Report 2016/2017
Op
era
tiona
l Bud
get
Out
put
# 1X Draft Annual Report (Section 121 of MFMA) submitted to the Auditor General by 31 August 2018
31-A
ug-1
8
1X Draft Annual Report (Section 121 of MFMA) submitted to the Auditor General
Draft Annual Report (Section 121 of MFMA) not submitted as per the set date to the Auditor General due to Challenges with system integration to produce statement
Ensure timeously submission as per legislative requirements
2 2-Not Fully Effective
52
FIN
AN
CE
KPA 6: GOVERNANCE AND STAKEHOLDER PARTICIPATION
To ensure good governance and the participation of
Gov
ern.
& S
take
.Pa
rt.
GO
V&
SP1.
1
Submit the Final Audited Annual Report (Section 121 of MFMA ) to Council on or before 25 January annually
Submit the Final Audited Annual Report (Section 121 of MFMA ) to Council annually on
Acknowledgement Letter by AG on submission of Sec 121 report / Council resolution/
All
1X S. 121 Audited Annual Report 2016/2017
Op
era
tiona
l Bud
get
Out
put
# 1X Final Audited Annual Report (Section 121 of MFMA) submitted to Council by 25 January 2019
25-J
an-1
9
1X Final Audited Annual Report (Section 121 of MFMA) submitted to Council
n/a n/a
2 2-Not Fully Effective
![Page 46: CHAPTER 1: INTRODUCTION & OVERVIEW OF PERFORMANCE MANAGEMENT](https://reader034.vdocuments.us/reader034/viewer/2022042421/626086e26631bd3fc016cb13/html5/thumbnails/46.jpg)
46
GOVAN MBEKI MUNICIPALITY : MUNICIPAL SCORECARD SDBIP
OVERALL PERFORMANCE ASSESSMENT 2018/2019
NO
DEPA
RTM
ENT
MUNICIPAL STRATEGY LINK MUNICIPAL DELIVERY TARGETS YEAR 2
2018/2019
Targ
et D
ate
OVERALL PERFORMANCE ASSESSMENT STATUS 2018/2019
Mun
icip
al
Key
Perfo
rman
ce
Are
a
Stra
tegi
c ob
ject
ive
(SO
)
IDP
linka
ge
IDP
Stra
tegy
num
ber
INDICATORS
Activity (ies), Programme(s
), Capital Projects
Evidence (POE) W
ards
Baseline as at 30 June 2018
Ann
ual B
udge
t
Type
ofIn
dica
tor
Targ
et Ty
pe-N
r (#)
/ Pe
rc (%
)
2018/2019
Overall Performance for the financial Year 2018/2019
Reasons for performance status
Remedial Action and Corrective Measures
Fina
l Sco
ring
on
Ann
ual T
arge
ts
2018
/201
9
Ove
rall
Perfo
rman
ce
2018
/201
9 Pe
rform
ance
Le
gend
Rat
ing
stakeholders.
or before 25 January
Audit Committee minutes
53
CO
RPO
RATE
SER
VIC
ES
KPA 6: GOVERNANCE AND STAKEHOLDER PARTICIPATION
To ensure good governance and the participation of stakeholders.
Gov
ern.
& S
take
.Pa
rt.
GO
V&
SP1.
1
Adoption of Oversight report 2017/2018 by Council by 31 March annually
Oversight report adopted by council by 31 March (Section 129 of MFMA)
Council Resolution / Oversight report
All
1X Approved Oversight report 2016/2017
Op
era
tiona
l Bud
get
Out
put
# 1 X Oversight report adopted by council by 31 March 2019
31-M
ar-1
9
1X Oversight report adopted
Annual report only adopted by council During March 2019
Ensure timeously submission as per legislative requirements 2 2-Not Fully
Effective