US Marine 1802 FJ 2002 5/29/01 1- HULL LAMINATION 1-1 = CHAPTER 1: HULL LAMINATION GELCOAT PROCEDURES: 1. Apply 18-20 mils of Gelcoat to entire hull, 6-7 mils of per pass in three even coats. 2. Allow a minimum of 30 seconds between coats. Note: Use 43 lbs. of Dream White Gelcoat (PN 39853). HULL ID 5" 3 1/4"

Upload: others

Post on 15-Oct-2021

16 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CHAPTER 1: HULL LAMINATION

US Marine 1802 FJ 2002 5/29/01

=

CHAPTER 1: HULL LAMINATION

GELCOAT PROCEDURES:

1. Apply 18-20 mils of Gelcoat to entire hull, 6-7 mils of per pass in three even coats.2. Allow a minimum of 30 seconds between coats.

Note: Use 43 lbs. of Dream White Gelcoat (PN 39853).

HULL ID

5" 3 1/4"

1- HULL LAMINATION 1-1

Page 2: CHAPTER 1: HULL LAMINATION

US Marine 1802 FJ 2002 5/29/01

ROVING CUTS

Transom Roving2ea.A

40”

54”A

31”

C24 oz. Bottom Roving

3ea

12’

16’-6”

54”

16"

19" 55" 49" 47"

STRINGER ROVING 2 EA

24 oz. Side Roving2 ea

E

G

STRAKE ROVING 2 eaF

17 ft 18 ft 6"

15 ft

32"

8"

44

24

1- HULL LAMINATION 1-2

Page 3: CHAPTER 1: HULL LAMINATION

US Marine 1802 FJ 2002 5/29/01

1- HULL LAMINATION 1-3

Page 4: CHAPTER 1: HULL LAMINATION

US Marine 1802 FJ 2002 5/29/01

1- HULL LAMINATION 1-4

Page 5: CHAPTER 1: HULL LAMINATION

US Marine 1802 FJ 2002 5/29/01

1- HULL LAMINATION 1-5

2 layers30 mils chop32" 24 oz wrside

90 milschop skin

BOTTOM & SIDE

60 MILS CHOPUNDER STRAKE

90 MILS CHOPOVER STRAKE

8" 24 OZ WROVER STRAKE

3 LAYERS30 MILS CHOP54" 24 OZ WR

90 milschop skin 3"

6"

3"90 milschop skin

1 LAYERS30 MILS CHOP24 OZ WR

TRANSOM

Page 6: CHAPTER 1: HULL LAMINATION

US Marine 1802 FJ 2002 5/29/01

STRAKE INSTALLATION:

1- STD-8 Fillet58 ea

24 OZ. ROVING (F)

1- HULL LAMINATION 1-6

Page 7: CHAPTER 1: HULL LAMINATION

US Marine 1802 FJ 2002 5/29/01

TRANSOM WOOD INSTALLATION:

1. Refer to Product Standards Manual for Transom Board lamination specification.

1- Assy; Transom Board1 ea

3- STD-40 Bilge Pump Pad1 ea

2"

2- Outboard Transom Pads3/4cc 19" X 6 1/2" PC

2 ea

1- HULL LAMINATION 1-7

Page 8: CHAPTER 1: HULL LAMINATION

US Marine 1802 FJ 2002 5/29/01

STRINGER / BULKHEAD INSTALLATION:

1. Place Stringer Assy in wet chop.2. Set Bow Bunk in for Stringer placement port to starboard, lift out Bow Bunk.3. Apply 90 mils Chop over part 1, 3 and stringers.4. Apply 24 oz roving over MAIN OUT BOARD STRINGERS ONLY.5. Apply 90 mils chop over INBOARD STRINGERS.6. Apply 90 mils chop to bulkheads at floor and intersections with a 3" overlap.7. Wet out remaining bulkhead wood.

1- Assy; Transom Braces2 ea

2- Assy; Main Stringers1 ea

Center Bow Block@ point of Chine

Bow Block

3- STD-7 Bow Block1 ea @ 6"

4- Drain TubesPVC (PN 3015) 2ea @

27 1/2"Chine

1- HULL LAMINATION 1-8

Page 9: CHAPTER 1: HULL LAMINATION

US Marine 1802 FJ 2002 5/29/01

BOW BUNK AND BUNK SPACER INSTALLATION:

2-Assy; Bow Bunk1 ea

1-Spacer1/2cc 3 3/4" x 15 1/2" PC

2 ea

NOTE: APPLY 3 oz CHOP WTH 3" TIE INWHERE BUNK AND FILLERS MEET HULL.

3- Drain TubesPVC (PN 3015) 1ea @

4- STD-40 Bilge PumpPad1 ea

1- HULL LAMINATION 1-9

Page 10: CHAPTER 1: HULL LAMINATION

US Marine 1802 FJ 2002 5/29/01

FOAM PLASTIC INSTALLATION:

1. Bow bunk is left out for clarity.2. Cut Plastic to fit each locker area.

1- Foam Plastic (PN 7837)

1- HULL LAMINATION 1-10

Page 11: CHAPTER 1: HULL LAMINATION

US Marine 1802 FJ 2002 5/29/01

HULL FLOORS INSTALLATION:

1. Bow Bunk Left out For Clarity.2. Center Part 2 between aft and middle bulkheads, butt against stringer.3. Apply floors in wet chop.4. Apply 3 oz chop to edges of all parts with a 3" tie in and roll out.5. Wet out remaining bare wood.

1- Assy; Aft Foam Locker2 ea

2- Fuel Tank Floor1/2cc 14" x 46" SC

2 ea

3- Assy; V/B Floor1 ea

4- Fwd Bulkhead1/2cc 31" x 55 7/8" PC

1 ea

5- Transom Side Stiff1/2cc 2" x15" SC

16 ea A

1- HULL LAMINATION 1-11

Page 12: CHAPTER 1: HULL LAMINATION

US Marine 1802 FJ 2002 5/29/01

FOAM FLOOR INSTALLATION:

1. Apply 3 oz chop to all edges with a 3" tie in.

1- Assy; Aft Foam Locker2 ea

2-assy;Fwd. Foam Locker2 ea

1- HULL LAMINATION 1-12

Page 13: CHAPTER 1: HULL LAMINATION

US Marine 1802 FJ 2002 5/29/01

FUEL TANK PREPARATION:

1. Apply 12" wide 8 mil Shrink Wrap (PN 7837) over fittings on Tank.

1- Fuel Tank (PN 109501)1 ea

2- Tank Rubber (PN 31795)

1- HULL LAMINATION 1-13

Page 14: CHAPTER 1: HULL LAMINATION

US Marine 1802 FJ 2002 5/29/01

PLASTIC FUEL TANK INSTALLATION:

1. Refer to Fuel Tank Installation Standard.(Refernce ECN.#A-202-94).2. Install Fuel Tank Hold Down Cleats and staple to stringer and floor.3. Apply 2 oz of chop over cleats.

1- Assy; Tank Cleat 4 ea

1- HULL LAMINATION 1-14

Page 15: CHAPTER 1: HULL LAMINATION

US Marine 1802 FJ 2002 5/29/01

FLOATATION FOAM LOCATION:

1. Total Flotation Foam usage ----- 40 lb part A2. -------------------------------------40 lb part B

NOTE: Use Floation Foam in shaded areas(Refer to Standards Manual)

1- HULL LAMINATION 1-15

Page 16: CHAPTER 1: HULL LAMINATION

US Marine 1802 FJ 2002 5/29/01

BASECOAT:

NO BASECOAT

BASECOAT ( PN 7220) 19.04 lbs

WEBBING (PN 62812)