Changes to the Red Carpet Policy Schedule on V2 Commercial Product System changes Policy Schedule changes “Renewal date” needs to be changed to “Review Date” (field in “SASRIA & General Section”) Schedule Sirius V2

Upload: ridah-solomon

Post on 03-Dec-2015

212 views

Category:

Documents


0 download

DESCRIPTION

Changes to the Red Carpet Policy Schedule on V2

TRANSCRIPT

Page 1: Changes to the Red Carpet Policy Schedule on V2

Changes to the Red Carpet Policy Schedule on V2Commercial ProductSystem changesPolicy Schedule changes

“Renewal date” needs to be changed to “Review Date” (field in “SASRIA & General Section”)Schedule

Sirius V2

Page 2: Changes to the Red Carpet Policy Schedule on V2
Page 3: Changes to the Red Carpet Policy Schedule on V2

R10 charge (Road-side assistance) to be shown on motor specified section in the scheduleSchedule

Sirius V2

Page 4: Changes to the Red Carpet Policy Schedule on V2

Contract works not pulling through to policy scheduleSchedule