change control list 06-11-15

5
Status Change Title 1160 Pending CAB Approval Apply Hotfx and patches to domain controllers 1161 Pending CAB Approval Change u!"er Oracle Perormance T ning !ased on "ata#ail Assessment Phase $

Upload: mastanvalishaik84359

Post on 04-Nov-2015

219 views

Category:

Documents


0 download

DESCRIPTION

abc

TRANSCRIPT

FootprintsFootprints Change Requests Pending CCB Approval for 06/11/15Change NumberStatusChange TitleScheduled Change WindowAssigneesUrgencyChange SummaryCategoryOutage RequiredCC Review BoardSuccessful (Y/N)Comments1160Pending CAB ApprovalApply Hotfix and patches to domain controllers6/5/15 1:00Greg WaibelEmergencyWe have identified an issue with our new 2012 R2 domain controllers in the environment. At times, users may try to log into their computer but their credentials will not pass. This is due to having 2003 and 2012 domain controllers in the same domain. Microsoft has a hotfix for this issue which will be applied to the 2012 domain controllers tonight. While these DCs are being worked on, we will also apply some other patches. The reboots of the Domain controllers will be staggered. Staggering the reboots will ensure there is no impact.System MaintenanceNo1161Pending CAB ApprovalOracle Performance Tuning based on DataVail Assessment Phase 26/13/15 10:00 PMJaime ThomsonPlannedWe will be performing phase 2 of the 2015 Masco Assessment Remediation Project Plan. This includes the steps that require a database bounce. We will be performing the following tasks.1. SGA Resizing2. Add User Temp Space3. Pin top requests in Memory4. Perform table maintenance and defragmentation5. Purge Debug Logs and System Alerts6. Purge Page access tracking7. Purge Obsolete Generic File Manager DataApplication MaintenanceYes

ITGITG Change Requests Pending CCB Approval for 06/11/15Request NoRequest StatusBusiness DescriptionEst Prod Install DateFunctional Team MemberCreated ByPriorityLast UpdatedPre-Migration Setup InstructionsTechnical Info [Package #, Lines, etc.]Post-Migration Setup InstructionsCC Review BoardSuccessful (Y/N)Comments

Sheet1ApprovedYesDeniedNoPending Deferred