    CHANGE CONTROL INITIATION MATRIX

    Change

    Code

    Scope of change Ownership the change

    control

    Consent to be taken from

    the department other than

    quality assurance

    C01 Change in building of

    Manufacturing Block

    Warehouse Utility Quality Control Microbiology Sterility Test

    Lab

    Operating owner of the

    building

    Engineering, Utility and

    Safety & Environment

    C02 Change in Equipment used forManufacturing process

    Change in accessories ofequipment e.g. instrument,

    Motor, stirrer etc (if not like to

    like)

    Operating owner of the

    building

    Engineering, Utility and

    Safety & Environment

    C03 Change in QC testinginstrument

    Change in accessories of QCInstrument (if not like to like)

    QC Engineering, Utility and

    Safety & Environment

    C04 Change in Critical Utility System

    (HVAC, Dust Extraction System

    Water system, Pure steam,

    Compressed air, Vacuum, Nitrogen

    and Heating-Cooling System)

    Operating owner of the

    system

    Engineering, Manufacturing

    and Safety & Environment

    C05 Manufacturing process:

    Change of site / stream Change of Batch size Change in equipment usage

    Manufacturing Engineering (for site change

    and equipment usage) andSafety & Environment

    C06 Manufacturing process:

    Change in

    Batch formula Manufacturing process

    sequence

    Process parameter In-process control and

    specification

    Manufacturing R&D, QC and Safety &

    Environment

    (Require R&D Lab

    Recommendation letter with

    back up experimental data )

    DR PREM R GOEL

    BSc,B.Pharm,M.Pharm[India]

    MS,Ph.D[Pharma][USA]MBA[USA]MIQA[UK]

    [email protected] Skype:gaoposher

    [email protected] MSN MESSENGER

    :[email protected]

    00 91 7600134939 / 9327316198

  • 8/3/2019 Change Control Initiation Matrix

    2/2

    CHANGE CONTROL INITIATION MATRIX

    Change

    Code

    Scope of change Ownership/Initiator of

    the change control

    Consent to be taken from

    the department other than

    quality assurance

    C07 Material specification Change in

    Raw Material Packing Material Intermediate Finished product Laboratory Chemical Cleaning and sanitization

    agents

    Quality Control Manufacturing, R&D and

    Safety & Environment

    R&D consent is not required

    for Laboratory chemical and

    cleaning agents

    C08 Change in Approved Vendor of

    RM & Packaging. Material

    Purchase R&D, Manufacturing, QC,

    Warehouse and Safety &

    Environment

    C09 Change in Artwork and shade

    cards of printed packing material

    Packing development Manufacturing, Quality

    Control, and Safety &

    EnvironmentC10 Change in Packing of Product:

    Procedure and sequence of packing

    materials

    Packing development Manufacturing, Quality

    Control, and Safety &

    Environment

    C11 Introduction of new product in the

    existing manufacturing facility

    Production QC, Engineering, R&D

    Warehouse, Purchase, and

    Safety & Environment

    C12 Change in Procedures :

    Standard operating procedure Standard testing procedure General testing procedure

    Related departments All related Departments

    C13 Change in Stability program Quality Control Manufacturing and Safety &

    EnvironmentC14 Change in Validation Protocol Who prepares the

    protocol

    Applicable department

    C15 Documentation :

    Site master file Validation master plan Quality manual Training Module

    Quality Assurance All Approving authority

    C16 Drawing Engineering & Utility Owner of the system drawn

    C17 Formats, which is mentioned as

    annexure to SOP

    Operating owner Related Department

    C 18 Soft wares for material movement,

    Batch release and equipment

    operation related to the product

    quality & safety.

    Operating owner EDP