Page 1: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

1 Public Workshop

Waterfront Access and Infrastructure Improvements

CHAMPLIN BEACH: WATERFRONT ACCESS AND INFRASTRUCTURE IMPROVEMENTS

May 23, 2019

Page 2: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

Agenda

• Introductions / Team Members

• Project Background

• 2015 Master Plan Review

• Design Area Alternatives

• Next Steps

Page 3: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

3 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Project Team Introductions

• Saratoga Associates

• Fagan Engineers

• Meagher Engineering

• Watts Architecture & Engineering

• Atlantic Testing Laboratories

• LMC Industrial Contractors

Page 4: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

4 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Project Background

• 2015: Master Plan Completed

• Empire State Development Grant

• Champlin Beach Pier

• Building and Parking Area

• Department of State Grant

• Trail, Boardwalk, & Observation

Tower

• Pedestrian Bridge over Inlet

• Kayak Launch at Curtiss Park

Page 5: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

5 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

2015 Master Plan

Page 6: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

6 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Champlin Beach Infrastructure Improvements

• Marina Area

• Building “Waterfront Center”

• Public Restrooms

• Parking Area

• Beach

• Pier / Slips

Page 7: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

7 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Keuka Lake Access Improvements

• Boardwalk / Trails

• Trailhead Kiosks

• Observation Tower

• Pedestrian Bridge

• Kayak Launch

• Curtiss Park / Parking

Page 8: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

DESIGN AREA ALTERNATIVES

Page 9: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

9 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Marina Area

Page 10: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

10 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Marina Area

• Option A

• Retain Baseball Fields

• Waterfront Center along Pier

• Gazebo at Terminus Points

• Pedestrian Plaza

• Boulevard Entrance & Turnaround

• Parking for 200 Vehicles

• Minor Beach Improvements & Small Pavilions

• Pedestrian Connection to Wetland & Curtiss Park

• Primary Building out of Wetland, but within the 100’ Wetland Buffer

Waterfront Center

Pavilions

Existing Fields

Plaza

Pedestrian Connection

Park Sign

Pier

Page 11: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

11 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Marina Area

• Option B

• Retain Larger Baseball Field

• Waterfront Center Adjacent to Pier

• Gazebo at Terminus Point

• Pedestrian Plaza

• Boulevard Entrance & Turnaround

• Parking for 250 Vehicles

• Service Connection to Waterfront Center

• Moderate Beach Improvements with Pavilion

• Pedestrian Connection to Wetland & Curtiss Park

• Primary Building out of 100’ wetland buffer

Waterfront Center

Pavilion

Existing Field

Plaza

Pedestrian Connection

Park Sign

Pier

Page 12: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

12 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Marina Area

• Option C

• Retain Smaller Baseball Field

• Waterfront Center along Pier

• Gazebo at Terminus Points

• Boulevard Entrance & Turnaround

• Parking for 175 Vehicles

• Minor Beach Improvements

• Relocate War Memorial

• Pedestrian Connection to Overlook, Wetland, & Curtiss Park

• Primary building components out of 100’ wetland buffer

Waterfront Center

Pavilion

Existing Field

Plaza

Pedestrian Connection

Park Sign

Pier

Overlook Area

Memorial Area

Page 13: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

13 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Marina Area

• Marina Building Concept

• Public Restrooms

• Commercial Spaces for

rent

• Storage areas for pier

support

Page 14: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

14 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Pier / Slips

Page 15: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

15 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Pier / Slips

• Option A

• Pier Elevation: 717’

• Main Pier is 12’ Wide

• Transient Docking: 8 Slips

• (10-15 Minutes)

• Commercial Docks: 16 Slips (Yearly Lease)

• Private Dockage: 100 Slips (50 + 50)

• Museum Dockage (40’ Boat)

• ADA Kayak Loading Dock with Ramp

• Gazebo at Terminus with Tables

12’ Wide Pier

Gazebo

16

50

50

8

Page 16: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

16 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Pier / Slips

• Option B

• Pier Elevation: 717’

• Main Pier is12’ Wide

• Transient Docking: 8 Slips

• (10-15 Minutes)

• Commercial Docks: 16 Slips (Yearly Lease)

• Private Dockage: 82 Slips (50 + 32)

• Museum Dockage (40’ Boat)

• ADA Kayak Loading Dock with Ramp

• Gazebo at Terminus with Tables

12’ Wide Pier

Gazebo

16

32

50

8

Page 17: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

17 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Pier / Slips

• Option C

• Pier Elevation: 717’

• Main Pier is12’ Wide

• Transient Docking: 8 Slips

• (10-15 Minutes)

• Commercial Docks: 32 Slips (Yearly Lease)

• Museum Dockage (40’ Boat)

• ADA Kayak Loading Dock with Ramp

• Platform Space at Terminus

12’ Wide Pier

Platform

32

8

Page 18: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

18 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Pier / Slips

• Option D

• Pier Elevation: 717’

• Main Pier is12’ Wide

• Transient Docking: 8 Slips

• (10-15 Minutes)

• Commercial Docks: 14 Slips (Yearly Lease)

• Private Dockage: 46 Slips (14 + 16 + 16)

• Museum Dockage (40’ Boat)

• ADA Kayak Loading Dock with Ramp

• Platform Space at Terminus

12’ Wide Pier

Platform

14

8 Platform

16

16

14

Page 19: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

19 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Pier / Slips

Page 20: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

20 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Pier / Slips

• Pier Gazebo Option

Page 21: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

21 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Boardwalk / Trails

Page 22: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

22 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Boardwalk / Trails

• Option A

• Boardwalk Elevation: 717’

• Wetland Boardwalk with Stone Walkway

• Trail Head Kiosks

• Connection to Overlook Area & Observation Tower

• Direct Connection between Champlin Beach & Curtiss Park that is Convenient & Safe

• ADA Compliant

• Low Impact to Sensitive Wetlands

Observation Tower

Overlook Area

10’ Wide Walkway

Pier

10’ Wide Boardwalk

Page 23: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

23 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Boardwalk / Trails

• Option B

• Boardwalk Elevation: 717’

• Wetland Boardwalk with Stone Walkway

• Trail Head Kiosks

• Connection to Observation Tower & Waterfront Edge

• Direct Connection between Champlin Beach & Curtiss Park that is Convenient & Safe

• ADA Compliant

• Minor Impact to Sensitive Wetlands

Observation Tower

10’ Wide Walkway

10’ Wide Boardwalk

Overlook Area

Boardwalk Through Wetland

Page 24: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

24 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Boardwalk / Trails

Ipe Wood PermaTrak Composite

Page 25: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

25 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Trailhead Kiosk

Option A Option B Option C

Page 26: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

26 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Observation Tower

Page 27: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

27 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Observation Tower

Option A

Option B

Option C Observation Tower

Observation Tower

Observation Tower

Page 28: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

28 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Observation Tower

The observation tower and wetland boardwalk will provide endless opportunities for recreational activities and educational learning.

The tower will be designed to seamlessly blend in with the surrounding natural beauty and unique ecosystem, and provide an alternative perspective from a higher vantage point above the wetland, including peaceful views up Keuka Lake.

Page 29: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

29 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements February 18, 2019

Observation Tower

Page 30: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

30 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Pedestrian Bridge

Page 31: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

31 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements February 18, 2019

Pedestrian Bridge

Curtiss Park

Wetland Area

Cold Brook Inlet

• Structural Challenge:

• Spanning into a

wetland area

• Accessible approach?

• Boat clearance under

Page 32: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

32 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements February 18, 2019

Pedestrian Bridge

Approximate Watercraft Heights

Schematic Bridge Cross Section

8’-0” Clear

Curtiss Park Wetland Area Cold Brook

Inlet

(Tied Arch Design)

Water Depth from 10” to 30” @ Inlet

Page 33: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

33 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Pedestrian Bridge

Option A • Aluminum Bridge with a cambered

truss

• Additional clearance under the

bridge with lower approaches

• Requires larger abutments to

handle the lateral thrust from the

structure

• May require additional permits to

provide a solid structure within the

wetlands

Page 34: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

34 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Pedestrian Bridge

Option B • Tied Arch Bridge with slight camber

• Camber provides some additional

clearance under the bridge.

• Similar cost as the Aluminum bridge

but the abutments costs will

decrease.

• Does not produce as much lateral

thrust and therefore will reduces the

structure size for the abutment within

the wetland area.

• Painted Steel Requires Maintenance

• Structure below the bridge reduces

clearance

Page 35: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

35 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Pedestrian Bridge

Option C • Weathering steel Pratt truss bridge

with flat deck

• Length and height of the approach

will be minimal

• Least expensive option

• Little clearance under bridge

Page 36: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

36 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Pedestrian Bridge

Page 37: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

37 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Kayak Launch

Page 38: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

38 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Kayak Launch

• Option A

• Stone Access Path & Kayak Launch Area

• Restrict Vehicular Access to Launch Area

• Low Cost

• ADA Compliance - Limited

Page 39: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

39 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Kayak Launch

• Option B

• Stone Access Path to

Kayak Launch Area

• ADA Compliant Launch

• Moderate Cost

Page 40: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

40 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Kayak Launch

• Option C

• Stone Access Path to

Kayak Launch Area

• ADA Compliant Launch

• Higher Cost

Page 41: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

41 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Curtiss Park

Page 42: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

42 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Curtiss Park

• Option A

• Formal Parking Area for 60 Vehicles

• Pedestrian Connection from Liberty Street

• Convenient Drop Off Area

• Pedestrian Access to Kayak Launch & Overlook Area

• ADA Accessible Connection to Champlin Beach

• Minor Improvements to Curtis Park Greenspace

• Shared Access to Adjacent Lot

Overlook Area

Kayak Launch

Private Driveway

Stone Walkway

ADA Ramp

Drop Off Area

Page 43: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

43 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Curtiss Park

• Option B

• Formal Parking Area for 75 Vehicles

• Pedestrian Connection from Liberty Street

• Convenient Access Unloading Area for Kayak Launch

• Pedestrian Access to Overlook Area with 2 Separate Fishing Areas

• ADA Accessibility Connection to Champlin Beach is Cost Prohibitive

• Moderate Improvements to Curtis Park Greenspace

• Separate Access to Adjacent Lot Overlook Area with Seating

Kayak Launch

Private Driveway

Fishing Access Area

Drop Off Area

Page 44: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

44 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Curtiss Park

• Option C

• Formal Parking Area for 80 Vehicles

• Pedestrian Connection from Liberty Street

• Convenient Drop Off Area

• Pedestrian Access to Kayak Launch & Overlook Areas along Shoreline

• ADA Accessibility Connection to Champlin Beach is Cost Prohibitive

• Major Improvements to Curtis Park Greenspace

• Separate Access to Adjacent Lot

• Potential Purchase of 2 Vacant Lots & Conversion of Existing Structure to Open Air Pavilion – Not in Scope of Work

Overlook Area with Seating

Kayak Launch

Private Driveway

Drop Off Area

Vacant Lots (2 Parcels)

Gazebo

Page 45: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

Voting Options

• Comment verbally

• Ballot Boxes

• Dot your favorite

WE NEED YOUR OPINIONS!

Page 46: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

46 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Next Steps

• Public

Presentation

• Final Design

• Construction

Documents

• Permitting

• Bidding &

Construction

Champlin

Beach

Keuka

Lake

Page 47: CHAMPLIN BEACH: WATERFRONT ACCESS AND … · 2019. 5. 28. · • ADA Accessibility Connection to Champlin Beach is Cost Prohibitive • Major Improvements to Curtis Park Greenspace

47 Stakeholder Meeting

Waterfront Access and Infrastructure Improvements May 23, 2019

Thank You!