©2017 Ulteig
Challenging Transmission Structure Designs: Case
StudiesMinnesota Power
Systems Conference
November 8, 2017
Marlon W. Vogt, PE, M. ASCE. F.SEIJosh E. Potts, PE
©2017 Ulteig 2
MIPSYCON 2017
Your assignment, should you decide to accept…..
©2017 Ulteig 3
Purpose
“Flying is hours and hours of boredomsprinkled with a few seconds of sheer terror.”
Gregory “Pappy” Boyington
©2017 Ulteig 4
Why Challenging?
LandownersROW
Design ConstraintsConflicting Facilities
Regulators
Why they pay us the ‘big bucks’
©2017 Ulteig 5
Impacts
Cost Schedule
Headaches (literally)Constructability
Aesthetics
Decisions have consequences
©2017 Ulteig 6
Case #1 - Scenario
• Politically-charged project• 115 kV wood H-frame• Franchised for 161 kV• Upgrade to double circuit 161 kV
©2017 Ulteig 7
Case #1 - Challenges
Same pole locationsSame pole spacing
Phase-to-Phase > 15.5 ft.
©2017 Ulteig 8
Case #1 - Challenges
Pole bearing(OMG moments!)
Flange joints
©2017 Ulteig 9
Case #1 - Challenges
Initial or later?
Insulator constraint
Fatigue?
Coating bleed?Vendor Involvement!
©2017 Ulteig 10
Case #2 - Scenario
• 345kV Dead End Crossing Structure• Highly Congested Area• Single Circuit Structure, from Triple Circuit• Significant Sideslope• Grading Required
©2017 Ulteig 11
Case #2
©2017 Ulteig 12
Case #2
345kV Circuit
69kV Circuits
Future 345kV Line
Existing 345kV Line
©2017 Ulteig 13
Case #3 - Scenario
• Mix of existing and new circuits• 69 kV• Public ROW• Minimum guying
©2017 Ulteig 14
Case #3Existing Circuit #1
Underbuild(of course)
New Circuit
Existing Circuit #2
©2017 Ulteig 15
Case #3
Loading Tree
GeometryClearances
Guying
©2017 Ulteig 16
Case #4 - Scenario
• 138kV DC T-line• 2nd Circuit for future Wind Farm• Narrow ROW• Distribution• Landowner Requests• Circuit-Circuit clearances
©2017 Ulteig 17
Case #4
©2017 Ulteig 18
Case #4
©2017 Ulteig 19
Case #5 - Scenario
• Politically-charged project
• Greenfield route
• Minimal footprint
BANANAS to NIMBY
©2017 Ulteig 20
Case #5
Quad bundle T2
Narrow profile
LandownerAccommodations
©2017 Ulteig 21
Case #5
Hardware
Deadends
Constructability
©2017 Ulteig 22
Conclusion
• Challenging Designs• Creativity• Collaboration• Flexibility• Maximize what you can cram into your ROW
Many Ways to Skin a Cat
©2017 Ulteig 23
Questions