chain control project pilot projekt 2014. plan of presentations why having chain control project...
TRANSCRIPT
![Page 1: Chain control project Pilot Projekt 2014. Plan of Presentations Why having chain control project ??? Pilot project start Practical part of the pilot](https://reader038.vdocuments.us/reader038/viewer/2022110400/56649d9e5503460f94a883b7/html5/thumbnails/1.jpg)
Chain control project Pilot Projekt 2014
![Page 2: Chain control project Pilot Projekt 2014. Plan of Presentations Why having chain control project ??? Pilot project start Practical part of the pilot](https://reader038.vdocuments.us/reader038/viewer/2022110400/56649d9e5503460f94a883b7/html5/thumbnails/2.jpg)
Plan of Presentations Why having chain control project ??? Pilot project start Practical part of the pilot project
Appointment of coordinators Preliminary Meeting Inspection of head office Inspection of retail units
Evaluation
![Page 3: Chain control project Pilot Projekt 2014. Plan of Presentations Why having chain control project ??? Pilot project start Practical part of the pilot](https://reader038.vdocuments.us/reader038/viewer/2022110400/56649d9e5503460f94a883b7/html5/thumbnails/3.jpg)
Why Chain control project A wish from the chain stores af the food
branch A wish from Food Administration Denmark Increased uniformity Inspection takes places where responsible
lies A sanction leads to correction in all the
chain's units Double Inspection is avoided
![Page 4: Chain control project Pilot Projekt 2014. Plan of Presentations Why having chain control project ??? Pilot project start Practical part of the pilot](https://reader038.vdocuments.us/reader038/viewer/2022110400/56649d9e5503460f94a883b7/html5/thumbnails/4.jpg)
Pilot Project Start A work group was established to find challenges. Some of the main challenges are: When does a Food business have chain status When are you allowed to have a head office Which activities should be in the head office What are the experiences of other EU countries.
Netherlands, Sweden and the UK Definition of food activities. When is something
a food activity? Economy: Is inspection more expensive?
![Page 5: Chain control project Pilot Projekt 2014. Plan of Presentations Why having chain control project ??? Pilot project start Practical part of the pilot](https://reader038.vdocuments.us/reader038/viewer/2022110400/56649d9e5503460f94a883b7/html5/thumbnails/5.jpg)
Pilot Project StartAdvantages: Inspection is carried out
where responsibility lies Detection of offenses and
guidance's are leads to corrections in the entire chain.
Is increased uniformity of inspection and assessments
More confidence for Inspector in retail units.
Disadvantages: Risk of consultant role
for businesses Who should be
sanctioned? Inspectors may be
exposed to great pressure from the head office
Control expenses is higher
![Page 6: Chain control project Pilot Projekt 2014. Plan of Presentations Why having chain control project ??? Pilot project start Practical part of the pilot](https://reader038.vdocuments.us/reader038/viewer/2022110400/56649d9e5503460f94a883b7/html5/thumbnails/6.jpg)
Practical part of thepilot project Appointment of coordinators and chains Preliminary meeting with chain head offices Development of inspection plans head office Inspection of head office Development of inspection plans in retail
units Meeting with the inspector of the retail units Inspection of retail units
![Page 7: Chain control project Pilot Projekt 2014. Plan of Presentations Why having chain control project ??? Pilot project start Practical part of the pilot](https://reader038.vdocuments.us/reader038/viewer/2022110400/56649d9e5503460f94a883b7/html5/thumbnails/7.jpg)
Appointment ofcoordinators and chains 4 chains were identified: three chains of
food and a chain of feed. All three food chains are represented all over Denmark. Compass Group, Mc Donald, Dansk Supermarked A/S (Netto, discount supermarket and Føtex supermarket)
4 coordinators selected. They were selected by the Head of Offices, control-unitsin the department where the head office was located.
![Page 8: Chain control project Pilot Projekt 2014. Plan of Presentations Why having chain control project ??? Pilot project start Practical part of the pilot](https://reader038.vdocuments.us/reader038/viewer/2022110400/56649d9e5503460f94a883b7/html5/thumbnails/8.jpg)
Premilinary meetingThere was a meeting with representatives from the different chains: The following were reviewed. A reconciliation of expectations, including
clarification of the rules to be checked at the head office
Presentation of appointed coordinators A cooperation agreement were reviewed and
signed A presentation of how the practical control will
take place
![Page 9: Chain control project Pilot Projekt 2014. Plan of Presentations Why having chain control project ??? Pilot project start Practical part of the pilot](https://reader038.vdocuments.us/reader038/viewer/2022110400/56649d9e5503460f94a883b7/html5/thumbnails/9.jpg)
Development of control plans head officeThe starting point for inspection plans was the agreement from the preliminary meeting, Examples of areas: Traceability, Withdrawal, Risk analysis, Marketing, Labeling, Prescriptions, Education/training.
![Page 10: Chain control project Pilot Projekt 2014. Plan of Presentations Why having chain control project ??? Pilot project start Practical part of the pilot](https://reader038.vdocuments.us/reader038/viewer/2022110400/56649d9e5503460f94a883b7/html5/thumbnails/10.jpg)
Inspection of head officeThe inspection was announced. The advantages for announced inspection: Time saving: two inspectors of
approximately 4 hours People we need to talk to are present Documents are prepared The inspection is of documents /
procedures and not physical inspection
![Page 11: Chain control project Pilot Projekt 2014. Plan of Presentations Why having chain control project ??? Pilot project start Practical part of the pilot](https://reader038.vdocuments.us/reader038/viewer/2022110400/56649d9e5503460f94a883b7/html5/thumbnails/11.jpg)
Development ofcontrol plans retail units 10 units were identified in each of the chains. Coordinators for the chain prepared three
inspection plans, covering all legislative areas.
Plans was drawn from experiences from the inspection at the head office.
Plans were sent to the inspectors who usually have inspection of the retail unit.
A meeting was held with the inspectors that would conduct inspections of retail units
![Page 12: Chain control project Pilot Projekt 2014. Plan of Presentations Why having chain control project ??? Pilot project start Practical part of the pilot](https://reader038.vdocuments.us/reader038/viewer/2022110400/56649d9e5503460f94a883b7/html5/thumbnails/12.jpg)
Inspection of retail unitsInspections is always unannounced, but in the pilot project, it was decided that quality managers from head offices was offered to come with three inspections Inspections was between 1 hour and 1 ½ hours and
carried out by 1 inspector The inspections of the retail units were carried out
over a period of 2 to 3 months A site on the internet was created to inssure the
coordinators and inspectors in retail unit could communicate. Mail and phone were of course also used.
![Page 13: Chain control project Pilot Projekt 2014. Plan of Presentations Why having chain control project ??? Pilot project start Practical part of the pilot](https://reader038.vdocuments.us/reader038/viewer/2022110400/56649d9e5503460f94a883b7/html5/thumbnails/13.jpg)
Evaluation Very few violations of rules, which was expected Important that inspection in head office can be
announced and is made by two inspectors Inspections of retail units must be unannounced, as it
is the control of the implementation of the procedures Important with the possibility of fast communication
between coordinators and inspectors in retail units Uniformity and plan to inspection all relevant
legislation could be better managed Double-checking can be minimized and perhaps even
eliminated