ch6a pipemanf

12
30.05.22 CHAPTER 6a PIPE&TUBE MANUFACTURING 1 CHAPTER 6 a PIPE & TUBE MANUFACTURING 6.1 TYPES OF PIPE MANUFACTURING ME 333 PRODUCTION PROCESSES II PIPE & TUBE MANUFACTURING WELDED MEDIUM OR LOW PRESSURE APPLICATIONS SEAMLESS HIGH TEMPERATURE & PRESSURE APPLICATIONS Pipeline constructions, general purpose Hydraulic equipment, boiler pipes Butt or electric welding of cold forged or rolled sheet Extrusion, Continuous casting, Centrifugal casting, Piercing (Mannesmann, Stiefel, Ehrhardt) Röckner, Spinning, Swaging

Upload: erdi-karacal

Post on 20-Jun-2015

50 views

Category:

Engineering


0 download

DESCRIPTION

Engineering Process 2 Mechanical Engineering University of Gaziantep

TRANSCRIPT

Page 1: Ch6a pipemanf

13.04.23 CHAPTER 6a PIPE&TUBE MANUFACTURING

1

CHAPTER 6 aPIPE & TUBE MANUFACTURING

6.1 TYPES OF PIPE MANUFACTURING

ME 333 PRODUCTION PROCESSES II

PIPE & TUBE MANUFACTURING

WELDEDMEDIUM OR LOW

PRESSURE APPLICATIONS

SEAMLESSHIGH TEMPERATURE

& PRESSURE APPLICATIONS

Pipeline constructions,general purpose

Hydraulic equipment,boiler pipes

Butt or electric welding of cold forged or rolled sheet

Extrusion,Continuous casting,Centrifugal casting,Piercing (Mannesmann, Stiefel, Ehrhardt)Röckner,Spinning,Swaging

Page 2: Ch6a pipemanf

13.04.23 CHAPTER 6a PIPE&TUBE MANUFACTURING

2

ME 333 PRODUCTION PROCESSES II

Page 3: Ch6a pipemanf

13.04.23 CHAPTER 6a PIPE&TUBE MANUFACTURING

3

6.2

ME 333 PRODUCTION PROCESSES II

Several examples of impact extrusion (a) forward, (backward) and (c) combination of forward and backward.

Page 4: Ch6a pipemanf

13.04.23 CHAPTER 6a PIPE&TUBE MANUFACTURING

4

6.3

ME 333 PRODUCTION PROCESSES II

Page 5: Ch6a pipemanf

13.04.23 CHAPTER 6a PIPE&TUBE MANUFACTURING

5

ME 333 PRODUCTION PROCESSES II

Page 6: Ch6a pipemanf

13.04.23 CHAPTER 6a PIPE&TUBE MANUFACTURING

6

6.4

ME 333 PRODUCTION PROCESSES II

Mannesmann Method

Piercing rolls

Page 7: Ch6a pipemanf

13.04.23 CHAPTER 6a PIPE&TUBE MANUFACTURING

7

ME 333 PRODUCTION PROCESSES II

Tube drawing

Page 8: Ch6a pipemanf

13.04.23 CHAPTER 6a PIPE&TUBE MANUFACTURING

8

6.5

ME 333 PRODUCTION PROCESSES II

Tube drawing

Page 9: Ch6a pipemanf

13.04.23 CHAPTER 6a PIPE&TUBE MANUFACTURING

9

ME 333 PRODUCTION PROCESSES II

Page 10: Ch6a pipemanf

13.04.23 CHAPTER 6a PIPE&TUBE MANUFACTURING

10

6.6

ME 333 PRODUCTION PROCESSES II

EHRHARDT METHOD

Page 11: Ch6a pipemanf

13.04.23 CHAPTER 6a PIPE&TUBE MANUFACTURING

11

ME 333 PRODUCTION PROCESSES II

Tube Spinning

Page 12: Ch6a pipemanf

13.04.23 CHAPTER 6a PIPE&TUBE MANUFACTURING

12

THE END