Training Center for Automation and Drives SIMATIC PCS 7 System Training Project structure Page 1 Date: 15.11.2006 File: ST-PCS7SYS_V70_p_stru.1 SIMATIC PCS 7 Siemens AG 2003. All rights reserved. SITRAIN Training for Automation and Drives ProjectStructure Content Page Project Environment ......................................................................................................................... 2 Our Plant (Factory 2) ........................................................................................................................ 3 Creating a Multiproject (MP) ............................................................................................................. 4 Creating Projects in the MP .............................................................................................................. 5 Setting the Language for Display Devices ......................................................................................... 6 Assigning the Plant Hierarchy ........................................................................................................... 7 PH Settings ................................................................................................................................ 9 Updating the Plant Hierarchy ............................................................................................................ 11 Plant View - Settings/Properties ....................................................................................................... 12 PH Assignment ................................................................................................................................ 13 HID Generation ................................................................................................................................ 14 OS Hierarchy (AS/OS) ..................................................................................................................... 15 OS Hierarchy (Picture Structure) ...................................................................................................... 16 Names in the Component View ........................................................................................................ 17

Upload: romanholo

Post on 07-May-2015

225 views

Category:

Technology


1 download

DESCRIPTION

treinamento automação siemens, pcs7 v7

TRANSCRIPT

Page 1: Ch3 v70 project_structure_en

Training Centerfor Automation and Drives

SIMATIC PCS 7 System TrainingProject structurePage 1

Date: 15.11.2006File: ST-PCS7SYS_V70_p_stru.1

SIMATIC PCS 7Siemens AG 2003. All rights reserved.

SITRAIN Training forAutomation and Drives

ProjectStructure

Content Page

Project Environment ......................................................................................................................... 2Our Plant (Factory 2) ........................................................................................................................ 3Creating a Multiproject (MP) ............................................................................................................. 4Creating Projects in the MP .............................................................................................................. 5Setting the Language for Display Devices ......................................................................................... 6Assigning the Plant Hierarchy ........................................................................................................... 7PH Settings ................................................................................................................................ 9Updating the Plant Hierarchy ............................................................................................................ 11Plant View - Settings/Properties ....................................................................................................... 12PH Assignment ................................................................................................................................ 13HID Generation ................................................................................................................................ 14OS Hierarchy (AS/OS) ..................................................................................................................... 15OS Hierarchy (Picture Structure) ...................................................................................................... 16Names in the Component View ........................................................................................................ 17

Page 2: Ch3 v70 project_structure_en

Training Centerfor Automation and Drives

SIMATIC PCS 7 System TrainingProject structurePage 2

Date: 15.11.2006File: ST-PCS7SYS_V70_p_stru.2

SIMATIC PCS 7Siemens AG 2003. All rights reserved.

SITRAIN Training forAutomation and Drives

Project Environment

Factory 1Basic

materialsFactory 2

Dyes

Repeat We shall repeat the project environment as in the previous chapter in order to create a suitable project structure for it. We will take into account the plant structure for this, while also considering the specific AS and PC equipment available in the training room.

Project environment Our project is part of a dye manufacturing plant. The basic materials are manufactured in Factory 1 and are transported from there to Factory 2.In Factory 2, the basic materials are stored in dedicated storage tanks.After undergoing the manufacturing process, the end product is stored in a different section of the tank farm for transport purposes.

Page 3: Ch3 v70 project_structure_en

Training Centerfor Automation and Drives

SIMATIC PCS 7 System TrainingProject structurePage 3

Date: 15.11.2006File: ST-PCS7SYS_V70_p_stru.3

SIMATIC PCS 7Siemens AG 2003. All rights reserved.

SITRAIN Training forAutomation and Drives

Our Plant (Factory 2)

Tank Farm North

Gro

up 1

Tank Farm East

Shipping

Controlbuilding

Group 4

Group 3 Group 7

Group 2

Group 1 incl.- Unit A- Unit B- Unit C- Unit D.

Group 5

Group 6

Mixed plantTank farmShipping

AS8

AS7

AS6

AS5

AS4

AS3

AS2

AS1

Tank Farm South

Factory 1

Factory 2

Gro

up 2

Gro

up 3

Gro

up 4

Gro

up 5

Gro

up 6

Gro

up 7

Plant overview The plant to be automated is part of Factory 2 and is broken down into several different zones (see above):

Tank Farms North, South and East

Shipping

Control building

Groups 1, 2, 3, 4, 5, 6, 7Each of which is configured with the following reactor units: Unit A, Unit B, Unit C, Unit D

You can specify this breakdown in the plant view (on additional pages) and retrieve it again later.

Automation systemsEight automation systems are used to carry out the automation tasks. The task assignment is displayed in the picture at the top right. Only part of this plant will be automated in our exercise, using one AS and one OS.

Note Tasks that were originally assigned to an AS or OS can be reallocated over the plant hierarchy in a later project phase with minor configuration effort.

Each participant takes on/configures a group in accordance with the training station number..

Page 4: Ch3 v70 project_structure_en

Training Centerfor Automation and Drives

SIMATIC PCS 7 System TrainingProject structurePage 4

Date: 15.11.2006File: ST-PCS7SYS_V70_p_stru.4

SIMATIC PCS 7Siemens AG 2003. All rights reserved.

SITRAIN Training forAutomation and Drives

Creating a Multiproject (MP)

Multiproject symbol

Tooltip showsstorage location

Objective A project containing an AS and OS is to be created in such a way that it can be simultaneously edited on different ES systems at a later time. The "multiproject" is the project type of choice for this application.

Exercise Create a PCS 7 multiproject in which one project is created for the AS side and one for the OS side. In each project, configure the hardware for the devices used (AS or PC) and download the configuration to the devices.---------------------------------------------------------------------------------------------------------

Steps 1. Create the multiproject using the SIMATIC Manager.2. Create the two projects in the multiproject (one project for the AS, the other project for the OS).3. Set the language for the display devices (in which language the plant operator will read his textual information).4. Configure the hardware used in each of the projects.5. Compile and download the configurations to the devices.

Remark Steps 4 and 5 can also be performed after the entire configuration has been completed, at the latest before debugging and startup. As we want to test online as soon as possible, we will carry out these steps even before creating the software.---------------------------------------------------------------------------------------------------------

Procedure 1.1 Start the SIMATIC Manager by clicking the icon on the desktop or by selecting the following in the task bar:

START -> SIMATIC -> SIMATIC Manager1.2 Select

File -> NewIn the "Multiprojects" tab, specify the storage location and enter a name for the multiproject (e.g., storage location = "PCS7courses_V61" directory on the data drive, and name = "DYE").

Page 5: Ch3 v70 project_structure_en

Training Centerfor Automation and Drives

SIMATIC PCS 7 System TrainingProject structurePage 5

Date: 15.11.2006File: ST-PCS7SYS_V70_p_stru.5

SIMATIC PCS 7Siemens AG 2003. All rights reserved.

SITRAIN Training forAutomation and Drives

Creating Projects in the MP

Project symbols

Multiproject symbol

Note Always use a directory on a drive other than the installation drive of Windows and PCS 7. If the Windows and PCS 7 hard disk partition is restored or reinstalled, the previously implemented projects will be retained!2.1 Select the multiproject icon, then

right-click and select Multiproject -> Create in Multiproject...Then, go to the User Projects tab and specify the storage location and the name for the AS project (the path of the multiproject is already preset for the storage location, the name can be "PRO_AS", for example).2.2 Now carry out the same procedure for the OS project. Name it "PRO_OS", for example

Page 6: Ch3 v70 project_structure_en

Training Centerfor Automation and Drives

SIMATIC PCS 7 System TrainingProject structurePage 6

Date: 15.11.2006File: ST-PCS7SYS_V70_p_stru.6

SIMATIC PCS 7Siemens AG 2003. All rights reserved.

SITRAIN Training forAutomation and Drives

Setting the Language for Display Devices

Project language

3.1First, select the AS project, and then selectOptions -> Language for Display Devices

If you have not already specified the message number concept in the SIMATIC Manager, you will be prompted to do so. Select the default setting (for V6). This query is necessary as the subsequent language selection will affect the message texts offered during configuration.3.2 Provided you only want to use German, all you have to do is set it as the default language. If you want the project to be available in multiple languages, it is advisable to set the default language to English (USA). Provision is also made for French, Italian and Spanish in PCS 7 libraries and in WinCC. You can easily add these languages to the "installed languages".If you want to use the project in a different language (other than German, English, French, Italian, or Spanish), we recommend setting English as the default language (i.e., do not enter any additional languages in the "Installed Languages in Project" box) and installing the required language in WinCC later (this is explained in detail for the OS project). The English texts found there (in WinCC) can be exported, translated and reimported.

Remark The language setting must be made for each project within the multiproject!The project language displayed in the properties of the project corresponds to the Windows language when the project was created, and cannot be subsequently changed.

For steps 4 and 5 mentioned at the beginning, please refer to Chapter 4 "System Configuration". As these steps do not have to be performed but, rather, can be performed later, they have been included elsewhere, as indicated.Now we will return to configuring the system.

Page 7: Ch3 v70 project_structure_en

Training Centerfor Automation and Drives

SIMATIC PCS 7 System TrainingProject structurePage 7

Date: 15.11.2006File: ST-PCS7SYS_V70_p_stru.7

SIMATIC PCS 7Siemens AG 2003. All rights reserved.

SITRAIN Training forAutomation and Drives

Assigning the Plant Hierarchy

In the exercise, you will assign your AS instead of the AS03 or AS07.

Use your PC as the OS/ES

Picture

Picture

CFC

AS01

AS02

AS03

AS04

AS05

AS06

AS07

AS08

Picture

Picture

Picture

Level 1

Level 2

Level 4Level 3

SFC

Objective You have carried out the system configuration. The automation and HMI stations are in the foreground.The plant presented at the beginning of the chapter is to be reflected in the project in a so-called "Plant view" (also known as Plant Hierarchy). The AS ("ASxx") you configured a little while ago will be used to automate the two structurally identical "A" and "B" reactors, the OS ("OSxx)" you configured will be used for operator control and monitoring.---------------------------------------------------------------------------------------------------------

Plant hierarchyYou can call a plant-related view (through PCS7) in the project (in the SIMATIC Manager).

View Plant ViewThis view is initially empty. Select the project name, then

right-click and select New Object -> Hierarchy FolderYou can then rename the new folders.After selecting a hierarchy folder, you can structure the secondary plant hierarchy in the same manner.Result: The plant view mirrors the structure of the plant.In our exercise we will create a PH with 4 levels. We will use Level 1 as the factory designation. This level is present for overview purposes only as the plant is large; it is not used in the AS and/or OS (nor is it part of the Higher Level Item Designation - HID) It is included in a printout of documentation.

Page 8: Ch3 v70 project_structure_en

Training Centerfor Automation and Drives

SIMATIC PCS 7 System TrainingProject structurePage 8

We will use Level 2 to divide the factory into plants, such as reactors, tank farms, etc.We will use Level 3 for the units (e.g. as Unit A, Unit C or Reactor A, Reactor C)Level 4 will describe the function (e.g., temperature control or inflow)

AS/OS assignment The plant folders must each be assigned to one AS and/or one OS so that the automation task runs in the correct AS (the one that is "wired directly" to the plant) and the monitoring objects (pictures) are created in the correct OS. Select a hierarchy folder, then

right-click and select Object Properties - AS-OS Assignment.If you select the "Lower-level objects..." check box, the lower-level directories will also inherit the assignment.

AS When the AS is assigned, its chart folder is recorded (containing all CFC and SFC charts that run on the assigned AS).

Select the AS ("ASxx")Note 1: The reason for assignment to the chart container and not to the CPU is as

follows:If you have not yet specified the hardware, you can insert an S7 program (software only) into the project. You can assign the program's chart folder to the Plant View. After you specify the hardware, you can cut and paste this S7 program into the CPU, which is now known. It replaces the (still empty) S7 program of this CPU configured using HW-Config. The already configured plant hierarchy and software also migrate.

OS Select the OS ("OSxx").The pictures configured later in the hierarchy folder are kept in this OS.

Name the tasks Select a hierarchy folder, thenright-click and select New Object -> (CFC, SFC, pictures, etc. )

to insert and name the relevant objects. These objects are implicitly inserted in the assigned AS (chart folder) or OS, where the objects are also loaded and must be executed.

Note 2: PH assignments can only refer to devices (AS/OS) that are located in the same project. However, identical names of the PH in different projects of a multiprojectrefer to the same plant component to be configured within the multiproject.

Page 9: Ch3 v70 project_structure_en

Training Centerfor Automation and Drives

SIMATIC PCS 7 System TrainingProject structurePage 9

Date: 15.11.2006File: ST-PCS7SYS_V70_p_stru.9

SIMATIC PCS 7Siemens AG 2003. All rights reserved.

SITRAIN Training forAutomation and Drives

PH Settings (1)

Exercise For the entire multiproject, set the plant hierarchy so that level 2 is defined as the OS area, levels 2, 3 and 4 are part of the higher-order item designation, and the picture hierarchy and diagnostics screens are derived from the plant hierarchy.

Note For instructional purposes, we will deactivate the "Diagnostics screens..." option again after checking the automatically generated structure. At the end of the second week of training, when we have completed the automation and HMI exercises, we will activate this option again and take a look at the end result.---------------------------------------------------------------------------------------------------------

Steps 1. Select the multiproject and open the settings screen.2. Select the project that is to serve as the template for the PH. 3. Define the OS that is to be used as a maintenance station (MS), i.e., your ES/OS.4. Check the changes that have been made.---------------------------------------------------------------------------------------------------------

Procedure 1. In the SIMATIC Manager open the plant view of the multiproject and select the name of the multiproject. To open the screen form,

right-click and select Plant Hierarchy SettingsThen set the options according to the requirements for the exercise.2. In the next screen, select the AS project as the template. (The goal is to avoid having to create the PH again for each project if the selected project already contains a PH.)

Page 10: Ch3 v70 project_structure_en

Training Centerfor Automation and Drives

SIMATIC PCS 7 System TrainingProject structurePage 10

Date: 15.11.2006File: ST-PCS7SYS_V70_p_stru.10

SIMATIC PCS 7Siemens AG 2003. All rights reserved.

SITRAIN Training forAutomation and Drives

PH Settings (2)

Result

3. Define your OS (ES) as a maintenance station.4. After confirming prompts, an operation is triggered, which performs the following

actions:

A first hierarchy folder is created in all projects included in the multiproject(e.g. "Plant(1)") which you can expand or adapt for each project as required.

A second hierarchy folder is created in all projects included in the multiproject for diagnostic purposes (e.g. "Diagnostics"). It is later automatically adapted after the software is used to access the hardware.

Remark In the slide above you can see the different breakdown of the diagnostic hierarchy in the two projects. While in the AS project only AS objects contribute to the diagnostics, the OS project contains folders for the AS, network and PC objects (full instrumentation and control setup). The maintenance station that is running on the OS must provide the entire instrumentation and control diagnostics.Whereas CFC charts with diagnostics drivers are created in the diagnostics folder of the AS project (the hardware-related software must run in the AS), pictures are created in the OS project and are displayed with graphic symbols when appropriate. The user accesses the OS diagnostics information for the status of the device via these symbols.The symbols are generated by the PCS 7 MS software.

Page 11: Ch3 v70 project_structure_en

Training Centerfor Automation and Drives

SIMATIC PCS 7 System TrainingProject structurePage 11

Date: 15.11.2006File: ST-PCS7SYS_V70_p_stru.11

SIMATIC PCS 7Siemens AG 2003. All rights reserved.

SITRAIN Training forAutomation and Drives

Updating the Plant Hierarchy

Result: both projects PRO_AS and PRO_OS have the same plant hierarchy

Right-click and select Plant Hierarchy Update in Multiproject

Exercise Create the hierarchy tree from the above slide in the PRO_AS project in the plant view.Update the PH in the multiproject to avoid having to make the entries again in the OS project.----------------------------------------------------------------------------------------------------------

Action In the plant view, click the multiproject,right-click and select Plant Hierarchy Update in Multiproject

to open the update screen.The option selected in the above slide will create the PH folders with identical names in all projects A identically-named PH folder in the projects represents the (identically named) assigned plant section.The second option enables limited updating of selected projects. This is necessary, for example, if different plant sections are to be monitored on OSs in different projects. Different plant hierarchies are required in that case.

Remark If you would like to rename the PH folder later, do this in the template project. Folders that were generated through an update will be automatically renamed.

Page 12: Ch3 v70 project_structure_en

Training Centerfor Automation and Drives

SIMATIC PCS 7 System TrainingProject structurePage 12

Date: 15.11.2006File: ST-PCS7SYS_V70_p_stru.12

SIMATIC PCS 7Siemens AG 2003. All rights reserved.

SITRAIN Training forAutomation and Drives

Plant View - Settings/Properties

1

3

PH settings The settings are taken from screen "1" for each hierarchy level of the current project.You can set the naming conventions for your project (number of levels, name length per level, whether the name of the level is added to the hierarchy identification and whether the screen hierarchy in the OS or the diagnostic pictures are derived fromthis plant view).With the OS area, you specify which hierarchy level is applicable as the OS area level. You have set level 2 (see circular mark).

Note: When you assign a name, note that the process tag name on the OS must not exceed 128 characters. The name is a combination of the names of the folders in the hierarchy path, the chart name, the block name, the separator, and the connection name (parameter name of the block).

Hierarchy folder - PropertiesAfter selecting a plant hierarchy (usually in level 1),

right-click and select Object Propertiesto set the properties.

Page 13: Ch3 v70 project_structure_en

Training Centerfor Automation and Drives

SIMATIC PCS 7 System TrainingProject structurePage 13

Date: 15.11.2006File: ST-PCS7SYS_V70_p_stru.13

SIMATIC PCS 7Siemens AG 2003. All rights reserved.

SITRAIN Training forAutomation and Drives

PH Assignment

AS/OS Assignment Select the following in the AS/OS Assignment tab (see above):

The AS (its CPU chart folder) in which the CFC and SFC charts are stored.

The OS in which the pictures and reports are stored.This assignment can be passed on to the lower level hierarchy folders, unless other assignments are necessary in lower levels.

Remark You can only assign those ASs or OSs that are located in the same project as the PH folder that is currently being assigned.

HMI Attributes The OS area ID for the hierarchy folder of the level selected as the OS area is displayed in the Control and Monitoring Attributes tab. The ID is preset with the name of the PH folder for this level. The area ID is passed on to (i.e. inherited by) all of the lower level hierarchy folders, OS pictures, OS reports and messages. This means that all lower-level hierarchy folders with their pictures belong to one plant area in the OS. This affects the area-specific authorizations for operating personnel.If the picture hierarchy is to be based on the plant hierarchy, the "Order..." button and the "Picture name for OS" field are active ("Picture name for OS" only if the OS area ID is not active). The name of the hierarchy folder is entered as the default setting for the picture name. The operator sees this name displayed in the WinCC picture hierarchy.

Remark All of the settings are associated with the AS/OS that you have assigned.

Page 14: Ch3 v70 project_structure_en

Training Centerfor Automation and Drives

SIMATIC PCS 7 System TrainingProject structurePage 14

Date: 15.11.2006File: ST-PCS7SYS_V70_p_stru.14

SIMATIC PCS 7Siemens AG 2003. All rights reserved.

SITRAIN Training forAutomation and Drives

HID Generation

1

2

34

5

7

HID on ES = 111\222\333\444\\555\666

6

HID on OS = 111/222/333/444/555/666

Selectable combination

Process tag on OS = 111/222/333/444/555/666.777777

Tooltipfor

QMAN_AUT

7

HID formation The Higher-level ItemDesignation (HID) is formed from the following components:a. Path name from the plant hierarchyb. Chart namec. Block nameWhereas the string the plant view contributes to the HID is the result of linking selectable combinations of the hierarchy folder names (components 1 to 4 in the slide), the chart name (5) and block name (6) are always present in the HID.

Process tag If individual parameters of the module are to be visualized in WinCC, the parameter name (7) is appended behind the previously described components, separated by a period.

ExamplesIn CFC In the chart reference data of CFC, block 2U301 is displayed as part of

Factory2\Reactors\UnitC\Drain\\Dr301. The chart name is separated from the hierarchy path by "\\".

In WinCC (HID) The name of the block is displayed asFactory2/Reactors/UnitC/Drain/Dr301/2U301 (if all PH levels contribute to the HID). In our example, "Do not include in HID" was selected for Level 1 in the PH settings. Therefore, the resulting HID for the same block:Reactors/UnitC/Drain/Dr301/2U301

In WinCC (process tag)If a parameter of the above block is addressed, it is identified as a process tag and displayed in WinCC as follows:Reactors/UnitC/Drain/Dr301/2U301.QCONTROL

Page 15: Ch3 v70 project_structure_en

Training Centerfor Automation and Drives

SIMATIC PCS 7 System TrainingProject structurePage 15

Date: 15.11.2006File: ST-PCS7SYS_V70_p_stru.15

SIMATIC PCS 7Siemens AG 2003. All rights reserved.

SITRAIN Training forAutomation and Drives

OS Hierarchy (AS/OS)

WinCC CS WinCC RTSIMATIC Manager

Relationship If you have derived the picture hierarchy from the plant view (preceding slide, screen "1") the above slide shows the relationships.To start the OS compilation from the SIMATIC Manager, select the OS, then

right-click and select CompileThe picture hierarchy is automatically provided to the "Picture Tree Manager" in WinCC CS (Configuration System).During runtime, in WinCC RT (Run Time) the plant operator can select an area, launch the graphic display of the picture hierarchy, and look at the desired sub-area.

Page 16: Ch3 v70 project_structure_en

Training Centerfor Automation and Drives

SIMATIC PCS 7 System TrainingProject structurePage 16

Date: 15.11.2006File: ST-PCS7SYS_V70_p_stru.16

SIMATIC PCS 7Siemens AG 2003. All rights reserved.

SITRAIN Training forAutomation and Drives

OS Hierarchy (Picture Structure)

Tank farm Reactors1 Reactors2

Overview of the reactors(REACTORS1.PDL)

Details(if necessary)

Reactors3

M M M Reactors1Unit A1,B1,C1,D1(UnitA1.PDL...)

A SGroup display

Shipping

Com.Plant

Reactors4

You can derive this OS picture hierarchy from the plant view.You must use the plant view to insert the pictures for the relevant plant component in the hierarchy folders and provide them with meaningful names . You can then use OS (Graphics Designer) tools to configure these pictures.

Tip: The following method is more efficient:- Start by inserting and renaming only one picture in the PH.- Open this picture in the Graphics Designer (WinCC) and change to the desired dimensions (height, width) there using its properties.- Copy this modified picture (which is still empty) in the PH, and then insert it into the various PH folders.

Page 17: Ch3 v70 project_structure_en

Training Centerfor Automation and Drives

SIMATIC PCS 7 System TrainingProject structurePage 17

Date: 15.11.2006File: ST-PCS7SYS_V70_p_stru.17

SIMATIC PCS 7Siemens AG 2003. All rights reserved.

SITRAIN Training forAutomation and Drives

Names in the Component View

AS Name

The S7 program name is displayed in WinCC as a substitute for the AS

Computer name (from Windows)

OS name

S7 program name for the library

Project name

Project name Was entered via the SIMATIC Manager. Can still be changed (especially if the projects are to be subsequently combined in a multiproject). The storage location on the hard disk remains the same.

AS name The SIMATIC 400 station should be renamed so it can be found again at the location of installation. Select the station, then

right-click and select Rename andenter a new name (ASxx, where xx is your station number).

S7 program name The name of the directory where the software is stored; this directory is displayed as a substitute for the AS name in the process control messages of this AS in WinCC. It should be similar or identical to the AS name e.g. S7_AS03.

Computer name A PC station is identified via the computer's Windows name. The name is assigned by the computer administrator. To determine the name, select the My Computer icon on the PC desktop, then

right-click and select Properties -> Computer NameThen, copy the indicated name.When renaming the PC station in the SIMATIC Manager, you can then insert this name there (do not use special characters in the name!).

OS name This name can be freely assigned, but should allow the OS function to be identified (SERV2, ARSRV, CL12 etc.).

S7 program name The S7 program directory can also be renamed for the library.