Page 1: ch03

3-1

Cost Cost AnalysisAnalysis

Prepared by Douglas Cloud

Pepperdine University33

Page 2: ch03

3-2

Understand the importance of cost management. Describe the two aspects of managing costs. Distinguish between value-added and non-value-

adding activities and costs. Understanding the limitations of methods of cost

behavior and analysis. Classify costs along several dimensions including

whether managers can change them at short notice.

ObjectivesObjectives

After reading this After reading this chapter, you should chapter, you should

be able to:be able to:

Page 3: ch03

3-3

Cost Drivers and PoolsCost Drivers and Pools

Activities that cause costs are cost drivers and include sales, production, and items

such as the number of products the company

makes and the number of customers it serves.

A group of costs driven by the

same activity is a cost pool.

Page 4: ch03

3-4

Estimated Cost BehaviorEstimated Cost Behavior

Fixed Cost Behavior Variable Cost Behavior

$$

Activity Activity

Unit Cost Varies with Volume Unit Cost Rate is Constant

Page 5: ch03

3-5

Total Costs = Fixed Amount + (Variable Cost Per Unit x Number of Units)Total Costs = Fixed Costs + Variable Costs

Total Costs$ Cost

Number of Units Produced

Fixed amount

Variable Costs

Estimated Cost BehaviorEstimated Cost BehaviorMixed Cost

Page 6: ch03

3-6

Estimating Cost Behavior

Account AnalysisEngineering ApproachInterviewsThe (High-Low) Two-Point MethodScatter-Diagram MethodRegression

Page 7: ch03

3-7

Account AnalysisAccount Analysis

Manager decides how to classify a cost by looking at its name and then checking this judgment by scanning the account for that cost for several periods.

Example: Rent, depreciation, salaries, and advertising are generally fixed.

Weakness: It only shows what costs have been, not what they should be.

Page 8: ch03

3-8

Engineering ApproachEngineering Approach

Engineers study the material and labor requirements of products and related operations, then make per-unit estimates of the costs that should vary with production.

Advantage: It indicates what costs should be rather than what they have been.

Page 9: ch03

3-9

InterviewsInterviewsThis is a simple tool that has proven useful in determining what drives many costs, and to determine what is likely to happen to particular costs, given specific actions.

Advantage: It does help to identify cost drivers.Weakness: Interviewing does not help determine how much of a particular cost is fixed or variable.

Page 10: ch03

3-10

High-Low (Two-Point) MethodHigh-Low (Two-Point) Method

The high-low (two-point) method is a relatively unsophisticated, yet widely used, method of estimating the components of a mixed cost.

Approach: This method uses two past levels of activity and the amounts of the cost incurred at those levels; more specifically, the highest and lowest levels of activity.

Page 11: ch03

3-11

High-Low (Two-Point) MethodHigh-Low (Two-Point) Method

Variable cost component of

mixed cost=

change in costchange in activity

Variable cost component of

mixed cost=

$40,800 – $14,80018,000 – 5,000

Variable cost component of

mixed cost= $26,000

13,000$2 per machine hour=

Page 12: ch03

3-12

High-Low (Two-Point) MethodHigh-Low (Two-Point) Method

Fixed cost component of

mixed cost=

total cost

– volume xvariable

cost components

At the high point: 18,000At the high point: 18,000Fixed cost

component of mixed cost

= $40,000 – (18,000 x $2)

Fixed cost component of

mixed cost= $4,800

Page 13: ch03

3-13

High-Low (Two-Point) MethodHigh-Low (Two-Point) Method

Fixed cost component of

mixed cost=

total cost

– volume xvariable

cost components

At the low point: 5,000At the low point: 5,000Fixed cost

component of mixed cost

= $14,800 – (5,000 x $2)

Fixed cost component of

mixed cost= $4,800

Page 14: ch03

3-14

Month Utility Costs Units ProducedJanuary $4,000 400February 5,000 800March 9,000 1,200April 10,000 1,600May 15,000 2,000

High-Low (Two-Point) MethodHigh-Low (Two-Point) Method

An Example

High!High!

Page 15: ch03

3-15

Month Utility Costs Units ProducedJanuary $4,000 400February 5,000 800March 9,000 1,200April 10,000 1,600May 15,000 2,000

High-Low (Two-Point) MethodHigh-Low (Two-Point) Method

An Example

Low!Low!

Page 16: ch03

3-16

Variable Cost = ($15,000 – $4,000) / (2,000 – 400) = $11,000 /1,600 = $6.875 per unit

Fixed Costs = $15,000 – ($6.875 x 2,000) = $1,250

The cost formula using the high-low method is:

Y = $1,250 + $6.875 (X)

High-Low (Two-Point) MethodHigh-Low (Two-Point) Method

Page 17: ch03

3-17

Scatter-Diagram MethodScatter-Diagram Method

The scatter-diagram (or graphical) method requires cost and volume data from prior periods, and drives an equation (cost prediction formula) based on those data.

Weakness: The placement and slope of the line are matters of

judgment; the manager “eyeballs” the data and fits the line visually.

Page 18: ch03

3-18

Scatter-Diagram MethodScatter-Diagram Method

Units Produced

Utility Cost$16,000

12,000

8,000

4,000

0 400 800 1,200 1,600 2,000

Analyst can fit linebased on his or herexperience

x x

x x

x

Page 19: ch03

3-19

Regression MethodRegression Method

Regression analysis (or just regression) is a more sophisticated method for estimating the fixed and variable components of a mixed cost.

Regression uses cost and volume data from prior periods to yield an equation of the form y = a + bx.The appendix covers regression in more detail.

Page 20: ch03

3-20

Problems and Pitfalls in Cost Behavior Analysis

Historical DataHistorical Data High-low, scatter-diagram, and regression

methods all use historical information.

Formulas based on historical data can give useful predictions only if past conditions prevail in the future.

Outliers should be ignore

Page 21: ch03

3-21

Problems and Pitfalls in Cost Behavior Analysis

Correlation and AssociationCorrelation and Association

For an equation to be useful for planning, the relationship between the cost and the activity must

be fairly close.

The visual aspect of the scatter-diagram method allows the manager to see whether the

activity chosen as the independent variable is a good

predictor of cost.

Page 22: ch03

3-22

Step Variable CostsStep Variable Costs

$ Cost

Number of Units Produced

Linearity Assumption

Narrow Width

Page 23: ch03

3-23

DefinitionsDefinitions

Discretionary costs are fixed costs that can be quickly altered by managerial action.

Example: Advertising, employee training, and research and development

Committed costs are fixed costs that cannot be changed so quickly.

Example: Depreciation

Page 24: ch03

3-24

DefinitionsDefinitions

Avoidable costs are costs that can be avoided by adding, dropping, or curtailing some activities.

Example: Advertising, sales salaries

A company that drops a product line might not be able to reduce its sales force or its rent.

Such costs are unavoidable.

Page 25: ch03

3-25

A direct cost is incurred specifically because of a particular activity of a firm, like a product line, or geographical area.

Direct costs are sometimes called separable or traceable costs.

An indirect cost does not relate to one specific activity, but rather to several.

An indirect cost is sometimes called a common or joint cost.

DefinitionsDefinitions

Page 26: ch03

3-26

Manufacturing Costs

Direct materials Direct labor Manufacturing overhead

Page 27: ch03

3-27

Regression Output (Appendix)Regression Output (Appendix)Regression Output: Constant$7,731.78 Standard Error of Y Estimate$1,763.16 R Squared .0954921 No. of Observations 12 Degrees of Freedom 10X Coefficient(s) $1.76678Standard Error of Coefficient $0.12139

Model: Y = $7,731.78 + $1.76678X

Page 28: ch03

3-28

Goodness of Fit (Appendix)Goodness of Fit (Appendix)

Goodness of fit tells us how well the regression line fits the data, and therefore suggests to managers how good their predictions are likely to be. Two potential measures are:

1. the coefficient of determination (R-squared).

2. the standard error of the estimate (Standard Error of Y Estimate).

Page 29: ch03

3-29

TC = FC + b1X1 + b2X2 + … + bnXn

Multiple Regression Equation (Appendix)

Page 30: ch03

3-30

The End

Chapter 3Chapter 3