Capitol Hill Open HouseMay 7, 2009

University Link ProjectI-5 Ramp Closure Update

Page 2: Ch Open House0905

2

Agenda

6:00 PM - Open House6:30 PM - Presentation

• University Link, Capitol Hill Station and I-5 Construction– Ron Endlich, Deputy Project Director, Sound Transit

• Q & A7:30 PM - Return to Open House8:00 PM - Close

Page 3: Ch Open House0905

3

• 3.15-mile extension of Initial Segment and Airport Link– Capitol Hill Station– UW Station and crossover

• Schedule– Design: completed early 2009– Construction: 6.5 years– System testing: 6 months– Open for Service: 2016

• Adds 70,000 daily riders, 114,000 riders systemwide (2030)

University Link

Page 4: Ch Open House0905

4

Capitol Hill Station

• Underground station with 3 entrances

• Staging area - station and tunnel excavation at site

• Ridership: 14,000 daily boardings

• Travel time: – 6 minutes to downtown

Seattle (University St.)– 3 minutes to UW Station

N

Page 5: Ch Open House0905

5

Capitol Hill Station Schedule

1

2

3

4

Page 6: Ch Open House0905

6

1. Demolition and Remediation• Jan. 2009 to mid-2009• 75% Recycling and salvage

goal• Denny remains open• Sidewalks remain open

– Will be few short term closures

• Site will be paved and remain fenced

Page 7: Ch Open House0905

7

Recycled and Salvaged ItemsA large amount of materials that otherwise would have been taken to landfills was removed for re-use. Among some of the items salvaged were:*Recycled Demolition Material to Date: 1,450 Tons• 224 doors• 180 cabinets• 18 restaurant booths• 50 light fixtures• 29 ranges• 31 refrigerators• 13 claw foot tubs• 21 sinks and toilets• 60 radiator fins• 121 ft. wrought iron railing• 90 ft. wood railing• Hundreds of feet of trim and molding• 3500 sq. ft. fir flooring• 500 sq. ft. tin ceiling panels

Page 8: Ch Open House0905

8

2. I-5 Undercrossing Work Vicinity

ParamountTheater

Convention Place Station

PINE STREET

BOREN STREET

NB

I-5SB I-

5

Work Area

Work Area

I-5 undercrossing contract awarded in February

-Prepares I-5 structures for future tunnel boring machines-Work being done now to avoid conflicts with other WSDOT freeway work and later U-Link contracts-Coordinated agency outreach to public on ramp closures-Contractor incentives to complete the work early

Page 9: Ch Open House0905

9

Work Pit Locations

Pine

St.

Boren Ave.

NB I-5

SB I-5

SBE Pit

NBE Pit

SBW Pit

NBW Pit

Page 10: Ch Open House0905

10

Page 11: Ch Open House0905

11

I-5 Ramp Closures

Cherry Street

Pine Street

Pike Street

Page 12: Ch Open House0905

12

Olive Way Off-Ramp Closure Detour

Page 13: Ch Open House0905

13

Cherry Street On-Ramp Detours

ϖ Cherry St. express lane on-ramp will be open to all traffic (currently only HOV) during detour

Page 14: Ch Open House0905

14

Agency Coordination & Public Outreach Efforts

• Coordination with WSDOT, SDOT and KC Metro• Sound Transit website• U-Link Website www.soundtransit.org/u-link• E-mail alerts• WSDOT construction information website• SDOT construction webpage• Portable Vehicle Messaging Systems along I-5• Highway Advisory Radio System (HARS)• Vehicle Message System with notification of

closures• Detour cards for businesses affected by closure

to educate patrons• Door-to-door business outreach

Page 15: Ch Open House0905

15

3. Station Excavation, Tunneling• Jan. 2010 to Dec. 2012• Plywood wall surrounding site• Denny and parts of Nagle closed to

traffic• Sidewalks open

– Will be few short term closures• Single Tunnel Boring Machine (TBM)• 24/7 surface activity to support

tunneling• High truck volumes

Page 16: Ch Open House0905

16

Capitol Hill Site Noise Variance•Sound Transit preparing noise variance application for the Capitol Hill site

-Construction wall will contain most but not all work noise

-24/7 site activities to support tunneling work-Work activities and equipment restrictions, other mitigation

•Noise informational meeting June 3, 2009•DPD will schedule a public meeting on the technical noise variance in late Summer 2009

Page 17: Ch Open House0905

17

4. Station Construction• Jan. 2013 to Dec. 2015• Less trucking activity• Sidewalks open

– Will be few short term closures• Cut and cover pedestrian tunnel

across Broadway (6 months)– Roadway remains open– Parking restrictions near work

Page 18: Ch Open House0905

18

Transit Oriented Development (TOD)• 4-5 sites available for TOD • TOD community forums scheduled during 2009

– June 24th forum on housing and retail

• Developer(s) to be selected in 2012-2013• Construction of some sites could begin prior to station

opening (2015)

N

Page 19: Ch Open House0905

19

Questions?

Page 20: Ch Open House0905

20

Staying Informed• Monthly electronic newsletters

www.soundtransit.org/subscribe

• Printed and electronic construction alerts

• Regular construction update meetings

• Full time outreach staff

• 24 hour construction hotline 1-888-298-2395

• www.soundtransit.org/u-link

Page 21: Ch Open House0905

21

Truck Haul Route(beginning 2010)