ch all utility work shown on this utilities by others … · 2018-02-09 · 10 0. 0 0 '...

4
-Y1- STA. 17+91.00 END CONSTRUCTION S R 1313 W A S H B U R N S W I T C H R D -L- 10 + 00 15 + 00 25 + 00 20 + 00 - Y 1 - N SR A I L R OAD C S X R A I L R OAD T O U S74 T O P L A T O LEER D -L- STA. 10+50.00 BEGIN TIP PROJECT R-5849 -L- STA. 29+90.00 END TIP PROJECT R-5849 -L- STA. 30+32.00 END CONSTRUCTION C US T O M E R F I R S T DR VICINITY MAP PROJECT S a nd R d B l a n t on W C a b a n i sR d W a s hbu r n P l a t o L ee R d A r t e e R d R a ndo l ph R d S wit c h R d P o l kv ill e R d W D i xon B l vd 6 5 UO- 4 UO-3 4 UO-2 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS 09/08/99 28 - SE P- 2017 13 : 37 C:\Us ers \NCDOTus er1 \Des ktop\R- 5849 \Utiliti es \E ngi neeri ng\UBO\Proj\290_001_ R5849_ut_ ts h_ UO01_ps h. dgn $$$$USE RNAME $$$$ INDEX OF SHEETS SHEET NO. R-5849 UO-1 S T A TE O F NO R T H C A R O L I NA D I V I S I ON O F H I GH W AY S T.I.P. NO. N E W I NDU S T R I A L E N T R AN C E S T O W A S H B U R N S W I T C H B U S I N E SS P A R K ADD I T I ON O F T U R N L AN E S ON S R 1313 ( W A S H B U R N S W I T C H R D ) AND LOCATION: WASHBURN SWITCH BUSINESS PARK RELOCATION CATV, GAS, AND SANITARY SEWER TYPE OF WORK: POWER DISTRIBUTION, TELEPHONE, C LE V EL AND C OUN T Y U T I L I T I E S B Y O T H E R S P L AN S 0 0 0 PROFILE (HORIZONTAL) GRAPHIC SCALES PLANS PROFILE (VERTICAL) 0 0 0 50 50 50 50 20 10 5 10 25 100 25 100 X X D E P A R T M E N T O F T R A N S P O R T A T I O N S T A T E O F N O R T H C A R O L I N A ERIC CONNER CHAD DREWERY ANNE SCHLEY WARREN ANDERSON UTILITIES REGIONAL ENGINEER UTILITIES ENGINEER UTILITIES COORDINATOR STEVE MODE DANNY LITTLE UTILITY OWNERS WITH CONFLICTS FAX (919) 250-4151 PHONE (919) 707-6690 RALEIGH NC 27699-1555 1555 MAIL SERVICES CENTER DIVISION OF HIGHWAYS UTILITIES UNIT PREPARED IN THE OFFICE OF: (E) CITY OF SHELBY - GAS (D) CITY OF SHELBY - SANITARY SEWER (C) AT&T - COMMUNICATIONS (B) CHARTER COMMUNICATION - CATV (A) DUKE ENERGY - POWER DISTRIBUTION UBO PLAN SHEETS TITLE SHEET DESCRIPTION: UO-2 THRU UO-4 UO-1 SHEET NO.: UTILITY PROJECT MANAGER PROJECT UTILITY COORDINATOR PROJECT UTILITY XXXX SHOWN ON THIS SHEET. THE CONTRACTOR FOR UTILITY WORK NO PAYMENT WILL BE MADE TO SHEET IS DONE BY OTHERS. ALL UTILITY WORK SHOWN ON THIS NOTE: T I P P ROJ E C T : R- 5849 UTILITIES AREA COORDINATOR DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Po l k v ill eRd Po l k v i l l eRd Po l kv il l eRd Cr ee k Brushy Cr e e k Sch B e a v e r d a m Ch Bapt Dover Sch Elem Dover Ch Deliverance Redemption Ch Dam Beaver NAD 83 / 201 1 226 74 74 PHONE (704) 732-3241 LINCOLNTON, NC 28092 849 SOUTH LAUREL ST TELICS

Upload: others

Post on 11-Mar-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ch ALL UTILITY WORK SHOWN ON THIS UTILITIES BY OTHERS … · 2018-02-09 · 10 0. 0 0 ' existing csx r/w existing r /w existing r 6 /w 0. 0 0 ' e ip s 7 4 ° 4 2 '5 5" w 4 0 5.3 2

-Y1- STA. 17+91.00END CONSTRUCTION

SR 1313

WASHBURN SWITCH RD

-L-

10+

00

15+

00

25+

00

20+

00 -

Y1-

NS RAILROAD

CSX RAILROAD

TO US 74

TO PLATO LEE RD

-L- STA. 10+50.00BEGIN TIP PROJECT R-5849

-L- STA. 29+90.00END TIP PROJECT R-5849

-L- STA. 30+32.00END CONSTRUCTIONC

USTO

MER FIR

ST D

R

VICINITY MAP

PROJECT

Sand Rd

Blanton

W Cabanis R

d

Wash

burn

Plato Lee R

d

Artee RdRandolph Rd

Switc

h R

d

Polkville R

d

W Dixon Blvd

6

5

UO-4

UO-34

UO-2

DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS

09/08/99

28-S

EP-2017 13:3

7C:\

Users\

NC

DO

Tuser1\

Deskto

p\

R-5849\

Utilitie

s\

Engin

eerin

g\

UB

O\

Proj\290_001_

R5849_ut_tsh_

UO01_

psh.d

gn

$$$$

US

ER

NA

ME$$$$

INDEX OF SHEETS

SHEET NO.

R-5849 UO-1STATE OF NORTH CAROLINADIVISION OF HIGHWAYS

T.I.P. NO.

NEW INDUSTRIAL ENTRANCES TO WASHBURN SWITCH BUSINESS PARK ADDITION OF TURN LANES ON SR 1313 (WASHBURN SWITCH RD) ANDLOCATION: WASHBURN SWITCH BUSINESS PARK

RELOCATION CATV, GAS, AND SANITARY SEWERTYPE OF WORK: POWER DISTRIBUTION, TELEPHONE,

CLEVELAND COUNTY

UTILITIES BY OTHERS PLANS

0

0

0

PROFILE (HORIZONTAL)

GRAPHIC SCALES

PLANS

PROFILE (VERTICAL)

0

00

50 50

50 50

2010510

25 100

25 100

XXDE

PA

RT

M

ENT OF TRANSPO

RT

ATI

ON

ST

ATE

OF

NORTH CAR

OLI

NA

ERIC CONNER

CHAD DREWERY

ANNE SCHLEY

WARREN ANDERSON

UTILITIES REGIONAL ENGINEER

UTILITIES ENGINEER

UTILITIES COORDINATOR

STEVE MODE

DANNY LITTLE

UTILITY OWNERS WITH CONFLICTS

FAX (919) 250-4151PHONE (919) 707-6690RALEIGH NC 27699-15551555 MAIL SERVICES CENTER

DIVISION OF HIGHWAYS

UTILITIES UNIT

PREPARED IN THE OFFICE OF:

(E) CITY OF SHELBY - GAS

(D) CITY OF SHELBY - SANITARY SEWER

(C) AT&T - COMMUNICATIONS

(B) CHARTER COMMUNICATION - CATV

(A) DUKE ENERGY - POWER DISTRIBUTION

UBO PLAN SHEETS

TITLE SHEET

DESCRIPTION:

UO-2 THRU UO-4

UO-1

SHEET NO.:

UTILITY PROJECT MANAGER

PROJECT UTILITY COORDINATOR

PROJECT UTILITY XXXX

SHOWN ON THIS SHEET.

THE CONTRACTOR FOR UTILITY WORK

NO PAYMENT WILL BE MADE TO

SHEET IS DONE BY OTHERS.

ALL UTILITY WORK SHOWN ON THIS

NOTE:

TIP P

ROJE

CT:

R-5849

UTILITIES AREA COORDINATOR

DOCUMENT NOT CONSIDERED FINAL

UNLESS ALL SIGNATURES COMPLETED

Polkville R

d

Polkville R

d

Polkville R

d

Creek

Brushy

Creek

SchBeaverdam

Ch

Bapt

Dover

Sch

Elem

Dover

Ch

Deliverance

Redemption

Ch

Dam

Beaver

NAD 83/ 2011

226

74

74

PHONE (704) 732-3241

LINCOLNTON, NC 28092

849 SOUTH LAUREL ST

TELICS

Page 2: Ch ALL UTILITY WORK SHOWN ON THIS UTILITIES BY OTHERS … · 2018-02-09 · 10 0. 0 0 ' existing csx r/w existing r /w existing r 6 /w 0. 0 0 ' e ip s 7 4 ° 4 2 '5 5" w 4 0 5.3 2

GRAVEL DRIVEPROP.

CONTRACTOR)AND SIGNAL (BY RAILROADPROP. RAILROAD CROSSING

ASPHALT DRIVE

PROP.

& GUY

ANCHOR

DE POLE

AT&T

CHARTER

AERIAL DE

DE POLE

DE POLE

REMOVED

DE POLE

REMOVED

DE POLE

28-S

EP-2017 13:4

5C:\

Users\

NC

DO

Tuser1\

Desktop\

R-5849\

Utilities\

Engineering\

UB

O\

Proj\290_003_

R5849_ut_rdy4_

UO02_psh.d

gn

$$$$

US

ER

NA

ME$$$$

5/14/99 SHEET NO.PROJECT REFERENCE NO.

MA

TC

H

TO

SH

EET N

O.3

MA

TC

H

LIN

E STA. -L- 23+

00.0

0

NAD 83/ 2011

MATCH TO SHEET NO.4

MATCH LINE STA. -Y1- 12+00.00

-Y1- POT 10+00.00-L- POC 20+60.91 =

DS = 55 mph

-L- CURVE DATA

2' FDPS

2' FDPS

-L-

16'10'R 10'R

-Y1-4' FDPS

2' FD

PS

2' FDPS4:1

4:1

2'FDPS

20'R

40'

15

-L- POT 10+00.00 -L- PC 11+60.32

-L- STA. 10+50.00BEGIN TIP PROJECT R-5849

01

02

03

04

W/ 24" RCP-III

COLLAR & EXTEND

RETAIN

FROM EX. PIPE

REMOVE SILT

SEE DETAIL 3

FALSE SUMP

REMOVE

HW

REMOVE

REMOVE

JB W/ MHREMOVE

REMOVEREMOVEREMOVE

HW

REMOVE

15"

REMOVE

RET

AIN

RET

AIN

RET

AIN

RETAIN

RETAIN

DI

DI

CB-F

-L- STA. 20+25 RT

Type of Liner= Class 'B' Rip-Rap

REMOVE DI FILL

FLOWABLE

CONC

5' CONC

JB

PL

AN

TE

R

21' CONC HW

4' CONC HW

DI

DI I/A

DI

RE

BA

R

CLEARWATER PAPER CORPORATION

EXISTING CSX R/W

100.0

0'

EXISTING CSX R/W

EXISTING R/W

EXISTING R/W60.0

0'

EIP

S 74°4

2'5

5"

W405.3

2' (EIP-EIP)

400.9

5' (R

W-EIP)

JJI LIG

HTIN

G

GR

OU

P, IN

C.

DB 1125 P

G 2356

EIP

A-10

07

A-10

08

100.0

0'

CLEARWATER PAPER CORPORATION

6' CONC HW

CLEARWATER PAPER CORPORATION

DB 1642 PG 197

CAPITAL FUNDS, INC.

CORPORATION BOOK 18 PG 604

A-1003

A-1006

DI

DB 1734 PG 1916

DI I/A

UTILITIES BY OTHERS

SHOWN ON THIS SHEET.

CONTRACTOR FOR UTILITY WORK

NO PAYMENT WILL BE MADE TO THE

SHEET WILL BE DONE BY OTHERS.

ALL UTILITY WORK SHOWN ON THIS

NOTE:

R-5849 UO-2

T

HH

PO

ST

S(11) 3.5

" M

TL

48"

CH

LW/

LT

S

LT

POSTS

(13) 3.5"

MT

L

8" VCP

6"VCP

8"

VC

P

8"

VC

P

6" STEEL

6" STEEL

6" STEEL

16"CIP

16"CIP

16"CIP

200PR

200PR

200PR

2"S

TE

EL

10"DIP

10"CIP

50 PR

100 PR

100 P

R

T

LT

HH

LT

SE

RVIC

E

4"S

TL

100

PR

24 S

TR

AN

D

12 S

TR

AN

D16

" DIP

16"

DIP

12 STR

24 STR

40.00'+50.00

40.00'+60.32

EX. R/W+50.00

EX. R/WPL

EX. R/WPL61.12'

+90.00

57.29'+39.61

RADIUS=1720'PROPOSED R/W

RADIUS=3510'PROPOSED R/W

RADIUS=1830'PROPOSED R/W

SPEC. DSN3GI

42" RC

P-III

15" RCP-IV

24" RCP-III

15" RCP-IVCB-G

15" RC

P-IV

15" RCP-III

24" CMP

24"

RC

P

15" RCP

15" RCP

24" CMP

24"

ST

L

RR SIG

SIG

RR

18" CMP

1SBD

18"

PV

C

(2) 24"

RC

P

12' S

OIL

ABANDONED

18" CMP

NORFOLK SOUTHERN

CSX TRANSPORTATION

BST VARIES

SR 1313 WASHBURN SWITCH RD

SHELBY GAS

UG CITY OF

ABANDONED

SHELBY GAS

UG CITY OF

SHELBY GAS

UG CITY OF

SHELBY SSWR

CITY OF

ABANDONED

SHELBY SSWR

CITY OF

SHELBY MH

CITY OF

ABANDONED

SHELBY MH

CITY OFSHELBY MH

CITY OF

SHELBY SSWR

CITY OF

SHELBY SSWR

CITY OF

ABANDONED

SHELBY MH

CITY OF

SHELBY SSWR

CITY OF

SHELBY SSWR

CITY OF

ABANDONED

SHELBY MH

CITY OF

SHELBY MH

CITY OF

ABANDONED

SHELBY GAS

UG CITY OF

Page 3: Ch ALL UTILITY WORK SHOWN ON THIS UTILITIES BY OTHERS … · 2018-02-09 · 10 0. 0 0 ' existing csx r/w existing r /w existing r 6 /w 0. 0 0 ' e ip s 7 4 ° 4 2 '5 5" w 4 0 5.3 2

DRIVEPROP. ASPHALT

ASPHALT DRIVEPROP.

(BY CONTRACTOR)WAY LINEPROPOSED RIGHT OFRELOCATE GATE TO

DE POLE

DE POLE

REMOVED

DE POLE

AT&T

CHARTER

AERIAL DE

28-S

EP-2017 13:4

9C:\

Users\

NC

DO

Tuser1\

Desktop\

R-5849\

Utilities\

Engineering\

UB

O\

Proj\290_005_

R5849_ut_rdy5_

UO03_psh.d

gn

$$$$

US

ER

NA

ME$$$$

5/14/99 SHEET NO.PROJECT REFERENCE NO.

MA

TC

H

TO

SH

EET N

O.2

MA

TC

H

LIN

E STA. -L- 23+

00.0

0

NAD 83/ 2011

29'

28' 40'

15'R

15'R10'R

-L-

2' FDPS

2' FDPS20'R 20'R

-L- PT 29+82.50

-L- POT 30+44.40

-L- STA. 29+90.00END TIP PROJECT R-5849

-L- STA. 30+32.00END CONSTRUCTION

0403

HW

REMOVE

RE

MO

VE

18"

18"DI

REMOVEREMOVE

HW

5' CONCEXISTING R/W

30.0

0'

A-10

05

CORPORATION BOOK 18 PG 604

CAPITAL FUNDS, INC.

PLANTER

JJI LIGHTING GROUP, INC.

DB 1125 PG 2356

UTILITIES BY OTHERS

SHOWN ON THIS SHEET.

CONTRACTOR FOR UTILITY WORK

NO PAYMENT WILL BE MADE TO THE

SHEET WILL BE DONE BY OTHERS.

ALL UTILITY WORK SHOWN ON THIS

NOTE:

UO-3R-5849

T

6" STEEL

16"CIP

50

PR

200PR

CO

AXIA

L

SE

RVIC

E

6"STEEL

b

n

G-F

AR

M

W\LT

W\LT

W\LT

W\LT

40.00'+40.00

EX. R/W+40.00

40.00'+82.50

24" RC

P-IV

18"

RC

P

15" RCP

15" RCP

20' B

ST

20' B

ST

19' B

ST

RR SIG

SHELBY GAS

UG CITY OF

SHELBY GAS

UG CITY OF

ABANDONED

Page 4: Ch ALL UTILITY WORK SHOWN ON THIS UTILITIES BY OTHERS … · 2018-02-09 · 10 0. 0 0 ' existing csx r/w existing r /w existing r 6 /w 0. 0 0 ' e ip s 7 4 ° 4 2 '5 5" w 4 0 5.3 2

ASPHALT DRIVEPROP.

ASPHALT DRIVEPROP.

CO

NTR

AC

TO

R)

AN

D

SIG

NA

L (B

Y

RAIL

RO

AD

PR

OP. R

AIL

RO

AD

CR

OSSIN

G

28-S

EP-2017 13:5

2C:\

Users\

NC

DO

Tuser1\

Desktop\

R-5849\

Utilities\

Engineering\

UB

O\

Proj\290_007_

R5849_ut_rdy6_

UO04_psh.d

gn

$$$$

US

ER

NA

ME$$$$

5/14/99 SHEET NO.PROJECT REFERENCE NO.

MA

TC

H

TO

SH

EET N

O.2

MA

TC

H

LIN

E STA. -Y1- 12

+00.0

0N

AD 83/ 2

011

-Y1- POT 22+57.70

-Y1- PC 16+76.07-Y1- PT 17+80.47

15+00

-Y1-

2'-6" C&G

2'-6" C&G2'-6" C&G

2'-6" C&G

-Y1- STA. 17+91.00END CONSTRUCTION

BEGIN 8"X12" CURB+23.97, 40'LT

01

CB-F

RETAIN

RET

AIN

RETAIN

RETAIN

OTHERS)DRAINAGE (BUILT BYTIE SYSTEM TO SITE

DI

CB-F

S 10

°14'4

0" E

32.8

7'

EIP

REBAR

N 74°50'20" E472.20'

N 74°50'20" E

374.32'

A-1004

A-2955

SUSAN SEAL ENTERPRISES, LLC

DB 1666 PG 1832

JOHN K. HASKELL

DB 1594 PG 2348

ESKRIDGE GROVE BAPTIST CHURCH

CLEARWATER PAPER CORPORATION

DB 1734 PG 1916

DB 1744 PG 19

CLEARWATER PAPER CORPORATION

UTILITIES BY OTHERS

SHOWN ON THIS SHEET.

CONTRACTOR FOR UTILITY WORK

NO PAYMENT WILL BE MADE TO THE

SHEET WILL BE DONE BY OTHERS.

ALL UTILITY WORK SHOWN ON THIS

NOTE:

R-5849 UO-4

CT

HH

S

HH

S

48" CHL

W/LT

W/LT

72" CHL W/ 3SBW

GA

TE

GATE

6" CHL

S

S

S

S

10' C

ON

C

5' CONC

72" CHL

48 ST

72" CHL W/ 3SBW

72" CHL W/ 3SBW

8" DI

8" V

CP

6"V

CP

10' BST

2"STEEL

2"S

TE

EL

2"STEEL

2"S

TE

EL

10"DIP10

"DIP

10"DIP10"DIP

10"DIP

4"DIP4"DIP

4"DIP

50 PR

100

PR

LT

LT

LT

LT

LT

PLPL

PLEX. R/W

54.26'+04.38

0.42'+01.43

PL+04.00

45.00'+76.07

45.00'EX. R/W

CB-G

15" RCP-IV RC

P-IV

15

"

CB-G

CB-G

15" RCP-III15" RCP-IV

15" RC

P-IV

24" RCP

24" R

CP

7" BST CURB 7" BST CURB

BLK BUS

7" BST CURB

7" B

ST

CU

RB

BST

BST

BST

BST

BST

7" BST CURB

CUSTOMER FIRST ST

SHELBY SSWR

CITY OF

SHELBY SSWR

CITY OF

ABANDONED

SHELBY SSWR

CITY OF

SHELBY MH

CITY OF

SHELBY MH

CITY OF

ABANDONED

SHELBY MH

CITY OF

SHELBY MH

CITY OF

SHELBY SSWR

CITY OF

SHELBY GAS

UG CITY OF

ABANDONED

SHELBY GAS

UG CITY OF

SHELBY GAS

UG CITY OF