Existing Conditions Recommended Project Need Unit Cost Unit Total Units (2020) Associated Cost 1 Project Cost (Rounded up to Nearest $1,000) Birmingham International BHM 3 ARC D-V Meets Required ARC (C-II or Greater) Yes Primary Runway Length 10,000 Meets Runway Length Requirement (5,500' or Greater) Yes Primary Runway Width 150 Meets ARC Width Requirement Yes Taxiway Full Meets Taxiway Requirement (Full Parallel) Yes Nav Aid Precision Meets Nav Aid (Precision Approach) Yes VASI (GVGI) PAPI (GVGI) ALS Meets Visual Aid (MALSR/ODALS, GVGI) Yes Lighting Type HIRL Lighting Beacon Windsock Meets Lighting (MIRL, Beacon, Windsock) Yes Weather Meets Weather (Automated Weather Reporting System) Yes Serv Phone Serv Restroom Serv FBO Serv Maintenance Serv Jet Fuel Serv Avgas Serv Ground Trans Serv RCO/ATCT Meets Services (Phone, Restroom, FBO, Maint., Jet Fuel, Ground Trans., RCO/ATCT) Yes Fac Terminal Fac Pilots Lounge Fac Aircraft Apron Fac Hangars Fac Auto Parking Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design Standards Yes ASV Ratio 2000 (2000 Operations/ASV)(%) 72.5 Meets ASV 2000 (Ratio Below 60%) No 12.5 ASV Ratio 2020 (2020 Operations/ASV)(%) 98.8 Meets ASV 2020 (Ratio Below 60%) No 38.8 Number of Hangar Spaces 2000 105 Meets Hangar 2000 (75% of Based Fleet) No Number of Hangar Spaces 2020 105 Meets Hangar 2020 (75% of Based Fleet) No Apron Spaces Required 2000 (25% of 2000 Based Aircraft + 25% of 2000 Itinerant Aircraft) 270 Meets Apron 2000 (Required Apron Spaces <= Current Apron Spaces) Yes Apron Spaces Required 2020 (25% of 2020 Based Aircraft + 25% of 2020 Itinerant Aircraft) 270 Meets Apron 2020 (Required Apron Spaces <= Current Apron Spaces) Yes Total Terminal (sq ft) 186,000 Meets Terminal (2,000 sq ft or Greater) Yes Number of Parking Spaces 2000 6205 Meets Parking 2000 (Ratio 100% or Greater) Yes Number of Parking Spaces 2020 6205 Meets Parking 2020 (Ratio 100% or Greater) Yes Pavement Rehabilitation Good Through the Fence Operations No Current Airport Management Full-Time Planning Documents (Years Old) 4 Years or Less 30,000.00 each 2 60,000 $7,967,000 $194,300,000 NPIAS Airport Aviation Support Infrastructure Design Standard Objectives Birmingham-International Navigational Visual Aid Objectives Dev. & Opt. Airport Activity Airport Name Airport ID 1 Includes estimated land acquisition costs, additional construction costs due to more than average cut/fill or drainage requirements, and road/utility relocations, etc. Region Service Objectives 311 206 unit 206 191 86 34,500.00 7,907,000 800,000 Total Recommended Projects Cost Total International Airport Capital Improvement Project Cost (See Following Sheet for Detailed CIP Costs) 8-50

Upload: others

Post on 26-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Existing Conditions Recommended Project Need Unit Cost Unit Total Units (2020)

Associated Cost1

Project Cost (Rounded up to Nearest $1,000)

Birmingham InternationalBHM

3

ARC D-V

Meets Required ARC (C-II or Greater) Yes

Primary Runway Length 10,000

Meets Runway Length Requirement (5,500' or Greater) Yes

Primary Runway Width 150

Meets ARC Width Requirement YesTaxiway FullMeets Taxiway Requirement (Full Parallel) Yes

Nav Aid Precision

Meets Nav Aid (Precision Approach) Yes

VASI (GVGI)PAPI (GVGI)ALSMeets Visual Aid (MALSR/ODALS, GVGI) Yes

Lighting Type HIRLLighting BeaconWindsockMeets Lighting (MIRL, Beacon, Windsock) Yes

WeatherMeets Weather (Automated Weather Reporting System) Yes

Serv PhoneServ RestroomServ FBOServ MaintenanceServ Jet FuelServ AvgasServ Ground TransServ RCO/ATCTMeets Services (Phone, Restroom, FBO, Maint., Jet Fuel, Ground Trans., RCO/ATCT)

Yes

Fac TerminalFac Pilots LoungeFac Aircraft ApronFac HangarsFac Auto ParkingMeets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking)

Yes

State Licensing Standards FullFAA Design Standards Yes

ASV Ratio 2000 (2000 Operations/ASV)(%) 72.5

Meets ASV 2000 (Ratio Below 60%) No 12.5

ASV Ratio 2020 (2020 Operations/ASV)(%) 98.8

Meets ASV 2020 (Ratio Below 60%) No 38.8

Number of Hangar Spaces 2000 105

Meets Hangar 2000 (75% of Based Fleet) No

Number of Hangar Spaces 2020 105

Meets Hangar 2020 (75% of Based Fleet) No

Apron Spaces Required 2000 (25% of 2000 Based Aircraft + 25% of 2000 Itinerant Aircraft)

270

Meets Apron 2000 (Required Apron Spaces <= Current Apron Spaces) Yes

Apron Spaces Required 2020 (25% of 2020 Based Aircraft + 25% of 2020 Itinerant Aircraft)

270

Meets Apron 2020 (Required Apron Spaces <= Current Apron Spaces) Yes

Total Terminal (sq ft) 186,000

Meets Terminal (2,000 sq ft or Greater) Yes

Number of Parking Spaces 2000 6205

Meets Parking 2000 (Ratio 100% or Greater) Yes

Number of Parking Spaces 2020 6205

Meets Parking 2020 (Ratio 100% or Greater) Yes

Pavement Rehabilitation Good

Through the Fence Operations No

Current Airport Management Full-Time

Planning Documents (Years Old) 4 Years or Less 30,000.00 each 2 60,000

$7,967,000

$194,300,000

NPIAS Airport

Avi

atio

n Su

ppor

t In

fras

truc

ture

Des

ign

Stan

dard

Obj

ectiv

es

Birmingham-International

Nav

igat

iona

l Vis

ual A

id O

bjec

tives

Dev

. & O

pt.

Air

port

Act

ivity

Airport NameAirport ID

1 Includes estimated land acquisition costs, additional construction costs due to more than average cut/fill or drainage requirements, and road/utility relocations, etc.

Region

Serv

ice

Obj

ectiv

es

311 206

unit 206

191 86

34,500.00 7,907,000800,000

Total Recommended Projects Cost

Total International Airport Capital Improvement Project Cost (See Following Sheet for Detailed CIP Costs)

8-50

Page 2: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Total Project Cost

$15,100,000$43,000,000$19,200,000$12,000,000$25,000,000$2,000,000$1,500,000

Total $117,800,000

$3,000,000

$18,000,000

$5,000,000Total $26,000,000

$30,000,000

$2,500,000

$15,000,000$3,000,000

Total $50,500,000

$194,300,000Source: Airport Capital Improvement Program (5/2003)

Lan

dsid

e

Construct Parking Facility

Land Acquisition for Parking/Rental Cars

Parking Deck and Roadway Signage

Total International Airport Capital Improvement Project Cost

Ter

min

al Terminal Building Renovations

Vehicles & Equipment FY 2004-2008

Replace Sewer Lift Station

Airfreight and Air Cargo Complex

Demolition of Old Air Traffic Control Tower

Noise Mitigation ProgramElectrical Cable for Runway 18/36

Birmingham-InternationalCapital Improvement Program Costs

Air Cargo Area - ApronRelocation of Taxiway "A"

ProjectA

irsi

de

Air Carrier Apron RehabilitationRunway 6/24 Extension

8-51

Page 3: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Existing Conditions Recommended Project Need Unit Cost Unit Total Units (2020)

Associated Cost1

Project Cost (Rounded up to Nearest $1,000)

Huntsville InternationalHSV12

ARC D-V

Meets Required ARC (C-II or Greater) Yes

Primary Runway Length 10,000

Meets Runway Length Requirement (5,500' or Greater) Yes

Primary Runway Width 150

Meets ARC Width Requirement YesTaxiway FullMeets Taxiway Requirement (Full Parallel) Yes

Nav Aid Precision

Meets Nav Aid (Precision Approach) Yes

VASI (GVGI)PAPI (GVGI)ALSMeets Visual Aid (MALSR/ODALS, GVGI) Yes

Lighting Type HIRLLighting BeaconWindsockMeets Lighting (MIRL, Beacon, Windsock) Yes

WeatherMeets Weather (Automated Weather Reporting System) Yes

Serv PhoneServ RestroomServ FBOServ MaintenanceServ Jet FuelServ AvgasServ Ground TransServ RCO/ATCTMeets Services (Phone, Restroom, FBO, Maint., Jet Fuel, Ground Trans., RCO/ATCT)

Yes

Fac TerminalFac Pilots LoungeFac Aircraft ApronFac HangarsFac Auto ParkingMeets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking)

Yes

State Licensing Standards FullFAA Design Standards Yes

ASV Ratio 2000 (2000 Operations/ASV)(%) 26.6

Meets ASV 2000 (Ratio Below 60%) Yes

ASV Ratio 2020 (2020 Operations/ASV)(%) 39.5

Meets ASV 2020 (Ratio Below 60%) Yes

Number of Hangar Spaces 2000 84

Meets Hangar 2000 (75% of Based Fleet) Yes

Number of Hangar Spaces 2020 84

Meets Hangar 2020 (75% of Based Fleet) No

Apron Spaces Required 2000 (25% of 2000 Based Aircraft + 25% of 2000 Itinerant Aircraft)

1476

Meets Apron 2000 (Required Apron Spaces <= Current Apron Spaces) Yes

Apron Spaces Required 2020 (25% of 2020 Based Aircraft + 25% of 2020 Itinerant Aircraft)

1476

Meets Apron 2020 (Required Apron Spaces <= Current Apron Spaces) Yes

Total Terminal (sq ft) 226,900

Meets Terminal (2,000 sq ft or Greater) Yes

Number of Parking Spaces 2000 3,990

Meets Parking 2000 (Ratio 100% or Greater) Yes

Number of Parking Spaces 2020 3,990

Meets Parking 2020 (Ratio 100% or Greater) Yes

Pavement Rehabilitation Good

Through the Fence Operations No

Current Airport Management Full-Time

Planning Documents (Years Old) 5 Years or Older 4 years or Less 30,000.00 each 1 30,000

$2,238,000

$109,333,863

NPIAS Airport

Avi

atio

n Su

ppor

t In

fras

truc

ture

34,500.00

Des

ign

Stan

dard

Obj

ectiv

es

1 Includes estimated land acquisition costs, additional construction costs due to more than average cut/fill or drainage requirements, and road/utility relocations, etc.

Nav

igat

iona

l Vis

ual A

id O

bjec

tives

Dev

. & O

pt.

Air

port

Act

ivity

Serv

ice

Obj

ectiv

es

Total Recommended Projects Cost

Airport NameAirport ID

Region

Huntsville-International

148 64

Total International Airport Capital Improvement Project Cost (See Following Sheet for Detailed CIP Costs)

2,208,000unit 64

8-52

Page 4: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Total Project Cost

$24,599,131$500,000

$7,166,666$3,202,116

$320,000$50,000

$26,660,000$20,000

$3,541,373$6,400,000

$825,000$6,000

$5,000,000$3,838,033

$90,000Total $82,218,319

Lan

dsid

e

Total $0

$266,600$275,000

$3,299,444$17,500

$10,500,000$1,800,000

$257,000$700,000

$10,000,000Total $27,115,544

$109,333,863

Ter

min

al

Jetbridge #9 ProcurementRJ Modifications/Baggage Lifts Phases II & III

Purchase Three Security Vehicles

Total International Airport Capital Improvement Project CostSource: Airport Capital Improvement Program (5/2003)

Overlay 18L/36RARFF Air Carrier Apron Access Ramp

No Projects Specified

Air

side

Runway Extension to 12,600 feetRunway Extension NAVAID ProjectTaxiway "E" Connector and Ramp Project Phase I & II

Air Carrier Ramp Joint Repair

Additional Noise Property Purchase (75-70 DNL)SMGCS/Runway Incursion PreventionAirfield Pavement RehabilitationNew Air Traffic Tower

Air Cargo Apron Expansion (III)Taxiway "L"/Tunnel and Connector Group VIMaster Plan UpdateElectronic DecelerometerMRO Taxiway & Ramp

Turbo Ramp 25' Passenger Access Ramp to Meet ADA Boarding NeedsTerminal Baggage Claim Expansion/Renovation/TASTerminal Front Canopy Paving and Lighting EnhancementsTSA Security Impacts Reimbursement for ConstructionARFF Vehicle ReplacementConcourse Building Expansion

Huntsville-InternationalCapital Improvement Program Costs

Project

8-53

Page 5: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Existing Conditions Recommended Project Need Unit Cost Unit Total Units (2020)

Associated Cost1

Project Cost (Rounded up to Nearest $1,000)

Anniston MetropolitanANB

4

ARC C-II

Meets Required ARC (C-II or Greater) Yes

Primary Runway Length 7,000Meets Runway Length Requirement (5,500' or Greater) Yes

Primary Runway Width 150Meets ARC Width Requirement YesTaxiway FullMeets Taxiway Requirement (Full Parallel) Yes

Nav Aid Precision

Meets Nav Aid (Precision Approach) Yes

VASI (GVGI)PAPI (GVGI)ALSMeets Visual Aid (MALSR/ODALS, GVGI) Yes

Lighting Type HIRLLighting BeaconWindsockMeets Lighting (MIRL, Beacon, Windsock) Yes

WeatherMeets Weather (Automated Weather Reporting System) Yes

Serv PhoneServ RestroomServ FBOServ MaintenanceServ Jet FuelServ AvgasServ Ground TransServ RCO/ATCTMeets Services (Phone, Restroom, FBO, Maint., Jet Fuel, Ground Trans., RCO/ATCT)

No

Fac TerminalFac Pilots LoungeFac Aircraft ApronFac HangarsFac Auto Parking

Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes

State Licensing Standards FullFAA Design Standards Yes

ASV Ratio 2000 (2000 Operations/ASV)(%) 16.5

Meets ASV 2000 (Ratio Below 60%) Yes

ASV Ratio 2020 (2020 Operations/ASV)(%) 20.4

Meets ASV 2020 (Ratio Below 60%) Yes

Number of Hangar Spaces 2000 49

Meets Hangar 2000 (75% of Based Fleet) No

Number of Hangar Spaces 2020 49

Meets Hangar 2020 (75% of Based Fleet) No

Apron Spaces Required 2000 (25% of 2000 Based Aircraft + 25% of 2000 Itinerant Aircraft)

22

Meets Apron 2000 (Required Apron Spaces <= Current Apron Spaces) No

Apron Spaces Required 2020 (25% of 2020 Based Aircraft + 25% of 2020 Itinerant Aircraft)

22

Meets Apron 2020 (Required Apron Spaces <= Current Apron Spaces) No

Total Terminal (sq ft) 15,500

Meets Terminal (2,000 sq ft or Greater) Yes

Number of Parking Spaces 2000 150

Meets Parking 2000 (Ratio 100% or Greater) Yes

Number of Parking Spaces 2020 150

Meets Parking 2020 (Ratio 100% or Greater) Yes

Pavement Rehabilitation/Maintenance Good 1.73 SF 2,571,750 4,450,000

Through the Fence Operations No

Current Airport Management FBO

Planning Documents (Years Old) 5 Years or Older 4 Years or Less 25,000.00 each 2 50,000

$5,270,0001 Includes estimated land acquisition costs, additional construction costs due to more than average cut/fill or drainage requirements, and road/utility relocations, etc.

NPIAS Airport

Avi

atio

n Su

ppor

t In

fras

truc

ture

68 19

Anniston-National

Nav

igat

iona

l Vis

ual A

id O

bjec

tives

Dev

. & O

pt.

Air

port

Act

ivity

Associated CityAirport ID

Region

Serv

ice

Obj

ectiv

esD

esig

n St

anda

rd O

bjec

tives

656,000

53 4

unit 1934,500.00

7

17,500 114,000

23 1

6.50 SF

Total Recommended Projects Cost

29

8-54

Page 6: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Existing Conditions Recommended Project Need Unit Cost Unit Total Units (2020)

Associated Cost1

Project Cost (Rounded up to Nearest $1,000)

Bessemer MunicipalEKY

3

ARC B-II

Meets Required ARC (C-II or Greater) No

Primary Runway Length 5,700

Meets Runway Length Requirement (5,500' or Greater) Yes

Primary Runway Width 100

Meets ARC Width Requirement YesTaxiway FullMeets Taxiway Requirement (Full Parallel) Yes

Nav Aid Precision

Meets Nav Aid (Precision Approach) Yes

VASI (GVGI)PAPI (GVGI)ALSMeets Visual Aid (MALSR/ODALS, GVGI) Yes

Lighting Type MIRLLighting BeaconWindsockMeets Lighting (MIRL, Beacon, Windsock) Yes

WeatherMeets Weather (Automated Weather Reporting System) Yes

Serv PhoneServ RestroomServ FBOServ MaintenanceServ Jet FuelServ AvgasServ Ground TransServ RCO/ATCT RCO/ATCT 17,250.00 each 1 18,000Meets Services (Phone, Restroom, FBO, Maint., Jet Fuel, Ground Trans., RCO/ATCT)

No

Fac TerminalFac Pilots LoungeFac Aircraft ApronFac HangarsFac Auto ParkingMeets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking)

Yes

State Licensing Standards FullFAA Design Standards Yes

ASV Ratio 2000 (2000 Operations/ASV)(%) 58.1

Meets ASV 2000 (Ratio Below 60%) Yes

ASV Ratio 2020 (2020 Operations/ASV)(%) 74.3 14.3

Meets ASV 2020 (Ratio Below 60%) No

Number of Hangar Spaces 2000 36

Meets Hangar 2000 (75% of Based Fleet) No

Number of Hangar Spaces 2020 36

Meets Hangar 2020 (75% of Based Fleet) No

Apron Spaces Required 2000 (25% of 2000 Based Aircraft + 25% of 2000 Itinerant Aircraft)

248

Meets Apron 2000 (Required Apron Spaces <= Current Apron Spaces) Yes

Apron Spaces Required 2020 (25% of 2020 Based Aircraft + 25% of 2020 Itinerant Aircraft)

248

Meets Apron 2020 (Required Apron Spaces <= Current Apron Spaces) Yes

Total Terminal (sq ft) 6,923

Meets Terminal (2,000 sq ft or Greater) Yes

Number of Parking Spaces 2000 62

Meets Parking 2000 (Ratio 100% or Greater) No

Number of Parking Spaces 2020 62

Meets Parking 2020 (Ratio 100% or Greater) No

Pavement Rehabilitation/Maintenance Good 1.73 SF 1,557,620 2,695,000

Through the Fence Operations No

Current Airport Management FBO

Planning Documents (Years Old) 4 Years or Less 25,000.00 each 2 50,000

$11,379,000

NPIAS Airport

Avi

atio

n Su

ppor

t In

fras

truc

ture

Des

ign

Stan

dard

Obj

ectiv

es

Bessemer-National

Nav

igat

iona

l Vis

ual A

id O

bjec

tives

Dev

. & O

pt.

Air

port

Act

ivity

Airport NameAirport ID

1 Includes estimated land acquisition costs, additional construction costs due to more than average cut/fill or drainage requirements, and road/utility relocations, etc.

Region

Serv

ice

Obj

ectiv

esC-II

254

237 201

unit 237

185 149

34,500.00 8,177,000

Total Recommended Projects Cost

254

space1,725.00 439,000

247 185

316

8-55

Page 7: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Existing Conditions Recommended Project Need Unit Cost Unit Total Units (2020)

Associated Cost1

Project Cost (Rounded up to Nearest $1,000)

Mobile DowntownBFM

8

ARC D-V

Meets Required ARC (C-II or Greater) Yes

Primary Runway Length 9,618

Meets Runway Length Requirement (5,500' or Greater) Yes

Primary Runway Width 150

Meets ARC Width Requirement YesTaxiway FullMeets Taxiway Requirement (Full Parallel) Yes

Nav Aid Precision

Meets Nav Aid (Precision Approach) Yes

VASI (GVGI)PAPI (GVGI)ALSMeets Visual Aid (MALSR/ODALS, GVGI) Yes

Lighting Type HIRLLighting BeaconWindsockMeets Lighting (MIRL, Beacon, Windsock) Yes

WeatherMeets Weather (Automated Weather Reporting System) Yes

Serv PhoneServ RestroomServ FBOServ MaintenanceServ Jet FuelServ AvgasServ Ground TransServ RCO/ATCTMeets Services (Phone, Restroom, FBO, Maint., Jet Fuel, Ground Trans., RCO/ATCT)

Yes

Fac TerminalFac Pilots LoungeFac Aircraft ApronFac HangarsFac Auto Parking

Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes

State Licensing Standards FullFAA Design Standards Yes

ASV Ratio 2000 (2000 Operations/ASV)(%) 38.5

Meets ASV 2000 (Ratio Below 60%) Yes

ASV Ratio 2020 (2020 Operations/ASV)(%) 44.4

Meets ASV 2020 (Ratio Below 60%) Yes

Number of Hangar Spaces 2000 12

Meets Hangar 2000 (75% of Based Fleet) No

Number of Hangar Spaces 2020 12

Meets Hangar 2020 (75% of Based Fleet) No

Apron Spaces Required 2000 (25% of 2000 Based Aircraft + 25% of 2000 Itinerant Aircraft)

1296

Meets Apron 2000 (Required Apron Spaces <= Current Apron Spaces) Yes

Apron Spaces Required 2020 (25% of 2020 Based Aircraft + 25% of 2020 Itinerant Aircraft)

1296

Meets Apron 2020 (Required Apron Spaces <= Current Apron Spaces) Yes

Total Terminal (sq ft) 2,500

Meets Terminal (2,000 sq ft or Greater) Yes

Number of Parking Spaces 2000 1050

Meets Parking 2000 (Ratio 100% or Greater) Yes

Number of Parking Spaces 2020 1050

Meets Parking 2020 (Ratio 100% or Greater) Yes

Pavement Rehabilitation/Maintenance Good 1.73 SF 6,970,200 12,059,000

Through the Fence Operations No

Current Airport Management Full-Time

Planning Documents (Years Old) 4 Years or Less 25,000.00 each 2 50,000

$13,558,000

NPIAS Airport

Avi

atio

n Su

ppor

t In

fras

truc

ture

Des

ign

Stan

dard

Obj

ectiv

es

Brookley-National

Nav

igat

iona

l Vis

ual A

id O

bjec

tives

Dev

. & O

pt.

Air

port

Act

ivity

Airport NameAirport ID

1 Includes estimated land acquisition costs, additional construction costs due to more than average cut/fill or drainage requirements, and road/utility relocations, etc.

Region

Serv

ice

Obj

ectiv

es

54 42

unit 42

42 30

34,500.00 1,449,000

Total Recommended Projects Cost

8-56

Page 8: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Existing Conditions Recommended Project Need Unit Cost Unit Total Units (2020)

Associated Cost1

Project Cost (Rounded up to Nearest $1,000)

Pryor Field RegionalDCU

12

ARC C-IIMeets Required ARC (C-II or Greater) Yes

Primary Runway Length 6,001Meets Runway Length Requirement (5,500' or Greater) Yes

Primary Runway Width 100Meets ARC Width Requirement YesTaxiway FullMeets Taxiway Requirement (Full Parallel) Yes

Nav Aid Non-Precision +Meets Nav Aid (Precision Approach) No

VASI (GVGI)PAPI (GVGI)ALS MALSR !Meets Visual Aid (MALSR/ODALS, GVGI) No

Lighting Type MIRLLighting BeaconWindsockMeets Lighting (MIRL, Beacon, Windsock) Yes

WeatherMeets Weather (Automated Weather Reporting System) Yes

Serv PhoneServ RestroomServ FBOServ MaintenanceServ Jet FuelServ AvgasServ Ground Trans Ground TransServ RCO/ATCTMeets Services (Phone, Restroom, FBO, Maint., Jet Fuel, Ground Trans., RCO/ATCT)

No

Fac TerminalFac Pilots LoungeFac Aircraft ApronFac HangarsFac Auto ParkingMeets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking)

Yes

State Licensing Standards FullFAA Design Standards No Yes # 200,000

ASV Ratio 2000 (2000 Operations/ASV)(%) 85.7

Meets ASV 2000 (Ratio Below 60%) No 25.7

ASV Ratio 2020 (2020 Operations/ASV)(%) 107.9

Meets ASV 2020 (Ratio Below 60%) No 47.9

Number of Hangar Spaces 2000 53

Meets Hangar 2000 (75% of Based Fleet) No

Number of Hangar Spaces 2020 53

Meets Hangar 2020 (75% of Based Fleet) No

Apron Spaces Required 2000 (25% of 2000 Based Aircraft + 25% of 2000 Itinerant Aircraft)

108

Meets Apron 2000 (Required Apron Spaces <= Current Apron Spaces) Yes

Apron Spaces Required 2020 (25% of 2020 Based Aircraft + 25% of 2020 Itinerant Aircraft)

108

Meets Apron 2020 (Required Apron Spaces <= Current Apron Spaces) Yes

Total Terminal (sq ft) 5,500Meets Terminal (2,000 sq ft or Greater) Yes

Number of Parking Spaces 2000 60

Meets Parking 2000 (Ratio 100% or Greater) No

Number of Parking Spaces 2020 60

Meets Parking 2020 (Ratio 100% or Greater) No

Pavement Rehabilitation/Maintenance Good 1.73 SF 1,111,650 1,924,000

Through the Fence Operations No

Current Airport Management FBO

Planning Documents (Years Old) 4 Years or Less 25,000.00 each 2 50,000

$5,835,000

1 Includes estimated land acquisition costs, additional construction costs due to more than average cut/fill or drainage requirements, and road/utility relocations, etc.

Avi

atio

n Su

ppor

t In

fras

truc

ture

Serv

ice

Obj

ectiv

esD

esig

n St

anda

rd O

bjec

tives

Decatur-National

+ Scheduled to Receive ILS

Nav

igat

iona

l Vis

ual A

id O

bjec

tives

Dev

. & O

pt.

Air

port

Act

ivity

Airport NameAirport ID

NPIAS Airport

Region

ILS/GPS

245,000space

152 99

unit 99

108 55

34,500.00

144 84

! MALSR included in ILS/GPS Package

142

Total Recommended Projects Cost

1,725.00 142

3,416,000

# Runway 36 - Cost for relocating Runway Road

202

8-57

Page 9: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Existing Conditions Recommended Project Need Unit Cost Unit Total Units (2020)

Associated Cost1

Project Cost (Rounded up to Nearest $1,000)

Dothan RegionalDHN

7

ARC D-V

Meets Required ARC (C-II or Greater) Yes

Primary Runway Length 8,498

Meets Runway Length Requirement (5,500' or Greater) Yes

Primary Runway Width 150

Meets ARC Width Requirement YesTaxiway FullMeets Taxiway Requirement (Full Parallel) Yes

Nav Aid Precision

Meets Nav Aid (Precision Approach) Yes

VASI (GVGI)PAPI (GVGI)ALSMeets Visual Aid (MALSR/ODALS, GVGI) Yes

Lighting Type HIRLLighting BeaconWindsockMeets Lighting (MIRL, Beacon, Windsock) Yes

WeatherMeets Weather (Automated Weather Reporting System) Yes

Serv PhoneServ RestroomServ FBOServ MaintenanceServ Jet FuelServ AvgasServ Ground Trans Ground TransServ RCO/ATCTMeets Services (Phone, Restroom, FBO, Maint., Jet Fuel, Ground Trans., RCO/ATCT)

No

Fac TerminalFac Pilots LoungeFac Aircraft ApronFac HangarsFac Auto ParkingMeets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking)

Yes

State Licensing Standards FullFAA Design Standards Yes

ASV Ratio 2000 (2000 Operations/ASV)(%) 41.3

Meets ASV 2000 (Ratio Below 60%) Yes

ASV Ratio 2020 (2020 Operations/ASV)(%) 45.8

Meets ASV 2020 (Ratio Below 60%) Yes

Number of Hangar Spaces 2000 161.0

Meets Hangar 2000 (75% of Based Fleet) Yes

Number of Hangar Spaces 2020 161.0

Meets Hangar 2020 (75% of Based Fleet) Yes

Apron Spaces Required 2000 (25% of 2000 Based Aircraft + 25% of 2000 Itinerant Aircraft)

72

Meets Apron 2000 (Required Apron Spaces <= Current Apron Spaces) Yes

Apron Spaces Required 2020 (25% of 2020 Based Aircraft + 25% of 2020 Itinerant Aircraft)

72

Meets Apron 2020 (Required Apron Spaces <= Current Apron Spaces) Yes

Total Terminal (sq ft) 39,000

Meets Terminal (2,000 sq ft or Greater) Yes

Number of Parking Spaces 2000 660.0

Meets Parking 2000 (Ratio 100% or Greater) Yes

Number of Parking Spaces 2020 660.0

Meets Parking 2020 (Ratio 100% or Greater) Yes

Pavement Rehabilitation/Maintenance Good

Through the Fence Operations No

Current Airport Management Full-Time

Planning Documents (Years Old) 4 Years or Less 25,000.00 each 2 50,000

$50,000

$4,205,5001 Includes estimated land acquisition costs, additional construction costs due to more than average cut/fill or drainage requirements, and road/utility relocations, etc.

NPIAS Airport

Avi

atio

n Su

ppor

t In

fras

truc

ture

Nav

igat

iona

l Vis

ual A

id O

bjec

tives

Dev

. & O

pt.

Air

port

Act

ivity

Serv

ice

Obj

ectiv

es

Total Recommended Projects Cost

Total Air Carrier Capital Improvement Project Cost (See Following Sheet for Detailed CIP Costs)

Des

ign

Stan

dard

Obj

ectiv

es

Dothan-National

Airport NameAirport ID

Region

8-58

Page 10: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Total Project Cost

$35,000$250,000

$1,050,000$850,000

$1,000,000$450,000$400,000

Total $4,035,000

$10,500

$50,000Total $60,500

Ter

min

al

$110,000Total $110,000

$4,205,500Total Air Carrier Capital Improvement Projects CostSource: Airport Capital Improvement Program (5/2003)

Rehabilitate Taxiway 'B"Rehabilitate Taxiway "A" from Taxiway "F" to Runway 32

Air

side

ALP UpdateTerminal Apron ImprovementsReplace Airfield Lighting/Upgrade SignageExpand GA Apron (Taxiway "L")Rehabilitate Runway 18/36

Terminal Demolition

Lan

dsid

e

Security Fencing

Landside Signage Upgrades

Dothan-NationalCapital Improvement Program Costs

Project

8-59

Page 11: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Existing Conditions Recommended Project Need Unit Cost Unit Total Units (2020)

Associated Cost1

Project Cost (Rounded up to Nearest $1,000)

Jack EdwardsJKA

8

ARC C-IIMeets Required ARC (C-II or Greater) Yes

Primary Runway Length 6,500Meets Runway Length Requirement (5,500' or Greater) Yes

Primary Runway Width 100Meets ARC Width Requirement YesTaxiway FullMeets Taxiway Requirement (Full Parallel) Yes

Nav Aid Non-Precision +Meets Nav Aid (Precision Approach) No

VASI (GVGI)PAPI (GVGI)ALS MALSR !Meets Visual Aid (MALSR/ODALS, GVGI) No

Lighting Type MIRLLighting BeaconWindsockMeets Lighting (MIRL, Beacon, Windsock) Yes

WeatherMeets Weather (Automated Weather Reporting System) Yes

Serv PhoneServ RestroomServ FBOServ MaintenanceServ Jet FuelServ AvgasServ Ground TransServ RCO/ATCT RCO/ATCT 17,250.00 each 1 18,000Meets Services (Phone, Restroom, FBO, Maint., Jet Fuel, Ground Trans., RCO/ATCT)

No

Fac TerminalFac Pilots LoungeFac Aircraft ApronFac HangarsFac Auto ParkingMeets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking)

Yes

State Licensing Standards FullFAA Design Standards Yes

ASV Ratio 2000 (2000 Operations/ASV)(%) 48.2

Meets ASV 2000 (Ratio Below 60%) Yes

ASV Ratio 2020 (2020 Operations/ASV)(%) 61.0

Meets ASV 2020 (Ratio Below 60%) No 1.0

Number of Hangar Spaces 2000 63

Meets Hangar 2000 (75% of Based Fleet) No

Number of Hangar Spaces 2020 63

Meets Hangar 2020 (75% of Based Fleet) No

Apron Spaces Required 2000 (25% of 2000 Based Aircraft + 25% of 2000 Itinerant Aircraft)

198

Meets Apron 2000 (Required Apron Spaces <= Current Apron Spaces) Yes

Apron Spaces Required 2020 (25% of 2020 Based Aircraft + 25% of 2020 Itinerant Aircraft)

198

Meets Apron 2020 (Required Apron Spaces <= Current Apron Spaces) Yes

Total Terminal (sq ft) 3,000Meets Terminal (2,000 sq ft or Greater) Yes

Number of Parking Spaces 2000 32

Meets Parking 2000 (Ratio 100% or Greater) No

Number of Parking Spaces 2020 32

Meets Parking 2020 (Ratio 100% or Greater) No

Pavement Rehabilitation/Maintenance Good 1.73 SF 1,740,000 3,011,000

Through the Fence Operations No

Current Airport Management Full-Time

Planning Documents (Years Old) 4 Years or Less 25,000.00 each 2 50,000

$4,568,000

1 Includes estimated land acquisition costs, additional construction costs due to more than average cut/fill or drainage requirements, and road/utility relocations, etc.

NPIAS Airport

103

38

101 38

+ Scheduled to Receive ILS

Nav

igat

iona

l Vis

ual A

id O

bjec

tives

Dev

. & O

pt.

Serv

ice

Obj

ectiv

es

! MALSR included in ILS/GPS Package

space

ILS/GPS +

1,725.00 178,000

Avi

atio

n Su

ppor

t In

fras

truc

ture

106 74

135 103

Gulf Shores-National

Airport NameAirport ID

Region

Des

ign

Stan

dard

Obj

ectiv

es

1,311,000unit

Total Recommended Projects Cost

Air

port

Act

ivity

80 17

34,500.00

8-60

Page 12: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Existing Conditions Recommended Project Need Unit Cost Unit Total Units (2020)

Associated Cost1

Project Cost (Rounded up to Nearest $1,000)

Madison County ExecutiveM8212

ARC D-II

Meets Required ARC (C-II or Greater) Yes

Primary Runway Length 5,008

Meets Runway Length Requirement (5,500' or Greater) No

Primary Runway Width 100

Meets ARC Width Requirement YesTaxiway FullMeets Taxiway Requirement (Full Parallel) Yes

Nav Aid Non-Precision +Meets Nav Aid (Precision Approach) No

VASI (GVGI)PAPI (GVGI)ALS MALSR !Meets Visual Aid (MALSR/ODALS, GVGI) No

Lighting Type MIRLLighting BeaconWindsockMeets Lighting (MIRL, Beacon, Windsock) Yes

WeatherMeets Weather (Automated Weather Reporting System) Yes

Serv PhoneServ RestroomServ FBOServ MaintenanceServ Jet FuelServ AvgasServ Ground Trans Ground TransServ RCO/ATCT RCO/ATCT 17,250.00 each 1 18,000Meets Services (Phone, Restroom, FBO, Maint., Jet Fuel, Ground Trans., RCO/ATCT)

No

Fac TerminalFac Pilots LoungeFac Aircraft ApronFac HangarsFac Auto ParkingMeets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking)

Yes

State Licensing Standards FullFAA Design Standards Yes

ASV Ratio 2000 (2000 Operations/ASV)(%) 19.9

Meets ASV 2000 (Ratio Below 60%) Yes

ASV Ratio 2020 (2020 Operations/ASV)(%) 32.4

Meets ASV 2020 (Ratio Below 60%) Yes

Number of Hangar Spaces 2000 75

Meets Hangar 2000 (75% of Based Fleet) Yes

Number of Hangar Spaces 2020 75

Meets Hangar 2020 (75% of Based Fleet) No

Apron Spaces Required 2000 (25% of 2000 Based Aircraft + 25% of 2000 Itinerant Aircraft)

78

Meets Apron 2000 (Required Apron Spaces <= Current Apron Spaces) Yes

Apron Spaces Required 2020 (25% of 2020 Based Aircraft + 25% of 2020 Itinerant Aircraft)

78

Meets Apron 2020 (Required Apron Spaces <= Current Apron Spaces) Yes

Total Terminal (sq ft) 5,890

Meets Terminal (2,000 sq ft or Greater) Yes

Number of Parking Spaces 2000 40

Meets Parking 2000 (Ratio 100% or Greater) No

Number of Parking Spaces 2020 40

Meets Parking 2020 (Ratio 100% or Greater) No

Pavement Rehabilitation/Maintenance Good 1.73 SF 884,800 1,531,000

Through the Fence Operations No

Current Airport Management FBO

Planning Documents (Years Old) 4 Years or Less 25,000.00 each 2 50,000

$3,544,000

1 Includes estimated land acquisition costs, additional construction costs due to more than average cut/fill or drainage requirements, and road/utility relocations, etc.

Region

68,000

Des

ign

Stan

dard

Obj

ectiv

es

10.35

Nav

igat

iona

l Vis

ual A

id O

bjec

tives

Dev

. & O

pt.

Air

port

Act

ivity

+ Scheduled to Receive ILS

! MALSR included in ILS/GPS Package

Avi

atio

n Su

ppor

t In

fras

truc

ture

109 34

194,000

Madison County-National

Airport NameAirport ID

NPIAS Airport

492 510,000SF including lighting 49,200

ILS/GPS +

unit 34

Total Recommended Projects Cost

1,725.00

89 49

space

145

105

Serv

ice

Obj

ectiv

es

12,000

105

34,500.00 1,241,000

8-61

Page 13: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Existing Conditions Recommended Project Need Unit Cost Unit Total Units (2020)

Associated Cost1

Project Cost (Rounded up to Nearest $1,000)

Mobile RegionalMOB

8

ARC D-V

Meets Required ARC (C-II or Greater) Yes

Primary Runway Length 8,521

Meets Runway Length Requirement (5,500' or Greater) Yes

Primary Runway Width 150

Meets ARC Width Requirement YesTaxiway FullMeets Taxiway Requirement (Full Parallel) Yes

Nav Aid Precision

Meets Nav Aid (Precision Approach) Yes

VASI (GVGI)PAPI (GVGI)ALSMeets Visual Aid (MALSR/ODALS, GVGI) Yes

Lighting Type HIRLLighting BeaconWindsockMeets Lighting (MIRL, Beacon, Windsock) Yes

WeatherMeets Weather (Automated Weather Reporting System) Yes

Serv PhoneServ RestroomServ FBOServ MaintenanceServ Jet FuelServ AvgasServ Ground Trans Ground TransServ RCO/ATCTMeets Services (Phone, Restroom, FBO, Maint., Jet Fuel, Ground Trans., RCO/ATCT)

No

Fac TerminalFac Pilots LoungeFac Aircraft ApronFac HangarsFac Auto ParkingMeets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking)

Yes

State Licensing Standards FullFAA Design Standards Yes

ASV Ratio 2000 (2000 Operations/ASV)(%) 62.4

Meets ASV 2000 (Ratio Below 60%) No 2.4

ASV Ratio 2020 (2020 Operations/ASV)(%) 69.2

Meets ASV 2020 (Ratio Below 60%) No 9.2

Number of Hangar Spaces 2000 29

Meets Hangar 2000 (75% of Based Fleet) No

Number of Hangar Spaces 2020 29

Meets Hangar 2020 (75% of Based Fleet) No

Apron Spaces Required 2000 (25% of 2000 Based Aircraft + 25% of 2000 Itinerant Aircraft)

63

Meets Apron 2000 (Required Apron Spaces <= Current Apron Spaces) Yes

Apron Spaces Required 2020 (25% of 2020 Based Aircraft + 25% of 2020 Itinerant Aircraft)

63

Meets Apron 2020 (Required Apron Spaces <= Current Apron Spaces) Yes

Total Terminal (sq ft) 161,000

Meets Terminal (2,000 sq ft or Greater) Yes

Number of Parking Spaces 2000 1,074

Meets Parking 2000 (Ratio 100% or Greater) Yes

Number of Parking Spaces 2020 1,074

Meets Parking 2020 (Ratio 100% or Greater) Yes

Pavement Rehabilitation/Maintenance Good

Through the Fence Operations No

Current Airport Management Full-Time

Planning Documents (Years Old) 4 Years or Less 25,000.00 each 2 50,000

$2,291,000

$95,971,5001 Includes estimated land acquisition costs, additional construction costs due to more than average cut/fill or drainage requirements, and road/utility relocations, etc.

NPIAS Airport

Avi

atio

n Su

ppor

t In

fras

truc

ture

Des

ign

Stan

dard

Obj

ectiv

es

Mobile-National

Nav

igat

iona

l Vis

ual A

id O

bjec

tives

Dev

. & O

pt.

Air

port

Act

ivity

Airport NameAirport ID

Total Air Carrier Capital Improvement Project Cost (See Following Sheet for Detailed CIP Costs)

Region

Serv

ice

Obj

ectiv

es

87 58

unit 58

68 39

34,500.00 2,241,000240,000

Total Recommended Projects Cost

8-62

Page 14: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Total Project Cost

$30,000$40,000

$550,000$220,000$100,000$150,000

$1,500,000$900,000$160,000$600,000

$3,265,000$10,021,500

$7,000,000$500,000$900,000

$34,700,000$3,600,000$1,000,000$1,000,000$2,700,000$2,200,000$1,000,000

Total $72,136,500

$1,300,000$1,500,000

$30,000$500,000$150,000

$7,000,000$400,000$300,000

Total $11,180,000

$160,000$1,400,000

$200,000$50,000

$150,000$20,000

$2,500,000$175,000

$7,000,000$1,000,000

Total $12,655,000

$95,971,500Source: Airport Capital Improvement Program (5/2003)

Airport Entrance Directional Signage

Infield Service Road - Phase I & II (Terminal Area to East Ramp)

Non-Eligible Portion of Terminal

Security System Upgrade

Elevated Parking Lot

FIDSExpand Terminal Building (Phase II & East Concourse)

Total Air Carrier Capital Improvement Projects Cost

Ter

min

al

Sweepers (2 each)Install Jet Bridges No. 2 & 3Construct Restroom on Concourse A

Purchase Snozzle Camera

Purchase Security VehiclesRehabilitate Carpet 2nd Floor Terminal Building

Fuel Farm Road ExtensionRehabilitate Access Road to East Ramp

Rehabilitate East Ramp Parking LotEmployee Parking Lot OL

ILS/MALSR Runway 14R/32LSpall Repairs East RampRehabilitate TW-ASitework/Earthwork Runway 14R/32L (Phase I& II)Noise Control Land Acquisition

Land Purchase

Construct TW-DRehabilitate East RampTW-C Bridge 14R/32LExtend TW-LMITL Runway 14R/32L II & CNTG TW's

Lan

dsid

e

Overlay TW-LWetland Mitigation 14R/32LPaving 14R/32L (Phase I& II)A

irsi

de

Preliminary Engineering - Runway 18/36 - TW-RWindsock - 4 eachOverlay TW-RRehabiliation MITL TW-RRehabiliation MITL TW-A (Portion)Replace Airport PAPI'sPlanning Engineering & Envir. Mitigation for Parallel RunwayOverlay Runway 18/36Rehabilitation MIRL Runway 18/36

Mobile-NationalCapital Improvement Program Costs

Project

8-63

Page 15: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Existing Conditions Recommended Project Need Unit Cost Unit Total Units (2020)

Associated Cost1

Project Cost (Rounded up to Nearest $1,000)

Montgomery Regional/Dannelly FieldMGM

9

ARC D-VMeets Required ARC (C-II or Greater) Yes

Primary Runway Length 9,001Meets Runway Length Requirement (5,500' or Greater) Yes

Primary Runway Width 150Meets ARC Width Requirement YesTaxiway FullMeets Taxiway Requirement (Full Parallel) Yes

Nav Aid Precision

Meets Nav Aid (Precision Approach) Yes

VASI (GVGI)PAPI (GVGI)ALSMeets Visual Aid (MALSR/ODALS, GVGI) Yes

Lighting Type HIRLLighting BeaconWindsockMeets Lighting (MIRL, Beacon, Windsock) Yes

WeatherMeets Weather (Automated Weather Reporting System) Yes

Serv PhoneServ RestroomServ FBOServ MaintenanceServ Jet FuelServ AvgasServ Ground TransServ RCO/ATCTMeets Services (Phone, Restroom, FBO, Maint., Jet Fuel, Ground Trans., RCO/ATCT)

Yes

Fac TerminalFac Pilots LoungeFac Aircraft ApronFac HangarsFac Auto ParkingMeets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking)

Yes

State Licensing Standards FullFAA Design Standards Yes

ASV Ratio 2000 (2000 Operations/ASV)(%) 59.9

Meets ASV 2000 (Ratio Below 60%) Yes

ASV Ratio 2020 (2020 Operations/ASV)(%) 78.5

Meets ASV 2020 (Ratio Below 60%) No 18.5

Number of Hangar Spaces 2000 28

Meets Hangar 2000 (75% of Based Fleet) No

Number of Hangar Spaces 2020 28

Meets Hangar 2020 (75% of Based Fleet) No

Apron Spaces Required 2000 (25% of 2000 Based Aircraft + 25% of 2000 Itinerant Aircraft)

85

Meets Apron 2000 (Required Apron Spaces <= Current Apron Spaces) Yes

Apron Spaces Required 2020 (25% of 2020 Based Aircraft + 25% of 2020 Itinerant Aircraft)

85

Meets Apron 2020 (Required Apron Spaces <= Current Apron Spaces) Yes

Total Terminal (sq ft) 62,000Meets Terminal (2,000 sq ft or Greater) Yes

Number of Parking Spaces 2000 1,063

Meets Parking 2000 (Ratio 100% or Greater) Yes

Number of Parking Spaces 2020 1,063

Meets Parking 2020 (Ratio 100% or Greater) Yes

Pavement Rehabilitation/Maintenance Good

Through the Fence Operations No

Current Airport Management Full-Time

Planning Documents (Years Old) 4 Years or Less 25,000.00 each 2 50,000

$6,664,000

$25,565,0181 Includes estimated land acquisition costs, additional construction costs due to more than average cut/fill or drainage requirements, and road/utility relocations, etc.

NPIAS Airport

Avi

atio

n Su

ppor

t In

fras

truc

ture

Des

ign

Stan

dard

Obj

ectiv

es

Montgomery-National

Nav

igat

iona

l Vis

ual A

id O

bjec

tives

Dev

. & O

pt.

Air

port

Act

ivity

Airport NameAirport ID

Total Air Carrier Capital Improvement Project Cost (See Following Sheet for Detailed CIP Costs)

Region

Serv

ice

Obj

ectiv

es

200 172

unit 172

123 95

34,500.00 6,614,000680,000

Total Recommended Projects Cost

8-64

Page 16: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Total Project Cost

Air

side

$569,415Total $569,415

$704,067

$200,198Total $904,265

$14,839,841$1,339,647$1,608,419

$419,781$568,215$183,963$797,380$609,868

$1,453,995$2,089,520

$180,709Total $24,091,338

$25,565,018Source: Airport Capital Improvement Program (5/2003)

Modify Lobby (Shell, Interiors, Services, Demolition, FF&E, Landscaping/Irrigation)Modify Vestibules (Demolition, New Vestibules)

Remove Control Tower (Demolition, Modifications)Lan

dsid

e

Remove Concourse (Demolition, Modifications)

Aircraft Support Systems (Passenger Boarding Bridges)Canopies (Demolition, New Canopies)

Central Plant Expansion (Demolition, Shell, Interiors, Site Work)

Total Air Carrier Capital Improvement Projects Cost

Ter

min

al

Terminal Expansion (Demolition, Shell, Interiors, FF&E, Equipment, Landscaping)

Special Systems/Equipment

New Holdroom/Restrooms (Shell, Interiors, Services, Demolition, FF&E)

ElevatorsF/PRF XTG Terminal

Montgomery-NationalCapital Improvement Program Costs

Project

Landside Civil (Curbside Modifications, Parking Area Modification, Terminal Related Civil)

Airside Civil (Apron Modifications, Utility Modifications, Storm Drain Modifications, Concrete Paving)

8-65

Page 17: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Existing Conditions Recommended Project Need Unit Cost Unit Total Units (2020)

Associated Cost1

Project Cost (Rounded up to Nearest $1,000)

Northwest Alabama RegionalMSL

1

ARC C-III

Meets Required ARC (C-II or Greater) Yes

Primary Runway Length 6,693

Meets Runway Length Requirement (5,500' or Greater) Yes

Primary Runway Width 150

Meets ARC Width Requirement YesTaxiway FullMeets Taxiway Requirement (Full Parallel) Yes

Nav Aid Precision

Meets Nav Aid (Precision Approach) Yes

VASI (GVGI)PAPI (GVGI)ALSMeets Visual Aid (MALSR/ODALS, GVGI) Yes

Lighting Type HIRLLighting BeaconWindsockMeets Lighting (MIRL, Beacon, Windsock) Yes

WeatherMeets Weather (Automated Weather Reporting System) Yes

Serv PhoneServ RestroomServ FBOServ MaintenanceServ Jet FuelServ AvgasServ Ground TransServ RCO/ATCT RCO/ATCT 17,250.00 each 1 18,000Meets Services (Phone, Restroom, FBO, Maint., Jet Fuel, Ground Trans., RCO/ATCT)

No

Fac TerminalFac Pilots LoungeFac Aircraft ApronFac HangarsFac Auto ParkingMeets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking)

Yes

State Licensing Standards FullFAA Design Standards Yes

ASV Ratio 2000 (2000 Operations/ASV)(%) 21.6

Meets ASV 2000 (Ratio Below 60%) Yes

ASV Ratio 2020 (2020 Operations/ASV)(%) 27.5

Meets ASV 2020 (Ratio Below 60%) Yes

Number of Hangar Spaces 2000 27

Meets Hangar 2000 (75% of Based Fleet) No

Number of Hangar Spaces 2020 27

Meets Hangar 2020 (75% of Based Fleet) No

Apron Spaces Required 2000 (25% of 2000 Based Aircraft + 25% of 2000 Itinerant Aircraft)

23

Meets Apron 2000 (Required Apron Spaces <= Current Apron Spaces) No

Apron Spaces Required 2020 (25% of 2020 Based Aircraft + 25% of 2020 Itinerant Aircraft)

23

Meets Apron 2020 (Required Apron Spaces <= Current Apron Spaces) No

Total Terminal (sq ft) 12,410

Meets Terminal (2,000 sq ft or Greater) Yes

Number of Parking Spaces 2000 175

Meets Parking 2000 (Ratio 100% or Greater) Yes

Number of Parking Spaces 2020 175

Meets Parking 2020 (Ratio 100% or Greater) Yes

Pavement Rehabilitation/Maintenance Good

Through the Fence Operations No

Current Airport Management Full-Time

Planning Documents (Years Old) 4 Years or Less 25,000.00 each 2 50,000

$431,000

$5,195,1001 Includes estimated land acquisition costs, additional construction costs due to more than average cut/fill or drainage requirements, and road/utility relocations, etc.

NPIAS Airport

Avi

atio

n Su

ppor

t In

fras

truc

ture

Des

ign

Stan

dard

Obj

ectiv

es

Muscle Shoals-National

Nav

igat

iona

l Vis

ual A

id O

bjec

tives

Dev

. & O

pt.

Air

port

Act

ivity

Airport NameAirport ID

Total Air Carrier Capital Improvement Project Cost (See Following Sheet for Detailed CIP Costs)

Region

Serv

ice

Obj

ectiv

es

80 53

unit 3

62 35

SF 30,000

35 12

27 4

259,0008.63

34,500.00 104,000

Total Recommended Projects Cost

8-66

Page 18: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Total Project Cost

$1,211,100$562,000

$1,053,000$152,000$150,000$700,000$362,000$233,000

Total $4,423,100

Lan

dsid

e

$667,000Total $667,000

$55,000

$50,000Total $105,000

$5,195,100Source: Airport Capital Improvement Program (5/2003)

Construct Partial Parallel Taxiway "E" to Runway 18/36 - Phase 2

Construct Southeast T-Hangar Taxiways - Phase 1 and Phase 2Seal Coat, Crack Seal and Mark Taxiways "A", "B", and "C", including Pavement Repairs

Extend Taxiway "B" to Runway 18 ThresholdRehabilitate & Overlay Runway 18/36Seal Coat, Crack Seal and Mark Entrance Roads; Parking Lots; and ARFF Access RoadMaster Plan Update

Total Air Carrier Capital Improvement Projects Cost

Air

side

Ter

min

al

Acuire ADA Passenger Lift Device

Acquire Commuter - Walk

Perimeter Access Road - Phase 2 (3,000')

Seal Coat, Crack Seal and Mark Runway 11/29 and Taxiway "A", including Pavement Repairs

Muscle Shoals-NationalCapital Improvement Program Costs

Project

8-67

Page 19: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Existing Conditions Recommended Project Need Unit Cost Unit Total Units (2020)

Associated Cost1

Project Cost (Rounded up to Nearest $1,000)

St. Clair CountyPLR

3

ARC B-IIMeets Required ARC (C-II or Greater) No

Primary Runway Length 5002*Meets Runway Length Requirement (5,500' or Greater) No

Primary Runway Width 80Meets ARC Width Requirement NoTaxiway FullMeets Taxiway Requirement (Full Parallel) Yes

Nav Aid Non-Precision

Meets Nav Aid (Precision Approach) No

VASI (GVGI)PAPI (GVGI)ALS ODALS 69,000.00 each 1 69,000Meets Visual Aid (MALSR/ODALS, GVGI) No

Lighting Type MIRLLighting BeaconWindsockMeets Lighting (MIRL, Beacon, Windsock) Yes

WeatherMeets Weather (Automated Weather Reporting System) Yes

Serv PhoneServ RestroomServ FBOServ MaintenanceServ Jet FuelServ AvgasServ Ground TransServ RCO/ATCT RCO/ATCT 17,250.00 each 1 18,000Meets Services (Phone, Restroom, FBO, Maint., Jet Fuel, Ground Trans., RCO/ATCT)

No

Fac TerminalFac Pilots LoungeFac Aircraft ApronFac HangarsFac Auto ParkingMeets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking)

Yes

State Licensing Standards Partial # Full (Underway) 708,000FAA Design Standards Yes

ASV Ratio 2000 (2000 Operations/ASV)(%) 18.8

Meets ASV 2000 (Ratio Below 60%) Yes

ASV Ratio 2020 (2020 Operations/ASV)(%) 24.0

Meets ASV 2020 (Ratio Below 60%) Yes

Number of Hangar Spaces 2000 66

Meets Hangar 2000 (75% of Based Fleet) No

Number of Hangar Spaces 2020 66

Meets Hangar 2020 (75% of Based Fleet) No

Apron Spaces Required 2000 (25% of 2000 Based Aircraft + 25% of 2000 Itinerant Aircraft)

139

Meets Apron 2000 (Required Apron Spaces <= Current Apron Spaces) Yes

Apron Spaces Required 2020 (25% of 2020 Based Aircraft + 25% of 2020 Itinerant Aircraft)

139

Meets Apron 2020 (Required Apron Spaces <= Current Apron Spaces) Yes

Total Terminal (sq ft) 4,862Meets Terminal (2,000 sq ft or Greater) Yes

Number of Parking Spaces 2000 30

Meets Parking 2000 (Ratio 100% or Greater) No

Number of Parking Spaces 2020 30

Meets Parking 2020 (Ratio 100% or Greater) No

Pavement Rehabilitation/Maintenance Fair Good 1.73 SF 977,730 1,692,000

Through the Fence Operations No

Current Airport Management Part-Time

Planning Documents (Years Old) 4 Years or Less 25,000.00 each 2 50,000

$3,483,000

* Planned Runway Extension

1,725.00

unit34,500.00

NPIAS Airport

# Projects Currently Underway to Fulfill State Licensing Standards

3

89

Total Recommended Projects Cost

Pell City-National

space

Des

ign

Stan

dard

Obj

ectiv

es

23

88

Airport NameAirport ID

Nav

igat

iona

l Vis

ual A

id O

bjec

tives

Dev

. & O

pt.

Air

port

Act

ivity

Serv

ice

Obj

ectiv

esA

viat

ion

Supp

ort

Infr

astr

uctu

re

N/F Not Feasible - Extensive cost for expansion due to relocation of golf course holes, roads, utilities, and tree removal.

1 Includes estimated land acquisition costs, additional construction costs due to more than average cut/fill or drainage requirements, and road/utility relocations, etc.

69

152,000

Region

N/F

23

N/F

N/F

N/F

118 88

92 62

794,000

8-68

Page 20: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Existing Conditions Recommended Project Need Unit Cost Unit Total Units (2020)

Associated Cost1

Project Cost (Rounded up to Nearest $1,000)

Autauga County1A9

9

ARC B-IIMeets Required ARC (C-II or Greater) No

Primary Runway Length 5,400Meets Runway Length Requirement (5,500' or Greater) No

Primary Runway Width 75Meets ARC Width Requirement NoTaxiway TurnaroundMeets Taxiway Requirement (Full Parallel) No

Nav Aid Non-Precision

Meets Nav Aid (Precision Approach) No

VASI (GVGI)PAPI (GVGI)ALS MALSR 400,000.00 each 1 400,000Meets Visual Aid (MALSR/ODALS, GVGI) No

Lighting Type MIRLLighting BeaconWindsockMeets Lighting (MIRL, Beacon, Windsock) Yes

WeatherMeets Weather (Automated Weather Reporting System) No AWOS 201,250.00 each 1 202,000

Serv PhoneServ RestroomServ FBOServ MaintenanceServ Jet FuelServ AvgasServ Ground TransServ RCO/ATCT RCO/ATCT 17,250.00 each 1 18,000Meets Services (Phone, Restroom, FBO, Maint., Jet Fuel, Ground Trans., RCO/ATCT)

No

Fac TerminalFac Pilots LoungeFac Aircraft ApronFac HangarsFac Auto ParkingMeets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking)

Yes

State Licensing Standards Partial # Full (Underway) 69,000FAA Design Standards Yes

ASV Ratio 2000 (2000 Operations/ASV)(%) 13.8

Meets ASV 2000 (Ratio Below 60%) Yes

ASV Ratio 2020 (2020 Operations/ASV)(%) 17.4

Meets ASV 2020 (Ratio Below 60%) Yes

Number of Hangar Spaces 2000 32

Meets Hangar 2000 (75% of Based Fleet) Yes

Number of Hangar Spaces 2020 32

Meets Hangar 2020 (75% of Based Fleet) No

Apron Spaces Required 2000 (25% of 2000 Based Aircraft + 25% of 2000 Itinerant Aircraft)

42

Meets Apron 2000 (Required Apron Spaces <= Current Apron Spaces) Yes

Apron Spaces Required 2020 (25% of 2020 Based Aircraft + 25% of 2020 Itinerant Aircraft)

42

Meets Apron 2020 (Required Apron Spaces <= Current Apron Spaces) Yes

Total Terminal (sq ft) 5,500Meets Terminal (2,000 sq ft or Greater) Yes

Number of Parking Spaces 2000 22

Meets Parking 2000 (Ratio 100% or Greater) No

Number of Parking Spaces 2020 22

Meets Parking 2020 (Ratio 100% or Greater) No

Pavement Rehabilitation/Maintenance Good 1.73 SF 882,930 1,528,000

Through the Fence Operations No

Current Airport Management Part-Time

Planning Documents (Years Old) 4 Years or Less 25,000.00 each 2 50,000

$2,465,000

3

1 Includes estimated land acquisition costs, additional construction costs due to more than average cut/fill or drainage requirements, and road/utility relocations, etc.

NPIAS Airport

N/F Not Feasible - Cost for a 100 foot runway extension outweighs benefit.

25

Prattville-National

# Projects Currently Underway to Fulfill State Licensing Standards

Nav

igat

iona

l Vis

ual A

id O

bjec

tives

Dev

. & O

pt.

Air

port

Act

ivity

Airport Name

Avi

atio

n Su

ppor

t In

fras

truc

ture

44,000

Airport IDRegion

Des

ign

Stan

dard

Obj

ectiv

es

Full (Underway)

Serv

ice

Obj

ectiv

es

N/F

C-II @

25 (Underway)

Total Recommended Projects Cost

47 25

1,725.00 space

37 15

34,500.00 unit

50,000.00 each 50,000

@ There is no additional cost associated with bringing the ARC from B-II to C-II for this airport because of the current runway/taxiway projects underway

104,000

1

35

GPS

3

8-69

Page 21: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Existing Conditions Recommended Project Need Unit Cost Unit Total Units (2020)

Associated Cost1

Project Cost (Rounded up to Nearest $1,000)

Shelby CountyEET

3

ARC B-IIMeets Required ARC (C-II or Greater) No

Primary Runway Length 4411*Meets Runway Length Requirement (5,500' or Greater) No

Primary Runway Width 75Meets ARC Width Requirement NoTaxiway FullMeets Taxiway Requirement (Full Parallel) Yes

Nav Aid Non-Precision**

Meets Nav Aid (Precision Approach) No

VASI (GVGI)PAPI (GVGI)ALS ODALS 69,000.00 each 1 69,000Meets Visual Aid (MALSR/ODALS, GVGI) No

Lighting Type MIRLLighting BeaconWindsockMeets Lighting (MIRL, Beacon, Windsock) Yes

WeatherMeets Weather (Automated Weather Reporting System) Yes

Serv PhoneServ RestroomServ FBOServ MaintenanceServ Jet FuelServ AvgasServ Ground TransServ RCO/ATCT RCO/ATCT 17,250.00 each 1 18,000Meets Services (Phone, Restroom, FBO, Maint., Jet Fuel, Ground Trans., RCO/ATCT)

No

Fac TerminalFac Pilots LoungeFac Aircraft ApronFac HangarsFac Auto ParkingMeets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking)

Yes

State Licensing Standards FullFAA Design Standards Yes

ASV Ratio 2000 (2000 Operations/ASV)(%) 10.7

Meets ASV 2000 (Ratio Below 60%) Yes

ASV Ratio 2020 (2020 Operations/ASV)(%) 13.6

Meets ASV 2020 (Ratio Below 60%) Yes

Number of Hangar Spaces 2000 14

Meets Hangar 2000 (75% of Based Fleet) No

Number of Hangar Spaces 2020 14

Meets Hangar 2020 (75% of Based Fleet) No

Apron Spaces Required 2000 (25% of 2000 Based Aircraft + 25% of 2000 Itinerant Aircraft)

40

Meets Apron 2000 (Required Apron Spaces <= Current Apron Spaces) Yes

Apron Spaces Required 2020 (25% of 2020 Based Aircraft + 25% of 2020 Itinerant Aircraft)

40

Meets Apron 2020 (Required Apron Spaces <= Current Apron Spaces) Yes

Total Terminal (sq ft) 13,125Meets Terminal (2,000 sq ft or Greater) Yes

Number of Parking Spaces 2000 35

Meets Parking 2000 (Ratio 100% or Greater) No

Number of Parking Spaces 2020 35

Meets Parking 2020 (Ratio 100% or Greater) No

Pavement Rehabilitation/Maintenance Good 1.73 SF 681,710 1,180,000

Through the Fence Operations No

Current Airport Management Part-Time

Planning Documents (Years Old) 4 Years or Less 25,000.00 each 2 50,000

$4,177,000

* Runway Extension Under Construction

34,500.00

Avi

atio

n Su

ppor

t In

fras

truc

ture

Serv

ice

Obj

ectiv

esD

esig

n St

anda

rd O

bjec

tives N/F

80

$

66

Shelby County-National

** Circling Approach

Nav

igat

iona

l Vis

ual A

id O

bjec

tives

Dev

. & O

pt.

Air

port

Act

ivity

Airport NameAirport ID

NPIAS Airport

Region

589 10.35 458,000SF including lighting

N/F

N/F

63 49

107 72

84 49

unit

44,175

Total Recommended Projects Cost

125,000

2,277,000

1,725.00 space 72

66

1 Includes estimated land acquisition costs, additional construction costs due to more than average cut/fill or drainage requirements, and road/utility relocations, etc.

N/F Not Feasible - Proximity to Interstate 65 creates expansion limitations.

$ Feasibilty study currently underway for runways 15/33 to be extended to 5,000 feet; Benchmark requirement of 5,500 feet Not Feasible

8-70

Page 22: Ch 8 Summary Tables+National-Delta Tables · Fac Auto Parking 9 Meets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking) Yes State Licensing Standards Full FAA Design

Existing Conditions Recommended Project Need Unit Cost Unit Total Units (2020)

Associated Cost1

Project Cost (Rounded up to Nearest $1,000)

Tuscaloosa MunicipalTCL

2

ARC C-III

Meets Required ARC (C-II or Greater) Yes

Primary Runway Length 6,499

Meets Runway Length Requirement (5,500' or Greater) Yes

Primary Runway Width 150

Meets ARC Width Requirement YesTaxiway FullMeets Taxiway Requirement (Full Parallel) Yes

Nav Aid Precision

Meets Nav Aid (Precision Approach) Yes

VASI (GVGI)PAPI (GVGI)ALSMeets Visual Aid (MALSR/ODALS, GVGI) Yes

Lighting Type HIRLLighting BeaconWindsockMeets Lighting (MIRL, Beacon, Windsock) Yes

WeatherMeets Weather (Automated Weather Reporting System) Yes

Serv PhoneServ RestroomServ FBOServ MaintenanceServ Jet FuelServ AvgasServ Ground TransServ RCO/ATCTMeets Services (Phone, Restroom, FBO, Maint., Jet Fuel, Ground Trans., RCO/ATCT)

Yes

Fac TerminalFac Pilots LoungeFac Aircraft ApronFac HangarsFac Auto ParkingMeets Facilities (Modern Terminal, Aircraft Apron, Hangars, Auto Parking)

Yes

State Licensing Standards FullFAA Design Standards Yes

ASV Ratio 2000 (2000 Operations/ASV)(%) 25.4

Meets ASV 2000 (Ratio Below 60%) Yes

ASV Ratio 2020 (2020 Operations/ASV)(%) 38.5

Meets ASV 2020 (Ratio Below 60%) Yes

Number of Hangar Spaces 2000 47

Meets Hangar 2000 (75% of Based Fleet) No

Number of Hangar Spaces 2020 47

Meets Hangar 2020 (75% of Based Fleet) No

Apron Spaces Required 2000 (25% of 2000 Based Aircraft + 25% of 2000 Itinerant Aircraft)

98

Meets Apron 2000 (Required Apron Spaces <= Current Apron Spaces) Yes

Apron Spaces Required 2020 (25% of 2020 Based Aircraft + 25% of 2020 Itinerant Aircraft)

98

Meets Apron 2020 (Required Apron Spaces <= Current Apron Spaces) Yes

Total Terminal (sq ft) 21,200

Meets Terminal (2,000 sq ft or Greater) Yes

Number of Parking Spaces 2000 260

Meets Parking 2000 (Ratio 100% or Greater) Yes

Number of Parking Spaces 2020 260

Meets Parking 2020 (Ratio 100% or Greater) Yes

Pavement Rehabilitation/Maintenance Good 1.73 SF 2,232,380 3,863,000

Through the Fence Operations No

Current Airport Management Part-Time

Planning Documents (Years Old) 4 Years or Less 25,000.00 each 2 50,000

$6,217,0001 Includes estimated land acquisition costs, additional construction costs due to more than average cut/fill or drainage requirements, and road/utility relocations, etc.

NPIAS Airport

130,000

21

Avi

atio

n Su

ppor

t In

fras

truc

ture

Des

ign

Stan

dard

Obj

ectiv

es

Tuscaloosa-National

Nav

igat

iona

l Vis

ual A

id O

bjec

tives

Dev

. & O

pt.

Air

port

Act

ivity

Airport NameAirport ID

Region

Serv

ice

Obj

ectiv

es

2,304,00063

Total Recommended Projects Cost

34,500.00

110 63

unit

68

8-71