    PROJECT MANAGEMENTINFORMATION SYSTEM

    (PMIS)

  • 7/30/2019 Ch. 10 PM__17-03-2012

    2/10

    PMISPMIS is a framework and methodology

    through which the entire planning and

    control information passes back and

    forth between the top management and

    those executives of middle and lower

    levels engaged in the project

    management.

  • 7/30/2019 Ch. 10 PM__17-03-2012

    3/10

    PMISManagementLevel

    PMISControl

    Pyramid

    CostParameters

    TimeSchedule

    Parameters

    Project

    Manager( Top)

    Strategic

    Plan

    Budgeting

    Control

    Milestone

    Managers

    ( Middle)

    Tactical

    Control

    Cost and

    Cash Flow

    Control

    Work

    Package

    Control

    Supervisors

    ( Lower)

    Operational

    Control

    Resources

    Productivity

    Control

    Activity

    Control

  • 7/30/2019 Ch. 10 PM__17-03-2012

    4/10

    E- Project

    An application of using updated software

    designed to manage a task more effectively

    and efficiently. It involves all stakeholdersof the project on a similar platform, where

    everybody can interact and share

    information and also be able to provide theirfeedback.

  • 7/30/2019 Ch. 10 PM__17-03-2012

    5/10

    Role of computers in project

    management To fix a project goal or plan

    To identify the work

    To set up the work period

    To set up resource availability and requirements

    To set up a baseline for the cost of the project

    To evaluate the baseline plan To keep a track of the progress of the work

    To evaluate the performance

    To report and export data

  • 7/30/2019 Ch. 10 PM__17-03-2012

    6/10

    Essentials of PMIS

    Integrated information system

    Sufficient flexibility

    Offer information on the cost, time andperformance parameters of a project

    Expose the inter-relationship among the

    three vital parameters.Decision oriented

    Capable of providing exception reports

  • 7/30/2019 Ch. 10 PM__17-03-2012

    7/10

    Features of PMISScheduling & Network

    Resource Management

    Budgeting

    Cost Control & Performance Analysis

    Reporting & Communication Interface

    Flexibility

  • 7/30/2019 Ch. 10 PM__17-03-2012

    8/10

    Benefits of PMIS

    Speed

    CapacityReduced Human Resources

    Economy

    Accuracy

    Optimum Decisions

  • 7/30/2019 Ch. 10 PM__17-03-2012

    9/10

    Demerits of PMIS There is a chance of information loss due to data

    insecurity.

    Generally people are not ready to accept changes

    easily.

    Legal considerations that need some adjustmentsand special attention are not fully taken care of.

    Use of mainframe software requires strong

    internal communication lines for support.

    Software implementation is less likely to succeed

    if the organization does not have sufficient

    training in project management principles.

  • 7/30/2019 Ch. 10 PM__17-03-2012

    10/10

    Project Management Software

    Packages PRISM : Tata Consultancy Services ( TCS) INSTA PLAN : WIPRO

    PROMIS : Integrated Project ManagementGroup ( Indian Agency)

    PROMT : BHEL

    PMS: IBM PCS : IBM