cfs / global – 29 september, 2010 pm report:
DESCRIPTION
CFS / Global – 29 September, 2010 PM Report:. SB2009: 4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ as advised by AAP, PAC and etc Written Workshop ‘Proposal’ for BAW # 1 sent to the GDE Project Director 28 September. Follows posted summary; to be posted (BAW Indico) - PowerPoint PPT PresentationTRANSCRIPT
CFS / Global – 29 September, 2010PM Report:
• SB2009: – 4 two-day workshops form the core of ‘TOP
LEVEL CHANGE CONTROL’– as advised by AAP, PAC and etc– Written Workshop ‘Proposal’ for BAW # 1 sent to
the GDE Project Director 28 September.• Follows posted summary; to be posted (BAW Indico)
• Reviews:– AAP? (Panel to receive BAW Proposal??)– PAC: November 11-12
• Focus on SRF industrialization and positron RD• Detector / Accelerator sessions more closely inter-twined
CFS/GBL 29 September, 2010 Marc Ross, Fermilab 1
CFS/GBL 29 September, 2010 Marc Ross, Fermilab 2
TLCC Process
When Where What
BAW 1 Sept. 7-10, 2010
KEK 1. Accelerating Gradient2. Single Tunnel (HLRF)
BAW 2 Jan 18-21, 2011
SLAC 3. Reduced RF 4. e+ source location
Baseline Assessment Workshops• Face to face meetings• Open to all
stakeholders• Plenary
Physics and detector input / representation mandatory
Physics and detector input / representation mandatory
Physics and Detector Group Participation
• (starting point: Joint ‘Scope and Parameters’ Plenary session at LCWS10)
• Similar session at IWLC10
• enhance interactions and facilitate joint work• 2010 - Workshop Connections:
– 5 contact persons identified: – Brau, Buesser, Fujii, Markiewicz, Thomson– 3 / 5 attended BAW 1.
CFS/GBL 29 September, 2010 3Marc Ross, Fermilab
CFS/GBL 29 September, 2010 Marc Ross, Fermilab 4
08:30->12:15 Plenary Session (CICG)
08:30 LHC (Machine) (25') Steve Myers (CERN)
09:00 FNAL talk (25') Greg Bock (FNAL)
09:30 Basic considerations on LC lumi & energy needs (up to 3 TeV) (25')
Jim Brau (Eugene Oregon)
10:00 Low energy running for CLIC (25') Daniel Schulte (CERN)
10:30 coffee break (15')
10:45 SB2009/ Low energy running for ILC (25') Andrei Seryi (JAI)
11:15 Discussion (1h00')
IWLC10 Tuesday AM Plenary Session
CFS/GBL 29 September, 2010 Marc Ross, Fermilab 5
Interim Report
CFS/GBL 29 September, 2010 Marc Ross, Fermilab 6
CFS/GBL 29 September, 2010 Marc Ross, Fermilab 7
CFS/GBL 29 September, 2010 Marc Ross, Fermilab 8
• be a significant milestone for the GDE. • comprehensively summarize the significant progress • be a 'half-way' point in the TD Phase• be a snapshot of the R&D • be forward looking content is encouraged, • emphasize what has been achieved.
• be positive and upbeat, • capture the significant progress
– Use of graphics, photographs etc. are strongly encouraged
• emphasize the international nature of our work. • (Only R&D that is in the TDR R&D Plan should be included).
Interim Report will :
Marc Ross, Fermilab 9
• We understand that much of the R&D is still on-going, - – timing of such status reports is never optimal.
• Technical Editorial Board (TEB) has been formed • one or two members of this editorial board have been
assigned as key contacts• TEB members are your primary points of contact • the report material will be sent to our Communicators,
– will be working with a professional layout firm to produce the finished document.
• We look forward to working with you on this exciting project.
• Please help us as best you can to show what we have achieved in the last years, working together in a true international environment.
TA WebEx meeting schedule 2010
TA Date day Focus topic Meetings/workshopsSCRF 22/09/2010 WednesdayCFS/Global 29/09/2010 WednesdayAS 06/10/2010 WednesdayAD&I 13/10/2010 Wednesday Parameters consolidation ECLOUD workshop @ Cornell
SCRF 20/10/2010 Wednesday GDE/CLIC/ECFA workshop (Geneva)CFS/Global 27/10/2010 Wednesday ILC schoolAS 03/11/2010 Wednesday ILC schoolAD&I 10/11/2010 Wednesday TF simulations, P&D studies PAC (Oregon)SCRF 17/11/2010 WednesdayCFS/Global 24/11/2010 Wednesday Day before US thanksgivingAS 01/12/2010 WednesdayAD&I 08/12/2010 Wednesday Upgrade and risk-mitigationSCRF 15/12/2010 WednesdayCFS/Global 22/12/2010 WednesdayAS 29/12/2010 WednesdayAD&I 05/01/2011 Wednesday Review parameters, cost, BAW programmeSCRF 12/01/2011 WednesdayCFS/Global 19/01/2011 Wednesday BAW-II (SLAC)AS 26/01/2011 WednesdayAD&I 02/02/2011 WednesdaySCRF 09/02/2011 WednesdayCFS/Global 16/02/2011 WednesdayAS 23/02/2011 Wednesday
10
To be used to prepare for Baseline Workshops – as needed
Wednesday ‘Technical Area’
Webex meetings, 06-11.2010
2010 / 2011 – Schedule• LOwLBT (FLASH): 4-7 Oct. DESY – postponed to
14-18 Feb• ECloud ’10: 8-12 Oct. Ithaca• IWLC 2010: 18-22 Oct. Geneva• (DESY / XFEL – PM+Peter G., 25-26 Oct.)• ILC PAC: 11-12 Nov. Eugene• SiD collaboration meeting 15-17 Nov. Eugene• Second Baseline Workshop: 18-21 Jan. SLAC• ALCPG11: 19-23 March, Eugene• (US PAC: 28 March – 1 April, New York)• ILC PAC: 19-20 May, Taipei• Next LCWS – September or October, 2011, Spain(?)
CFS/GBL 29 September, 2010 Marc Ross, Fermilab 11