cet energy profile - · pdf filecet energy profile siemens var partner day, ... rex 5xx abb...

20
CET Energ Siemens VAR Partner Armin Selimić, Owner and general Man Sanjin Čekić, Communication and Autom gy profile r day, Budapest 2016 nager mation Engineer www.cet-energy.com

Upload: trinhanh

Post on 12-Mar-2018

225 views

Category:

Documents


4 download

TRANSCRIPT

CET Energy profileSiemens VAR Partner day, Budapest 2016

Armin Selimić, Owner and general ManagerSanjin Čekić, Communication and Automation

CET Energy profileSiemens VAR Partner day, Budapest 2016

ManagerAutomation Engineer

www.cet-energy.com

About us

Reference projects

Reference projects

Ideas & suggestions

2

Reference projects – key facts

Reference projects – examples & tips

Ideas & suggestions

About us

Reference projects

Reference projects

Ideas & suggestions

3

Reference projects – key facts

Reference projects – examples & tips

Ideas & suggestions

• Founded in 2009. in Sarajevo, Bosnia and HerzegovinaSuccessor of SIJA company founded in 2000.

• Market leader in consulting, engineering and projectengineering, as well as construction, testing &power systems.

• 90% of employees are skilled and experienced electrical

• ISO 9001 / ISO 14001 certified

• Most important clients: Elektroprenos B&H (NationalB&H, RS and HZ HB (Public power utility Companies

About us

4

Herzegovina

project documentation design in electrical power& commissioning and maintenance of electrical

electrical engineers

National Transmission company), ElektroprivredaCompanies in B&H), Siemens AG etc.

More than 50 implemented projects

About us

Clients:

Bihać

5

Sarajevo

Brčko

Tuzla

Zenica

Bihać

Mostar

Banja Luka

LivnoGoražde

• Concept solutions• Tender documentation• Design documentation• Supervision• Training

CONSULTING ENGINEERING• Design documentation

protection settings studies• Protection and control devices

configuration• RTU configuration• SCADA design and configuration• Mission-critical

networks design andconfiguration

About us – areas of expertise

ENGINEERING TESTING & COMMISSIONINGDesign documentation,

settings studiesand control devices

configurationdesign and configuration

critical communicationnetworks design and

• Protection and controldevices

• MV and HV Switchgears• HV apparatuses and

power transformers• Control and monitoring

systems (RTU, SCADA)• Mission-critical

communication systems

6

About us

Reference projects

Reference projects

Ideas & suggestions

7

Reference projects – key facts

Reference projects – examples & tips

Ideas & suggestions

Reference projects – key facts

• Turn-key solutions

• Retrofit projects

• MV and HV switchgears (from 6

• Control, protection and substation

• Regional and national control centers

8

6 kV to 400 kV)

substation automation system

centers (SCADA system)

• SIPROTEC 4 and 5 implementation

• First to install SIPROTEC 5 devices in B&H

• More than 300 installed SIPROTEC devices

• SICAM SAS, SICAM PAS and SICAMcompanies

• SICAM WinCC / SICAM SCC HMI systems

Reference projects – key facts

9

B&H

devices in B&H

SICAM RTUs in distribution and transmision

systems; SPECTRUM POWER systems

About us

Reference projects

Reference projects

Ideas & suggestions

10

Reference projects – key facts

Reference projects – examples & tips

Ideas & suggestions

Reference projects – examples & tips

Project #1 – basic details:• Power 3 SAS• Investor: Elektroprivreda B&H• Scope of work: Factory Acceptance Testing, Site

Acceptance Testing• Equipment: SIPROTEC 4, REx 5xx ABB relays, SICAM SAS,

SICAM WinCC• Communication protocols: PROFIBUS, IEC 60870-5-103,

IEC 60870-5-101• Implementation: 2004-2006

Project specifics / issues:• Two substations 400/x kV and five substations

220/x kV

11

Reference projects – examples & tips

Project #2 – basic details:• Power 3 SCADA/EMS• Investor: Elektroprivreda/Elektroprenos B&H• Scope of work: Factory Acceptance Testing, Site

Acceptance Testing• Equipment: SIPROTEC 4, REx 5xx ABB relays,

SICAM SAS, SICAM WinCC• Communication protocols: PROFIBUS, IEC 60870-

5-103, IEC 60870-5-101• Implementation: 2006-2012

Project specifics / issues:• TPP 450 MW Kakanj, TPP 715 MW Tuzla,• 44 substations 110/x kV

12

Reference projects – examples & tips

Project #3 – basic details:• TPP Kakanj 450 MW, 6/0,4 kV auxiliary

switchgears• Investor: TPP Kakanj, Elektroprivreda B&H• Equipment: SIPROTEC 4 7SJ63, Siemens ETU45B,

ABB REF615, REX521, RTU SICAM emic, SICAM TM,redundant SICAM PAS, SICAM WinCC

• Communication protocols: PROFIBUS DP, IEC 61850,IEC 60870-5-104

• Implementation: 2011.

Project specifics / issues:• Interoperability issues ABB relays – SICAM PAS• Multi-vendor equipment integration in new

SCADA system

13

Project #4 – basic details:• Power distribution Regional control center

Sarajevo• Investor: JP Elektroprivreda B&H• Equipment: SCADA system Spectrum Power 5

system• Communication protocols: Modbus, IEC 60870-5-

101, IEC 60870-5-104• 110 kV, 35 kV, 10/0,4 kV substations etc.• Implementation: 2013.

Project specifics / issues:• Equipment in substations: SICAM SAS, SICAM

RTUs, RTUs from other vendors (ABB, Motorola,Eaton etc.) using different communicationprotocols

Reference projects – examples & tips

14

Project #5 – basic details:• SS 110/x kV Sarajevo 13• Investor: Elektroprenos B&H• Equipment: SIPROTEC 5 IEDs – 6MD, 7SA, 7UT,

7SJ, GPS LANTime M100, redundant RTUs SICAMAK3, SICAM CMIC, HMI SICAM SCC

• Communication protocols: IEC 61850, IEC 60870-5-101, IEC 60870-5-104

• Implementation: in progress

Project specifics / issues:• RTU SICAM AK3 redundancy

Reference projects – examples & tips

15

Project #6 – basic details:• Protection & Control cubicles, 37 pcs• Investor: Elektroprenos B&H• Equipment: SIPROTEC 5 IEDs – 6MD, 7SA, 7UT, 7SJ• Communication protocols: IEC 61850, IEC 60870-

5-103• Implementation: 2015.

Project specifics / issues:• Automatic voltage control issues for 7UT• Only master follower voltage regulation

Reference projects – examples & tips

16

Project #7 – basic details:• SS 400/x kV Sarajevo 10• Investor: Elektroprenos B&H• Equipment: SIPROTEC 4 IEDs, SIPROTEC 5 IEDs,

RTU SICAM TM, GPS LanTime M100, redundantSICAM PAS, redundant SICAM SCC

• Communication protocols: PROFIBUS FMS, IEC60870-5-103, IEC 61850, IEC 60870-5-101, IEC60870-5-104

• Implementation: In progress

Reference projects – examples & tips

Project specifics / issues:• Implementation of interlocking function (IRC,

GOOSE)• Redundant SICAM PAS / SICAM SCC

17

About us

Reference projects

Reference projects

Ideas & suggestions

18

Reference projects – key facts

Reference projects – examples & tips

Ideas & suggestions

Ideas & suggestions

• Automatic voltage control function

• Automatic voltage regulation for parallel(not only for master follower voltage

• RTU redundancy solution without external

19

using one phase-to-neutral voltage

parallel connected transformersvoltage regulation)

external voters (not yet released)

Contact

Thank you!

Any questions?

You can find us at:

Phone/Fax: +387 (0)33 46 02 30Mobile: +387 (0)61 17 32 33CET Energy LtdTrg Barcelone 271000 SarajevoBosna and Herzegovinae-mail: [email protected]: www.cet-energy.com

20