CET Energy profileSiemens VAR Partner day, Budapest 2016
Armin Selimić, Owner and general ManagerSanjin Čekić, Communication and Automation
CET Energy profileSiemens VAR Partner day, Budapest 2016
ManagerAutomation Engineer
www.cet-energy.com
About us
Reference projects
Reference projects
Ideas & suggestions
2
Reference projects – key facts
Reference projects – examples & tips
Ideas & suggestions
About us
Reference projects
Reference projects
Ideas & suggestions
3
Reference projects – key facts
Reference projects – examples & tips
Ideas & suggestions
• Founded in 2009. in Sarajevo, Bosnia and HerzegovinaSuccessor of SIJA company founded in 2000.
• Market leader in consulting, engineering and projectengineering, as well as construction, testing &power systems.
• 90% of employees are skilled and experienced electrical
• ISO 9001 / ISO 14001 certified
• Most important clients: Elektroprenos B&H (NationalB&H, RS and HZ HB (Public power utility Companies
About us
4
Herzegovina
project documentation design in electrical power& commissioning and maintenance of electrical
electrical engineers
National Transmission company), ElektroprivredaCompanies in B&H), Siemens AG etc.
More than 50 implemented projects
About us
Clients:
Bihać
5
Sarajevo
Brčko
Tuzla
Zenica
Bihać
Mostar
Banja Luka
LivnoGoražde
• Concept solutions• Tender documentation• Design documentation• Supervision• Training
CONSULTING ENGINEERING• Design documentation
protection settings studies• Protection and control devices
configuration• RTU configuration• SCADA design and configuration• Mission-critical
networks design andconfiguration
About us – areas of expertise
ENGINEERING TESTING & COMMISSIONINGDesign documentation,
settings studiesand control devices
configurationdesign and configuration
critical communicationnetworks design and
• Protection and controldevices
• MV and HV Switchgears• HV apparatuses and
power transformers• Control and monitoring
systems (RTU, SCADA)• Mission-critical
communication systems
6
About us
Reference projects
Reference projects
Ideas & suggestions
7
Reference projects – key facts
Reference projects – examples & tips
Ideas & suggestions
Reference projects – key facts
• Turn-key solutions
• Retrofit projects
• MV and HV switchgears (from 6
• Control, protection and substation
• Regional and national control centers
8
6 kV to 400 kV)
substation automation system
centers (SCADA system)
• SIPROTEC 4 and 5 implementation
• First to install SIPROTEC 5 devices in B&H
• More than 300 installed SIPROTEC devices
• SICAM SAS, SICAM PAS and SICAMcompanies
• SICAM WinCC / SICAM SCC HMI systems
Reference projects – key facts
9
B&H
devices in B&H
SICAM RTUs in distribution and transmision
systems; SPECTRUM POWER systems
About us
Reference projects
Reference projects
Ideas & suggestions
10
Reference projects – key facts
Reference projects – examples & tips
Ideas & suggestions
Reference projects – examples & tips
Project #1 – basic details:• Power 3 SAS• Investor: Elektroprivreda B&H• Scope of work: Factory Acceptance Testing, Site
Acceptance Testing• Equipment: SIPROTEC 4, REx 5xx ABB relays, SICAM SAS,
SICAM WinCC• Communication protocols: PROFIBUS, IEC 60870-5-103,
IEC 60870-5-101• Implementation: 2004-2006
Project specifics / issues:• Two substations 400/x kV and five substations
220/x kV
11
Reference projects – examples & tips
Project #2 – basic details:• Power 3 SCADA/EMS• Investor: Elektroprivreda/Elektroprenos B&H• Scope of work: Factory Acceptance Testing, Site
Acceptance Testing• Equipment: SIPROTEC 4, REx 5xx ABB relays,
SICAM SAS, SICAM WinCC• Communication protocols: PROFIBUS, IEC 60870-
5-103, IEC 60870-5-101• Implementation: 2006-2012
Project specifics / issues:• TPP 450 MW Kakanj, TPP 715 MW Tuzla,• 44 substations 110/x kV
12
Reference projects – examples & tips
Project #3 – basic details:• TPP Kakanj 450 MW, 6/0,4 kV auxiliary
switchgears• Investor: TPP Kakanj, Elektroprivreda B&H• Equipment: SIPROTEC 4 7SJ63, Siemens ETU45B,
ABB REF615, REX521, RTU SICAM emic, SICAM TM,redundant SICAM PAS, SICAM WinCC
• Communication protocols: PROFIBUS DP, IEC 61850,IEC 60870-5-104
• Implementation: 2011.
Project specifics / issues:• Interoperability issues ABB relays – SICAM PAS• Multi-vendor equipment integration in new
SCADA system
13
Project #4 – basic details:• Power distribution Regional control center
Sarajevo• Investor: JP Elektroprivreda B&H• Equipment: SCADA system Spectrum Power 5
system• Communication protocols: Modbus, IEC 60870-5-
101, IEC 60870-5-104• 110 kV, 35 kV, 10/0,4 kV substations etc.• Implementation: 2013.
Project specifics / issues:• Equipment in substations: SICAM SAS, SICAM
RTUs, RTUs from other vendors (ABB, Motorola,Eaton etc.) using different communicationprotocols
Reference projects – examples & tips
14
Project #5 – basic details:• SS 110/x kV Sarajevo 13• Investor: Elektroprenos B&H• Equipment: SIPROTEC 5 IEDs – 6MD, 7SA, 7UT,
7SJ, GPS LANTime M100, redundant RTUs SICAMAK3, SICAM CMIC, HMI SICAM SCC
• Communication protocols: IEC 61850, IEC 60870-5-101, IEC 60870-5-104
• Implementation: in progress
Project specifics / issues:• RTU SICAM AK3 redundancy
Reference projects – examples & tips
15
Project #6 – basic details:• Protection & Control cubicles, 37 pcs• Investor: Elektroprenos B&H• Equipment: SIPROTEC 5 IEDs – 6MD, 7SA, 7UT, 7SJ• Communication protocols: IEC 61850, IEC 60870-
5-103• Implementation: 2015.
Project specifics / issues:• Automatic voltage control issues for 7UT• Only master follower voltage regulation
Reference projects – examples & tips
16
Project #7 – basic details:• SS 400/x kV Sarajevo 10• Investor: Elektroprenos B&H• Equipment: SIPROTEC 4 IEDs, SIPROTEC 5 IEDs,
RTU SICAM TM, GPS LanTime M100, redundantSICAM PAS, redundant SICAM SCC
• Communication protocols: PROFIBUS FMS, IEC60870-5-103, IEC 61850, IEC 60870-5-101, IEC60870-5-104
• Implementation: In progress
Reference projects – examples & tips
Project specifics / issues:• Implementation of interlocking function (IRC,
GOOSE)• Redundant SICAM PAS / SICAM SCC
17
About us
Reference projects
Reference projects
Ideas & suggestions
18
Reference projects – key facts
Reference projects – examples & tips
Ideas & suggestions
Ideas & suggestions
• Automatic voltage control function
• Automatic voltage regulation for parallel(not only for master follower voltage
• RTU redundancy solution without external
19
using one phase-to-neutral voltage
parallel connected transformersvoltage regulation)
external voters (not yet released)
Contact
Thank you!