cesg-222 October 2008
1. Space Packet Protocol Working Group
2. Asynchronous Message Service Working Group
3. Mars 2015 Interoperability Working Group
4. IP Over CCSDS Working Group
5. Motion Imagery and Applications Working Group
6. Delay Tolerant Networking Working Group
7. Voice Working Group
SIS REPORT
A. CURRENT GROUPS WITHIN AREA
cesg-322 October 2008
*x/y x = registered; y = attended.
SIS REPORT
B. ATTENDANCE METRICS
SIS
IPO WG AMS WG Voice WG DTN WG MIA WG Plenary
Secretariat 1 1
BNSC 1 1 3
CNES 2 1
CSA
DLR 1 1 1
ESA 2 1 1 4 1 1
FSA 1 1 1 1
JAXA 2
USA 8 7 5 14 5 18
Total 12 11 8 22 8 25
MeetingDuration
1 day 2.5 days 1 day 1 day 1 day 1 day
AgencyDiversity
3 4 4 5 4 5
cesg-422 October 2008
1. Space Packet Protocol WG
Goals: • Did not meet
Working Group Status:
• Green Book complete and in final editing
• Pink Sheets in CESG Review
Working Group Summary Situation:
• Will move to dissolve when Pink Sheet ballot is completestatus: OK CAUTION PROBLEM
comment: Work complete
SIS REPORT
C. SUMMARY TECHNICAL STATUS
cesg-522 October 2008
2. Asynchronous Message Service WG
Goals: • Discuss ESA/SciSys and CNES implementations• Interoperability testing• Specification discussions
Working Group Status:
• Interoperability testing under way: 1 spec change and 1 clarification found to date
• Spec review yielded 11 clarifications to Red Book, ready for Agency Review by May 2009 or earlier (interoperability testing completes end of March)
• Reviewed draft Green Book
Working Group Summary Situation:status: OK CAUTION PROBLEM
comment: Ahead of schedule.
SIS REPORT
cesg-6
AMS WG Findings
• The AMS WG endorses the AMS profile on which the SOIS MTS prototype is built
• Funding permitting, the AMS WG recommends initiation of ESA/SciSys – JHU/APL interoperability testing over SOIS packet service. To be completed before the spring meetings.
• We recommend that further JPL/GSFC/MSFC interoperability testing be conducted face-to-face some time in January, location TBD. On track to report test results by March 30 as scheduled.
• Plan to revise spec by December 15, publish Green Book on March 30, and start final agency (Blue Book) review per Charter schedule.
cesg-722 October 2008
3. Mars 2015 Interoperability WG
Goals: • Did not meet
Working Group Status:• Green book complete
• Resources not available for Magenta Book, work covered by Cross Support Architecture WG.
• Motion to close WG forthcoming
Working Group Summary Situation: Moribund
status: OK CAUTION PROBLEM
comment:
SIS REPORT
cesg-822 October 2008
4. IP Over CCSDS WG
Goals: • Develop a CCSDS recommended best practice document for
how to transfer IP datagrams over the 4 CCSDS link layer protocols.
Working Group Status:• IP over CCSDS Red-3 currently in Agency Review• Consensus achieved on NASA-RID on IP over ENCAP
• Requires Pink Sheet to add Internet Protocol Extension (IPE) PID plus normative Annex to Space Link Identifers BB, and remove IPv6 PID from same
• These actions complete the technical work of the group
Working Group Summary Situation:
status: OK CAUTION PROBLEM
comment: Good
SIS REPORT
cesg-922 October 2008
5. Motion Imagery and Applications WG
Goals: • Review draft Green book text• Achieve consensus on forward work (Magenta or Blue Book)• Plan Spring ‘09 meeting timing and location
Working Group Status:• Reviewed June 23-27 visits to Columbus Control Center, European
Astronaut Center, and the ATV Control Center• Reviewed content of Green Book, made writing assignments• Settled on Magenta Book rather than Blue Book• Reviewed plan for interim meeting
Working Group Summary Situation:
status: OK CAUTION PROBLEM
comment: On schedule for GB publication.
SIS REPORT
cesg-1022 October 2008
6. Delay Tolerant Networking WG
Goals: • Review working group charter and status.• Review draft Green Book.• Discuss RFC5050 applicability and any deficiencies• Agree on documents the WG will produce and way forward
Working Group Status:• Reviewed draft Green Book, including comments by JAXA and
ESA.• Need identified to provide additional books on Application
Utilization (Magenta) and DTN Routing (Blue). Charter mod required.
Working Group Summary Situation:
status: OK CAUTION PROBLEM
comment: On Schedule.
SIS REPORT
cesg-1122 October 2008
7. Voice WG
Goals: • Review results of agency survey• Sanity check schedules• Review draft White Book
Working Group Status:• Voice communication survey preliminary results reviewed.• Reviewed White Book Draft, conclusions:
• Need separate drafts for the proposed Green and Magenta books. • An analysis by segment has been engaged that considers the
breadth of earth – habitat – in-space nodes in regard to voice communication.
• Assigned actions for Green Book document content.
Working Group Summary Situation:
status: OK CAUTION PROBLEM
comment: On Schedule.
SIS REPORT
cesg-12
Cross Area Meetings for Spring ‘09
• SIS-SLS: Determine interest and need for pursuing Robust Header Compression (ROHC) for CCSDS Links
• SIS-CSS: Support development of Cross-Support Services Architecture, particularly focusing on in-space cross-support
• SIS-SOIS, SIS-MOIMS: Joint meetings between AMS WG SOIS ASS WG; AMS WG and SMC WG
• SIS-SLS: High rate uplink requirements versus Video requirements; Voice emergency link requirements – between meetings Voice and MIA to contact HRU Chair
22 October 2008
cesg-13
Forthcoming Resolutions from SIS to CESG
• (Via SLS): Ballot Pink Sheets from Space Packet Protocol WG
• Dissolve Mars WG
• Ballot Space Link Identifiers Pink Sheets and publish IP Over CCSDS Magenta Books
22 October 2008
cesg-1422 October 2008
1. AMS Interoperability testing proceeding well, overall WG ahead of schedule
2. Mars Interoperability and IP Over CCSDS have completed their technical work and will close
3. SIS welcomes Mr. Ivan Antonov, FSA/Roscosmos, as the Deputy Chair of the Voice WG and as a contributor to the Voice and Motion and Imagery Applications WGs
SIS REPORT
D. SUMMARY: MAJOR ACCOMPLISHMENTS, F’08 MEETING