ces review of zpmc quote

4

Click here to load reader

Upload: khoai-sai-gon

Post on 16-Dec-2015

15 views

Category:

Documents


3 download

DESCRIPTION

review quotation zpmc

TRANSCRIPT

  • FW: URGENT FW: Revised technical proposal for CMIT repair [email protected]

    Dear Scott,

    Please see below feedback from CES.

    Seems that no problem for the technical proposal of crane repair, and you can proceed the next step.

    Thanks for your patience .

    Best Regards

    Nick

    _____________________________________________From: Scheijven, Theo Sent: Thursday, September 25, 2014 7:06 PMTo: Wang, Nick Xiao Dong

    Cc: Oostwouder, Walter Arie Johannes; Ross, Halfdan; Franken, Laurens; Hu, Shi LinSubject: RE: URGENT FW: Revised technical proposal for CMIT repair

    Hi Nick,

    Attached doc can be now be used as guidance regarding the repair process.

    I did not make any more remarks to it but following to be added as important note:

    Before the repair process starts, CES will define the various hold and witness points in detail.Just a few hold points for now as an example:

    CES approval required before any attempt to move the crane

    CES approval of measurement report after measuring before repair

    CES approval of measurement report after measuring after repair

    So proposal can be sent to CMIT.

    Best regards,

    Theo

    _____________________________________________From: Wang, Nick Xiao Dong Sent: Thursday, September 25, 2014 8:13 AM

    To: Scheijven, TheoCc: Oostwouder, Walter Arie Johannes; Ross, Halfdan; Franken, Laurens; Hu, Shi LinSubject: RE: URGENT FW: Revised technical proposal for CMIT repair

    Dear Theo,

    Thanks for your below comments;

    Sent: 25 September 2014 6:12 PM To: [email protected]

    Cc: Robert Hildebrand; Nghia, Le Van; [email protected]; [email protected]; CMITOPSCLMAttachments:Repair of_ VietNam~1.pdf (3 MB)

    Page 1 of 4FW: URGENT FW: Revised technical proposal for CMIT repair

    26/09/2014https://mail.cmit.com.vn/owa/?ae=Item&t=IPM.Note&id=RgAAAADlNANq70nGR55t...

  • For the first comment, after clarification with Alex, ZPMC revised the document in page 13 , and also adding the

    jack up drawing at last page of this file.

    Please take a look.

    For the second comments, the original intention from ZPMC was to create more detailed workshop

    procedure /drawings for repair work when they get order, but brought the confusions to you. Now ZPMC move

    this statement in page 5.

    Attached is the more clear version. Appreciate your final review and approval.

  • Appreciate your kind supports.

    Best Regards

    Nick

    -----Original Message-----

    From: [mailto:[email protected]]

    Sent: Tuesday, September 23, 2014 7:06 PM

    To: Wang, Nick Xiao DongCc: ; luaifeng; ; ; ;

    Subject: Re: RE: Confidentiality agreement

    Hi Nick,

    The attachments are the quotation and the technical proposal.for CMIT crane repair.

    The quotation has been adjusted based on the technical proposal updated by technical department.

    Best regards,________________________________

    /Cao Pengwei

    Product Service Center

    Shanghai Zhenhua Heavy Industries Co., Ltd.

    :3261A1803

    Add:3261 Dong Fang Road, Shanghai, P.R.ChinaTel:0086-21-31192668

    Fax:0086-21-58397999Cell (:0086-13701893412

    Email:[email protected]

    [email protected]

    From: [email protected]

    Date: 2014-09-22 12:32 To:

    Subject: RE: Confidentiality agreement

    Dear Cao,

    Attached is revised NDA document.

    Please add the correct name of documents you submitted official into last page : SCHEDULE 1 SPECIFICATION OF CONFIDENTIAL INFORMATION

    Then we can sign that accordingly. Please let me know who need to sign from APMT?

    Thanks

    Best Regards

    Nick

    Page 3 of 4FW: URGENT FW: Revised technical proposal for CMIT repair

    26/09/2014https://mail.cmit.com.vn/owa/?ae=Item&t=IPM.Note&id=RgAAAADlNANq70nGR55t...

  • From: Wang, Nick Xiao Dong

    Sent: Sunday, September 21, 2014 12:54 PM To: caopengwei ([email protected])

    Subject: FW: Confidentiality agreement

    Dear Cao,

    Please see attached Maersk template for NDA

    ________________________________

    The information contained in this message is privileged and intended only for the recipients named. If

    the reader is not a representative of the intended recipient, any review, dissemination or copying of this message or the information it contains is prohibited. If you have received this message in error, please

    immediately notify the sender, and delete the original message and attachments.

    Please consider the environment before printing this email.

    > >

    ________________________________

    The information contained in this message is privileged and intended only for the recipients named. If the reader is not a representative of the intended recipient, any review, dissemination or copying of this message or the information it contains is prohibited. If you have received this message in error, please immediately notify the sender, and delete the original message and attachments.

    Please consider the environment before printing this email.

    Page 4 of 4FW: URGENT FW: Revised technical proposal for CMIT repair

    26/09/2014https://mail.cmit.com.vn/owa/?ae=Item&t=IPM.Note&id=RgAAAADlNANq70nGR55t...