CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY – MARINE ENGINEER OFFICER EXAMINATIONS ADMINISTERED BY THE SCOTTISH QUALIFICATIONS AUTHORITY ON BEHALF OF THE MARITIME AND COASTGUARD AGENCY STCW 78 as amended MANAGEMENT ENGINEER REG. III/2 (UNLIMITED) 040-36 – ENGINEERING, SYSTEMS AND SHIP’S DRAWINGS WEDNESDAY, 19 JULY 2017 1315 - 1615 hrs Examination paper inserts: Notes for the guidance of candidates: Materials to be supplied by colleges: Candidate’s examination workbook DRG – 015 DRG – 014 DGR – 013 DRG – 019 DRG - 012 1. Candidates are required to obtain 50% of the total marks allocated to this paper to gain a pass AND also obtain a minimum 40% in Sections A and B of the paper. 2. Non-programmable calculators may be used. 3. All formulae used must be stated and the method of working and ALL intermediate steps must be made clear in the answer.

Upload: others

Post on 26-Oct-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY...LT-Soot Release Unit PI CI CI CI PI PI Key Saturated steam Condensate Distilled Water Sea Water Control Air To Safe Position V3 V21

CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY – MARINE ENGINEER OFFICER

EXAMINATIONS ADMINISTERED BY THE

SCOTTISH QUALIFICATIONS AUTHORITY

ON BEHALF OF THE

MARITIME AND COASTGUARD AGENCY

STCW 78 as amended MANAGEMENT ENGINEER REG. III/2 (UNLIMITED)

040-36 – ENGINEERING, SYSTEMS AND SHIP’S DRAWINGS WEDNESDAY, 19 JULY 2017 1315 - 1615 hrs Examination paper inserts: Notes for the guidance of candidates:

Materials to be supplied by colleges:

Candidate’s examination workbook

DRG – 015 DRG – 014 DGR – 013 DRG – 019

DRG - 012

1. Candidates are required to obtain 50% of the total marks allocated to this paper to gain a pass AND also obtain a minimum 40% in Sections A and B of the paper.

2. Non-programmable calculators may be used. 3. All formulae used must be stated and the method of working and ALL intermediate

steps must be made clear in the answer.

Page 2: CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY...LT-Soot Release Unit PI CI CI CI PI PI Key Saturated steam Condensate Distilled Water Sea Water Control Air To Safe Position V3 V21

[OVER

ENGINEERING, SYSTEMS AND SHIP’S DRAWINGS Attempt ALL questions Marks for each part question are shown in brackets

Section A

1. Piping Systems - DRG. 015 (a) Describe the following device, stating its function.

(b) Describe the following device, stating its function at the feed pump.

(c) Describe how the temperature of the boiler circulating pumps is controlled. (d) Describe the following device, stating its function.

(e) Describe the function of the economiser feed pump.

(2)

(2)

(2)

(2)

(2)

2. Mechanical Assembly – DRG 014 (a) Describe how the impeller is attached to the shaft. (b) Explain the function of item 20. (c) On the side elevation shown, state what sides the suction and discharge are

on. (d) Explain the function of item 530. (e) Explain the purpose of item 180.

(2)

(2)

(2)

(2)

(2)

Page 3: CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY...LT-Soot Release Unit PI CI CI CI PI PI Key Saturated steam Condensate Distilled Water Sea Water Control Air To Safe Position V3 V21

3. Ship’s Construction Drawing – DRG 013 (a) State the precise location of No.4 WBT bottom plug. (b) State the total number of bottom plugs. (c) State what S.C. are. They are located between frames 40-42, port and stb. (d) State between what frame numbers the void space around the pump room

runs. (e) Discuss, with reasons, what areas you would avoid placing support blocks,

when the vessel is in dry dock.

(2)

(2)

(2)

(2)

(2)

4. Hydraulic and Pneumatic System Drawings – DRG. 019 (a) State what station currently has control of the main engine, and identify

where on the drawing this is evident. (b) State what items 7 and 88 are, explaining their function. (c) State what item 127 is, explaining its function. (d) Detail any drawing references that may help you physically identify the

location of the ahead, astern, start and stop, remote control solenoid valves.

(e) State what item 30 is, explaining its function.

(2)

(2)

(2)

(2)

(2)

Page 4: CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY...LT-Soot Release Unit PI CI CI CI PI PI Key Saturated steam Condensate Distilled Water Sea Water Control Air To Safe Position V3 V21

[OVER

5. Electrical Power Systems and Control Drawings – DRG 012 (a) State the type of device and its function for EACH of the following:

(i)

(ii)

(b) Describe the device and its function for both the emergency switchboard

and the main switchboard 220 V feeder panel breakers.

(c) State the purpose of having two transformers feeding MSB feeder panel. (d) Describe the Main/Emergency Board Interconnector.

(2)

(2)

(2)

(2)

(2)

Page 5: CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY...LT-Soot Release Unit PI CI CI CI PI PI Key Saturated steam Condensate Distilled Water Sea Water Control Air To Safe Position V3 V21

Section B

6. Hydraulic and Pneumatic Systems - DRG 019 The main air start automatic valve, does not return to the closed position on completion of the starting sequence, but remains open, and slowly returns to the closed position over a period of time. (a) State the item numbers of the components in the system that may cause the

fault. (b) Describe the operation of control for the automatic valve. (c) Explain the possible faults that may cause the control failure, stating why

this is of concern.

(8)

(10)

(7)

7. Mechanical Assembly - DRG 014 Describe the procedure for replacing the impeller wear rings on the illustrated pump.

(25)

Page 6: CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY...LT-Soot Release Unit PI CI CI CI PI PI Key Saturated steam Condensate Distilled Water Sea Water Control Air To Safe Position V3 V21

220V FeederPanel

No.2 440VFeeder Panel

No.1 440VFeeder Panel

No.1 GroupStarter Panel

Moulded Case Circuit Breaker (MCCB)

Disconnector Switch

Air Circuit Breaker (ACB)

No.23 phase 120kVA

No.13 phase 120kVA

Main/EmergencyBoard Interconnector

Main Switchboard

Key

No.1

Bus-Tie PanelSynchronising Panel No.1 GeneratorPanel

G

Bolted Bus Link

No.2 GroupStarter Panel

440VGroup StarterConsumers

440V Consumers

440V Consumers

220V Consumers

220V Consumers

440V Consumers440VGroup StarterConsumers

No.2

No.2 GeneratorPanel

No.3 GeneratorPanel

G

No.3

G

1phase 15kVA x3

Emergency GeneratorBus Tie Panel

EmergencyGenerator Panel

Shore PowerPanel

220VFeeder Panel

440VFeeder Panel

G

180kW 289A

Shore Power

P-EG-1

P-EM-01

P-GE1-1

P-1M-1P-2M-1

P-GE2-1 P-SY-1P-GE3-1

P-EM-01A

P-SY-1

Emergency Switchboard

(drg. 012)

Page 7: CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY...LT-Soot Release Unit PI CI CI CI PI PI Key Saturated steam Condensate Distilled Water Sea Water Control Air To Safe Position V3 V21

(DRG. 013)

Page 8: CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY...LT-Soot Release Unit PI CI CI CI PI PI Key Saturated steam Condensate Distilled Water Sea Water Control Air To Safe Position V3 V21

(drg. 014)

Page 9: CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY...LT-Soot Release Unit PI CI CI CI PI PI Key Saturated steam Condensate Distilled Water Sea Water Control Air To Safe Position V3 V21

PITI

TI

TI

TI

TI TI

ChemicalDosingUnit

LT-SootReleaseUnit

PI CI

CI CI

PI PI

Key

Saturated steam

Condensate

Distilled Water

Sea Water

Control Air

To SafePosition

V3

V21

V12

V1V1

V2

V8

V5 V5-1

V3 V3-1V13

V10

V13-1

Main Boiler

SB32V

SB14V

SB41V SB40V

SB17V SB16V

SB34V

SB02V

SB09V

SB20V

SB21V

SB19V

SB46VSB18V

SB05V

SB37V

SB10V

SB35V

SB33V

SB12V

SB13V

SamplingCooler

LS LAH1523

SAH

LAL1735

LS10

LS LAL1524

Boiler Water Circulating Pumps(4.5m 3/h x 40mth)

Economiser Feed Water Pump(1.2m 3/h x 100mth)

Boiler FeedWater Pumps

(25m3/h x 120mth)No.1

PI CI

SX

SB03V

SB08V

SB06V

SB38V

No.2

PI CI

SB04V

SB36V

SB07V

SB39V

SB01V

From7kg/cm2

Control Air

ControlPanel

OilDetector

BoilerPanel

SB26V

SB25V

SB27V

SB28V

SB29V

SB30V

SB31V

Feed WaterFilter Tank

(4m3)

To Bilge Holding TankSalinometer

From FreshWater Tank

Upper Deck

From Upper DeckSteam Service Drain

From Engine RoomSteam Service Drain

WS17V

WS16VFrom Sea

Water System

Exhaust Gas Economiser(900kg/h x 7kg/cm 2)

To Safe Position

To Accommodationand Air Conditioning

To Tank Cleaning SeaWater Heater/Cargo Heating

To Engine RoomSteam Service

From Main EngineScavenge Air

From 7kg/cm2

Control Air

From 7kg/cm2

Control Air

S

From 7kg/cm2

Control Air

To EngineRoom Steam

Service

To LT FWCoolingSystem

From LT FWCoolingSystem

To EngineRoom SteamService

SB22V

SB24V

PC

Dump / DrainCooler

(DRG. 015)

Page 10: CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY...LT-Soot Release Unit PI CI CI CI PI PI Key Saturated steam Condensate Distilled Water Sea Water Control Air To Safe Position V3 V21

DRG. 019

170

180

190

Page 11: CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY...LT-Soot Release Unit PI CI CI CI PI PI Key Saturated steam Condensate Distilled Water Sea Water Control Air To Safe Position V3 V21

SCOTTISH QUALIFICATIONS AUTHORITY

MARKERS REPORT FORM

PART I SUBJECT: 040-36

DATE: 19-07-2017

General Comments on Examination Paper

A procedure must have a sequence of actions in an order that is achievable, and when item numbers are evident on

the drawing they should be included in the procedure to avoid any element of doubt or confusion. Good

understanding can usually be demonstrated by simple explanations rather than highly complex ones, however an

answer that totals 6 lines for 25 marks is not going to provide sufficient information.

General Comments of Specific Examination Questions

Q1. There was general confusion over when the smaller feed pump would be used, with many candidates stating it

would be used ‘at sea’, to supply the economiser, when the vessel would be using less steam? This is not correct on

many levels and the drawing clearly shows this not to be correct.

Q2. It is of concern that a significant number of candidates could not identify the suction and discharge sides of a

centrifugal pump. Only a few candidates included axial and radial locating of the impeller to the shaft.

Q3. Well answered by most candidates.

Q4. Well answered by most candidates.

Q5. Several candidates stated that the interlock between the bus tie and emergency generator supply breaker, was

to ensure that they both closed at the same time, and opened at the same time? Unfortunately their wording left no

room for grammatical error in what was meant?

Q6. Many items that candidates clearly identified as integral to the operational control of the air automatic valve

were not included in the initial list of items that may cause the stated fault?

Q7. Several candidates only replaced one wear ring, when there are two, with a few removing the impeller without

first gaining access. Some replaced both wear rings without removing either the impeller or casing cover?

Page 12: CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY...LT-Soot Release Unit PI CI CI CI PI PI Key Saturated steam Condensate Distilled Water Sea Water Control Air To Safe Position V3 V21

CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY – MARINE ENGINEER OFFICER

EXAMINATIONS ADMINISTERED BY THE

SCOTTISH QUALIFICATIONS AUTHORITY

ON BEHALF OF THE

MARITIME AND COASTGUARD AGENCY

STCW 78 as amended MANAGEMENT ENGINEER REG. III/2 (UNLIMITED)

040-36 – ENGINEERING, SYSTEMS AND SHIP’S DRAWINGS WEDNESDAY, 29 MARCH 2017

1315 - 1515 hrs Examination paper inserts: Notes for the guidance of candidates:

Materials to be supplied by colleges:

Candidate’s examination workbook

DRG – 001 DRG – 002 DRG – 003 DRG – 004

DRG - 011

1. Candidates are required to obtain 50% of the total marks allocated to this paper to gain a pass AND also obtain a minimum 40% in Sections A and B of the paper.

2. Non-programmable calculators may be used. 3. All formulae used must be stated and the method of working and ALL intermediate

steps must be made clear in the answer.

Page 13: CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY...LT-Soot Release Unit PI CI CI CI PI PI Key Saturated steam Condensate Distilled Water Sea Water Control Air To Safe Position V3 V21

[OVER

ENGINEERING, SYSTEMS AND SHIP’S DRAWINGS Attempt ALL questions Marks for each part question are shown in brackets

Section A

1. Piping Systems – DRG - 001 (a) Explain the purpose of EACH temperature regulating valve in the system

shown. (b) State the pipe specification used for the main engine jacket water inlet. (c) Describe the fitting requirement for all horizontal sections of pipe running

to the expansion tank, stating the reason for this requirement. (d) Describe the options available for maintaining main engine jacket water in a

warm condition when in port, stating, with reasons, the preferred option.

(2)

(2)

(2)

(4)

2. Mechanical Assembly – DRG - 002 (a) Describe the type of shaft seal arrangement used on the pump. (b) State what type of impeller is fitted to the pump. (c) Describe item 46, stating its purpose. (d) Describe item 48, stating its purpose. (e) Describe the main casing sections which make up the pump assembly.

(2)

(2)

(2)

(2)

(2)

3. Ship’s Construction Drawing – DRG - 003 (a) State the dimensions of the plate sections on the flat bottom of the hull

mid-ship. (b) Identify the longitudinal girders between which the pipe tunnel runs. (c) Identify, using drawing references, the location of No.3 double bottom tank. (d) State the frame number at which you would expect the bilge keel to stop. (e) State what the hull plate thickness is at the sheer strake.

(2)

(2)

(2)

(2)

(2)

Page 14: CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY...LT-Soot Release Unit PI CI CI CI PI PI Key Saturated steam Condensate Distilled Water Sea Water Control Air To Safe Position V3 V21

4. Hydraulic and Pneumatic System Drawings – DRG - 004

(a) Describe EACH of the following devices, stating the function of EACH:

(i)

(ii)

(iii)

(iv)

(b) If fuel and lubricating oil purifier alarms activated and air can be heardescaping in the engine room, identify the valve that should be checked toensure it was in the closed position.

(2)

(2)

(2)

(2)

(2)

5. Electrical Power Systems and Control Drawings – DRG - 011

(a) State the purpose of the circuit shown.

(b) State the type of device and its function for EACH of the following:

(i) C29

(ii) T1

(c) State what type of neutral the vessel uses.

(d) State what type of excitation is used.

(2)

(2)

(2)

(2)

(2)

Page 15: CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY...LT-Soot Release Unit PI CI CI CI PI PI Key Saturated steam Condensate Distilled Water Sea Water Control Air To Safe Position V3 V21

Section B

6. Piping Systems Drawing – DRG - 001

(a) Describe how the cooling system valves should be set up, including flowpaths, in order to use the generator jacket water to maintain the mainengine in a warm condition in port.

(b) Describe the effect on the system, and any impact on other controllers, ifthe HT temperature regulating valve were to stick in the HT cooler full openposition, when the vessel is in port.

(10)

(15)

7. Ship Construction Drawing – DRG - 003

On inspection in dry dock, two sections of damage were found on the ship’s hull,which have been identified on the shell expansion plan.

The first was an indentation approximately 75mm deep extendingapproximately 700mm long x 700mm wide. Identified on the drawing as ‘A’.

The second was an indentation approximately 200mm deep extendingapproximately 1400mm long x 1400mm wide. Identified on the drawing as‘B’.

(a) Using drawing references, identify the location of both areas of damage.

(b) State, with reasons, the sections requiring repair, describing all steelinvolved in the repair, including any specifications, along with anycomplications.

(4)

(21)

SCOTTISH QUALIFICATIONS AUTHORITY

MARKERS REPORT FORM

SUBJECT: 040-36

DATE: 29-03-2017

General Comments on Examination Paper

This is not an engineering knowledge exam. The answers required are on the drawing, so candidates should relate their answers to the drawing, and not quote ‘normal procedures’ or ‘safety routines’, which don’t relate to the question being asked. More time should be spent reading and understanding the drawing, before answering the question.

General Comments of Specific Examination Questions

Q1. Candidates struggled with the concept that there was more than one option for maintaining the main engine in a warm condition in port, therefor struggled to explain any preferred option.

Q2. Few candidates could identify any casing sections beyond ‘volute’, regardless of terminology.

Q3. Several candidates did not attempt this question, indicating they had not seen a shell expansion plan before, despite it being part of the syllabus.

Q4. Well answered by most candidates.Q5. Well answered by most candidates.Q6. Disappointing that no candidates could demonstrate an understanding of the direction of flow when using generator jacket outlet water, to maintain the main engine in a warm condition when in port. Some ignored the question and simply stated that a pre-heat pump is used, (for 10 marks?), with some stating the pre-heat pump is used in conjunction with the main jacket water pumps? This demonstrates a serious inability to read the drawing. The question requested ‘flow paths’ to demonstrate an understanding of the drawing.Q7. There was a wide variation in answers, between those that has seen a shell expansion before and those that obviously had not. The complications in the repairs should be taken from the drawing, not the procedure or safety aspects involved in undertaking the repair.

ahunter
Highlight
Page 16: CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY...LT-Soot Release Unit PI CI CI CI PI PI Key Saturated steam Condensate Distilled Water Sea Water Control Air To Safe Position V3 V21
Page 17: CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY...LT-Soot Release Unit PI CI CI CI PI PI Key Saturated steam Condensate Distilled Water Sea Water Control Air To Safe Position V3 V21
Page 18: CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY...LT-Soot Release Unit PI CI CI CI PI PI Key Saturated steam Condensate Distilled Water Sea Water Control Air To Safe Position V3 V21
Page 19: CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY...LT-Soot Release Unit PI CI CI CI PI PI Key Saturated steam Condensate Distilled Water Sea Water Control Air To Safe Position V3 V21
Page 20: CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY...LT-Soot Release Unit PI CI CI CI PI PI Key Saturated steam Condensate Distilled Water Sea Water Control Air To Safe Position V3 V21
Page 21: CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY...LT-Soot Release Unit PI CI CI CI PI PI Key Saturated steam Condensate Distilled Water Sea Water Control Air To Safe Position V3 V21

SCOTTISH QUALIFICATIONS AUTHORITY

MARKERS REPORT FORM

SUBJECT: 040-36

DATE: 29-03-2017

General Comments on Examination Paper

This is not an engineering knowledge exam. The answers required are on the drawing, so candidates should relate

their answers to the drawing, and not quote ‘normal procedures’ or ‘safety routines’, which don’t relate to the

question being asked. More time should be spent reading and understanding the drawing, before answering the

question.

General Comments of Specific Examination Questions

Q1. Candidates struggled with the concept that there was more than one option for maintaining the main engine in

a warm condition in port, therefor struggled to explain any preferred option.

Q2. Few candidates could identify any casing sections beyond ‘volute’, regardless of terminology.

Q3. Several candidates did not attempt this question, indicating they had not seen a shell expansion plan before,

despite it being part of the syllabus.

Q4. Well answered by most candidates.

Q5. Well answered by most candidates.

Q6. Disappointing that no candidates could demonstrate an understanding of the direction of flow when using

generator jacket outlet water, to maintain the main engine in a warm condition when in port. Some ignored the

question and simply stated that a pre-heat pump is used, (for 10 marks?), with some stating the pre-heat pump is

used in conjunction with the main jacket water pumps? This demonstrates a serious inability to read the drawing.

The question requested ‘flow paths’ to demonstrate an understanding of the drawing.

Q7. There was a wide variation in answers, between those that has seen a shell expansion before and those that

obviously had not. The complications in the repairs should be taken from the drawing, not the procedure or safety

aspects involved in undertaking the repair.