centre for the creative arts and media (ccam) | gmit general arrangment drawings
TRANSCRIPT
-04.27-03.61
0100.00
00.00
00.00
00.00
00.00
00.00
04.62
+04.62
-00.10
-00.10
00.00
DK
DK DK
34
15
3510 2025
2025
2000
00.30
Slope:1:20
SURFACE OF RAMPAND LANDING NON-SLIP FAIR FACEDCONCRETE
Surface of ramp and landingslip resistant fair facedconcrete
Surface oframp andlanding slipresistant fairfacedconcrete
Slope:1:20
Sign Indicatingdirection to building
Sign Indicatingdirection to building
DK
-01.09
-00.45
LS
LS
LS
LS
LSLS
LSLS
LS
LS
LS
LSLSLSLSLSLSLS
BusStop
Sign Indicatingbuilding
-03.07
-02.42
-00.79
-00.1000.00-00.10
-00.10
-00.10
-00.10
-00.96
00.00
-03.62
-02.98
-02.35
-01.72
1800
1800
1800
1975
Slope:1:20
Slope:1:20
Slope:1:20
Slope:1:20
Slope:1:20
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
ProposedCar Park
Proposed GreenArea and
LandscapingProposed
Ramp
PROPOSED CAR PARK
CCAM MainEntrance
WellparkRoad
NoAccess
CCAMMain
Building
DK
Legend
0000
2025
2025
2025
-00.00
DK
ABOVE ORDINANCEDATUM
PUBLIC LIGHTSTAND TO COMPLYWITH ESBSTANDARDS
ACCESS ROUTE
DIMENSION LINE
EXISTING CHAPELSTRUCTURE
EXTENSIONSTRUCTURE
TACTILE SURFACE
DISHED KERBINGDK
8000
PROPOSED HARD STANDING
1800
MiniRoundabout
ExistingChapel
SUDS PERMEABLEPAVING
SURFACEWATERDRAINAGE SUDS
SURFACEWATERDRAINAGE SUDS
MH
MH
Fall toCentre:
1:60
ProposedExtension
ACCESSIBLEENTRANCE A
ACCESSIBLEENTRANCE B
ACCESSIBLEENTRANCE C
PROPOSEDLANDSCAPING
PROPOSED RESURFACEOF ROAD AND MARKINGS
ACCESSIBLE ROUTE FROMCAR PARK TO ENTRANCE C
ACCESSIBLE ROUTE FROMCAR PARK TO ENTRANCE A
ACCESSIBLE ROUTE FROMCAR PARK TO ENTRANCE B
ROADSTONEPAVIERS
GRASS MARGIN
GRASS MARGIN
GRASS MARGIN
GRASS MARGIN
EXISTING ROADWAY
ACCESS JUNCTION
MAN HOLE
FOUL WATER PIPE
RAIN WATER PIPE
F.F.L.+00.30
F.F.L.+00.30
MH
MH
MH
AJ
HOARDING LINE
SUDS 1:50 FALL TODRAINAGE SITE
SUDS SOAK PIT
100mm Ø RAIN WATERPIPE LAID TO FALL 1:50TO SUDS
100mm Ø FOUL WATERPIPE LAID TO FALL 1:50
Set D
ow
nA
rea/H
ard
sta
ndin
g
Det.014
DK
2125
ACCESS ROUTE ANDFIRE ESCAPE
MH
AJ
LS
00.00
AJ
4025
CCAM MAINBUILDING
1844
1788
1500
1844
1850
2400
4800
6000
14004872
8000
48002050 2025
4810
2985
F.F.L.+00.30
+00.30
13
09
0
Fall toCentre:
1:60
ACO 125DRAIN
ACO 125DRAIN
+0.000M
-0.100M
PERMEABLE PAVING600x50mm ROADSTONE PLAIN FLAGPAVING LAID ON 50mm SANDBLINDING ON 50mm GRAVEL WITH AROADSTONE HALF BATTERED KERBAT EDGE
PERMEABLE ROAD25mm PERMEABLE ASPHALTSURFACE COURSE ON 50mmPERMEABLE BASE COURSE ON100MM GRAVEL ON COMPACTEDEARTH
50
50
10
5025
100
50
DETAIL 014
1:10
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan80 Gleann Rua,Renmore,Galway.
DESIGNERS ADDRESS
ConstructionInformation/Working Drawings
Galway Mayo Institute ofTechnology
CONTACT DETAILS
Phone: 0830054478Email:[email protected]
G00262330 28/04/2015
28/0
4/20
15 1
3:08
:50
Site Layout Plan
1:200
GA_001
DDS4_P09
Site Layout Plan
Nor
th
1:200
GA_001
DDS4_P09
UP
ExistingStairs
25285
15338
2425
26525
LegendEXTENT OF WALLDEMOLITION
Existing Walls
EXTENT OF DOORDEMOLITION
EXTENT OF STAINGLASS WINDOWDEMOLITION
2909
8865
897
850
1210
1210
24003596
2510
2554
1494
3253
SCULPTURE
GALWAY FILM CENTRE
STAGING AREA
EXTENT OF FLOORSDEMOLITION
19603
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan80 Gleann Rua,Renmore,Galway.
DESIGNERS ADDRESS
ConstructionInformation/Workign Drawings
Galway Mayo Institute ofTechnology
CONTACT DETAILS
Phone: 0830054478Email:[email protected]
G00262330 28/04/2015
20/0
4/2
015 1
8:2
9:0
5
Demolition Plan
1:50
GA_002
DDS4_P09
Chapel Ground Floor Plan Demolition
UP
UP
30.07 m²Green Room
158 G
EXISTING VICTORIAN TILE
5.23 m²Costume Store
154 K
EXISTING VICTORIAN TILE
5.95 m²Costume Store
155 J
EXISTING VICTORIAN TILE
5.32 m²Costume Store
156 I
EXISTING VICTORIAN TILE
5.74 m²Costume Store
157 H
EXISTING VICTORIAN TILE
14.07 m²Tech Support
161 B
EXISTING PARQUET AND TILE
14.37 m²Prop Store
161 A
EXISTING PARQUET AND TILE
15.12 m²Matrix Chair Store
161 C
EXISTING PARQUET AND TILE15.69 m²Lobby161 M
EXISTING LIESTONE TILEFLOOR
185.87 m²Creative Space
161 L
EXISTING PARQUET ANDVICTORIAN TILE
A-A
678
7.08 m²Disabled Shower/WC
161 E
SOLUS CERAMICS MODULARTILE R11
16.66 m²Matrix Chair Store
161 D
EXISTING PARQUET AND TILE
25.53 m²Changing Room
161 F
SOLUS CERAMICS MODULARTILE R11
1050
4260
Slo
pe:
1:2
0
ModestyScreen
2398
LegendDemolished Walls
EXISTING DOOR TO BERETAINED ANDPAINTED WITH A FIRERESISTANT SELANT,INCHUMESCENT STRIPAND DOOR CLOSER
EXISTING DOOR TO BERETAINED AND PAINTEDWITH A FIRE RESISTANTSELANT,INCHUMESCENT STRIPAND DOOR CLOSER
EXISTING PARTITIONSTO BE DEMOLISHED
EXISTING PARTITIONS TOBE DEMOLISHED
EXISTING DOOR TO BEREMOVED ANDOPENING CLOSED
00.30
00.30
UPGR.
D-01
D-06
FD 30 S
D-08
FD 30 S
D-03
FD 30 S
UPGR.
D-09
Existing Walls
00.3
0
1263
4938
331128552855
897
00.30
00.00
008GA_013
2500
2800
D-02
FD 30 S
D-04
FD 30 S
D-05
FD 30 S
D-11
FD 30 S
D-12
FD 30 S
D-13
FD 30 S
D-14
FD 30 S
D-16
D-15
FD 30 S
D-07
S
D-101200
2850
00.30
3224
3029
1770
1770
1252
1050
NEW WALL OPEFOR FIRE DOOR
ALL EXISTING STAIN GLASS AND FRAMES RETAINED ANDREPAIRED BY USING SUITABLE CONSERVATIONTECHNOLOGIES UNLESS REMOVED IN DEMOLITION PLAN.
STAIN GLASS WINDOW REVEALS AND BORDERS TO BECLEANED.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THEEXISTING OPE BEHIND WINDOW.
EXTERIOR GLAZED GUARD REPLACED WITH SINGLEGLAZED WINDOW GUARD. 20mm GAP LEFT ALONGBOTTOM OF GLAZING TO VENTILATE AND MITIGATECONDENSATION.
ALL EXISTING STAIN GLASS AND FRAMESRETAINED AND REPAIRED BY USING SUITABLECONSERVATION TECHNOLOGIES UNLESS REMOVEDIN DEMOLITION PLAN.
STAIN GLASS WINDOW REVEALS AND BORDERS TOBE CLEANED.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THEEXISTING OPE BEHIND WINDOW.
EXTERIOR GLAZED GUARD REPLACED WITHSINGLE GLAZED WINDOW GUARD. 20mm GAP LEFTALONG BOTTOM OF GLAZING TO VENTILATE ANDMITIGATE CONDENSATION.
ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND REPAIRED BYUSING SUITABLE CONSERVATION TECHNOLOGIES UNLESS REMOVED INDEMOLITION PLAN.
STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPEBEHIND WINDOW.
EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED WINDOWGUARD. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TO VENTILATEAND MITIGATE CONDENSATION.
EXISTINGTEMPORARY FLOORREMOVED ANDPARQUET ANDVICTORIAN TILESRETAINED ANDREFURBISHED
1010
STAGING AREA/TV STUDIOFORBO MARMOLEUM REAL
00.30 00.3000.30
00.3000.30
00.30
00.00
EXISTING DOOR TOBE RETAINED ANDPAINTED WITH A FIRERESISTANT SELANT,INCHUMESCENTSTRIP AND DOORCLOSER
W-05
W-04
W-07
W-06
W-16
W-14 W-12 W-10
W-09 W-08
W-03W-02W-01
W-18
W-20
W-17
W-11W-13W-15
W-19
EXISTING FRENCH DRAIN TOBE REMOVED FROMPERIMETER OF CHAPELBUILDING AND REPALCEDWITH PREMEABLE PAVING
DOOR GUARD RAIL1100x1100mm
006GA_013
010GA_013
009GA_013
005GA_013
B-B
PROPOSED WALLOPENINGS TO BEMADE GOOD.FINISHES TO WALLSOF DEMOLITIONWORK TO BE MADEGOOD WITHAPPROPRIATE FILLINGAND LIME RENDERFINISH TO MATCHEXISTING WALLS
FOWL WATERDRAINAGE
RAIN WATERDRAINAGE
PROPOSED WALLCLOSURES TO BEMADE GOOD.FINISHES TO WALLSOF DEMOLITIONWORK TO BE MADEGOOD WITHAPPROPRIATEFILLING AND LIMERENDER FINISH TOMATCH EXISTINGWALLS
450MM MINIMUMACTIVITY TURNINGSPACE
SSOUNDER
EXISTING VICTORIAN TILE,PARQUET AND THEIR ADHESIVESTO BE REPLACED WITH SOLUSCERAMICS MODULAR TILES ANDLAID ON A BED OF TELLING UNILIT45 LIME
EXISTING PARQUET FLOOR TOBE RETAINED AND CLEANEDWITH VACUUM, MOPPED WITHARBO CLEANER 16. 2 COATS OFBONA HARDWAX OIL TO BEAPPLIED TO PARQUET WHENFULLY DRY AND BUFFED TOFINISH
EXISTING VICTORIAN TILES TO BERETAINED, GROUT AND TILES TOBE CLEANED BY VACUUM ANDMOP WITH ARBO CLEANER 16.WHEN DRY APPLY DUPONTSTONE TECH GROUT SEALER.BUFF FLOOR TO FINISH.
EXISTING VICTORIAN TILES TO BERETAINED, GROUT AND TILES TOBE CLEANED BY VACUUM ANDMOP WITH ARBO CLEANER 16.WHEN DRY APPLY DUPONTSTONE TECH GROUT SEALER.BUFF FLOOR TO FINISH.
EXISTING OPE TO BE WIDENEDAND 30 MIN. FIRE DOORINSTALLED. TO BE PERMANENTLYLOCKED AT ALL TIMES.
EXTENT OF PARQUET
EXTENT OF SOLUSCERAMICS MODULARTILES
EXTENT OF VICTORIANTILES
EXTENT OF FORBOMARMOLEUM REAL
1500
300
18
50
OAK LAMINATE FLOORBOARDS
OAK LAMINATE FLOORBOARDS
OAK LAMINATE FLOORBOARDS
OAK LAMINATE FLOORBOARDS
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan80 Gleann Rua,Renmore,Galway.
DESIGNERS ADDRESS
ConstructionInformation/Working Drawings
Galway Mayo Institute ofTechnology
CONTACT DETAILS
Phone: 0830054478Email:[email protected]
G00262330 28/04/2015
28/0
4/20
15 1
3:18
:37
Ground Floor Chapel Plan
1:50
GA_003
DDS4_P09
Proposed Ground Floor Chapel Plan
North
Key Plan
DN
24.85 m²Gallery161 T
INACCESSIBLE
5.44 m²Existing Stairs
?
?
B-B
A-A
846
UPGR.
D-17
EXISTING DOORTO BE RETAINEDAND PAINTEDWITH A FIRERESISTANTSELANT. TO BEPERMANENTLYLOCKED AT ALLTIMES.
EXISTINGBALUSTRADE TOBE RETAINEDAND PAINTEDWITH A LIGHTVARNISH
W-30
W-28
W-36W-37 W-35 W-34 W-33 W-32 W-31
W-22W-21 W-23 W-24 W-25
W-29W-39
W-38
LegendDemolished Walls
Existing Walls
PROPOSED WALLOPENINGS TO BEMADE GOOD.FINISHES TO WALLSOF DEMOLITIONWORK TO BE MADEGOOD WITHAPPROPRIATE FILLINGAND LIME RENDERFINISH TO MATCHEXISTING WALLS
FOWL WATERDRAINAGE
RAIN WATERDRAINAGE
PROPOSED WALLCLOSURES TO BEMADE GOOD.FINISHES TO WALLSOF DEMOLITIONWORK TO BE MADEGOOD WITHAPPROPRIATEFILLING AND LIMERENDER FINISH TOMATCH EXISTINGWALLS
450MM MINIMUMACTIVITY TURNINGSPACE
SSOUNDER
EXTENT OF PARQUET
EXTENT OF SOLUSCERAMICS MODULARTILES
EXTENT OF VICTORIANTILES
EXTENT OF FORBOMARMOLEUM REAL
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan80 Gleann Rua,Renmore,Galway.
DESIGNERS ADDRESS
ConstructionInformation/Working Drawings
Galway Mayo Institute ofTechnology
CONTACT DETAILS
Phone: 0830054478Email:[email protected]
G00262330 28/04/2015
28/0
4/20
15 1
4:29
:17
Gallery Floor Plan
1:50
GA_004
DDS4_P09
Proposed Gallery Floor Plan
North
UP
26.74 m²Glass Link
161 N
ROADSTONE LIMESTONEPAVING FLAGS
6741
B-B
A-A
700
2240
4.35 m²LobbyWC
SOLUS CERAMICS MODULARTILE R11
6.25 m²Disabled WC
161 Q
SOLUS CERAMICS MODULARTILE R11
3.89 m²LobbyWC
SOLUS CERAMICS MODULARTILE R11
10.61 m²Male WC
161 S
SOLUS CERAMICS MODULARTILE R11
10.33 m²Female WC
161 R
SOLUS CERAMICS MODULARTILE R11
1611
1440
2163
Slo
pe:
1:2
0
00.30
00.30
00.30
00.00
1700
00.30
63.23 m²Reception
161 P
Oak Laminate Floor
00.30
1850
D-21
N/A
D-24
N/A
D-16
N/A
1800
1500
D-18
D-19
1200
1200
C-C
2500
1605
OVER DOORHEATERSRECESSED INCEILING
W-1
8W
-20
W-1
9
W-4
3W
-42
W-4
1
W-4
0
014GA_014
017GA_014
GA_015
GA_014
022
015
GA_015
022GA_015
023
18267
1500
300
100
942
1844
1200
1010
1010
1010
1010
790
1077
LegendDemolished Walls
Existing Walls
PROPOSED WALLOPENINGS TO BEMADE GOOD.FINISHES TO WALLSOF DEMOLITIONWORK TO BE MADEGOOD WITHAPPROPRIATE FILLINGAND LIME RENDERFINISH TO MATCHEXISTING WALLS
FOWL WATERDRAINAGE
RAIN WATERDRAINAGE
PROPOSED WALLCLOSURES TO BEMADE GOOD.FINISHES TO WALLSOF DEMOLITIONWORK TO BE MADEGOOD WITHAPPROPRIATEFILLING AND LIMERENDER FINISH TOMATCH EXISTINGWALLS
450MM MINIMUMACTIVITY TURNINGSPACE
SSOUNDER
EXTENT OF PARQUET
EXTENT OF SOLUSCERAMICS MODULARTILES
EXTENT OF VICTORIANTILES
EXTENT OF FORBOMARMOLEUM REAL
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan80 Gleann Rua,Renmore,Galway.
DESIGNERS ADDRESS
Disability Access CertificateApplication
Galway Mayo Institute ofTechnology
CONTACT DETAILS
Phone: 0830054478Email:[email protected]
G00262330 15/01/2015
28/0
4/2
015 1
3:2
0:0
9
Ground Floor Extension Plan
1:50
GA_005
DDS4_P09
Ground Floor Extension Plan
North
Key Plan
00 Ground Level
0
01 Ground Floor
300
Chapel Flat Roof Level
4620
Chapel Eaves 1
7935
10 Chapel Ridge Level
11978
001GA_012
012GA_012
004GA_013
003GA_012
004GA_013
185.87 m²Creative Space
161 L
EXISTING PARQUET ANDVICTORIAN TILE
25.53 m²Changing Room
161 F
SOLUS CERAMICS MODULARTILE R11
7.08 m²Disabled Shower/WC
161 E
SOLUS CERAMICS MODULARTILE R11
30.07 m²Green Room
158 G
EXISTING VICTORIAN TILE
3135
3135
007GA_013
EXISTING SLATES TO BE REUSED WHEREPOSSIBLE AND REPLACEMENTS TO BEMADE GOOD WITH RECLAIMED BANGORBLUE AGED SIMILAR WHERE NECESSARY.
ALL EXISTING STAIN GLASS AND FRAMES RETAINED ANDREPAIRED BY USING SUITABLE CONSERVATION TECHNOLOGIESUNLESS REMOVED IN DEMOLITION PLAN.
STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPEBEHIND WINDOW.
EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZEDWINDOW GUARD. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TOVENTILATE AND MITIGATE CONDENSATION.
EXISTING STAIN GLAS WINDOWRETAINED ANDREPAIRED/UPGRADED WITH SINGLEGLAZE ISOTHERMAL GLAZING ANDA EXTERIOR GLAZED GUARD.
EXISTING STAIN GLAS WINDOWRETAINED ANDREPAIRED/UPGRADED WITH SINGLEGLAZE ISOTHERMAL GLAZING ANDA EXTERIOR GLAZED GUARD.
EXISTING STAIN GLAS WINDOWRETAINED ANDREPAIRED/UPGRADED WITH SINGLEGLAZE ISOTHERMAL GLAZING ANDA EXTERIOR GLAZED GUARD.
00 Ground Level
0
01 Ground Floor
300
02 Gallery FFL
4525
Chapel Eaves 1
7935
2051
016GA_014
185.87 m²Creative Space
161 L
EXISTING PARQUET ANDVICTORIAN TILE
24.85 m²Gallery161 T
INACCESSIBLE
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan80 Gleann Rua,Renmore,Galway.
DESIGNERS ADDRESS
ConstructionInformation/Working Drawings
Galway Mayo Institute ofTechnology
CONTACT DETAILS
Phone: 0830054478Email:[email protected]
G00262330 28/04/2015
28/0
4/20
15 1
3:23
:37
Chapel Sections AA - BB
1:50 DDS4_P05
Section A-A
Section B-B
1:50
GA_006
DDS4_P09
00 Ground Level
0
01 Ground Floor
300
Extension Parapet Level
4983
Extension Roof Level
4568
011GA_014
019GA_015
012GA_014
013GA_014
011GA_014
ALUMINIUM PARAPET TOEXTENSION ANODISED BLACK
SVK ORNIMAT FIBRECEMENTRAINSCREEN CLADDINGCOLOUR BLACK
SCHUCO FW60+ALUMINIUM TRIPLEGLAZING
3722
1:60 FALL 1:60 FALL
00 Ground Level
0
01 Ground Floor
300
Extension Parapet Level
4983
Extension Roof Level
4568
3722
3739 2500 10840
2000
150
600 600600
842
1750
1100
63.23 m²Reception
161 P
Oak Laminate Floor
6.25 m²Disabled WC
161 Q
SOLUS CERAMICS MODULARTILE R11
10.33 m²Female WC
161 R
SOLUS CERAMICS MODULARTILE R11
011GA_014
019GA_015
015GA_014
011GA_014
012GA_014
013GA_014
ALUMINIUM PARAPET TOEXTENSION ANODISED BLACK
SVK ORNIMAT FIBRECEMENTRAINSCREEN CLADDINGCOLOUR BLACK
SCHUCO FW60+ALUMINIUM TRIPLEGLAZING
00 Ground Level
0
01 Ground Floor
300
Link Roof Level
4500
016GA_014
024GA_015
120026.74 m²
Glass Link161 N
ROADSTONE LIMESTONEPAVING FLAGS
PILKINGTON PLANARGLAZED WALLS ANDROOF
1:60 FALL
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan80 Gleann Rua,Renmore,Galway.
DESIGNERS ADDRESS
ConstructionInformation/Working Drawings
Galway Mayo Institute ofTechnology
CONTACT DETAILS
Phone: 0830054478Email:[email protected]
G00262330 28/04/2015
28/0
4/2
015 1
3:2
4:5
8
Extension Sections A-A & B-B
& C-C
1:50 DDS4_P05
Section A-A
Section B-B
1:50
GA_007
DDS4_P09
Section C-C
00 Ground Level
0
Chapel Eaves
7600
10 Chapel Ridge Level
11978
Extension Parapet Level
4983
550 1
100
Ramps and Hand rails inaccordance with TGDPart M 2010
SVK ORNIMAT FIBRECEMENTRAINSCREEN CLADDING COLOURBLACK
ALUMINIUM PARAPET TOEXTENSION ANODISEDBLACK
ALL EXISTING STAIN GLASS AND FRAMESRETAINED AND REPAIRED BY USINGSUITABLE CONSERVATIONTECHNOLOGIES UNLESS REMOVED INDEMOLITION PLAN.
STAIN GLASS WINDOW REVEALS ANDBORDERS TO BE CLEANED.
ISOTHERMAL SINGLE GLAZED UNITADDED TO THE EXISTING OPE BEHINDWINDOW.
EXTERIOR GLAZED GUARD REPLACEDWITH SINGLE GLAZED WINDOW GUARD.20mm GAP LEFT ALONG BOTTOM OFGLAZING TO VENTILATE AND MITIGATECONDENSATION.
EXISTING WALL AND QUOIN STONES TO BEREPAIRED AND RE-POINTED ASNECESSARY
EXISTING WALL RENDER TO BE REPAIREDAS NECESSARY TO EXTERIOR AT CRACKSAND WITH SIMILAR PEBBLE DASH RENDER
EXISTING SASH WINDOW TO BE CAREFULLYREPAIRED USING SUITABLE CONSERVATIONTECHNOLOGIES AND MATERIALS BYSPECIALIST JOINER
Extension Roof Level
4568
EXISTING SLATES TO BE REUSED WHEREPOSSIBLE AND REPLACEMENTS TO BE MADEGOOD WITH RECLAIMED BANGOR BLUE AGEDSIMILAR WHERE NECESSARY.
PARAPET ANDFLASHING TO BERETAINED,CLEANED ANDREPAIRED ASNECESSARY WITHSIMILAR
1100
EXISTING DOVE COTRETAINED AND CLEANED,REPAIR AND REPLACELOUVRES AS NECESSARYWITH SIMILAR
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan80 Gleann Rua,Renmore,Galway.
DESIGNERS ADDRESS
ConstructionInformation/Working Drawings
Galway Mayo Institute ofTechnology
CONTACT DETAILS
Phone: 0830054478Email:[email protected]
G00262330 28/04/2015
28/0
4/2
015 1
3:3
0:2
2
North Elevation
1:50
GA_008
DDS4_P09
North Elevation
North Elevation (Key)
00 Ground Level
0
Chapel Flat Roof Level
4620
Chapel Eaves
7600
10 Chapel Ridge Level
11978
EXISTING WALL RENDER TO BE REPAIRED ASNECESSARY TO EXTERIOR AT CRACKS ANDWITH SIMILAR PEBBLE DASH RENDER
ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND REPAIRED BY USINGSUITABLE CONSERVATION TECHNOLOGIES UNLESS REMOVED IN DEMOLITIONPLAN.
STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE BEHINDWINDOW.
EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED WINDOW GUARD.20mm GAP LEFT ALONG BOTTOM OF GLAZING TO VENTILATE AND MITIGATECONDENSATION.
EXISTING WALL AND QUOIN STONES TO BEREPAIRED AND RE-POINTED AS NECESSARY
EXISTING RAIN WATER GOODS TO BEREPAIRED AND RE-PAINTED AS NECESSARYWITH SIMILAR MATERIALS AND COLOUR BYCONSERVATION METALWORKER
BARGE TO BE RETAINED AND CLEANED WITHJET WASHER.
EXISTING SLATES TO BE REUSED WHEREPOSSIBLE AND REPLACEMENTS TO BE MADEGOOD WITH RECLAIMED BANGOR BLUE AGEDSIMILAR WHERE NECESSARY.
PARAPET AND FLASHING TOBE RETAINED, CLEANEDAND REPAIRED ASNECESSARY WITH SIMILAR
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan80 Gleann Rua,Renmore,Galway.
DESIGNERS ADDRESS
ConstructionInformation/Working Drawings
Galway Mayo Institute ofTechnology
CONTACT DETAILS
Phone: 0830054478Email:[email protected]
G00262330 28/04/2015
28/0
4/2
015 1
3:3
1:4
4
East Elevation
1:50
GA_010
DDS4_P09
East Elevation
East Elevation (Key)
00 Ground Level
0
Chapel Flat Roof Level
4620
Chapel Eaves
7600
10 Chapel Ridge Level
11978
Extension Parapet Level
4983
EXISTING WALL RENDER TO BEREPAIRED AS NECESSARY TOEXTERIOR AT CRACKS AND WITHSIMILAR PEBBLE DASH RENDER
ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND REPAIRED BYUSING SUITABLE CONSERVATION TECHNOLOGIES UNLESS REMOVED INDEMOLITION PLAN.
STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE BEHINDWINDOW.
EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED WINDOWGUARD. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TO VENTILATE ANDMITIGATE CONDENSATION.
EXISTING WALL AND QUOIN STONESTO BE REPAIRED AND RE-POINTED ASNECESSARY WITH SIMILAR
EXISTING SLATES TO BE REUSED WHEREPOSSIBLE AND REPLACEMENTS TO BE MADEGOOD WITH RECLAIMED BANGOR BLUEAGED SIMILAR WHERE NECESSARY.
EXISTING DOVE COT RETAINED ANDCLEANED, REPAIR AND REPLACELOUVRES AS NECESSARY WITH SIMILAR
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan80 Gleann Rua,Renmore,Galway.
DESIGNERS ADDRESS
ConstructionInformation/Working Drawings
Galway Mayo Institute ofTechnology
CONTACT DETAILS
Phone: 0830054478Email:[email protected]
G00262330 28/04/2015
28/0
4/2
015 1
3:3
0:5
9
South Elevation
South Elevation
South Elevation (Key)
1:50
GA_009
DDS4_P09
00 Ground Level
0
01 Ground Floor
300
Chapel Flat Roof Level
4620
Chapel Eaves 1
7935
10 Chapel Ridge Level
11978
EXISTING RAIN WATER GOODS TOBE REPAIRED AND RE-PAINTED ASNECESSARY WITH SIMILAR COLOUROF ANTI-RUST PAINT
EXISTING WALL RENDER TO BEREPAIRED AS NECESSARY TOEXTERIOR AT CRACKS AND WITHSIMILAR PEBBLE DASH RENDER
ALL EXISTING STAIN GLASS AND FRAMES RETAINED ANDREPAIRED BY USING SUITABLE CONSERVATIONTECHNOLOGIES UNLESS REMOVED IN DEMOLITION PLAN.
STAIN GLASS WINDOW REVEALS AND BORDERS TO BECLEANED.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTINGOPE BEHIND WINDOW.
EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZEDWINDOW GUARD. 20mm GAP LEFT ALONG BOTTOM OFGLAZING TO VENTILATE AND MITIGATE CONDENSATION.
EXISTING WALL AND QUOIN STONESTO BE REPAIRED AND RE-POINTEDAS NECESSARY
BARGE TO BE CLEANED WITH JET WASHER.
EXISTING SLATES TO BE REUSED WHEREPOSSIBLE AND REPLACEMENTS TO BE MADEGOOD WITH RECLAIMED BANGOR BLUE AGEDSIMILAR WHERE NECESSARY.
1100
150
300150
300 100
950
1500
00 Ground Level
0
01 Ground Floor
300
Extension Parapet Level
4983
Link Roof Level
4500
Glass Manifestations are 50mm high andplaced at 850mm and 1400mm AboveFloor Level
Extension Roof Level
4568
2400x1200mm SVK ORNIMATFIBRECEMENT RAINSCREENCLADDING COLOUR BLACK
1200
1200
2400
600 600 1500
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan80 Gleann Rua,Renmore,Galway.
DESIGNERS ADDRESS
ConstructionInformation/Working Drawings
Galway Mayo Institute ofTechnology
CONTACT DETAILS
Phone: 0830054478Email:[email protected]
G00262330 28/04/2015
28/0
4/2
015 1
3:3
6:1
3
West Elevation
Roof PlanWest Elevation (Extension)
West Elevation (Chapel)
1:50
GA_011
DDS4_P09
West Elevation (Key)
RIDGE RESTORATION
EXISTING OAK KING POST TRUSS TO BE INSPECTED AND REPAIRED AS NECESSARY WITH CAST IRONBRACING TO BE RESTORED. VOID REGION BETWEEN EXISTING OAK ROOF PURLINS.
PURLINS TO BE RESTORED AS PART OF ROOF TRUSS INSPECTION. EXISTING 125x50mm OAK RAFTERSAT 600mm CENTRES TO BE INSPECTED AND RESTORED AS NECESSARY. 20mm EXISTING OAK CEILINGBOARDS TO BE INSPECTED AND RESTORED AS NECESSARY.
160mm GUTEX THERMOFLEX WOOF FIBREBOARD INSULATION PLACED ABOVE EXISTING OAK CEILINGWITH A LAYER OF PRO CLIMA INTELLO PLUS BREATHER MEMBRANE TAPED AT JOINTS BETWEEN SHEETSWITH TESCON NO.1.
38x50mm SOFTWOOD COUNTER BATTENS TO ENSURE VENTILATED AIR SPACE. EXISTING SLATES TO BEREUSED WHERE POSSIBLE AND REPLACEMENTS TO BE MADE GOOD WITH RECLAIMED BANGOR BLUEAGED SIMILAR WHERE NECESSARY. EXISTING CLAY RIDGE TILE TO BE RETAINED.
DETAIL 002
1:5
EAVES RESTORATION
EXISTING SLATES TO BE RETAINED/RE-USED WHERE POSSIBLE ANDREPLACEMENTS TO BE MADE WITH RECALIMED BANGOR BLUE AGES SIMILARWHERE NECESSARY. LEAD FLASHING AT EAVES TO EXISTING CAST IRONGUTTER TO BE INSPECTED AND REPAIRED WITH ASPHALT OVER SMALL LEAKSAND REPLACED IN AREAS OF MAJOR DAMAGE EVIDENT. EXISTING CORNICE TOBE CLEANED AND RETAINED. 38x50mm SOFTWOOD COUNTER BATTENS TOENSURE VENTILATED AIR SPACE.
PRO CLIMA INTELLO PLUS BREATHER MEMBRANE LAID ON 160mm GUTEXTHERMOFLEX WOOD FIBREBOARD INSULATION ON 20mm EXISTING OAKCEILING BOARDS TO BE INSPECTED AND RESTORED AS NECESSARY.EXISTING 125x50mm OAK RAFTERS AT 600mm CENTRES TO BE INSPECTED ANDRESTORED AS NECESSARY. 80mm GUTEX WOOD FIBREBOARD INSULATION ONEXISTING SURFACE OF INTERNAL WALL WITH 12.5mm GYPSUM WALL BOARDWITH A 3mm SKIM COAT OF TELLING UNILIT 45 FINISHED WITH A WHITERENDER.
DETAIL 001
1:5
+0.000M
+0.300M
INTERIOR WALL RESTORATION
SURFACE OF INTERIOR WALL CLEANED WITH NON ABRASIVECLEANER AND WATER WITH ANY LOOSE DEBRIS BEINGREMOVED AND ALLOWED TO DRY CREATING A FLAT EVENSURFACE.
ALL INTERIOR SKIRTING BOARDS TO BE CAREFULLYREMOVED AND RE-PAINTED WITH A LIGHT VARNISH ANDBONDED TO NEW WALL SURFACE.
80mm GUTEX THERMOROOM ADHESIVELY FIXED TO INTERNALSURFACE OF EXISTING WALL WITH A LAYER GUTEX KLEBE-UND SPACHTELPUTZ. 12.5mm GYPSUM WALL BOARDADHESIVELY FIXED WITH A LAYER OF GUTEX KLEBE-UNDSPACHTELPUTZ AND A 3mm SKIM COAT OF TELLING UNILIT 45FINISHED WITH A WHITE RENDER.
EXISTING FLOOR BUILD UP
NOTE: THIS IS WHAT IS BELIEVED TO BE UNDER THEFLOOR BUT CANNOT BE DETERMINED UNTIL TRIAL HOLESARE DUG
20mm EXISTING CLAY VICTORIAN TILE AND PARQUET FLOORON 10mm SAND CEMENT ADHESIVE BEDDING ON 100mmCONCRETE SLAB ON 365mm LAYER OF COMPACTEDRUBBLE TO COMPACTED EARTH WITH EXISTING EXTERIORWALL LAID 900mm DEEP FROM INTERIOR FLOOR TO ASTEPPED FOOTING WITH A WEARING COURSE OF STONEUNDERNEATH
PERMEABLE PAVING
FRENCH DRAIN REMOVED FROMPERIMETER OF BUILDING ANDREPLACED WITH 50mm ROADSTONEPLAIN FLAG PAVING LAID ON 50mmSAND BLINDING ON GRAVEL BED TOCOMPACTED EARTH WITH A 1:50FALL TO SUDS
DETAIL 003
1:5
12.5 80 580
50
50
100
365
100
102
0
35
160
20
125
100
250
35
250
250
100
125
20
160
35
580 80 12.5
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan80 Gleann Rua,Renmore,Galway.
DESIGNERS ADDRESS
ConstructionInformation/Working Drawings
Galway Mayo Institute ofTechnology
CONTACT DETAILS
Phone: 0830054478Email:[email protected]
G00262330 28/04/2015
28/0
4/20
15 1
3:53
:20
Chapel Details Pt. 1
1:5
GA_012
DDS4_P09
SKIRTING
150x40mm OAK CHAMFEREDSKIRTING BOARD PAINTED WITH ALIGHT VARNISH AND BONDED WITHEVOSTIK GRIP FILL TO PARTITION
BASE FIXING
50x70mm TREATED SW TIMBERFRAME SCREW FIXED TO BASE OFPARTITION SEALED WITH A BEADOF GYPROC ACOUSTIC SEALANTEITHER SIDE
PARTITION
2NO. 12.5mm GYPROC MOISTURERESISTANT WALL BOARDSCREWFIXED EITHER SIDE TO70x50mm TREATED SW TIMBERFRAME @600 CENTRES WITHNOGGINS @600 CENTRES
WALL IS FINISHED WITH A 3MMSCRATCH COAT OF TELLING UNILIT45 FINISHED AND TILED WITHTILESTYLE SABBIA LAPPATO300X600MM
HEAD FIXING
50x70mm TREATED SW TIMBERFRAME SCREW FIXED TO 12MMOSB
GYPROC ACOUSTIC SEALANTPLACED BETWEEN DOOR JAMB ANDPARTITION
150X40MM WHITE OAKCHAMFERED AND PAINTED WITH ALIGHT VARNISH AND GLUE FIXEDWITH EVOSTIK GRIPFILL TOPARTITION
50
70
150
40
30MIN. FIRE DOOR
SOLID HARDWOOD OAKFIRE DOOR TO GIVE 30 MIN. FIREPROTECTION. 30 MIN. INTEGRITYTOUGHENED VISION PANELS.30 MIN. FIRE AND SMOKE INTUMESCENTSTRIPS ON FRAME AND FIRE DOOR.
BEHIND GYPROC SEALANT IS A50X70MM SW TIMBER STUDSCREW FIXED EITHER SIDE WITH 2NO.12.5mm GYPROC MOISTURE RESISTANTWALLBOARD WITH A 3mm PLASTERFINISH
WALL IS FINISHED WITH A 3MMSCRATCH COAT OF TELLING UNILIT 45AND TILED WITH TILESTYLE SABBIALAPPATO 300X600MM
12 12.570
150
DETAIL 010
1:10
BASE FIXING
50x70mm TREATED SWTIMBER FRAME SCREWFIXED TO BASE OF PARTITIONSEALED WITH A BEAD OFGYPROC ACOUSTIC SEALANTEITHER SIDE
PARTITION
12.5mm GYPROC SOUNDBLOCWALLBOARD SCREWFIXEDEITHER SIDE TO 70x50mmTREATED SW TIMBER FRAME @600 CENTRES WITH NOGGINS @600 CENTRES
WALL IS FINISHED WITH A 3mmSKIM COAT OF TELLING UNILIT 45FINISHED WITH A WHITE RENDER.
HEAD FIXING
50x70mm TREATED SW TIMBERFRAME SCREW FIXED TO12MM OSB
GYPROC ACOUSTIC SEALANT PLACEDBETWEEN DOOR JAMB ANDPARTITION
150X40MM WHITE OAK CHAMFERED ANDPAINTED WITH A LIGHT VARNISH AND GLUEFIXED WITH EVOSTIK GRIPFILL TOPARTITION
50
70
150
40
30MIN. FIRE DOOR
SOLID HARDWOOD OAKFIRE DOOR TO GIVE 30 MIN. FIREPROTECTION. 30 MIN. INTEGRITYTOUGHENED VISION PANELS.30 MIN. FIRE AND SMOKE INTUMESCENTSTRIPS ON FRAME AND FIRE DOOR.
BEHIND GYPROC SEALANT IS A50X70MM SW TIMBER STUDSCREW FIXED EITHER SIDE WITH 12.5mmGYPROC SOUND BLOC WALLBOARD WITH A3mm SKIM COAT OF TELLING UNILIT 45FINISHED WITH A WHITE RENDER.
70 12.5
70 12
.5
70
DETAIL 009
1:10
PIVOTING DOCK DOOR
STAINLESS STEEL PIVOT HINGE SECURED TO BASEOF EXISTING FLOOR AND HEAD OF DOOR FRAME
DOCK DOOR CONSISTS OF 70x195mm TONGUE ANDGROOVE TREATED OAK ADHESIVELY FIXEDTOGETHER AND PAINTED WITH A LIGHT VARNISH
195
DOCK DOOR JAMB
80x60mm TREATED OAK DOOR STOP TONGUE ANDGROOVED TO 230x80mm MULLION WITH A DRAUGHTEXCLUDER TO RUN AROUND FRAME SCREWFIXED TOTREATED HARDWOOD STUD COUNTERSUNK BOLTFIXED TO EXISTING WALL WITH A 10MM SILICONEMOVEMENT JOINT
80
60
80
230
DETAIL 008
1:10
70
50
600
195
225
100
30MIN. CONCERTINA FIRE DOOR
SOLID HARDWOOD OAK CONCERTINA FIREDOOR TO GIVE 30 MIN. FIRE PROTECTION.30 MIN. FIRE AND SMOKE INTUMESCENTSTRIPS ON FRAME AND CONCERTINADOOR.
FIRE INCHUMESCENT AND SMOKE STRIPSTO FOLLOW OPE OF ARCH
30MIN. CONCERTINA FIRE DOOR
CONCERTINA DOOR SLIDES OVER AALUMINIUM C CHANNEL GUIDED WITH ASTEEL PIN FIXING FROM THE DOOR.
CONCERTINA FRAME IS MADE FROM100x80mm TREATED OAK WITH A 195x30mmOAK MULLION FIXED TO THE EXISTING OPEOF THE ARCH AND A 245x30mm OAKMULLION FIXED TO THE EXISTING WALL ANDFRAME
DETAIL 005
1:10FLAT ROOF UPGRADE
EXISTING ASPHALT FLAT ROOF COVERING WITH WRAPOVER PARPAET TO BE RETAINED AND REPAIRED WHERENECESSARY ON A 20mm OAK HARD WOOD WITHEXISTING TIMBER JOISTS TO BE INSPECTED ANDREPAIRED WHERE NECESSARY. 160mm GUTEXTHERMOFLEX WOODFIBREBOARD INSULATION. 80mmGUTEX WOOD FIBREBOARD INSULATION ON EXISTINGSURFACE OF INTERNAL WALL WITH 12.5mm GYPSUMWALL BOARD WITH A 3mm LIME PLASTER RENDER.
DETAIL 004
1:5
12.5 80 580
850
215
12
.5160
12
.5
STAIN GLASS WINDOW UPGRADE
SURFACE OF WINDOW REVEALS CLEANED WITH NON ABRASIVECLEANER AND WATER WITH ANY LOOSE DEBRIS BEING REMOVEDAND ALLOWED TO DRY CREATING A FLAT EVEN SURFACE.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPEBEHIND WINDOW HELD IN PLACE WITH A TREATED HW TIMBERWINDOW FRAME WITH A TREATED SW STUD SCREW FIXED TOFRAME TO HOLD IN PALCE AND 5mm ø DRILL HOLES ALONG TOP OFSINGLE GLAZE TO VENTILATE AND MITIGATE BUILD UP OFCONDENSATION.
EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZEDWINDOW GUARD FIXED IN PLACE AROUND OPE OF WINDOW WITHLIME PUTTY. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TOVENTILATE AND MITIGATE CONDENSATION.
80mm GUTEX THERMOROOM ADHESIVELY FIXED TO INTERNALSURFACE OF EXISTING WALL AND WINDOW REVEALS WITH ALAYER OF GUTEX KLEBE-UND SPACHTELPUTZ. 12.5mm GYPSUMWALL BOARD ADHESIVELY FIXED WITH A LAYER OF GUTEX KLEBE-UND SPACHTELPUTZ AND A 3mm SKIM COAT OF TELLING UNILIT 45FINISHED WITH A WHITE RENDER.
DETAIL 007
1:5DETAIL 006
1:5
12.5 80 580
20
79 24
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan80 Gleann Rua,Renmore,Galway.
DESIGNERS ADDRESS
ConstructionInformation/Workign Drawings
Galway Mayo Institute ofTechnology
CONTACT DETAILS
Phone: 0830054478Email:[email protected]
G00262330 28/04/2015
28/0
4/20
15 1
4:05
:59
Chapel Details Pt. 2
1:5/1:10
GA_013
DDS4_P09
PERMEABLE PAVING
600x50mm ROADSTONE PLAINFLAG PAVING LAID ON 50mmSANDBLINDING ON GRAVEL BED TOCOMPACTED EARTH WITH A 1:50FALL TO SUDS
+0.000M
+0.300M
GROUND FLOOR
20mm OAK LAMINATE FLOOR ADHESIVE BONDED TO 75MM SANDCEMENT SCREED.
150mm BALLYTHERM PIR INSULATION ACHIEVING A U-VALUE OF 0.14W/m²K WITH A 25mm PIECE AT END OF SLAB TO PREVENT THERMALBRIDGE. IN ACCORDANCE WITH TGD PART L 2011.
MIN. 1200 GAUGE D.P.M. RADON BARRIER LAID ON TOP OF 175MMSLAB LAPPING AT STRUCTURAL UPSTAND.
50MM SAND BLINDING ON COMPACTED HARDCORE IN MAX. LAYERSOF 225mm.
CURTAIN WALL
SCHUCO FW60+TRIPLE GLAZEDTHERMALLY BROKEN ALUMINIUMGLAZING SYSTEM ACHIEVING A U-VALUE OF 0.8 W/m²K INACCORDANCE WITH TGD PART L2011.ENSURE TESCON
NO. 1 V.C.L TAPE ISSEALED TOMULLION ANDSCREED
PRO CLIMA INTELLO PLUS V.C.L.MEMBRANE LAPPED INTOMULLION AND TAPE SEALED WITHTESCON NO.1 TAPE
ENSURE TYVEK BREATHERMEMBRANE IS LAPPED OVERHORIZONTAL ALUMINIUMD.P.C. WEDGED INTOMULLION
12.5
EXTERIOR WALL
SVK ORNIMAT BLACK FIBRE CEMENTCLADDING PANEL AND RAIL SYSTEMFIXED BACK TO 12mm OSB SCREW FIXEDTO 150x50mm TREATED SW TIMBER IJOISTS AND NOGGINS AT 600mmCENTRES. 150MM GUTEX THERMOROOMFIXED BETWEEN I JOISTS WITH A 25mmGUTEX THERMOROOM LAYER FIXED TOINTERNAL FACE OF STUD WORKMINMIMISING THERMAL BRIDGE AT I JOISTACHIEVING A U-VALUE OF 0.11 W/m²K. INACCORDANCE WITH TGD PART L 2011.
VERTICAL TYVEK BREATHER MEMBRANEOVERLAPS ALUMINIUM VERTICAL D.P.C.@100mm WEDGED INTO SCHUCO FW60+MULLION.
CURTAIN WALL INTERFACE
150x70mm TREATED SW TIMBER LINTELSFIXED EITHER SIDE OF 10mm STEELFLANGE WELDED TO 10mm STEEL PLATEBOLT FIXED TO TRANSOM
MIN
.150
Fall 1:60
1250 12 104
40
150
25
212
18
50 52 340
27890
15025
50
50
50
225
50
175
150
75
20
CURTAIN WALL BASE FIXING
SCHUCO FW60+ TRANSOM BOLTFIXED TO 10mm STEEL FLANGEWELDED TO 10mm STEEL PLATEBOLT FIXED TO BASE OFCONCRETE UPSTAND
68
60
60
50
INTERIOR WALL
PRO CLIMA INTELLO PLUS VAPOUR BARRIER FIXED TO FACE OFGUTEX WITH 50x25mm TREATED SW TIMBER STUDWORK TOCREATE SERVICE CAVITY WITH 12.5MM GYPSUM PLASTERBOARDFINISHED WITH A 3MM SKIM COAT AND RENDER TO ARCHITECTSSPECIFICATION.
DETAIL 013
1:5
DETAIL 012
1:5
DETAIL 011
1:5
PARAPET
ALUMINIUM PARAPET FORMED AROUNDSTEEL FRAME @600 CENTRES BOLT FIXEDTO 12mm OSB AND 50x25mm TREATED SWTIMBER STUD FRAMED BOX.
SVK ORNIMAT BLACK FIBRE CEMENTCLADDING PANEL AND RAIL SYSTEM FIXEDBACK TO 12mm OSB SCREW FIXED TO150x50mm TREATED SW TIMBER I JOISTSAND NOGGINS AT 600mm CENTRES. 150MMGUTEX THERMOROOM FIXED BETWEEN IJOISTS WITH A 25mm GUTEXTHERMOROOM LAYER FIXED TO INTERNALFACE OF STUD WORK MINMIMISINGTHERMAL BRIDGE AT I JOIST ACHIEVING AU-VALUE OF 0.11 W/m²K. IN ACCORDANCEWITH TGD PART L 2011.
VERTICAL TYVEK BREATHER MEMBRANELAPPED AROUND TREATED SW TIMBERSTUD FRAME BOX
FLAT ROOF
SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAILSYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO 150x50mmTREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES.150MM GUTEX THERMOROOM FIXED BETWEEN I JOISTS WITH A25mm GUTEX THERMOROOM LAYER FIXED TO INTERNAL FACE OFSTUD WORK MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING AU-VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L 2011.
VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUMVERTICAL D.P.C. @100mm WEDGED INTO SCHUCO FW60+ MULLION.
CURTAIN WALL INTERFACE
150x70mm TREATED SW TIMBER LINTELS FIXED EITHER SIDE OF10mm STEEL FLANGE WELDED TO 10mm STEEL PLATE BOLT FIXEDTO TRANSOM
EXTERIOR WALL
SVK ORNIMAT BLACK FIBRE CEMENTCLADDING PANEL AND RAIL SYSTEMFIXED BACK TO 12mm OSB SCREWFIXED TO 150x50mm TREATED SWTIMBER I JOISTS AND NOGGINS AT600mm CENTRES. 150MM GUTEXTHERMOROOM FIXED BETWEEN I JOISTSWITH A 25mm GUTEX THERMOROOMLAYER FIXED TO INTERNAL FACE OFSTUD WORK MINMIMISING THERMALBRIDGE AT I JOIST ACHIEVING A U-VALUE OF 0.11 W/m²K. IN ACCORDANCEWITH TGD PART L 2011.
ALUMINIUM FORMED TO STEEL FRAMEPLACED BEHIND FIBRECEMENTCLADDING.
ENSURE TESCON NO. 1V.C.L TAPE SEALSINTELLO MEMBRANETO OSB
SKIRTING
150x40mm OAK CHAMFEREDSKIRTING BOARD PAINTED WITHA LIGHT VARNISH AND BONDEDWITH EVOSTIK GRIP FILL TOPARTITION
BASE FIXING
50x70mm TREATED SW TIMBERFRAME SCREW FIXED TO BASEOF PARTITION SEALED WITH ABEAD OF GYPROC ACOUSTICSEALANT EITHER SIDE
PARTITION
2NO. 12.5mm GYPROC MOISTURERESISTANT WALL BOARDSCREWFIXED EITHER SIDE TO70x50mm TREATED SW TIMBERFRAME @600 CENTRES WITHNOGGINS @600 CENTRES
WALL IS FINISHED WITH A 3MMSCRATCH COAT AND TILED WITHTILESTYLE SABBIA LAPPATO300X600MM
HEAD FIXING
50x70mm TREATED SW TIMBERFRAME SCREW FIXED TO 12MMOSB
GYPROC ACOUSTICSEALANT PLACEDBETWEEN DOOR JAMBAND PARTITION
150X40MM WHITE OAKCHAMFERED ANDPAINTED WITH A LIGHTVARNISH AND GLUE FIXEDWITH EVOSTIK GRIPFILLTO PARTITION
50
70
150
1
2.5
40
30MIN. FIRE DOOR
SOLID HARDWOOD OAKFIRE DOOR TO GIVE 30 MIN. FIREPROTECTION. 30 MIN. INTEGRITYTOUGHENED VISION PANELS.30 MIN. FIRE AND SMOKEINTUMESCENT STRIPS ON FRAMEAND FIRE DOOR.
BEHIND GYPROC SEALANT IS A50X70MM SW TIMBER STUDSCREW FIXED EITHER SIDE WITH2NO. 12.5mm GYPROC MOISTURERESISTANT WALLBOARD WITH A3mm PLASTER FINISH
WALL IS FINISHED WITH A 3MMSCRATCH COAT AND TILED WITHTILESTYLE SABBIA LAPPATO300X600MM 12 12.570
150
70
DETAIL 015
1:10
STRUCTURAL GLASS ROOF AND EXISTING WALL INTERFACE
PILKINGTON 10mm PLANAR SINGLE GLAZING FIXED IN PLACEWITH PILKINGTON 905J SPIDER FIXINGS FIXED TO 100x10mmSTAINLESS STEEL JOIST SECURED TO 100MM STAINLESSSTEEL BEAM WITH A STAINLESS STEEL BRACE AND BOLTCONNECTION.
PLANAR GLAZING WEDGED INTO 50x50MM ALUMINIUM GLAZINGCHANNEL CONSISTING OF NEOPRENE GUIDES AND A SILICONESEALANT SECURED IN EXISTING WALL WITH A 150x10mmSTAINLESS STEEL PLATE WATER BAR.
STRUCTURAL GLASS FIXING TO EXISTING STRUCTURE
PILKINGTON 10mm PLANAR SINGLE GLAZING WITH A 10MM OPEN JOINTFIXED IN PLACE USING PILKINGTON 905J SPIDER FIXINGS FIXED TO10mm STEEL FLANGE WELDED TO 100mm VERTICAL STEEL COLUMN
PLANAR GLAZING WEDGED INTO 50x50MM ALUMINIUM GLAZINGCHANNEL CONSISTING OF NEOPRENE GUIDES AND A SILICONESEALANT SECURED IN EXISTING WALL WITH A 150x10mm STAINLESSSTEEL PLATE WATER BAR.
STRUCTURAL GLASS ROOF INTERMEDIATE FIXING
PILKINGTON 10mm PLANAR SINGLE GLAZING WITH A10MM SILICONE SEALED JOINT FIXED IN PLACEWITH PILKINGTON 905J SPIDER FIXINGS FIXED TO100x10mm STAINLESS STEEL JOIST SECURED TO100MM STAINLESS STEEL BEAM WITH A STAINLESSSTEEL BRACE AND BOLT CONNECTION.
580
10
100580 109
205
100
10
10
DETAIL 016
1:10
DETAIL 017
1:10
DETAIL 018
1:10
EXTERIOR WALL
SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAILSYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO 150x50mmTREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES.150MM GUTEX THERMOWALL FIXED BETWEEN I JOISTS WITH A25mm GUTEX THERMOWALL LAYER FIXED TO INTERNAL FACE OFSTUD WORK MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVINGA U-VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L 2011.
VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUMVERTICAL D.P.C. @100mm WEDGED INTO SCHUCO FW60+ MULLION.
INTERFACE BETWEEN SCHUCO GLAZING SYSTEM ANDRAINSCREEN CLADDING SEALED WITH 10mm ORCON F JOINT AND150x50mm STUD.
SCHUCO ADS 65HD SINGLE DOOR WEDGED INTO SCHUCO MULLIONAND TRANSOM
60
2525
SCHUCO FW60+ ALUMINIUMGLAZING SYSTEM
5025
150
12
104
12
DETAIL 014
1:10
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan80 Gleann Rua,Renmore,Galway.
DESIGNERS ADDRESS
ConstructionInformation/Workign Drawings
Galway Mayo Institute ofTechnology
CONTACT DETAILS
Phone: 0830054478Email:[email protected]
G00262330 28/04/2015
28/0
4/2
015 1
2:1
6:1
1
Extension Details Pt. 1
1:5/1:10
GA_014
DDS4_P09
EXTERIOR WALL
SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAIL SYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO150x50mm TREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES. 150MM GUTEX THERMOROOM FIXEDBETWEEN I JOISTS WITH A 25mm GUTEX THERMOROOM LAYER FIXED TO INTERNAL FACE OF STUD WORKMINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING A U-VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L2011.
VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUM VERTICAL D.P.C. @100mm WEDGED INTO SCHUCOFW60+ MULLION.
INTERFACE BETWEEN SCHUCO GLAZING SYSTEM AND RAINSCREEN CLADDING SEALED WITH 10mm ORCON F JOINTAND 150x50mm STUD.
12
104
12
150
25
50
13
13 50 25 150 12 104 12
278
38
60
2525
INTERIOR WALL
PRO CLIMA INTELLO PLUS VAPOUR BARRIER FIXED TO FACE OFGUTEX WITH 50x25mm TREATED SW TIMBER STUDWORK TOCREATE SERVICE CAVITY WITH 12.5MM GYPSUM PLASTERBOARDFINISHED WITH A 3MM SKIM COAT AND RENDER TO ARCHITECTSSPECIFICATION.
DETAIL 022
1:5
DETAIL 023
1:5
+0.300M
DOOR THRESHOLD
SCHUCO ADS65HD DOUBLE GLAZED ALUMINIUM DOUBLE DOORSECURED ON CONCRETE UPSTAND SET IN BETWEEN WAVIN 100SKCHANNEL DRAIN, INSULATION AND OAK LAMINATE FLOOR.
600x50mm ROADSTONE PLAIN FLAG PAVING LAID ON 50mm SANDBLINDING.
PRO CLIMA INTELLO PLUS V.C.L.MEMBRANE LAPPED INTOMULLION AND TAPE SEALED WITHTESCON NO.1 TAPE
DPC LAPS OVERTYVEK @100mm ANDINTO CURTAIN WALLJOINT
GROUND FLOOR
20mm OAK LAMINATE FLOOR ADHESIVE BONDED TO 75MM SANDCEMENT SCREED.
150mm BALLYTHERM PIR INSULATION ACHIEVING A U-VALUE OF 0.14W/m²K WITH A 25mm PIECE AT END OF SLAB TO PREVENT THERMALBRIDGE. IN ACCORDANCE WITH TGD PART L 2011.
MIN. 1200 GAUGE D.P.M. RADON BARRIER LAID ON TOP OF 175MMSLAB LAPPING AT STRUCTURAL UPSTAND.
50MM SAND BLINDING ON COMPACTED HARDCORE IN MAX. LAYERSOF 225mm.
ENSURE PRO CLIMA INTELLO V.C.L. ISWRAPPED FROM SCREED TO DOORSADDLE WEDGE AND SEALED WITHTESCON NO.1 V.C.L. TAPE
20
150
75
175
50
50
50
200
50 150 12 104 1225 12.5
60
65
225
DETAIL 020
1:5
DETAIL 021
1:5
EXTERIOR WALL
SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAILSYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO 150x50mmTREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES.150MM GUTEX THERMOROOM FIXED BETWEEN I JOISTS WITH A 25mmGUTEX THERMOROOM LAYER FIXED TO INTERNAL FACE OF STUDWORK MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING A U-VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L 2011.
VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUMVERTICAL D.P.C. @100mm WEDGED INTO SCHUCO FW60+ MULLION.
CURTAIN WALL DOOR INTERFACE
150x70mm TREATED SW TIMBER LINTELS FIXED EITHER SIDE OF 10mmSTEEL FLANGE WELDED TO 10mm STEEL PLATE BOLT FIXED TOTRANSOM. SCHUCO ADS65HD DOUBLE GLAZED ALUMINIUM DOUBLEDOOR WEDGED INTO SCHUCO GLAZING TRANSOM
11210190
+0.300M
12
+0.000M
+0.300M
GROUND FLOOR
20mm ENGINEERED OAK LAMINATE FLOOR BONDED TO 75MMSAND CEMENT SCREED.
150mm BALLYTHERM PIR INSULATION ACHIEVING A U-VALUE OF0.14 W/m²K WITH A 25mm PIECE AT END OF SLAB TO PREVENTTHERMAL BRIDGE. IN ACCORDANCE WITH TGD PART L 2011.
MIN. 1200 GAUGE RADON BARRIER LAID ON TOP OF 175MM SLABLAPPING AT STRUCTURAL UPSTAND.
50MM SAND BLINDING ON COMPACTED HARDCORE IN MAX.LAYERS OF 225mm.
50
ENSURE PRO CLIMAINTELLO PLUSMEMBRANE ISSEALED TO SCREENWITH TESCON NO. 1TAPE V.C.L ISSEALED TO SCREED
20
150
175
50
225
75
DETAIL 019
13 15050 25 12 104 12 EXTERIOR WALL
SVK ORNIMAT BLACK FIBRE CEMENTCLADDING PANEL AND RAIL SYSTEM FIXEDBACK TO 12mm OSB SCREW FIXED TO150x50mm TREATED SW TIMBER I JOISTS ANDNOGGINS AT 600mm CENTRES. 150MM GUTEXTHERMOROOM FIXED BETWEEN I JOISTSWITH A 25mm GUTEX THERMOROOM LAYERFIXED TO INTERNAL FACE OF STUD WORKMINMIMISING THERMAL BRIDGE AT I JOISTACHIEVING A U-VALUE OF 0.11 W/m²K. INACCORDANCE WITH TGD PART L 2011.
VERTICAL TYVEK BREATHER MEMBRANEOVERLAPS ALUMINIUM D.P.C. @100mm ANDBOLT FIXED TO 12mm OSB.
EXTERIOR WALL BASE FIXING
2NO. 150x50mm TREATED SW TIMBER SOULPLATES SECURED TO CONCRETE UPSTANDWITH ANCHOR BOLT.
PERMEABLE PAVING
600x50mm ROADSTONE PLAIN FLAGPAVING LAID ON 50mm SANDBLINDING ON GRAVEL BED TOCOMPACTED EARTH WITH A 1:50 FALL TOSUDS
PLINTH
ROADSTONE LIMESTONE PAVING FLAGSFIXED BACK TO CONCRETE PLINTH WITHHALFEN STONE ANCHOR FIXINGS.
+0.300M
STRUCTURAL GLASS BASE FIXING
PILKINGTON 10mm PLANAR SINGLE GLAZING FIXED IN PLACE WITHPILKINGTON 905J SPIDER FIXINGS BOLTED TO 100x90mm STAINLESSSTEEL FLANGE WELDED TO 100mm ø STAINLESS STEEL COLUMN SETIN CONCRETE BASE SHEAR CONNECTED TO BASE WITH STAINLESSSTEEL BASE PLATE SECURED WITH HOLDING DOWN BOLTS
PLANAR GLAZING WEDGED INTO 50x42mm ALUMINIUM GLAZINGCHANNEL CONSISTING OF NEOPRENE GUIDES AND A SILICONESEALANT WEDGED INTO CONCRETE BASE.
600x30mm ROADSTONE LIMESTONE PAVING FLAGS ON 50mm SANDBLINDING
LANDSCAPING AND DRAINAGE
ACO MODULAR 125 GALVANISED STEEL DRAINAGECHANNEL LAID AGAINST ROADSTONE LIMESTONEPAVING FLAGS FIXED BACK TO CONCRETE PLINTHWITH HALFEN STONE ANCHOR FIXINGS.
PERMEABLE PAVING
50mm ROADSTONE PLAIN FLAG PAVING LAID ON50mm SANDBLINDING ON 50mm GRAVEL TO COMPACTED EARTHWITH A 1:50 FALL TO SUDS
50
50
50
10
50
30
340
100
170
42
10
250
+0.000M
DETAIL 024
1:10
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan80 Gleann Rua,Renmore,Galway.
DESIGNERS ADDRESS
ConstructionInformation/Workign Drawings
Galway Mayo Institute ofTechnology
CONTACT DETAILS
Phone: 0830054478Email:[email protected]
G00262330 28/04/2015
28/0
4/2
015 1
2:1
6:2
9
Extension Details Pt. 2
1:5/1:10
GA_015
DDS4_P09
Galway Mayo Institute of Technology
Door ScheduleLevel Mark Count Fire Rating Width Height Phase Created
01 Ground Floor D-01 1 Fire Upgrade 1620 3000 Existing
01 Ground Floor D-02 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-03 1 FD 30 S 1212 2110 New Construction
01 Ground Floor D-04 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-05 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-06 1 FD 30 S 1080 2110 Existing
01 Ground Floor D-07 1 FD 30 S 1212 2110 New Construction
01 Ground Floor D-08 1 FD 30 S 1263 2110 New Construction
01 Ground Floor D-09 1 Fire Upgrade 795 2100 Existing
01 Ground Floor D-10 1 FD 30 S 1252 2110 New Construction
01 Ground Floor D-11 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-12 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-13 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-14 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-15 1 FD 30 S 1080 2110 New Construction
01 Ground Floor D-16 1 N/A 2000 2000 New Construction
02 Gallery FFL D-17 1 Fire Upgrade 970 2100 Existing
01 Ground Floor D-18 1 N/A 980 2910 New Construction
01 Ground Floor D-19 1 N/A 1927 2810 New Construction
01 Ground Floor D-21 1 N/A 1212 2110 New Construction
01 Ground Floor D-24 1 N/A 1212 2110 New Construction
01 Ground Floor D-25 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-26 1 N/A 910 1800 New Construction
01 Ground Floor D-27 1 N/A 910 1800 New Construction
01 Ground Floor D-28 1 N/A 910 1800 New Construction
01 Ground Floor D-29 1 N/A 1212 2110 New Construction
01 Ground Floor D-30 1 FD 30 S 1212 2110 New Construction
01 Ground Floor D-31 1 N/A 1212 2110 New Construction
Grand total: 28
Design Detail
Window ScheduleLevel Mark Description Count Width Height Phase Created
01 Ground Floor W-01 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-02 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-03 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-04 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-05 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-06 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-07 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-08 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-09 Retained & Upgraded 1 600 1680 Existing
Level 1 W-10 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-11 Retained & Upgraded 1 600 1680 Existing
Level 1 W-12 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-13 Retained & Upgraded 1 600 1680 Existing
Level 1 W-14 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-15 Retained & Upgraded 1 600 1680 Existing
Level 1 W-16 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-17 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-18 Retained & Upgraded 1 380 1126 Existing
01 Ground Floor W-19 Retained & Upgraded 1 600 2175 Existing
01 Ground Floor W-20 Retained & Upgraded 1 1174 1650 Existing
01 Ground Floor W-21 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-22 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-23 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-24 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-25 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-28 Retained & Upgraded 1 600 1680 Existing
Chapel Flat Roof LevelW-29 Retained & Upgraded 1 1000 1500 Existing
01 Ground Floor W-30 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-31 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-32 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-33 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-34 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-35 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-36 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-37 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-38 Retained & Upgraded 1 1000 1500 Existing
Chapel Flat Roof LevelW-39 Retained & Upgraded 1 1000 1500 Existing
01 Ground Floor W-40 Schüco AWS 65 1 480 470 New Construction
01 Ground Floor W-41 Schüco AWS 65 1 480 510 New Construction
01 Ground Floor W-42 Schüco AWS 65 1 480 510 New Construction
01 Ground Floor W-43 Schüco AWS 65 1 480 510 New Construction
01 Ground Floor W-44 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-45 Retained & Upgraded 1 530 2120 Existing