cenic/nlr optical networks winter 2006 joint techs workshop february 7, 2006 chris costa cenic...
TRANSCRIPT
![Page 1: CENIC/NLR Optical Networks Winter 2006 Joint Techs Workshop February 7, 2006 Chris Costa CENIC ccosta@cenic.org](https://reader031.vdocuments.us/reader031/viewer/2022020417/56649f1e5503460f94c35574/html5/thumbnails/1.jpg)
CENIC/NLR Optical Networks
Winter 2006 Joint Techs WorkshopFebruary 7, 2006
Chris CostaCENIC
![Page 2: CENIC/NLR Optical Networks Winter 2006 Joint Techs Workshop February 7, 2006 Chris Costa CENIC ccosta@cenic.org](https://reader031.vdocuments.us/reader031/viewer/2022020417/56649f1e5503460f94c35574/html5/thumbnails/2.jpg)
Agenda
• Provide overview of CENIC and NLR’s Optical Networks.
• Define the tools and processes used to support these networks.
• Identify some of the challenges in supporting large optical networks.
![Page 3: CENIC/NLR Optical Networks Winter 2006 Joint Techs Workshop February 7, 2006 Chris Costa CENIC ccosta@cenic.org](https://reader031.vdocuments.us/reader031/viewer/2022020417/56649f1e5503460f94c35574/html5/thumbnails/3.jpg)
CENIC Optical Backbone• DWDM Long Haul
systems• Supports up to 80
channels in C-Band• Utilizes Cisco 15808 and
15454 ONS platforms• Supports CalREN Multi-
tiered routed backbone• Provides dedicated
lambdas for researchers
![Page 4: CENIC/NLR Optical Networks Winter 2006 Joint Techs Workshop February 7, 2006 Chris Costa CENIC ccosta@cenic.org](https://reader031.vdocuments.us/reader031/viewer/2022020417/56649f1e5503460f94c35574/html5/thumbnails/4.jpg)
National Lambda Rail
• DWDM Long Haul / Extended Long Haul systems• Utilizes Cisco 15808/15454 Platforms• Provides dedicated 10GE/OC192 P2P circuits
![Page 5: CENIC/NLR Optical Networks Winter 2006 Joint Techs Workshop February 7, 2006 Chris Costa CENIC ccosta@cenic.org](https://reader031.vdocuments.us/reader031/viewer/2022020417/56649f1e5503460f94c35574/html5/thumbnails/5.jpg)
Network Management Systems• Individual NE provisioning tools
– Cisco Transport Controller (CTC)• 15454 provisioning/troubleshooting
– Cisco Wavelength Director (CWD)• 15808 provisioning/troubleshooting
• Centralized NMS. Overview of all NE’s in the topology, across multiple spans in the network.– CTM - Cisco Transport Manager
• Inventory Management• Fault Management• Performance Management• Configuration Management
![Page 6: CENIC/NLR Optical Networks Winter 2006 Joint Techs Workshop February 7, 2006 Chris Costa CENIC ccosta@cenic.org](https://reader031.vdocuments.us/reader031/viewer/2022020417/56649f1e5503460f94c35574/html5/thumbnails/6.jpg)
Performance Management• Performance Monitoring Reports
– Real time and trend analysis reports– Provides Forward Error Correction Statistics
![Page 7: CENIC/NLR Optical Networks Winter 2006 Joint Techs Workshop February 7, 2006 Chris Costa CENIC ccosta@cenic.org](https://reader031.vdocuments.us/reader031/viewer/2022020417/56649f1e5503460f94c35574/html5/thumbnails/7.jpg)
Commissioning Data Reports• Provides detailed analysis of optical parameters
– Run prior to and after maintenances and service interruptions
NODE_NAME UNIT_NAME BAY-SRCK-SLOT IOGEN_NAME IOGEN_VALUE THR_1_NAME THR_1_VALUE THR_2_NAME THR_2_VALUE STTNWA08 BT10E-LL25 [01-02-05]
OutPwr_R 1 (dBm) -2.67 Fail Thr -10.5 High Thr 1.5 OutPwr_T 1 (dBm) -2.01 Fail Thr -10 High Thr -1.04 InpPwr_R 1 (dBm) -5.32 Fail Thr -15 High Thr 0 InpPwr_T 1 (dBm) -8.75 Fail Thr -17 High Thr 1.5 LasPwr_T 1 (mW) 20 N/A N/A High Thr 24 LasCurr_T 1 (mA) 98.8 Fail Thr 140.84 N/A N/A LasTemp_T 1 (∞C) 29.5 N/A N/A High Thr 31.52
![Page 8: CENIC/NLR Optical Networks Winter 2006 Joint Techs Workshop February 7, 2006 Chris Costa CENIC ccosta@cenic.org](https://reader031.vdocuments.us/reader031/viewer/2022020417/56649f1e5503460f94c35574/html5/thumbnails/8.jpg)
Optical Spectrum Analyzer• Isolate specific wavelengths across a composite signal• Identify bad filters / broken transmitters / bad connections
![Page 9: CENIC/NLR Optical Networks Winter 2006 Joint Techs Workshop February 7, 2006 Chris Costa CENIC ccosta@cenic.org](https://reader031.vdocuments.us/reader031/viewer/2022020417/56649f1e5503460f94c35574/html5/thumbnails/9.jpg)
Challenges• NE connectivity during fiber cuts
– complex routed solutions • Hybrid Management systems
– Utilize CTM and CTC/CWD to provision and troubleshoot
– Alarm correlation
• NMS Upgrades to support new hardware• Documentation
– Keeping provisioning data up to date• Deploying test equipment• Configuration History
– Audit Trail