cemetery in churriana de la vega. a new canal divisor in the “vega”

2
DINAMIC WATER GEOMETRY OF THE WATER LINEAL Surounding canals Canales dam STATIC WATER Ponds and ditches network of Churriana de la Vega dam-river scheme. Genil watershed in the “Vega” ORGANIC Network of rivers and canals Tour to the parcel in relation to the main canals 3APP - 1041 Water points Water points in public spaces Crosses Places Cross Churriana de la Vega Landmarks Hammam. Arab Baths Iglesia de la Visitación Ermita de Nuestra Señora de la Cabeza Public washing place Longitudinal principal axis Transverse principal axis Funeral home Virgen de la Cabeza Historical Evolution until century XV century XV-XVI century XVII-middle XX A-E 1-9 1 2 3 4 5 3 C E D B A 4 Actual cemetery Proyecto nuevo cementerio 8 7 6 5 1 2 3 4 9 5.Washing place (Puerta a la vega) 1.Baños árabes Hamman Ace q u ia A r a bule il a Acequia T a rra m o n t a D.Cross Plaza A.Church Plaza of the Visitación 5.Washing place 1.Arab baths (Hammam) 1.Constitution Plaza (Town hall) 7.Chapel Plaza 8.Water tank CROSSES WATER POINTS WATER LANDMARKS 0m 100 300 GABIA LA CHICA HUÉTOR VEGA HUÉTOR VEGA ARMILLA CHURRIANA DE LA VEGA Cementerio actual CHURRIANA DE LA VEGA Proyecto LAS GABIAS CÚLLAR-VEGA PURCHIL BELICENA SANTA FE CHAUCHINA FUENTE VAQUEROS ATARFE VALDERRUBIO PINOS PUENTE ESCÓZNAR CIJUELA LÁCHAR OTURA UBICACIÓN EXTERIOR UBICACIÓN PERIMETRAL CHURRIANA DE LA VEGA GABIA LA CHICA ALHENDÍN OTURA GÓJAR OGÍJARES LA ZUBIA CÁJAR MONACHIL HUÉTOR VEGA GRANADA CENES DE LA VEGA ARMILLA LAS GABIAS CÚLLAR-VEGA AMBROZ PURCHIL EL VENTORRILLO BELICENA SANTA FE EL JAU CHAUCHINA ROMANILLA FUENTE VAQUEROS ATARFE VALDERRUBIO ZUJAIRA CASANUEVA PINOS PUENTE ESCÓZNAR CIJUELA LÁCHAR 0Km 5 10 20 THE WATER LIKE SUPPORT ELEMENT OF THE “VEGA” FROM CHURRIANA DE LA VEGA TO THE NEW CEMETERY CEMETERY IN CHURRIANA DE LA VEGA. A NEW CANAL DIVISOR IN THE “VEGA” CEMETERY LOCATION REGARDING URBAN AGGLOMERATIONS IN THE BASIN OF GENIL RIVER RELATIONSHIP RIVER-RESERVOIR IN THE WATERSHED OF THE VALLEY OF GENIL IN GRANADA

Upload: ngobao

Post on 14-Dec-2016

215 views

Category:

Documents


1 download

TRANSCRIPT

dam-river scheme. Genil watershed in the “Vega”
ORGANIC
Tour to the parcel in relation to the main canals
3APP - 1041
Water points
Crosses Places
Hammam. Arab Baths Iglesia de la Visitación
Ermita de Nuestra Señora de la Cabeza
Public washing place
Historical Evolution until century XV century XV-XVI
century XVII-middle XX
3
C
E
1.Baños árabes Hamman
5.Washing place
ALHENDÍN
OTURA
GÓJAR
OGÍJARES
CHURRIANA DE LA VEGA Proyecto
LAS GABIAS
LAS GABIAS
ALHENDÍN
OTURA
GÓJAR
OGÍJARES
CHURRIANA DE LA VEGA Proyecto
LAS GABIAS
LAS GABIAS
FROM CHURRIANA DE LA VEGA TO THE NEW CEMETERY
CEMETERY IN CHURRIANA DE LA VEGA. A NEW CANAL DIVISOR IN THE “VEGA”
CEMETERY LOCATION REGARDING URBAN AGGLOMERATIONS IN THE BASIN OF GENIL RIVER RELATIONSHIP RIVER-RESERVOIR IN THE WATERSHED OF THE VALLEY OF GENIL IN GRANADA
CEMENTERIO ACTUAL
Detalle 5
Detalle 6
E: 1/75
Planta nivel Capilla (cota -3.4m)
Point where the water is born. Here they are initiated and separate paths.
The cemetery trickle of water flows in the direction of it.
The water leaves the canal to expand into the enclosure of the panthe- ons looking calm.
NICHES FRONT ELEVATION
NICHES LATERAL ELEVATION
CEMETERY ELEMENTS
MAUSOLEUM E:1/400
OSSUARIES E:1/300
NICHES E:1/300
TOMBS E:1/300
VEGETACION STUDY (CHROMATIC SEASONS)
CONSTRUCTIVE SECTIONS E: 1/100
Inicio
Final
RecorridoAcequia
Fuente
Estanque
Dinamismo
Reposo
ev a d a
4. 3’. 3. 2. 1.
Repose. Final pond The water guides the path Reflection of the Chapel Drop point. Sound as a prelude to the chapel Calm water Water as threshold The water becomes a path Water from the water. Birth Before seeing the water. Sound. Reflection on deck
Water marking the threshold between funeral home and cemetery
The cafeteria space oriented to Sierra Nevada
Mortuary room with folding flexible partition
CAPILLA (PUNTO DE CONEXIÓN)
Principal
Secundaria
Crematorio
Principal
Secundaria
Cementerio
Principal
Secundaria
Principal
Secundaria
GEOMETRY OF THE WATER FROM THE CENTER The project based on these premises is con- ceived as a starter irrigation ditches. Partidor oriented, in which each guideline water (with visual), will articulate a project schedule (funeral home and cemetery) consolidating the chapel as a link between the two. All this through a process of emptying the center, through a vacuum articulator that responds to the emotional burden that this project should pay attention delicate. It seeks to give both physical amplitude and soul to a senso- ry level to accompany the mourning. Understanding the starter as a beginning of the route (source) and the end of each guideline as a final (pond). Giving each space a type of water feature with road function or threshold in each case.
WATER TOUR The project is built based on the different sensations that water generate. Paying at- tention to elements such as sound, reflection, movement, sealing.
Floor elevation 0m E: 1/750
STRATEGY