Energinet.dk Cell Controller Pilot Project Dr. Sunil Cherian Spirae, Inc. Project Owner: Energinet.dk Main Project Participants Syd Energi – Network Owner Tjaeborg Industri, A/S Spirae, Inc Pon Power, A/S Energynautics, GmbH Siemens, A/S EPRI Workshop on Active Distribution System Management 3 rd International Conference on Integration of RDER December 9, Nice, France

Upload: phungkien

Post on 01-Apr-2018

218 views

Category:

Documents


3 download

TRANSCRIPT

Energinet.dk Cell Controller Pilot Project

Dr. Sunil CherianSpirae, Inc.

Project Owner: Energinet.dkMain Project ParticipantsSyd Energi – Network Owner Tjaeborg Industri, A/SSpirae, Inc Pon Power, A/SEnergynautics, GmbH Siemens, A/S

EPRI Workshop on Active Distribution System Management3rd International Conference on Integration of RDER

December 9, Nice, France

SPIRAE CONFIDENTIAL

Danish Power System

Wind and DCHP Gen

Central power plant

DCHP unit

Wind turbine

2

SPIRAE CONFIDENTIAL

Energinet.dk Vision

3

Source: Energinet.dk

SPIRAE CONFIDENTIAL

Transient Events

Wind Turbine Availability

Reactive Power Exchange

Wind Turbine Pole Switching

Reverse Power Flow

4

SPIRAE CONFIDENTIAL

Control Center Cell Controller(s)SubstationControllers

Asset Controllers

•Normal Ops•Ridethrough•Island•KW/Kvar Imp/Export•Isochronous master

Cell Controller Concept

5

SPIRAE CONFIDENTIAL

ÅRR

AGB

GLE

HEJ

VOB

BMØ

GØRHOS

FØV

BRØ

HOD

LIK

REV

VJV

BIS

MØR

BIO

BID

G

G

G

G

15,5 MW

G

8,8 MW

2 MW

3 MW 3,8 MW

WindWind

Wind

Wind

3,6 MW

7 MW

3,3 MW

2 MW

Wind

Wind2 MW

2 MW

Wind

4 MWTest area 1

Test area 2

Pilot Cell: Holsted 60 kV Grid

Installed CHP: 37 MWInstalled Wind: 39 MWMaximum Load: 61 MW150/60 kV Trf: 100 MVA

Test area 3

6

SPIRAE CONFIDENTIAL

Project Timeline

B1 B2 C1 B3 C2 C32006 2007 2008 2009 2010 2011

Area 1 CC Testing Completed

7

SPIRAE CONFIDENTIAL© 2008 Spirae, Inc. 8

Area 1 Cell Controller Test Phases

Go/No Go Meeting with all Stakeholders

Go/No Go Meeting with all Stakeholders

Phase 2 (October 08)Grid Connected TestingImport/Export Control

Spinning Reserve

Phase 3 (November 08)Fast Islanding

ResynchronizingWind-only “mini-island

Phase 1 (September 08)Asset Level I/O verification

Communications verificationRemote commands verification

SPIRAE CONFIDENTIAL

Wind Turbines and CHPs

9

SPIRAE CONFIDENTIAL

Synchronizer, Synch Condenser, and Secondary Load Controller

10

SPIRAE CONFIDENTIAL

Hejnsvig Substation: Cell Nerve Center

11

SPIRAE CONFIDENTIAL© 2008 Spirae, Inc. 1212

On 14 November 2008, at 12:15, Virtual Generator (VGen) formed with: 

• Two CHPs (neither spinning):   one at Billund CHP plant and one at Hejnsvig CHP plant.

• 3 wind turbines, generating at about 45% capacity.

• 7 online load‐feeders.

The synchronous condensor (SC) and secondary load controller  (SLC) are not available to the VGen.

Sequence of events:  

• A (12:15):  import/export control is enabled with a zero active/reactive set point for the VGen.  In response to wind levels, Cell Controller starts only one CHP (Billund unit 1)

• B (12:35):  operator increases import/export set point of the VGen is increased. 

• C (12:45): the Cell controller brings a second generator (Hejnsvig CHP 1) online.

• 12:45 to 13:02: the VGen works to maintain the set point.

• D (13:02): a zero import/export active set point is requested and the VGen responds accordingly.

Phase 2 Testing: Virtual Generator

SPIRAE CONFIDENTIAL© 2008 Spirae, Inc. 1313

VGen Performance: Overview

SPIRAE CONFIDENTIAL

Next Steps

• Complete C1 data analysis!• Next phase will include Area 2• Plan to demonstrate:

– Dynamic Cell creation– Sub-cell formation and merging– Virtual Gens for market operations– Automatic topology management– Wind smoothing

• C2 Duration: 2009-2010

14

SPIRAE CONFIDENTIAL

Thank you for your attention!

Dr. Sunil CherianSpirae, Inc.

255 Linden St., Suite 201Fort Collins, CO 80524

www.spirae.comwww.integridlab.com

[email protected]