Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
TPI &Monitoring of Physical & Financial Progress for Various Rural Water Supply Projects –Devipatan (Cluster 08) Balrampur District
DATE: 30.09.2021
MONTHLY PROGRESS REPORT
SEPTEMBER 2021
State Water and Sanitation Mission
CEINSYS TECH LTD.
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
Disclaimer
Revision Prepared By Checked By Approved By
00
Name VAIBHAV TRIPATHI
ANURAG AGRAWAL
MANISH KUMAR SINGH
Signature
Date 02-Sep-21 02-Sep-21 02-Sep-21
This document is submitted to SWSM (UP) which specially made it
and for specific purposes linked with the work order issued by SWSM
only. It should not be relied upon by any other party or used for any
other purpose.
The results stated are in based on tender & reference documents received
from client and site survey while preparation every care has been taken in
preparing these documents, CEINSYS Tech Ltd makes no representations and
gives no warranties of whatever nature in respect of these documents,
including but not limited to the accuracy or completeness of any information,
facts and/or results contained therein. The data furnished with this document
is confidential shall not be disclosed outside the account and shall not be
duplicated, used or disclosed in whole or part for any purpose without
permission of State Water & Sanitation Mission (SWSM) Uttar Pradesh.
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
Acronyms & Abbreviations
Government and Other Organizations
CPHEEO Central public Health Environmental Engineering Organization
TPI Third Party Inspection
CTL CEINSYS Tech Ltd UP Uttar Pradesh
SWSM State Water & Sanitation Mission JJM Jal Jeevan Mission
GOI Government of India UPJN Uttar Pradesh Jal Nigam
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
Contents
INTRODUCTION ............................................................................................................................................... 1
1. BACKGROUND ............................................................................................................................................... 1
2. OBJECTIVE OF THE PROJECT ............................................................................................................................. 1
3. CTL UNDERSTANDING OF TERMS OF REFERENCE (TOR) & SCOPE OF SERVICE ........................................................... 2
4. PROJECT AREA & LOCATION ............................................................................................................................ 3
5. BRIEF DESCRIPTION OF PROJECT AREA ............................................................................................................... 4
PROJECT PROGRESS ......................................................................................................................................... 5
1. TPI CONTRACT AGREEMENT ..................................................................................................................... 5
2. STAFF DEPLOYMENT ................................................................................................................................. 5
2.1 DIVISION TEAM STAFF DEPLOYMENT .............................................................................................. 5
3. OFFICE DETAILS ......................................................................................................................................... 6
4. PROGRESS OF WORKS ............................................................................................................................... 7
4.1 JAL JEEVAN MISSION RETROFITTING & ON-GOING WORKS ........................................................... 7
5. INFORMATION/ASSISTANCE REQUIRED FROM CLIENT.......................................................................... 13
TPI SITE PERIODIC VISIT PHOTOGRAPHS ........................................................................................................ 14
TPI SITE INSPECTION PHOTOGRAPHS ............................................................................................................. 19
ANNEXURE TRANSMITTALS (INWARD/OUTWARD) ........................................................................................ 23
Outward Communication Summary ........................................................................................................... 23
Inward Communication Summary .............................................................................................................. 23
.
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
List of Tables- TABLE 1. CLUSTER AND REVENUE DISTRICT INFORMATION 5 TABLE 2. CLUSTER AND DISTRICT DETAILS: 5 TABLE 3. DIVISION TEAM STAFF DEPLOYMENT IS AS FOLLOWS- 5 TABLE 4. DISTRICT TEAM STAFF DEPLOYMENT IS AS FOLLOWS- 6 TABLE 5. LIST OF RETROFITTING SCHEMES- 8 TABLE 6. LIST OF ON-GOING SCHEMES- 9 TABLE 7.TPI RETROFITTING AND ONGOING SCHEME BILL DETAIL 10 TABLE 8. SCHOOLS &ANGANWADI INSPECTION- 12 TABLE 10. ABSTRACT OF BILL VERIFICATION OF JAL JEEVAN MISSION 13 TABLE 18. PERIODIC SITE VISIT PHOTOGRAPHS 14 TABLE 19. SITE INSPECTION PHOTOGRAPHS WITH COMMENTS 19 TABLE 20. OUTWARD TRANSMITTALS 23 TABLE 21. INWARD TRANSMITTALS 23
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
Introduction
In India, about 80% of the rural population lack safe and piped drinking water supply facility. In this context, Government of India has launched a scheme ‘Jal Jeevan Mission’ and is keen to finish the work by the end of year 2024. Owing to this, State water and Sanitation Mission (SWSM), Govt. of Uttar Pradesh has proposed to implement this Program. The scope of area covers all 18 Revenue Divisions having 75 Districts in the State of Uttar Pradesh.
1. Background
SWSM has taken up implementation of the various Rural Water Supply Projects in the state
under the Jal Jeevan Mission for all 75 districts of the state divided in 18 clusters. The
projects are being implemented in a phased manner. For this purpose, it has been decided
to appoint a consultant to provide Consultancy Services to State Water and Sanitation
Mission, Department of Rural Development, GOUP for Third Party Inspection (TPI) and
Monitoring of Physical & Financial Progress of Various Rural Water Supply Projects
comprising of tube wells/ WTP with its rising/ pressure mains, overhead tanks (OHT),
distribution pipelines, individual house connections, public stand posts, booster Pumping
Stations etc.
2. Objective of the Project
The objective of the assignment is to ensure quality, timely completion of projects within the budgeted costs without cost and time overrun. The main job of the TPI appointed by State Water Sanitation Mission, Department of Rural Development, and GROUP is to work as an extended arm of SWSM in the technical and contractual issues connected with the implementation of the project. The major activities involved are inspection of construction work such as sample checking of test reports of material used for construction, quality measures adopted in the field, safety measure adopted and payment for labour by the executing agency at the time of construction, also quantity and quality of works executed as per bill for payment claimed, checking of functioning of the infrastructure during trial run and making recommendation of the payment of work executed shall be done. Besides ensuring implementation of environmental and social covenants, reviewing and certifying stages of works shall also be conducted by the consultant. Duration of the project is 24 months from the date of receipt of work order. Services of TPI are required in the following major activities
Third Party inspection of construction materials & construction workmanship and
submission of monthly reports.
Inspection of Machineries & electromechanical equipment.
Monitoring of Physical & Financial Progress.
Documentation of the above said activities.
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
3. CTL understanding of Terms of reference (TOR) & Scope of Service
We appreciate the intention and efforts of the Government of UP and its Implementing
Agency SWSM to achieve the objective of the Jal Jeevan Mission. We are aware that the
objective of the assignment is monitoring of quality of works, physical and financial progress
of the project in order to make ensure timely and economically completion of the water
supply scheme maintaining good quality of works to make schemes durable and long lasting.
Appointed consultant will provide assistance to SWSM in carrying out overall monitoring of
the various type of Contracts (Item rate/ EPC / Turnkey) of rural water supply. Broadly scope
will include:
Inspection of materials, machineries and equipment
Inspection of Construction activities,
Testing of materials
Monitoring of the project (Physical & Financial)
Assist in commissioning activities
The detailed scope of work as mentioned in the ToR is summarized as given below.
To scrutinize construction methods proposed by contractor including environmental,
safety, personnel and public issues
To monitor construction work of each and every stage of contract package as per the
schedule of each works.
To establish Quality assurance system including verification of source of all the
material and certification.
To supervise the works to ensure conformance of construction works and materials
to relevant IS standards/ Bid specifications/Designs/drawings. Approve materials and
quality of works based on test results produced by the works Contractor, factory
inspection, site testing etc. (Quality control)
To conduct factory Inspection of equipment under the project
To monitor progress with reference to pre-fixed targets drawn up jointly with the
Contractors and furnish monthly progress reports in the formats as decided in
consultation with the SWSM.
To ensure environmental and social safeguards as per standard practices
To co-ordinate with all concerned agencies and SWSM to be appraised of all.
To ensure strict compliance of labour laws by the contract RFP Firm.
To inspect and certify that the works are completed according to the specifications
on final completion before final settlement of bills. Prepare completion of work
report for all the works.
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
Inspect all the completed works once in two months during the defects liability
period of one year and assist the SWSM in ensuring that the contract RFPs attend to
all kinds of construction /laying defects brought to their notice.
Prepare monthly project progress reports describing the physical and financial
progress of each package, highlighting impediments to the quality and progress of
the works and remedial actions, for submission to the Client.
Prepare periodic Statement of Expenditure for getting reimbursement of
expenditure in external funded projects
To assure the safety measures of the construction site.
We understand that the scope of services under the TOR is to extend the arms and visibility
of SWSM with help of TPI on the execution of water supply schemes throughout the entire
state. Role of the TPI is to act as extended arm of SWSM. TPI will remain present at the
ongoing works to ensure the quality of works as per technical specification and BIS
requirements. TPI will also inform SWSM about the physical and financial progress of the
work which will have double fold purpose. On one side SWSM will ensure that the physical
and financial progress are matching and on other side SWSM will also ensure smooth flow
of funds so as not to hamper the progress of the works to achieve timely completion of the
schemes to pass on the benefit to the end users /beneficiaries.
The services expected from TPI is to remain present on site for inspection of critical stages
of work periodically, factory inspection of major items like pumps, valves, flowmeters,
transformers and WTP equipment, quality records of construction materials through
material test certificates, quality records of workmanship through filed and laboratory tests
(like hydraulic pressure test for pipelines, water retaining test for OHT & reservoirs, cube
tests for concrete works and so on). Adherence to the technical specification and BIS code
requirements is expected to be ascertained by TPI.
CEINSYS aims to serve clients in a way that they can benefit from the solution oriented
services. With our ability to work with utmost dedication along with our well experienced
staff of Engineering and Project Management backgrounds. We at CEINSYS aim to work with
the same zeal and enthusiasm that we have been working with over past 22 years and
create and benefit our client with best possible results.
4. Project Area & Location
Uttar Pradesh being the spiritual land of India, is one of the most populated state of the
country with a population of 199,812,341 according to 2011 Census. The total area of the
state is 2,40,928 sq. km. The 18 clusters identified for the project are well known tourist
places of India and cover to the complete state. The state is divided into 18 clusters based
on Revenue Divisions. CTL has received the order for following clusters.
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
5. Brief Description of Project Area
Division: Devipatan Revenue District: Balrampur
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
Table 1. Cluster and Revenue District Information
Table 2. Cluster and District Details:
Sr.No. Revenue Division District Name Area in Sq Km
No of blocks
No of Villages
1 Devi Patan Balrampur 3457 9 324
Project Progress
1. TPI CONTRACT AGREEMENT
Project Name Third Party Inspection and Monitoring of Physical and Financial Progress and its documentation of various Rural Water Supply Projects in the state of Uttar Pradesh - Cluster-8 – District Balrampur
Client Name STATE WATER & SANITATION MISSION (SWSM), Namami Gange and Rural Water Supply Department, Lucknow, UP.
Work Order No./ Contract Ref:100/ED/2020-21, Dated16thJune2021
Commencement of TPI Team Mobilization
16 June 2021 onwards
2. STAFF DEPLOYMENT
2.1 DIVISION TEAM STAFF DEPLOYMENT
Table 3. Division Team Staff Deployment is as follows-
Sr. No Division Name Designation 1. Devipatan Uma Shankar Singh Team leader cum Project Manager
2. Devipatan Mr.Manish Kumar Singh Deputy Project Manager
3. Devipatan Mr. Aditya Geo technical Engineer
4. Devipatan Mr. Shashikant Structural Engineer
5. Devipatan Mr. Neeraj Jha QA/QC Engineer
Cluster Revenue Division District
Cluster No.08 Devipatan Balrampur
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
Sr. No Division Name Designation
6. Devipatan Mr.Sameer Kumar Singh Mechanical Engineer
7. Devipatan Mr.Kamlesh Agadi Electrical Engineer
8. Devipatan Mr.Mohammad tariq Instrumentation & Control Engineer
9. Devipatan Mr.Vineeth Jayakrishsna Safety Engineer
10. Devipatan Mr.Anand kumar paswan
Support Staff
11. Devipatan Mr. Prashant Kumar Support Staff
Table 4. District Team Staff Deployment is as follows-
Sr. No District Name Designation
1 Balrampur Mr. Anurag Agarwal Deputy Project Manager
2 Balrampur Mr.Vaibhav Tripathi QA/QC Engg.
3 Balrampur Mr.Deepak Kumar QA/QC Engg.
4 Balrampur Mr.Syed Kaifi Aftab Mechanical Engineer
5 Balrampur Mr.Kundan Kumar Singh
Safety Engineer
6 Balrampur Mr. Faisal Khan Support staff
7 Balrampur Mr.Hemchand Thakur Support staff
8 Balrampur Mr.MD. Farman Ansari Support staff
9 Balrampur Mr.Jaspal Singh Support staff
3. OFFICE DETAILS
S.No District Office Address
1 Balrampur
House no 116 B Anand Bagh Maltikunj colony Gonda Road Near Jyoti Talkies, Balrampur -271201 Uttar Pradesh India.
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
4. PROGRESS OF WORKS
4.1 JAL JEEVAN MISSION RETROFITTING & ON-GOING WORKS
Summary of Retrofitting works and on-going works-
TPI Lucknow- Detail of Retrofitting works and on-going works
S.NO District Retrofitting scheme total
Ongoing scheme total
Retrofitting scheme running
Ongoing scheme running
1 Balrampur 89 25 verified / 15 Nos duplicate or
return with observation
Amount of Verified invoice
38575823.00 upto Previous
Month 21414086.00
Total 59989909.36
TPI Lucknow- Detail of Retrofitting works and on ongoing works
S.NO District Retrofitting scheme total
Ongoing scheme total
Retrofitting scheme
running as per portal
Ongoing scheme running as per portal
1
Balrampur
30 33
Table2-1:Retrofitting inspection details
TPI DeviPatan-Abstract ofInspectionstatusof Retrofittingworks
S.NO District Noof Total Invoices Completed inspection
Remarks
1 Balrampur
40 40 25 Verified & 15 Bill Returned with Observation
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
Table 5. List of Retrofitting Schemes-
SI Name of Scheme Villages Contractor Name 1 Itairampur Itairampur Mohd. Dargahi
2 BISHUNAPUR BISHUNAPUR M/S Sunita Kumari
3 BISHUNPUR BISHRAM BISHUNPUR BISHRAM Manu
4 DEVIPATAN DEVIPATAN M/S Mohd.Dargahi
5 CHARANGAHIYA CHARANGAHIYA Mohd. Dargahi
6 MAJGAWA MAJGAWA Ramraj Mishra
7 BHADUA SHANKER NAGAR BHADUA SHANKER NAGAR Mohd. Dargahi
8 GULHARIYA GULHARIYA M/S Neel Kanth Construction
9 GUGUALI KHURD GUGUALI KHURD M/S Shakeel Ahmad Khan
10 MADHAVDEEH MADHAVDEEH
11 DEORIA MUBARAKPUR DEORIA MUBARAKPUR
12 DEEH SURAT SINGH DEEH SURAT SINGH M/S Shakeel Ahmad Khan
13 PARASPUR KAMDA PARASPUR KAMDA
14 BELWA BELWA,LAKHAURI M/S Shakeel Ahmad Khan
15 BARGADWA SAIF BARGADWA SAIF Jeevdhar Pandey
16 BAUDIHAAR BAUDIHAAR Awadh anaryan Tiwari
17 BISHUNPUR KALA BISHUNPUR
KALA,KHAKHRA,LUDHAURI
M/S Ramraj Mishra
18 GANESHPUR GANESHPUR M/S Ramraj Mishra
19 GANWARIYA (TULSIPUR
DEHAT) GANWARIYA (TULSIPUR DEHAT)
M/S Shakeel Ahmad Khan
20 GULHARIYA HISAMPUR GULHARIYA HISAMPUR M/S NeelKanth Construction
21 MANGRA KOHAL MANGRA KOHAL Mohd Dargahi
22 KHAMHARIYA KHAMHARIYA,GANWARIYA M/S Shakeel Ahmed Khan
23 KALWARI KALWARI M/S Mohd.Dargahi
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
SI Name of Scheme Villages Contractor Name
24 JARWA RANIYAPUR,LOHTI,MOHKAMPUR M/S Sunpower water Technology
25 HADPUR JANAKPUR HADPUR JANKPUR Mohd dargahi
26 LAUKIKALA LAUKIKALA M/S Sunpower water Technology
27 RAMWAPUR RAMWAPUR Mohd. dargahi
28 LALPUR LALPUR,AMWABAS Mohd Dargahi
29 KHAKHADEI KHAKHADEI M/S Ramraj Mishra
30 SONPUR SONPUR M/S Ramraj Mishra
Table 6. List of on-going Schemes-
SI Name of Scheme Villages Contractor Name
1 BADKA BHUKURWA BADKA BHUKURWA M/S Sunita Devi
2 GOVINDPUR GOVINDPUR M/S Dharampal Jaisawal
3 DEORAWA DEORAWA M/S Mohd.Dargahi
4 KATHER KATHER Shakeel Ahmad
5 PIPRI KOLHUI PIPRI KOLHUI M/S Mohd.Dargahi
6 TERAHWA TAPPAVANK TERAHWA TAPPAVANK M/S Mohd.Dargahi
7 AKALGHARWA AKALGHARWA Dharamapal Jaisawal
8
CHOTKA
BHUKURWA(BHAWANIPUR)
SOLAR BASED
CHOTKA
BHUKURWA(BHAWANIPUR)
SOLAR BASED
M/S Manu Enterprises
9 SEKHUI KALAN SEKHUI KALAN M/S Shakeel Ahmad Khan
10 SHIVA NAGAR SHIVA NAGAR M/S Shakeel Ahmad Khan
11 NARIHWA NARIHWA Dharampal Jaisawl
12 DULHINPUR DULHINPUR Manu Enterprise
13 KANCHANPUR KANCHANPUR M/S Dharampal Jaisawal
14 GAINSARI GAINSARI M/S Dharampal Jaisawal
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
SI Name of Scheme Villages Contractor Name
15 GUGUALI KALAN GUGUALI KALAN M/S Shakeel Ahmad Khan
16 HARRIYA SATGHARWA HARRIYA SATGHARWA M/S Shakeel Ahmad Khan
17 GUMDI GUMDI M/S Dargahi
18 MAHARAJGANJ MAHARAJGANJ Shakeel Ahmed khan
19 RUKHI MAJHARI RUKHI MAJHARI Saleem Ahmed
20 CHAINPUR CHAINPUR SKG Trading Co.
21 LAUKAHWA MADARBAKSH LAUKAHWA MADARBAKSH SKG trading Co.
22 JAINAGRA JAINAGRA Shakeel Ahmad khan
23 RAMWAPUR RAMWAPUR M/S Mohd.Dargahi
24 HUSAINABAD GRANT HUSAINABAD GRANT M/S Ramraj Mishra
25 SISHANIYA BARGADHI SISHANIYA BARGADHI SKG Trading Co.
26 BISHUNPUR TANTANWA BISHUNPUR TANTANWA SKG Trading Co.
27 KALWARI KALWARI M/S Mohd.Dargahi
28 BHUSHARPURAI BHUSHARPURAI M/S Shakeel Ahmad Khan
29 BARAHWA BARAHWA M/S Sunita Devi
30 BHOJPUR THARU BHOJPUR THARU M/S Ramraj Mishra
31 KATKUIEYAN KATKUIEYAN M/S Mohd.Dargahi
32 KHADGAURA KHADGAURA Mohd Dargahi
33 BANGAI
BANGAI M/S Mohd.Dargahi
Table 7.TPI Retrofitting and ongoing scheme Bill Detail
SI No Scheme Name Date Invoice ID Bill with GST
1 GULHARIYA HISAMPUR
27-08-2021 UPJN/Balrampur/0320506 349532.00 2 GULHARIYA 27-08-2021 UPJN/Balrampur/0320516 381574.00 3 RAMWAPUR 27-08-2021 UPJN/Balrampur/0320526 1336261.00 4 RAMWAPUR 03-09-2021 UPJN/Balrampur/0324726 24950.00 5 KHADGAURA 04-09-2021 UPJN/Balrampur/0325246 103250.00 6 KATKUIEYAN 04-09-2021 UPJN/Balrampur/0325256 88205.00
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
SI No Scheme Name Date Invoice ID Bill with GST
7 BHOJPUR THARU 04-09-2021 UPJN/Balrampur/0325266 88205.00 8 KANCHANPUR 06-09-2021 UPJN/Balrampur/0326206 320531.00 9 HARRIYA SATGHARWA 06-09-2021 UPJN/Balrampur/0326326 8237386.00 10 RAMWAPUR 07-09-2021 UPJN/Balrampur/0327366 91041.00 11 BANGAI 08-09-2021 UPJN/Balrampur/0328136 103250.00 12 DEVIPATAN 08-09-2021 UPJN/Balrampur/0328556 1483865.60 13 BELWA 13-09-2021 UPJN/Balrampur/0330646 10030 14 GANWARIYA
(TULSIPUR DEHAT) 13-09-2021 UPJN/Balrampur/0330656
815942.00
15 BISHUNPUR KALA 13-09-2021 UPJN/Balrampur/0330686 78373.00 16 GOVINDPUR 15-09-2021 UPJN/Balrampur/0332066 619636.00 17 GAINSARI 15-09-2021 UPJN/Balrampur/0332076 568944.00 18 GAINSARI 15-09-2021 UPJN/Balrampur/0332086 619340.00 19 HARRIYA SATGHARWA 15-09-2021 UPJN/Balrampur/0332396 1953133.00 20 JARWA 20-09-2021 UPJN/Balrampur/0335716 1774109.10 21 GOVINDPUR 20-09-2021 UPJN/Balrampur/0335736 1447971.80 22 KATKUIEYAN 22-09-2021 UPJN/Balrampur/0336716 691756.80 23 DEORAWA 22-09-2021 UPJN/Balrampur/0337006 75600.00 24 PIPRI KOLHUI 22-09-2021 UPJN/Balrampur/0337016 67200.00 25 SHIVA NAGAR 22-09-2021 UPJN/Balrampur/0337026 84000.00
Total For the current month 21414086.36 Up to Last Month 38575823.00
Cumulative Value up to current month 59989909.36
Divided Details of Villages Allotment
Sr.No
Districts
Name of the Contractor
No. of New Scheme
No. of Quality Affected Scheme
No. of Re-organization Scheme
1 BALRAMPUR M/SLARSEN & TOUBROLTD(L&T)
291
0
91
Status of Survey
S.No Districts Name of the Contractors
No.of Villages Surveyed
1
BALRAMPUR
M/SLARSEN & TOUBROLTD
(L&T)
150
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
Status of Submission/Approval of DPRs
S.No
Districts
Name of Contractor
No. of DPRs
Submitted
No. of DPRs
Inspected by TPI
No. of DPRs Approved
1
BALRAMPUR
M/SLARSEN &TOUBROLTD(L&T)
67
0
13
Table 8. Schools &Anganwadi inspection-
Cluster District No of
School No of
Anganwadi Inspected
School Inspected
Anganwadi Remarks
Devipatan Balrampur 1837 1834 1681 1367 Survey is in
Progress
S.N
o
Distri
ct
No
of
Bloc
ks
Total Scope the Work Current month
progress Cumulative
Anganw
adi
Scho
ol
Tot
al
Angan
wadi
Schoo
l
Tota
l
Anganw
adi
Scho
ol
Tota
l
1
Balra
mpur 11 1834 1837
367
1 684 858
154
2 1367 1681 3048
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
Table 9. Abstract of Bill Verification of Jal Jeevan Mission
Abstract of Bill Verification of Jal Jeevan Mission works
S.NO
Month District Name of Schemes
No of Total
Invoices Raised to
TPI
Invoice Amount
(Rs.)
Completed
inspection by TPI
Remarks
1 Up to Previous Month
Balrampur
JJM Phase 2
2 Retrofitting 89 38575823.0 89
3 Current Month
JJM Phase 2
4 Retrofitting 47 21414086.6 40
Total (Till Date) 136 72219413.6 129
5. INFORMATION/ASSISTANCE REQUIRED FROM CLIENT
We request SWSM to arrange for the following for smooth functioning of TPI.
I. List of names and contact details of the Contractor’s working in the district II. Contract documents of ongoing works
III. Approved scope of work of the contracts Bill of Quantities, drawings,
technical specifications and other relevant documents necessary for
carrying out our inspections
IV. Approved construction plan and progress achieved till date V. Details of paid and approved invoices of the contractors.
6. INSPECTIONOFEXISTINGINFRASTRUCTURE
I. CTL shall communicate with the client and gain all the necessary information related to the project.
II. CTL shall inspect the site on regular basis and visit the construction activities performed by the contract workers.
III. CTL shall inspect all the existing infrastructure along with their site report, sample test reports survey data and approved method statements.
IV. Our representative shall evaluate the necessity of additional work if any claimed by the contractor.
`
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
TPI SITE PERIODIC VISIT PHOTOGRAPHS
Table 10. Periodic Site Visit Photographs
Photographs Description
T The
Site: Haraiya Satgarwa Water supply Scheme
Location : Haraiya Satgarwa Market
Date of Visit : 07.09.2021
The Photograph is Taken at Haraiya Satghrawa Over head Tank Site. The
photographs indicate that Staging work is in Progress. The column has been raised up
to Height of 6m.No Proper safety Practices were used by Contractor at site. Our Safety
Engineer Has instructed the Contractor to use PPEs.
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
Photographs Description
Site: Govind Water supply Retrofitting
Location : Govindpur (Gaisadi Block)
Date of Visit : 22.09.2021
Observation : The Photograph is Taken at Govindpur Over head Tank Site.
The photographs indicate that Top dome has been Finished. Staircase has been
constructed up to Landing Platform .No Proper safety Practices were used by
Contractor at site. Our Safety Engineer Has instructed the Contractor to use PPEs while
working at Height.
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
Photographs Description
Site: Jarwa Water supply Retrofitting Scheme
Location : Jarwa (Haraiya Satgarwa)
Date of Visit : 22.09.2021
Observation :
Pressure in FHTC is Normal.
Supply at Houses is given on Daily basis. The quality of water is Portable
Inspect House Connection Progress work and physically verified.
List of house connection was verified physically.
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
Photographs Description
Site: HisampurW/S Retrofitting Scheme
Location : Hisampur (Haraiya Satgarwa)
Date of Visit : 01.09.2021
Description : The Already Laid Pipe Line is Excavated for checking of Depth
above Pipe Cushion. The Pipe is Laid at Depth of 1m Cushion.
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
Photographs Description
Site: Devipatan W/S Retrofitting Scheme
Location : Near Devipatan Temple Block Tulsipur
Date of Visit : 01.09.2021
Description : The Pipe line was Laid for Distribution of water from OHT to
devipatan Colony.The pressure is satisfactory
Site: DevarawaW/S Retrofitting Scheme
Location : Devarahwa ( Balrampur Dehat)
Date of Visit : 29.09.2021
Description: Inspected renovation work for OHT,Construction of Sluice chamber ,Painting work and Misl. work
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
TPI SITE INSPECTION PHOTOGRAPHS
Table 11. Site Inspection Photographs with comments
DATE WORK ACTIVITY SITE LOCATION AND COMMENTS SITE PHOTOGRAPHS
02.09.2021 Soil Testing in Gram Panchayat Gaidas Bujurag Block Gaidas Bujurg District
Balrampur UP.
03.09.2021 Site Inspection Visit for Work Progress
Review of Retrofitting Scheme Ramwapur
and for Verification of Bill invoice
Gram Panchayat Ramwapur Block Tulsipur District Balrampur UP
07.09.2021 Site Inspection Visit for Work Progress
Review of Retrofitting Scheme Haraiya
Satgaraw also for Verification of Bill
invoice
Gram Panchayat Haraiya Satgarawa Block Haraiya Satgarawa
District BalrampurUP. Observation:The Construction of Column of
Over Head Tank was in Progress. The Quality of Concrete was
Satisfactory. The Slump Test and Cube Test were performed at Site.
The result of Cube Test and Slump Test was found satisfactory.
In List of FHTC house connection was checked Randomly and
Verified. The Pressure in Pipe Line was checked and found okay.
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
DATE WORK ACTIVITY SITE LOCATION AND COMMENTS SITE PHOTOGRAPHS
07.09.2021 Soil Testing Near Katia GP Chulhabhari Block- Balrampur District- Balrampur
Agency: L&T Limited Project : JJM Second Phase
08.09.2021 Soil Testing GP- Luchiya Block –Balrampur District- Balrampur
Agency: L&T Limited Project : JJM Second Phase
15.09.2021 Construction of Borewell and
Development of Borewell
Vishunpur KalaBlock –Gaisadi District Balrampur .The work Found
Satisfactory.
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
DATE WORK ACTIVITY SITE LOCATION AND COMMENTS SITE PHOTOGRAPHS
21.09.2021 Safety Audit of Construction site Gram Panchayat Haraiya Satgarawa Block Haraiya Satgarawa
District Balrampur UP. Observation: The Workers were not using
PPEs on construction site. There was No Approach to reach at
Height. No Safety shoes and Jacket were used by Labour.
Instruction was given to Contractor Regarding this issue.
23.09.2021 Inspection work for Invoice verification
Kautukiyan and Deorawa Retrofitting
Water supply scheme
Kautukiyan And Deorawa Retrofitting Water supply scheme
Located in Balrampur Dehat and Haraiya satgarawa Block.
In List of FHTC house connection was checked Randomly and
Verified. The Pressure in Pipe Line was checked and found okay.
Road restoration was checked and found not satisfactory. The Road
was needed again to reinstated. The Contractor was instructed to
rectify the work.
25.09.2021 Inspection work for Invoice verification of
Jarwa Retrofitting Water supply scheme
The site is located in Balrampur District. In List of FHTC house
connection List was checked and found okay. The Pressure in Pipe
Line was checked and found okay. Road restoration was checked
and found not satisfactory.
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
DATE WORK ACTIVITY SITE LOCATION AND COMMENTS SITE PHOTOGRAPHS
25.09.2021 Construction of Borewell and
Development of Borewell
Gram Panchayat Shiva Nagar Block Balrampur .The work Found
Satisfactory
29.09.22021 Mock-Drill of Safety Practices by ceinsys
Staff
Ceinsys Tech Office Balrampur Maltikunj Colony
Third Party Inspection (TPI) & Monitoring of Physical & Financial
Progress for Various Rural Water Supply Projects
ANNEXURE TRANSMITTALS (INWARD/OUTWARD)
Outward Communication Summary
Table 12. Outward Transmittals
Sr. No
Letter no. Date Subject Department Reference
1 Ceinsys/opr/2021-22/09/357
29.10.2021 Regarding Safety Violation By Contractor at site
UP Jal Nigam
2 Ceinsys/opr/2021-22/09/358
Requesting List of Community centre,Toilets,Panchyat bhavan
CDO office
Inward Communication Summary
Table 13. Inward Transmittals
Sr. No
Letter no. Date Subject
1 1722/W-23/TPI 27.09.2021 Physical Inspection of Financial Progress
1 W-17/Material Testing/2020-21/1525
14.09.2021 Approval of QAP in JJM Phase 2 for approval of Vender SWSM Lucknow
2 914/Work/83/208 12.08.2021 Meeting of DWSM Committee By CDO Balrampur