Wind Wind Resource Resource Assessment Assessment in in South South-Karelia Karelia CEID seminar 1 2 2012 CEID seminar 1.2.2012 Katja Hynynen LUT Energia Katja Hynynen, LUT Energia

Upload: others

Post on 21-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CEID seminar 1 2 2012CEID seminar 1.2.2012 Katja Hynynen ...Microsoft PowerPoint - Wind_resource_assessment_01022012.pptx Author: khynynen Created Date: 2/8/2012 1:59:55 PM

WindWind ResourceResource AssessmentAssessment in in SouthSouth--KareliaKarelia

CEID seminar 1 2 2012CEID seminar 1.2.2012

Katja Hynynen LUT EnergiaKatja Hynynen, LUT Energia

Page 2: CEID seminar 1 2 2012CEID seminar 1.2.2012 Katja Hynynen ...Microsoft PowerPoint - Wind_resource_assessment_01022012.pptx Author: khynynen Created Date: 2/8/2012 1:59:55 PM

ContentContent

Obj ti f th h− Objectives of the research− Wind measurements− Wind conditions

− Monthly variability− Annual variability− Diurnal variability− Diurnal variability− Turbulence− Wind grandient and wind shear

− Energy output

− Wind measurements at LUT with a LIDAR remote sensorWind measurements at LUT with a LIDAR remote sensor

Page 3: CEID seminar 1 2 2012CEID seminar 1.2.2012 Katja Hynynen ...Microsoft PowerPoint - Wind_resource_assessment_01022012.pptx Author: khynynen Created Date: 2/8/2012 1:59:55 PM

Objectives of the researchObjectives of the research

G l i d i l i S h K li i 2009− General wind power potential assessment in South-Karelia in 2009− Wind conditions are sufficient for further study− More detailled measurements necessaryMore detailled measurements necessary− Territories adequate for wind power production were pointed

− Wind measurements in three places in South-Karelia in 2009-2011− Inland wind conditions

P fit bilit f i l d i d d ti− Profitability of inland wind power production

Page 4: CEID seminar 1 2 2012CEID seminar 1.2.2012 Katja Hynynen ...Microsoft PowerPoint - Wind_resource_assessment_01022012.pptx Author: khynynen Created Date: 2/8/2012 1:59:55 PM

Wind measurements (1/2)

Joutseno

Wind measurements (1/2)

Met mast measurements− Met mast measurements− in Puumala 1.11.2009-

31.10.2011 131 m− in Joutseno 1.11.2009-

31.10.2010− Ultrasonic anemometers in 3 Puumala

heights, 2 anemometers in eachheight

− Wind speed and wind direction,

90 m 88 m

p ,relative humidity and temperature

− 10 min average, standard

60 m

49 m0 a e age, s a da ddeviation, and gust speed (10 min max) + 1 sec data

30 m

Page 5: CEID seminar 1 2 2012CEID seminar 1.2.2012 Katja Hynynen ...Microsoft PowerPoint - Wind_resource_assessment_01022012.pptx Author: khynynen Created Date: 2/8/2012 1:59:55 PM

Wind measurements (2/2)Wind measurements (2/2)

LIDAR− LIDAR remote sensor measurementsin Joutseno

− Measurement heights 40, 60, 80, 100, g , , , ,120, 140, 160, 180, 200, 300 m

− Wind speed and wind direction10 i 1 d t− 10 min average + 1 sec data

− Additionally reference data from a windfarm in the North-West cost (80 m)

− Wind speed and direction− 10 min average data

Page 6: CEID seminar 1 2 2012CEID seminar 1.2.2012 Katja Hynynen ...Microsoft PowerPoint - Wind_resource_assessment_01022012.pptx Author: khynynen Created Date: 2/8/2012 1:59:55 PM

Wind conditionsMonthly variability (1/4)

6

7

Puumala met mast 2009 ‐ 2010

4

5

6

d m/s

2

3

4

Wind speed

90 m

60 m

30 m

0

1

2

0

Page 7: CEID seminar 1 2 2012CEID seminar 1.2.2012 Katja Hynynen ...Microsoft PowerPoint - Wind_resource_assessment_01022012.pptx Author: khynynen Created Date: 2/8/2012 1:59:55 PM

Wind conditionsMonthly variability (2/4)

7

8

Joutseno met mast 2009 ‐ 2010

5

6

d m/s

3

4

Wind speed

131 m

88 m

49 m

0

1

2

0

Page 8: CEID seminar 1 2 2012CEID seminar 1.2.2012 Katja Hynynen ...Microsoft PowerPoint - Wind_resource_assessment_01022012.pptx Author: khynynen Created Date: 2/8/2012 1:59:55 PM

Wind conditionsMonthly variability (3/4)

9

10

Monthly average speeds 2009 ‐ 2010

6

7

8

d m/s

3

4

5

Wind speed

Puumala 90 m

Joutseno 88 m

Joutseno 131 m

0

1

2

3North‐West coast 80 m

0

Page 9: CEID seminar 1 2 2012CEID seminar 1.2.2012 Katja Hynynen ...Microsoft PowerPoint - Wind_resource_assessment_01022012.pptx Author: khynynen Created Date: 2/8/2012 1:59:55 PM

Wind conditionsMonthly variability (4/4)

8

9Monthly variability 2010 ‐ 2011

6

7

4

5

Wind speed m/s Joutseno 80 m

Joutseno 100 m

Joutseno 120 m

North‐West coast 80 m

2

3

W

Puumala 90 m

0

1

November December January February March April May June July August

Page 10: CEID seminar 1 2 2012CEID seminar 1.2.2012 Katja Hynynen ...Microsoft PowerPoint - Wind_resource_assessment_01022012.pptx Author: khynynen Created Date: 2/8/2012 1:59:55 PM

Wind conditionsAnnual variability

7

8

Puumala met mast 90 m

5

6

7

m/s

3

4

Wind speed 

2009 ‐ 2010

2010 ‐ 2011

0

1

2

0

Page 11: CEID seminar 1 2 2012CEID seminar 1.2.2012 Katja Hynynen ...Microsoft PowerPoint - Wind_resource_assessment_01022012.pptx Author: khynynen Created Date: 2/8/2012 1:59:55 PM

Diurnal variability - monthly avarage of each hour

 

January April

July October

Page 12: CEID seminar 1 2 2012CEID seminar 1.2.2012 Katja Hynynen ...Microsoft PowerPoint - Wind_resource_assessment_01022012.pptx Author: khynynen Created Date: 2/8/2012 1:59:55 PM

Wind gradient and wind shearWind gradient and wind shearFrom up

Page 13: CEID seminar 1 2 2012CEID seminar 1.2.2012 Katja Hynynen ...Microsoft PowerPoint - Wind_resource_assessment_01022012.pptx Author: khynynen Created Date: 2/8/2012 1:59:55 PM

TurbulenceTurbulence

Wi d t ll− Wind measurements are usuallymade using 10 min average data.

− Especially in inlands, the wind10

11

speed changes a lot during 10 minutes => Turbulence

− Turbulence affects 7

8

9

peed

 m/s

90 m

− Energy content of wind− Stress on the turbine− Smoothness of the energy 3

4

5

6

Wind sp

60 m

30 m

Smoothness of the energyproduction

− Influences on the selection of turbine

20 1 2 3 4 5 6 7 8 9 1

0

turbine

Page 14: CEID seminar 1 2 2012CEID seminar 1.2.2012 Katja Hynynen ...Microsoft PowerPoint - Wind_resource_assessment_01022012.pptx Author: khynynen Created Date: 2/8/2012 1:59:55 PM

Monthly energy output with Enercon 3 MW turbineMonthly energy output with Enercon 3 MW turbine

1400

Energy output 2009 ‐ 2010

1000

1200

th

600

800

MWh/Mon

t

Puumala 90 m

Joutseno 88 m

Joutseno 131 m

N th W t t 80

200

400North‐West coast 80 m

0

Energy productions estimated using power curve of Enercon E‐101 turbine.(Source: http://www.enercon.de/p/downloads/EN_Productoverview_0710.pdf)

Page 15: CEID seminar 1 2 2012CEID seminar 1.2.2012 Katja Hynynen ...Microsoft PowerPoint - Wind_resource_assessment_01022012.pptx Author: khynynen Created Date: 2/8/2012 1:59:55 PM

Monthly energy output with Enercon 3 MW turbineMonthly energy output with Enercon 3 MW turbine

1400

Energy output 2010 ‐ 2011

1000

1200

Joutseno 140 m

600

800

MWh/Mon

th

Joutseno 140 m

Joutseno 120 m

Joutseno 100 m

Joutseno 80 m

P l 90

200

400

Puumala 90 m

North‐West coast 80 m

0

200

November December January February March April May June July August

Energy productions estimated using power curve of Enercon E‐101 turbine.(Source : http://www.enercon.de/p/downloads/EN_Productoverview_0710.pdf)

Page 16: CEID seminar 1 2 2012CEID seminar 1.2.2012 Katja Hynynen ...Microsoft PowerPoint - Wind_resource_assessment_01022012.pptx Author: khynynen Created Date: 2/8/2012 1:59:55 PM

Wind measurements at LUT with a LIDARWind measurements at LUT with a LIDAR

Page 17: CEID seminar 1 2 2012CEID seminar 1.2.2012 Katja Hynynen ...Microsoft PowerPoint - Wind_resource_assessment_01022012.pptx Author: khynynen Created Date: 2/8/2012 1:59:55 PM

Wind measurements at LUT with LIDARWind measurements at LUT with LIDAR

Wind speed at LUT on 31.1.2012 at 60, 100, and 120 m heightsp , , g