ceia sdm project
TRANSCRIPT
SCOPE OF PROJECT
Networking of passenger & staff Security screening metal Detectors (CEIA) in CA, CB, T3 all areas.
Server Integration for SDM Data collection requirements in passenger security screening areas & staff screening Areas.
Make all devices status Online to generate SDM report with accurate passenger count, alarm count and random alarm statistics.
Port activation and VPN & IP configuration.
APSIM Module & Programming module configuration, parameter settings with standard security levels in compliance with Dubai police .
Device renaming with drawing ID, Location and Graphical design.
OUR MOTIVATORS
MR.KHALIFA AL HABSI- SECURITY SYSTEMS MANAGER, ABL-SAS ENGINEERING.
MR.HARIS POOKOTH –SYSTEM ENGINEER, XRAY SYSTEMS.
MR.THOMAS LAKAPARAMBU – SYSTEM ENGINEER, BUSINESS SUPPORT.
MR.ROSHAN RAMAKRISHNAN- SYSTEM ENGINEER, XRAY SYSTEMS.
MR.ARSHAD KHAN- SYSTEM SPECIALIST.
MR.THUMMY VARGHESE –SYSTEM SPECIALIST.
THANK YOU FOR ALL AND CELEBRATING THE TEAM WORK.
SDM PRIORITY REPORT
Priority Area Total ONLINE Comp %
Priority 1 Departure Passenger 22 22 100%
Priority 2 Concourse 3 Upper Level 1 24 24 100%
Priority 3 Departure Transfer Desk K 12 12 100%
Priority 4 Departure Transfer Desk G 27 27 100%
Priority 5 Concourse 3 Ground Floor 13 13 100%
Priority 6 Departure Transfer Passenger 4 4 100%
Priority 7 Apron Staff Entrance 16 16 100%
Total 118 118 100%
COMPLETED PROJECTS 2014
CEIA SDM NETWORKING AND INTEGRATIOIN PROJECT- CA,CB-T3,T2
ETD NETWORKING & REMOTE CONNECTIVITY- CA,CB-T3,T1,T2.
DATA COLLECTION OF ASSETS & NETWORK DETAILS- CA,CB-T3,T2.
MASTER DOCUMENTS PREPARATION FOR ALL ABOVE.
CEIA SYSTEM FUTURE ENHACEMENTS -INPROGRESS
SAS CONTROL ROOM- MONITORING PROVISION IN T3 L5- IN PROGRESS
MULTI MONITORING SYSTEM SOFTWARE DEVELOPMENT – IN PROGRESS