cedar mountain survey results
DESCRIPTION
Cedar Mountain Survey Results. Account Executive : Jon Woehl Managing Director : Sarah Gass Executive Director : Mike Rich. Completion Rate. 1352 surveys mailed out 347 returned surveys 344 received in mail 3 completed via online Response rate of 26%. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/1.jpg)
Cedar MountainSurvey Results
Account Executive: Jon WoehlManaging Director: Sarah GassExecutive Director: Mike Rich
![Page 2: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/2.jpg)
Completion Rate
• 1352 surveys mailed out– 347 returned surveys• 344 received in mail• 3 completed via online
• Response rate of 26%
![Page 3: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/3.jpg)
Channels for information received88%
44%
17%10% 9%
2% 2%
![Page 4: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/4.jpg)
Gender
Male58%
Fe-male42%
![Page 5: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/5.jpg)
Age of Respondents
18-25 26-35 36-50 51-65 over 65
1%
7%
21%
33%
38%
![Page 6: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/6.jpg)
Size of Household
1 2 3 to 5 6 or more
26%
41%
29%
4%
![Page 7: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/7.jpg)
Years lived in Cedar Mountain School District
Less than 5 6 to 10 11 to 15 16 to 20 21 to 25 More than 25
9%5% 6% 8% 7%
65%
![Page 8: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/8.jpg)
Number of school age children
0 1 2 to 3 4 to 5
72%
9%15%
4%
![Page 9: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/9.jpg)
Current school-aged children
No school-a
ged ch
ildren
High Sc
hool
Cedar
Mtn. Elem
entar
y
Another sch
ool dist
rict
Other
St. M
ichae
l's Cath
olic Sch
ool
Home-sch
ooled
64%
18%12%
7% 5% 2% 1%
30%
![Page 10: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/10.jpg)
Occupation of Respondents
Agricultural Producer
Retired Employed outside of Morgan or
Franklin
Employed in Morgan or
Franklin
Business Owner
38%36%
22%
14% 14%
![Page 11: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/11.jpg)
Respondents by Resident Status
Residents who are Non-Agricultural Producers
52%Residents who are Agriculture Producers
27%
Non-Residents21%
![Page 12: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/12.jpg)
Respondents’ Status
Other Residents52%
Agricultural Landowners48%
![Page 13: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/13.jpg)
DIFFERENCES IN PERCEPTIONS BY AGRICULTURAL LANDOWNERS AND
OTHER RESIDENTS
![Page 14: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/14.jpg)
Average level of agreement regarding current school building
75% 72% 63% 62%
34%
56%66%
48% 55% 48%
Other Residents Agricultural Landowners
![Page 15: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/15.jpg)
Average level of agreement regarding physical improvements to the Cedar Mountain School
A more usable school will benefit Franklin and Morgan com-
munities
Will enhance com-munity support
Attract new teachers and staff members
Attract new students Not enhance learning and teaching envi-
ronment
68%64%
56%53%
40%
54% 52%46%
40%
53%
Other Residents Agricultural Landowners
![Page 16: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/16.jpg)
Level of agreement on the proposed changes will benefit students even though respondent
does not have school age children
Strongly Agree
Agree Neither Agree nor Disagree
Disagree Strongly Disagree
Does not Apply
22%
38%
11%8%
3%
18%18%
33%
18%
8%
15%
8%
Other Residents Agricultural Landowners60%
![Page 17: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/17.jpg)
Factors to determine level of support toward proposed bond referendum
67%45%
28%8%
75%
37%24% 18%
Other Residents Agricultural Landowners
![Page 18: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/18.jpg)
Average level of agreement regarding proposed bond referendum
There
was
ample i
nformation to
mak
e an inform
ed deci
sion
Community ca
n come t
o a co
ncensu
s
There
was
ample time t
o consid
er full im
pact of re
feren
dum
There
will b
e a re
asonable in
crease
in propert
y taxes
Cedar
Mountain co
mmunity is
capab
le of a
ffording bond
Improve
ments
proposed exceed th
e nee
ds of s
chool fa
cility
70% 65% 65% 63% 56%47%
57% 55% 53% 50% 46%59%
Other Residents Agricultural Landowners
![Page 19: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/19.jpg)
Average level of agreement with upgrades to building structure are necessary
Other Resident Agricultural Landowner
75%
56%
![Page 20: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/20.jpg)
Tax Rate per Acre According to District
Redwood Falls
Cedar Mountain
BOLD Wabasso GFW Springfield
$13.59
$5.84 $5.52 $5.37 $4.71
$2.96
![Page 21: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/21.jpg)
PERCEPTIONS OF VOTING RESIDENTS
![Page 22: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/22.jpg)
Average level of agreement with upgrades to building structure are necessary based
on the school children attend79% 75% 72% 67% 66%
44%
![Page 23: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/23.jpg)
Level of agreement with upgrades to building structure are necessary based on school children attend
Strongly Agree
Agree Neither Agree nor Disagree
Disagree Strongly Disagree
48%
30%
0%6%
16%
Cedar Mountian High School78%
![Page 24: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/24.jpg)
Level of agreement with upgrades to building structure are necessary based on school children attend
Strongly Agree
Agree Neither Agree nor Disagree
Disagree Strongly Disagree
65%
23%
3% 3%6%
Cedar Mountian Elementary School88%
![Page 25: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/25.jpg)
Level of agreement with upgrades to building structure are necessary based on school children attend
Strongly Agree
Agree Neither Agree nor Disagree
Disagree Strongly Disagree
8%
15%
46%
8%
23%
Another School District
23%
31%
![Page 26: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/26.jpg)
Level of agreement with upgrades to building structure are necessary based on school children attend
Disagree and Strongly Disagree
57%
Agree and Strongly Agree43%
Another School District
![Page 27: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/27.jpg)
Level of agreement with upgrades to building structure are necessary based on school children attend
Strongly Agree
Agree Neither Agree nor Disagree
Disagree Strongly Disagree
24%
46%
13%10%
7%
No School-Age Children70%
17%
![Page 28: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/28.jpg)
Level of agreement with upgrades to building structure are necessary based on school children attend
Agree and Strongly Agree
80%
Disagree and Strongly Disagree
20%
No School-Age Children
![Page 29: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/29.jpg)
Average level of agreement with upgrades to building structure are necessary based
on occupation90%
74% 71%64%
57%
![Page 30: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/30.jpg)
Level of agreement with upgrades to building structure are necessary based on occupation of resident
Strongly Agree
Agree Neither Agree nor Disagree
Disagree Strongly Disagree
20%
34%
15% 17%15%
Agricultural Producers54%
32%
![Page 31: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/31.jpg)
Level of agreement with upgrades to building structure are necessary based on occupation of resident
Agree and Strongly Agree72%
Disagree and Strongly Disagree
28%
Agricultural Producers
![Page 32: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/32.jpg)
Level of agreement with upgrades to building structure are necessary based on occupation of resident
Strongly Agree
Agree Neither Agree nor Disagree
Disagree Strongly Disagree
67%
31%
0%2% 0%
Employed in Morgan or Franklin98%
![Page 33: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/33.jpg)
Level of agreement with upgrades to building structure are necessary based on occupation of resident
Strongly Agree
Agree Neither Agree nor Disagree
Disagree Strongly Disagree
18%
46%
17%12%
7%
Retired64%
19%
![Page 34: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/34.jpg)
Level of agreement with upgrades to building structure are necessary based on occupation of resident
Agree and Strongly Agree77%
Disagree and Strongly Disagree
23%
Retired
![Page 35: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/35.jpg)
Conclusions
• Cost is the primary factor that will determine community members’ support for the proposed bond referendum.
• A high percentage of respondents, who are residents and non-agricultural producers, agreed that upgrades were necessary.
• More than 50% of Agricultural Landowners would agree that the proposed changes would benefit students even though respondents do not have school aged children.
![Page 36: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/36.jpg)
Conclusions
• Respondents employed in Morgan or Franklin strongly agree that there is a need for upgrades to the current school facility. – Other occupation groups including Agricultural
Producers indicated they also agree.• Other Residents of the Cedar Mountain School
District agree more strongly that upgrades are necessary than Agricultural Landowners.
![Page 37: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/37.jpg)
Conclusions
• Regarding the proposed bond referendum, other residents and Agricultural landowners agreed that there was ample information to make an informed decision and that the community can come to a consensus.
![Page 38: Cedar Mountain Survey Results](https://reader036.vdocuments.us/reader036/viewer/2022070500/568168ae550346895ddf6811/html5/thumbnails/38.jpg)
Concluding comments or questions?