cebu-cordova link expressway (cclex) project brief
TRANSCRIPT
DRAFT
SEGMENT9– OtherActivities(cont’d.)Cebu Cordova Link Expressway
Cebu Cordova Link Expressway Project Brief Update
RadissonHotel,CebuCity02March2017
DRAFT
SEGMENT9– OtherActivities(cont’d.)Cebu Cordova Link Expressway
Project information
§ TotalLength- 8.25km
§ NumberofLanes- 2x2oratotalof4lanes
§ HeightofBridge- 51meters
§ ConcessionPeriod– 35years(inclusiveofconstructionperiod,exclusiveofROW)
§ DesignSpeed- 80- 90kph
§ Alignment– ConnectiontoCebuCitysideviaon- andoff-rampsalongCebu
SouthCoastalRoadandanothersetalongtheGuadalupeRiver–theconstructionoftheGuadalupeon/offrampsisdeferredattherequestofLGUs;
– MainbridgespanningthenavigationpathtoShellIsland;– Viaductthatbringsthebridgetothelevelofthecauseway;– CausewaywhichleadstoPilipog inCordova;and– At-graderoadconnectingtotheMactan CircumferentialRoad
Russky Bridge(Russia)
RAMAVIIIBridge(Bangkok,Thailand)
DRAFT
SEGMENT9– OtherActivities(cont’d.)Cebu Cordova Link Expressway
Project information
DRAFT
SEGMENT9– OtherActivities(cont’d.)Cebu Cordova Link Expressway
Project information
CSCRon/offramps 1.21/0.79km
Mainbridge 0.40km
Cordovaviaduct 1.06km
Causeway 4.96km
At-grade connectiontoMCR 0.61km
TotalLength 8.25 km
DRAFT
SEGMENT9– OtherActivities(cont’d.)
Project information
Cebu Cordova Link Expressway
DRAFT
SEGMENT9– OtherActivities(cont’d.)
Project information
Cebu Cordova Link Expressway
DRAFT
SEGMENT9– OtherActivities(cont’d.)
Project information
Cebu Cordova Link Expressway
DRAFT
SEGMENT9– OtherActivities(cont’d.)
Project information
Cebu Cordova Link Expressway
DRAFT
SEGMENT9– OtherActivities(cont’d.)Cebu Cordova Link Expressway
Project information
DRAFT
SEGMENT9– OtherActivities(cont’d.)Cebu Cordova Link Expressway
Project information
MainBridge:StayCable– IconicFeature
DRAFT
SEGMENT9– OtherActivities(cont’d.)Cebu Cordova Link Expressway
Project information
DRAFT
SEGMENT9– OtherActivities(cont’d.)Cebu-Cordova Link Expressway
Toll Plaza
DRAFT
SEGMENT9– OtherActivities(cont’d.)Cebu-Cordova Link Expressway
The Light ring will have a diameter of approx. 520m and will have 8 masts, each being 10m in height
DRAFT
SEGMENT9– OtherActivities(cont’d.)Cebu Cordova Link Expressway
Projecthighlights
• JointVentureAgreementwiththeLGUsoftheCityofCebuandMunicipalityofCordovasignedon15Apr2016
• ConcessionAgreementsignedbytheGrantorson03Oct2016
• COWIA/SwithDCCDEngineeringCorporationasitssub-consultantengagedasTechnicalAdvisor/Owner’sEngineer
DRAFT
SEGMENT9– OtherActivities(cont’d.)Cebu Cordova Link Expressway
DRAFT
SEGMENT9– OtherActivities(cont’d.)Cebu-Cordova Link Expressway
Thankyou