1. HIGHLIGHTS OF POWER SECTOR a Installed Generation Capacity (As on 31-12-10 ) Thermal All India Coal Gas Diesel MW 92378.38 17456.35 1199.75 %age 54.4 10.3 0.7 @ Based on data as on 31.03.2010. b Capacity Addition Target during 11th Plan Hydro MW %age c 15627 19.9 Thermal 59693 75.8 Nuclear 3380 4.3 Total 78700 100.0 Nuclear Total 111034.48 65.4 4560.00 2.7 Hydro(Renewable)

37367.40 22.0

RES@ Grand Total (MNRE) 16786.98 169748.86 9.9 100.0

Generation Capacity Addition Target/Achievement (2010-11)

Hydro Target (MW) Achievment upto Dec. 10 (MW) %age

Thermal

Nuclear

Total

1466.0 490.0 33.4

18755.2 9240.5 49.3

1220.0 0.0 0.0

21441.2 9730.5 45.4

d Electricity Generation Target/achievement (2010-11) Hydro Target MU 111352 Achievment upto Dec. 10 MU 90145.27 %age 80.96 e Thermal Nuclear Bhutan (Imp) 6548 5364.05 81.92 Total

690856.5 483931.46 70.05

22000 17848.9 81.13

830756.5 597289.68 71.90

Status of CEA Concurrence to Hydro SchemesPeriod Project report receivedCarry forward

from Prev. year

Under Prelim. Exam -

Accepted for concurrence

Concurrence

Project reports

given by CEA

returned to Developer

2007-082008-09 2009-10 2010-11

13 8

3

3 1

4 4

10 5

19 18

10 23

2 2

9 10

3 4

6 17

f

All India Thermal PLF (%) 2002-03 72.2 provisional* 2003-04 72.7 2004-05 74.8 2005-06 73.6 2006-07 76.8 2007-08 78.6 2008-09 77.2 2009-10 77.48 2010-11 *upto Dec. 10

72.86

ENERGY SAVED IS ENERGY PRODUCED

g

All India Annual per Capita consumption of Electricity Year Per Capita Consumption ( kWh)(As per U. N. methodology)

2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 h All India Transformation, T&D and AT&C losses : Year T&D losses 2002-03 32.54 2003-04 32.53 2004-05 31.25 2005-06 30.42 2006-07 28.65 2007-08 27.20 2008-09 25.47* PFC Figs.

566.69 592.00 612.50 631.50 671.89 717.13 733.54

AT&C Losses*

32.54 34.78 34.33 33.02 30.59 29.24 28.44

i

a) All India Village Electrification (as on 30.11. 2010): b) Pumpsets Energised (as on 30.11. 2010):

531425 (89.5%) 16968373 (85.5%)

j

k

All India Coal Consumption for Power Generation (Utilities) YEAR Coal Cunsumption ( Million Tonnes ) 2001-02 240 2002-03 253 2003-04 263 2004-05 278 2005-06 280 2006-07 302 2007-08 330 2008-09 355 Average cost of power supply & average realization ( paise/kWh ) Year cost of supply realization(paise/unit) (paise/unit) Including Only Agriculture Agriculture 2001-02 246 181 58.67 2002-03 238 195 77.48 2003-04 239 203 72.39 2004-05 254 209 75.68 2005-06 258 221 79.37 2006-07 276 227 71.32Source:- PFC Reports on the performance of State Power Utilities

l

Power supply Position 2010-11(DECEMBER,10)* Energy(MU) Deficit% Peak Deficit% Region Requirement Demand(MW) Northern 21,490 -7.5 34,570 -10.7 Western 23,795 -14.3 39,621 -17.4 Southern 17,831 -2.5 29,022 -3.3 Eastern 7,433 -4.6 12,520 -5.1 North Eastern 814 -5.7 1,676 -8.8 All India 71,363 -8.2 117,409 -10.5* Provisional ENERGY SAVED IS ENERGY PRODUCED

1.1 CAPACITY ADDITION & GENERATION DURING Description CAPACITY ADDITION (MW) THERMAL HYDRO NUCLEAR RES @ TOTAL GENERATION (MU) THERMAL NUCLEAR HYDRO BHUTAN IMPORT TOTAL DECEMBER.10 Target Achivement 1986.00 100.00 220.00 2306.00 60885.12 2021.00 7206.04 247.40 70359.56 2635.75 0.00 0.00 2635.75 57532.86 2410.77 6966.65 169.38 67079.66

DECEMBER.10 DECEMBER.09 Target Achivement 2426.00 188.00 220.00 2834.00 57086.33 1839.00 7975.00 400.00 67300.33 233.00 0.00 0.00 233.00 56002.66 1471.22 6453.01 170.05 64096.94

@ Renewable Energy Sources (RES) includes Small Hydro Project(SHP), Biomass Gas(BG), Biomass Power(BP), Urban & Industrial waste Power(U&I), and Wind Energy. Note: Generation (MU) achieved in Dec.10 is provisional. TARGET/ACHIVEMENT IN CAPACITY ADDITION ( MW ) DURING DECEMBER.10

3000 2500 1986 2000 1500 1000 500 0

2636 2306

2636

100 THERMAL

220 0 0 NUCLEAR TOTAL

HYDRO

Target

Achievement

ACHIEVEMENT IN GENERATION ( MU ) DURING DECEMBER.10

6967 2411

169

57533

THERMAL

NUCLEAR

HYDRO

Bhutan IMP

ENERGY SAVED IS ENERGY PRODUCED

2. CAPACITY ADDITION TARGET 11TH PLAN(MW)

Type/Sector Thermal Hydro Nuclear Total

Central 24840 8654 3380 36874

State 23301 3482 0 26783

Private 11552 3491 0 15043

Total 59693 15627 3380 78700

3380 15627

59693Thermal Hydro Nuclear

ENERGY SAVED IS ENERGY PRODUCED

3.

CAPACITY ADDITION FOR DECEMBER.10 AND APRIL'10-DECEMBER.10(MW)

Schemes Status of Schemes Central Thermal State Pvt. Total Hydro Central State Pvt. Total Nuclear Central Total State RES @ Pvt. Total All India Central State Pvt. Total

Target 2010-11 6015.00 6549.20 6191.00 18755.20 649.00 356.00 461.00 1466.00 1220.00 1220.00

DECEMBER.10Target Achievement

APRIL'10- DECEMBER.10Deviation Target Achievement (+) / (-)

1000.00 851.00 135.00 1986.00 100.00 0.00 0.00 100.00 220.00 220.00

500.00 210.00 1925.75 2635.75 0.00 0.00 0.00 0.00 0.00 0.00

7884.00 6905.20 6652.00 21441.20

1320.00 851.00 135.00 2306.00

500.00 210.00 1925.75 2635.75

3990.00 4948.20 4648.50 13586.70 220.00 262.00 461.00 943.00 220.00 220.00 0.00 0.00 0.00 0.00 4430.00 5210.20 5109.50 14749.70

2115.00 2331.00 4794.50 9240.50 120.00 178.00 192.00 490.00 0.00 0.00 0.00 0.00 0.00 0.00 2235.00 2509.00 4986.50 9730.50

-1875.00 -2617.20 146.00 -4346.20 -100.00 -84.00 -269.00 -453.00 -220.00 -220.00 0.00 0.00 0.00 0.00 -2195.00 -2701.20 -123.00 -5019.20

@ Renewable Energy Sources (RES) includes Small Hydro Project(SHP), Biomass Gas(BG), Biomass Power(BP), Urban & Industrial waste Power(U&I), and Wind Energy.

TARGET & ACHIEVEMENT ( MW ) APRIL 10-DECEMBER.10

15000 12000 9000 6000

13587

18000

14750 9241 943 490 220 0 0Hydro NuclearTarget Achievement

3000 0

Thermal

Wind

0

Total

ENERGY PRODUCED IS ENERGY SAVED

9731

4.

PROGRAMME AND ACHIEVEMEMT OF ENERGY GENERATION (MU)

DECEMBER.10 Gen. Sch. Target (2010APRIL'10- DECEMBER.10 11) Sector-wise Programme Achievement* % Ach. Programme Achievement* Thermal Central Sector 269999.11 23479.52 22867.59 97.39 197789.90 201745.08 State Sector 317092.64 27982.74 25371.55 90.67 232595.98 201887.52 Pvt.IPP Sector 76520.57 7301.65 7346.67 100.62 53894.71 59726.66 Pvt.UTL Sector 27244.18 2121.21 1947.05 91.79 20964.35 20572.20 Total 690856.50 60885.12 57532.86 94.49 505244.94 483931.46 Hydro Central Sector 41642.00 2292.87 2311.23 100.80 34958.37 38531.22 State Sector 63990.00 4613.17 4396.95 95.31 50234.74 46899.73 Pvt.IPP Sector 4092.00 162.50 161.53 99.40 3623.05 3722.24 Pvt.UTL Sector 1628.00 137.50 96.94 70.50 1213.90 992.08 Total 111352.00 7206.04 6966.65 96.68 90030.06 90145.27 Nuclear Central Sector 22000.00 2021.00 2410.77 119.29 16168.00 17848.90 Total 22000.00 2021.00 2410.77 119.29 16168.00 17848.90 Bhutan Import 6548.00 247.40 169.38 68.46 6071.05 5364.05 All India Central Sector 333641.11 27793.39 27589.59 99.27 248916.27 258125.20 State Sector 381082.64 32595.91 29768.50 91.33 282830.72 248787.25 Pvt. Sector 109484.75 9722.86 9552.19 98.24 79696.01 85013.18 Total 830756.50 70359.56 67079.66 95.34 617514.05 597289.68 * Provisional based on actual-cum-AssesmentALL INDIA ENERGY GENERATION DURING APRIL'10-DECEMBER.10800000 750000 700000 650000 600000 550000 500000 450000 400000 350000 300000 250000 200000 150000 100000 50000 0

% Ach. 102.00 86.80 110.82 98.13 95.78 110.22 93.36 102.74 81.73 100.13 110.40 110.40 88.35 103.70 87.96 106.67 96.72

505245

483931

90030.06

90145

16168.00

Thermal

Hydro

Nuclear

17849

617514

Total

Programme

Achievement

ENERGY PRODUCED IS ENERGY SAVED

597290

5. ALL INDIA PLANT LOAD FACTOR Sector-wise PLF (%) Programme and Achievsments ( Thermal )SECTOR Dec-10 PROG.(%) ACH.(%)* Apr, 10 - Dec.,10 PROG.(%) ACH.(%)*

Central Sector 76.54 83.62 State Sector 73.19 70.69 Pvt.UTL Sector 71.97 66.53 All India 72.41 76.05 * Provisional based on actual-cum-Assesment90 80 70 60 50 40 30 20 10 0 76.54 83.62 73.19 70.69 71.97

76.79 70.38 81.40 71.35

83.14 63.91 79.68 72.86

ALL INDIA PLANT LOAD FACTOR ( % ) DURING DECEMBER.1072.41 76.05

66.53

Central Sector

State SectorPROG.(%)

Pvt.UTL SectorACH.(%)

All India

LIST OF UTILITY/ORGANISTION WHOSE PLF ACHIEVEMENT WERE LOWER THAN THE RESPECTIVE PROGRAMME DURING DECEMBER.10 PLF in % Name of Power Stn. Shortfall Programme Achievement BADARPUR TPS I. CENTRAL 91.70 74.65 17.05 FARAKKA STPS 90.22 81.18 9.04 DADRI (NCTPP) 74.52 55.25 19.27 KAHALGAON TPS 79.28 76.88 2.40 RAMAGUNDAM STPS 96.05 84.50 11.55 UNCHAHAR TPS 96.52 96.34 0.18 NEYVELI TPS-I 62.28 53.70 8.58 NEYVELI TPS-II 69.12 62.62 6.50 DURGAPUR TPS 87.76 28.61 59.15 HPGCL 75.62 73.80 1.82 II. STATE IPGPCL 79.65 74.67 4.98 GSECL 71.83 61.69 10.14 GMDCL 80.11 71.12 8.99 MAHAGENCO 74.70 72.88 1.82 MPPGCL 80.58 73.77 6.81 KPCL 76.30 73.34 2.96 TNEB 73.27 67.21 6.06 BSEB 13.01 11.23 1.78 DPL 70.52 26.41 44.11 JSEB 38.58 8.05 30.53 TVNL 78.41 70.88 7.53 WBPDC 65.15 60.80 4.35 OPGC 92.00 77.72 14.28

ENERGY PRODUCED IS ENERGY SAVED

6.

ALL INDIA REGIONWISE GENERATING INSTALLED CAPACITY (MW) OF POWER UTILITIES INCLUDING ALLOCATED SHARES IN JOINT AND CENTRAL SECTOR UTILITIESREGION Northern Western Southern Eastern N. Eastern Islands All IndiaCOAL 23620.00 31080.50 19382.50 18235.38 60.00 0.00 92378.38 (As on 31-12-10 ) THERMAL Nuclear HYDRO R.E.S.@ TOTAL (MNRE) (Renewable) GAS DSL TOTAL 3884.76 12.99 27517.75 1620.00 13622.75 2777.32 45537.82 7903.81 17.48 39001.79 1840.00 7447.50 4918.28 53207.57 4690.78 939.32 25012.60 1100.00 11299.03 8517.55 45929.18 190.00 17.20 18442.58 0.00 3882.12 344.41 22669.11 787.00 142.74 989.74 0.00 1116.00 223.32 2329.06 0.00 70.02 70.02 0.00 0.00 6.10 76.12 17456.35 1199.75 111034.48 4560.00 37367.40 16786.98 169748.86 19509 Captive Genrating capacity connected to the Grid (MW) =

SL. NO. 1 2 3 4 5 6 7

RES -Renewable Energy Sources includes Small Hydro Project(SHP), Biomass Gas(BG), Biomass Power(BP), Urban & Industrial waste Power(U&I), and Wind Energy. The installed capacity figures as on 30.06.2010 in respect of RES is based on statement dated 02.11.2010 from Ministry of Renewable Energy(MNRE) where cumulative Grid interactive power installed capacity has been indicated as 17174.60 MW. Reconciliation of installed capacity of Hydro capacity resulted in transfer of 135 MW from conventional to SHP-RES and retrieval of installed capacity of 67.20 from SHP-RES to conventional Hydro has resulted in net addition of 67.8 MW to SHP under RES. under Also 30 RES.Also MW of capacity 30 MW of in capacity the nature in of the Waste nature Heat of Waste Recovery HeatPower Recovery Plant Power at Goa Plant Energy at Goa Private Energy Limited Private under Limited U&I category under U&I of RES Out of this installed capacity due to wind - (374.636 MW) and small hydro (110.79 MW) appearing in captive has been deducted to arrive at installed capacity of utilities inutilities respectin of respect RES. captivecapacity capacity has been deducted to arrive at installed capacity of of RES. (17174.60-485.43+67.8+30=16786.98)

Note:- UNITS COMMISSIONED, DERATED & DECOMMISSIONED DURING DECEMBER.101) JSW Energy ( Ratnagiri ) TPP, U-2 (300 MW) of JSW Energy (Ratnagiri) Ltd. has been commissioned (i.e.Achieving of full load ) on 09-12-2010 2) Mundra TPP, Ph-I, U-4 (330 MW) of Adani Power Ltd. has been commissioned (i.e. Achieving of full load ) on 20-12-2010 3) Mundra TPP, Ph-II, U-1 (660 MW) of Adani Power Ltd. has been commissioned (Full load ) on 26-12-2010 4) Korba STPP, U-7 ( 500 MW ) of NTPC Ltd. has been commissioned (i.e Full load ) on 26-12-2010 5) Sterlite ( Jharsuguda ) TPP, U-1 (600 MW) of Sterlite Energy Ltd. has been commissioned (i.e Full load ) on 29-12-2010 6) Rayalaseema TPP, Stage III U-5 ( 210 MW ) of APGENCO. has been commissioned on 31-12-2010 7) Rithala CCPP GT -1 ( 35.75 MW ) of NDPL. achieved their base load on 09-12-2010

200000 175000 150000 125000 100000 75000 50000 25000 0 Thermal Nuclear Thermal Nuclear Hydro Hydro RES RES Total Captive Total Captive 4560 37367 16787 19509 111034 169749

ENERGY SAVED IS ENERGY PRODUCED

7. GENERATION INSTALLED CAPACITY(MW) OF POWER UTILITIES IN STATES/UTS(As on 31-12-10 )

State/UT (Utilities)STATE SECTOR A & N ISLAND ANDHRA PRADESH ARUNACHAL PRD. ASSAM BIHAR CHANDIGARH CHHATISGARH D & N HAVELI DAMAN & DIU DELHI GOA GUJARAT HARYANA HIMACHAL PRD. JAMMU & KASHMIR JHARKHAND KARNATAKA KERALA LAKSHADWEEP MADHYA PRADESH MAHARASHTRA MANIPUR MEGHALAYA MIZORAM NAGALAND ORISSA PONDICHERRY PUNJAB RAJASTHAN SIKKIM TAMIL NADU TRIPURA UTTAR PRADESH UTTRAKHAND WEST BENGAL

COAL0.00 4592.50 0.00 60.00 530.00 0.00 2060.00 0.00 0.00 385.00 0.00 4440.00 3410.00 0.00 0.00 1190.00 2220.00 0.00 0.00 2807.50 7295.00 0.00 0.00 0.00 0.00 420.00 0.00 2630.00 3615.00 0.00 2970.00 0.00 4072.00 0.00 4780.00

MODE WISE BREAKUP NUCLEAR HYDRO THERMAL (Renewable) GAS DIESEL TOTAL0.00 0.00 0.00 239.00 0.00 0.00 0.00 0.00 0.00 800.40 0.00 892.72 25.00 0.00 175.00 0.00 0.00 0.00 0.00 0.00 672.00 0.00 0.00 0.00 0.00 0.00 32.50 25.00 443.80 0.00 523.20 148.50 0.00 0.00 100.00 40.05 0.00 15.88 20.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.28 3.92 0.13 8.94 0.00 127.92 234.60 9.97 0.00 0.00 45.41 2.05 51.86 2.00 0.00 0.00 0.00 0.00 5.00 0.00 4.85 0.00 0.00 12.06 40.05 4592.50 15.88 319.69 530.00 0.00 2060.00 0.00 0.00 1185.40 0.00 5350.00 3438.92 0.13 183.94 1190.00 2347.92 234.60 9.97 2807.50 7967.00 45.41 2.05 51.86 2.00 420.00 32.50 2655.00 4058.80 5.00 3493.20 153.35 4072.00 0.00 4892.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3695.53 0.00 100.00 0.00 0.00 120.00 0.00 0.00 0.00 0.00 772.00 884.51 393.60 780.00 130.00 3599.80 1881.50 0.00 1703.66 2884.84 0.00 156.00 0.00 0.00 2061.92 0.00 2230.23 987.96 0.00 2122.20 0.00 524.10 1252.15 977.00

RES(MNRE)

TOTAL

5.25 190.83 78.55 27.11 54.60 0.00 19.05 0.00 0.00 0.00 0.05 29.90 70.10 337.82 129.33 4.05 594.55 142.83 0.00 11.76 257.73 5.45 31.03 36.47 28.67 64.30 0.00 222.55 30.25 47.11 85.55 16.01 25.10 132.92 143.40

45.30 8478.86 94.43 446.80 584.60 0.00 2199.05 0.00 0.00 1185.40 0.05 6151.90 4393.53 731.55 1093.27 1324.05 6542.27 2258.93 9.97 4522.92 11109.57 50.86 189.08 88.33 30.67 2546.22 32.50 5107.78 5077.01 52.11 5700.95 169.36 4621.20 1385.07 6012.46

Total State

47477.00

4077.12

602.61

52156.73

0.00 27257.00

2822.32

82236.05

Contd

ENERGY SAVED IS ENERGY PRODUCED

(As on 31-12-10 )

State/UT(Utilities)CENTRAL SECTORDVC HP / NJPC JV NEEPCO NHDC NHPC NTPC NUCLEAR P CORPNTPC+ONGC

COAL

THERMAL GAS DIESEL

MODE WISE BREAKUP HYDRO NUCLEAR (Renewable) TOTAL

RES(MNRE)

TOTAL

3700.00 0.00 0.00 0.00 0.00 26105.00 0.00 0.00 0.00

90.00 0.00 375.00 0.00 0.00 0.00 4017.23 0.00 2220.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3790.00 0.00 375.00 2615.00 0.00 0.00 30122.23 0.00 2220.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 4560.00 0.00 0.00

143.20 1500.00 755.00 0.00 1520.00 3767.20 0.00 0.00 0.00 1000.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3933.20 1500.00 1130.00 2615.00 1520.00 3767.20 30122.23 4560.00 2220.00 1000.00

NEVEYLY LIG. CORP. 2615.00

TEHRI HYD CORP.

Total CentralA & N ISLAND ANDHRA PRADESH ARUNACHAL PRD. ASSAM BIHAR CHHATISGARH DELHI GOA GUJARAT HARYANA HIMACHAL PRD. JAMMU & KASHMIR JHARKHAND KARNATAKA KERALA LAKSHADWEEP MADHYA PRADESH MAHARASHTRA MIZORAM ORISSA PONDICHERRY PUNJAB RAJASTHAN TAMIL NADU TRIPURA UTTAR PRADESH UTTRAKHAND WEST BENGAL

32420.000.00 0.00 0.00 0.00 0.00 1600.00 0.00 0.00 2630.00 0.00 0.00 0.00 360.00 1460.00 0.00 0.00 0.00 2770.00 0.00 1200.00 0.00 0.00 270.00 250.00 0.00 600.00 0.00 1341.38

6702.230.00 2878.40 0.00 24.50 0.00 0.00 71.50 48.00 2577.50 0.00 0.00 0.00 0.00 220.00 174.00 0.00 0.00 180.00 0.00 0.00 0.00 0.00 0.00 503.10 0.00 0.00 0.00 0.00

0.0020.00 36.80 0.00 0.00 0.00 0.00 0.00 0.00 0.20 0.00 0.00 0.00 0.00 106.50 21.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 411.66 0.00 0.00 0.00 0.14

39122.2320.00 2915.20 0.00 24.50 0.00 1600.00 71.50 48.00 5207.70 0.00 0.00 0.00 360.00 1786.50 195.84 0.00 0.00 2950.00 0.00 1200.00 0.00 0.00 270.00 1164.76 0.00 600.00 0.00 1341.52

4560.000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

8685.400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 578.00 0.00 0.00 0.00 0.00 0.00 0.00 447.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 400.00 0.00

0.000.10 530.76 0.03 0.00 9.50 199.90 1.05 30.00 1821.14 35.80 0.00 0.00 0.00 1842.94 0.03 0.75 232.60 2316.15 0.00 4.30 0.03 73.08 1132.20 5130.04 0.00 587.08 0.05 17.15

52367.6320.10 3445.96 0.03 24.50 9.50 1799.90 72.55 78.00 7028.84 35.80 578.00 0.00 360.00 3629.44 195.87 0.75 232.60 5713.15 0.00 1204.30 0.03 73.08 1402.20 6294.80 0.00 1187.08 400.05 1358.67

PRIVATE SECTOR

Total Pvt. Sector 12481.38 6677.00 597.14 19755.52 0.00 1425.00 13964.66 35145.18 TOTAL 92378.38 17456.35 1199.75 111034.48 4560.00 37367.40 16786.98 169748.86 Captive Generating Capacity (MW) connected to the Grid = 19509.49

ENERGY SAVED IS ENERGY PRODUCED

8. GROWTH OF INSTALLED CAPACITY SINCE 6TH PLAN (in MW) Plan / YearEnd of 6th Plans(31.03.85) End of 7th Plan (31.03.90) End of 2nd Plans(31.03.92) End of 8th Plan (31.03.97) End of 9th Plan (31.03.02) March, 2003 March, 2004 March, 2005 March, 2006 End of 10th Plan (31.03.07) March, 2008 March, 2009 March, 2010

Coal26310.83 41237.48 44791.48 54154.48 62130.88 63950.88 64955.88 67790.88 68518.88 71121.38 76048.88 77648.88 84198.38 92378.38

Thermal Gas Diesel541.50 2343.00 3095.00 6561.90 11163.10 11633.20 11839.82 11909.82 12689.91 13691.71 14656.21 14876.61 17055.85 17456.35

Total

Nuclear

Hydro(Renewable)

RES(MNRE)

Total42584.72 63636.34 69065.19 85795.37 105045.96 107877.37 112683.50 118425.70 124287.17 132329.21 143061.01 147965.41 159398.49 169748.86

DECEMBER.10

177.37 27029.70 1095.00 165.09 43745.57 1565.00 167.52 48054.00 1785.00 293.90 61010.28 2225.00 1134.83 74428.81 2720.00 1178.07 76762.15 2720.00 1172.83 77968.53 2720.00 1201.75 80902.45 2770.00 1201.75 82410.54 3360.00 1201.75 86014.84 3900.00 1201.75 91906.84 4120.00 1199.75 93725.24 4120.00 1199.75 102453.98 4560.00 1199.75 111034.48 4560.00

14460.02 18307.63 19194.31 21658.08 26268.76 26766.83 29506.84 30942.24 32325.77 34653.77 35908.76 36877.76 36863.40 37367.40

0.00 18.14 31.88 902.01 1628.39 1628.39 2488.13 3811.01 6190.86 7760.60 11125.41 13242.41 15521.11 16786.98

Captive Generating Capacity (MW) connected to the Grid = 19509.49 ALL INDIA GENERATING INSTALLED CAPACITY ( MW ) (As on 31-12-10 )

16786.98

37367.40

92378.38

4560.00 1199.75

17456.35

TOTAL: 169748.86 MWCoal Gas Diesel Nuclear Hydro RES

ENERGY SAVED IS ENERGY PRODUCED

9. COAL SUPPLY List of critical Thermal Power Stations having critical coal stock of less than 7 days (As on 31-12-10 ) NORTHERN 1 Kota 2 Obra 3 Panipat 4 Singrauli 5 Suratgarh 6 Sanjay Gandhi 7 Chhabra WESTERN 8 Dhanu 9 Khaparkheda-II 10 Vindhyachal TPS 11 Simhadri 12 Parli SOUTHERN 13 Ennore 14 Mettur 15 Tuticorin EASTERN 16 Kahalgaon 17 Talcher STPS 18 Sagardighi TPS 19 Mejia 20 Bakreswar TPS 21 D.P.L. 22 Kolaghat 23 Bandel 24

Import of coal during 2010-11 yet to commence. Due to less receipt of coal from CIL & delay in import of coal Due to less receipt of coal from CIL & delay in import of coalDue to higher generation

Import of coal during 2010-11 yet to commence. Due to less receipt of coal from CIL during the month of Dec., 2010 Due to less receipt of coal from CIL & delay in import of coal Due to less receipt of coal during the month of Dec., 2010 Due to less receipt of coal during the month of Dec., 2010 Due to less receipt of coal during the month of Dec., 2010 Due to less receipt of coal from CIL & delay in import of coal Due to delay in signing of MOU by MCL for new unit resulted in less supply by CIL Due to less receipt of coal from CIL during the month of Dec., 2010 Due to less receipt of coal from CIL during the month of Dec., 2010 Due to less receipt of coal from CIL during the month of Dec., 2010 i. Due to inadequate coal availability in linked mine ECL (Rajmahal) ii)Due to less receipt of imported coal because of transporting and unloading limitations Less receipt due to transportation condtraints in MCL Due to higher generation and less receipt of imported coalDue to Higher Turn around time of rakes between Raniganj and the power station due to law and order problems

Due to higher generationDue to less receipt of coal from CIL during the month of Dec., 2010 and stock adjustment of 145 thousand tones

Farakka

Due to less receipt of coal from CIL during the month of Dec., 2010 Due to less receipt of coal from CIL during the month of Dec., 2010 i) Due to inadequate coal availability in linked mine ECL (Rajmahal) ii)Due to less receipt of coal because of transporting and unloading limitations

ENERGY SAVED IS ENERGY PRODUCED

10. TRANSMISSION LINES (PROGRAMME & ACHIEVEMENT) DECEMBER 10 (Fig.in ckt Kms)VOLTAGE LEVEL/SECTORPROG. 2010-11 INCLUDING SLIPPED Prog. 2009-10

PROGRAMME ACHIEVEMENT Dec-10

April 2010- Dec-10 PROGRAMME ACHIEVEMENT

+/- 800 kV HVDC Central Sector State Sector Total +/- 500 kV HVDC Central Sector JV/Private Sector Total 765 kV Central Sector State Sector Total 400 Kv Central Sector State Sector JV/Private Sector Total 220kV Central Sector State Sector JV/Private Sector Total Grand Total

0 0

0 0

0 0

0 0

0 0 0 0 0 0 07261 2380

0 0 0 0 0 0 094

0 0 0 0 0 0 06520

0 0 0 0 0 0 03529

2889 2365 12515 481 5375 192 6048 18563

82 253 2715 89 331 38 458 3173

0 0 94 0 404 0 404 498

1878 1537 9935 290 3484 124 3898 13833

1742 402 5673 72 3953 358 4383 10056

SUB-STATIONS (PROGRAMME & ACHIEVEMENT) DECEMBER 10 (Fig. in MVA/MW)VOLTAGE LEVEL/SECTORPROG. 2010-11 INCLUDING SLIPPED Prog. 2009-10

PROGRAMME ACHIEVEMENT DECEMBER

April 2010- Dec-10PROGRAMME ACHIEVEMENT

+/- 500 kV HVDC Central Sector State Sector Total 765 kV Central Sector State Sector Total 400 kV Central Sector State Sector JV/Private Sector Total 220 kV Central Sector State Sector JV/Private Sector Total

0 0 0 0 0 0 5010 10320 630 15960 650 11000 126 11776 2305 500 315 3120 50 1070 126 1246

0 0 0 0 0 0 0 945 0 945 0 1750 0 1750

0 0 0 0 0 0 4065 7430 315 11810 350 7500 126 7976

0 0 0 0 0 0 2575 6615 0 9190 500 8580 0 9080

Grand Total

27736

4366

2695

19786

18270

ENERGY SAVED IS ENERGY PRODUCED

11. TRANSMISSION LINES COMMISSIONED DURING DECEMBER 10

A.

TRANSMISSION LINES

Voltage level (kV)

Name of the Transmission line

Type

Executive Agency length (ckm)

Central Sector+/-500 kV HVDCNil Nil Pirana-Degham Nil

765400 220 Private Sector 400

D/C

PGCIL

94 94

Total CSNil

Total PS

0

State Sector400 220Nil

LILO of one ckt. Of Moga-Mukatasar DC at Sadiq LILO of Agra(400)-Ferozabad at Shamshabad Rajgoli to Halkarni S/S LILO of Mysore-Shimoga line at Hassan(Shanthigrama) Narendra 400 kV S/S-Ghataprabha Narendra S/S-MK Hubli S/S LILO of Hootagalli-TK Hali-Vajamangala Varahi-Shimoga Peenya-NRS Anandrao Circlce-Nimhas-HALNarendra-KIDAB

D/C D/CS/C onD/C

PSTCLUPPTCL

38 50 22 28 191 34 3 9 8 17 4 404 498

MSETCL KPTCL KPTCL KPTCL KPTCL KPTCL KPTCL KPTCL

2XD/C D/C S/C D/C D/C D/C S/C

M/C on D/C line KPTCL

Total SSGrand Total

ENERGY SAVED IS ENERGY PRODUCED

B. SUB-STATIONVoltage level (kV) Name of the Substation Type Executive Agency Nil Nil Nil Nil Total CS Nil Nil Nil Nil Daulatabad (3rd Trans.) Akai (Jaisalmer) (2nd Trf.) Talaguppa (3rd) 220kV F P Nabha(1X100) Sahnewal (3rd Trf.)Jaipur (Indra Gandhi Nagar) GSS (1X100)

Capacity (MVA)

Central Sector+/- 500 kV HVDC

765 kV400 kV 220 kV Private Sector 400kV 220kV

State Sector+/- 500 kV HVDC Terminal

765 kV 400kV

400/220 400/220 400/220 220/66 220/66 220/132 220/132 220/33 220/22 220/110 220/110 220/66 220/66 220/66 220/66 220/66

HVPNL RRVPNL KPTCL PSTCL PSTCL RRVPNL UPPTCL MSETCL MSETCL KPTCL KPTCL KPTCL KPTCL KPTCL KPTCL KPTCL

315 315 315 100 100 100 100 100 50 100 100 150 100 300 150 300 2695 2695

Etah Shendra Temghr MK Hubli GhataprabhaA'Station compound(Anand Rao coircle)

Ramanagar(Kothipura) Nimhans Vajamangala East Division Compouynd Total SSGrand Total

ENERGY SAVED IS ENERGY PRODUCED

12. GROWTH OF TRANSMISSION SECTOR SINCE 6TH FIVE YEAR PLAN A. TRANSMISSION LINES (ckm) 400 kV Transmission lines 220 kV Transmission lines At the end of Central State JV/Pvt Central State JV/Pvt Total 6th Plan 1831 4198 1641 44364 6029 7th Plan 13068 6756 4560 55071 19824 8th Plan 23001 13141 6564 73036 36142 9th Plan 29345 20033 8687 88306 49378 10th plan 50992 24730 9444 105185 75722 11th Plan upto 68423 29931 4558 102912 10360 121630 423 DECEMBER.1 B. SUB-STATIONS (MVA) 400 kV Sub-Stations 220 kV Sub-Stations At the end of Central State JV/Pvt Central State JV/Pvt Total 6th Plan 715 8615 500 36791 9330 7th Plan 6760 14820 1881 51861 21580 8th Plan 17340 23525 2566 81611 40865 9th Plan 23575 36805 2866 113497 60380 10th plan 40455 52487 4276 152221 92942 11th Plan upto DECEMBER.1 61170 64447 5276 191389 1440 125617 0 GROWTH OF TRANSMISSION SECTOR (As on 31-12-10 ) Central Sector State Sector Transmission Lines (ckm.) 765 kV 3573 409 400 kV 68423 29931 220 kV 10360 121630 +/- 500 kV HVDC Lines (ckm) 5948 1504 Sub Stations: (MVA) 765 kV 400 kV 220 kV +/- 500 kV HVDC Converter/ BTB Stn.Converter Terminal (MW)

Total 46005 59631 79600 96993 114629 132413

Total 37291 53742 84177 116363 156497 198105

JV/Pvt

Total 3982 102912 132413 8234

4558 423 782

4500 61170 5276 7000

0 64447 191389 1700

1440

4500 125617 198105 8700

13. RURAL ELECTRIFICATION(as on 30.11.2010) 1. 2. 3. 4. 5. 6. Total No. of Villages No. of villages Electrified % of Villages Electrified Potential of Energ. of Pumps No. of Pumpsets Energised % of Pumpsets Energised 593732 531425 89.5% 19594000 16968373 85.5%

ENERGY SAVED IS ENERGY PRODUCED

13 A.

PROGRESS OF RURAL ELECTRIFICATION & PUMPSETS ENERGISATIONPLAN/YEARCumu achvd.at the end of 8th plan(31-3-1997)

1997-98 1998-99 1999-00 2000-01 2001-02 9th PlanCumu. At the End of 9th Plan(31-3-2002)

2002-03 2003-04 2004-05 2005-06 2006-07 10th PlanCumu. upto End of 10th Plan(31-3-2007)

01.04.07 to 31.03.08 01.04.08 to 31.03.09 01.04.09 to 31.03.10 01.04.10 to 30.11.10 11th Plan

VILLAGES ELECTRIFIED 498836 3207 2780 2093 1218 4111 13409 489699 2626 2781 3884 12632 22594 44517 482864 5743 8629 3684 30505 48561

*

#

PUMP SETS ENERGISED 11565342 284064 367244 297594 311060 316074 1576036 13141378 651095 322968 331020 397343 611750 2314176 15455554 412667 474936 417298 207918 1512819

531425 16968373 * Cumulative achvd.were recast as per definitation of villages electrification notified by GOI in Oct. 1997.As a result threre has been a downward revision from the earlier figure of 512245 (which was based on old definition) to 489699 # Cumulative achvd. Of villages electrified has been revised as per list of villages as per 2001 census and new definition .

14. STATUS OF SCHEMES CLEAREDHYDRO SCHEMES APPRAISED BY CENTRAL ELECTRICITY AUTHORITY FROM APRIL'10-DECEMBER.10Sl.No.

Name of

Schemes

State

Executing Agency

Installed Capacity(M.W.)

Date of Cost Clearance by CEA

1

Teesta Stage-IV HEP

Sikkim

NHPC

4x130=520

US$13.125 M+Rs. 3530.99 Crs. (FE Rate 13.05.2010 Rs. 48.57/US$) at July 2009 price level US$ 4.11 M+Rs. 1778.99 Crs. (FE Rate 31.08.2010 Rs. 46.58/US$) Rs 2113.09 Crores (without Mega Power status) and 2007.29 Crores (with Mega Power status) at Dec,09 price level

2

Kutehar HEP

H.P.

JSW Energy Ltd.

3X80=240

3

Balighar HEP

J&K

J&K SPDC

3X150=450

29.12.2010

4

Sainj HEP

H.P.

H.P.PCL

2X50=100

Rs 676.29 Crores at June,2009 price 29.12.2010 Level

ENERGY SAVED IS ENERGY PRODUCED

15.

GENERATION CAPACITY ADDITION DURING 2010-11(PROGRAMME & ACHIEVEMENT )

Sl. No.

Unit name

Unit no.

State

Company

Type Capacity(MW) Prog. Ach.

Commissioning Schedule As per Prog.

Actual(A)

IST QUARTER (APRIL - JUNE 2010 )CENTRAL SECTOR 1 Barsingsar Lignit 2 Sewa - II 3 4 5 Kuttiyadi Addl. Extn. 6 7 Myntdu(Leishka) St-I 8 Priyadarshini Jurala 9 Lawka Waste Heat Unit 10 Pragati CCGT- III 11 12 Surat Lignite TPP Extn 3 13 14 Rajiv Gandhi TPS ,Hissar 15 Raichur 16 Chabra TPS 17 Konaseema CCPP 19 Rithala CCPP 20 21 Mundra TPP Ph-I 22 23 JSW Ratnagiri TPP 24 25 Sterlite TPP 26 Jallipa-Kapurdi TPP 27 28 Rosa TPP Ph - 1 29 Allain Duhangan 30 Wardha Warora 31 Wardha Warora 4 2 8 2 ST GT-! GT-2 3 4 1 2 1 2 3 2 Haryana Karnatka Rajasthan AP AP Delhi Delhi Gujarat Gujarat HPGCL KPCL TH TH Gujarat GIPCL 1 1 2 3 1 2 1 4 ST GT-1 Rajasthan J&K J&K J&K Kerala Kerala Meghalaya AP Assam Delhi NLC NHPC NHPC TH HY HY 125.00 40.00 40.00 40.00 50.00 50.00 42.00 39.00 37.20 250.00 250.00 125.00 125.00 600.00 250.00 250.00 165.00 133.00 35.75 35.75 330.00 330.00 300.00 300.00 600.00 135.00 135.00 300.00 96.00 300.00 96.00 135.00 135.00 5208.70 4764.50 125.00 125.00 600.00 250.00 250.00 165.00 133.00 35.75 35.75 330.00 330.00 300.00 300.00 600.00 135.00 39.00 125.00 40.00 40.00 40.00 50.00 50.00 Apr-10 May,10 Jun, 10 Jun, 10 Apr,10 Apr,10 May,10 May,10 Jun, 10 May,10 Jun, 10 Apr,10 Apr,10 Jun, 10 Jun, 10 Apr,10 Apr,10 May,10 Jun, 10 Jun, 10 May,10 Jun,10 May,10 Jun,10 Jun,10 May,10 Jun,10 Apr,10 Jun,10 26-06-10(A) 16-09-10(A) 05-06-10(A) 10-10-10(A) 12-04-10(A) 23-04-10(A) 01-1010(A) 26-06-10(A) 04-05-10(A) 30-06-10(A) 19-07-10(A) 09-12-10(A) 04-10-10(A) 02-08-10(A) 20-12-10(A) 24-08-10(A) 09-12-10(A) 29-12-10(A) 08-07-10(A) 28-08-10(A) 28-06-10(A) 22-06-10(A) 23-07-10(A) 01-07-10(A) 25-05-10(A) 23-09-10(A)

NHPC HY STATE SECTOR KSEB KSEB MeSEB APGENCO APGCL PPCL HY HY HY HY ST GT-1 GT-2 TH

RRVUNL TH PRIVATE SECTORKonaseema gas power ltd

ST ST GT-1 GT-2 TH TH

18 Lanco Kondapalli Ph II ST

Lanco Kondapalli NDPL NDPL Adani Power ltd Adani Power ltd

Maharashtra JSW Energy(Ratnagiri)ltd TH Maharashtra JSW Energy(Ratnagiri)ltd TH Orissa Rajasthan Rajasthan UP H.P Sterlite Energy ltdRaj West Power ltd(JSW) Raj West Power ltd(JSW) Rosa Power supply co. ltd

TH TH TH TH HY

1 1 2

ADHPL

MaharashtraWardha Power co.ltd TH MaharashtraWardha Power co.ltd TH Sub Total CENTRAL SECTOR

IIND QUARTER (JULY-SEPTEMBER 2010)32 Indra Gandhi STPP 33 34 35 36 37 Myntdu(Leishka) St-I 38 39 40 41 Baramura GT Extn 42 Paricha Extn Kakatiya TPP Pragati CCGT- III Barsingsar Lignit NCP Project St II Mejia TPS Extn 1 2 6 1 2 2 1 GT-3 ST-1 5 5 Haryana Rajasthan UP WB WB Meghalaya AP Delhi Delhi Tripura UP APCPL NLC NTPC DVC TH TH TH TH 500.00 125.00 490.00 500.00 500.00 42.00 500.00 250.00 250.00 21.00 250.00 Sep,10 500.00 490.00 500.00 500.00 Sep,10 Aug,10 Jul,10 Jul,10 Sep,10 Aug,10 Jul,10 Sep,10 Sep,10 03-08-10(A) 27-05-10(A) 30-07-10(A) 30-09-10(A) 31-10-10(A)

DVC TH STATE SECTOR MeSEB APGENCO PPCL PPCL TSECL UPRVUNL HY TH GT-3 ST-1 GT-5 TH

ENERGY SAVED IS ENERGY PRODUCED

PRIVATE SECTOR 43 Allain Duhangan 44 Chujachen 45 46 47 48 Rithala CCPP Udupi TPP Sterlite TPP Jallipa-Kapurdi TPP

21 ST 1 2 4

H.PSikkim Delhi Karnatka Orissa Rajasthan

ADHPLGati NDPL UPCL Sterlite Energy ltdRaj West Power ltd(JSW)

HYHY ST TH TH TH

96.0049.50 36.50 507.50 600.00 135.00 4831.50

96.00

Jul,10Sep,10 Sep,10

18-09-10(A)

600.00 600.00 3307.00

Jul,10 Sep,10 Sep,10

23-07-10(A) 14-10-10(A)

Sub Total CENTRAL SECTOR THDC HY NTPC DVC NLC NPC TH TH TH Nucl.

IIIRD QUARTER (OCTOBER-DECEMBER 2010)49 50 51 52 53 54 Koteshwar Korba STPP Kodarma TPP Neyveli TPS-II Exp Kaiga Durgapur Steel TPS 1 7 1 1 4 1 5 5 Uttranchal Chattisgarh Jharkhand TN Karnatka WB AP AP Delhi Delhi Gujarat Maharashtra WB HP HP HP HP Sikkim Maharashtra Rajasthan Rajasthan 100.00 500.00 500.00 250.00 220.00 500.00 39.00 210.00 39.00 210.00 250.00 500.00 Dec,10 Oct,10 Dec,10 Nov,10 Dec,10 Dec,10 Oct,10 Nov,10 Dec,10 Dec,10 Dec,10 Oct,10 Nov,10 Oct,10 Nov,10 Oct,10 Nov,10 Oct,10 Oct,10 Nov,10 Dec,10 660.00 4709.50 1659.00 26-12-10(A) 09-11-10(A) 31-12-10(A) 24-10-10(A) 26-12-10(A)

55 Priyadarshini Jurala 56 Rayalseema TPP St-III

DVC TH STATE SECTOR APGENCO HY APGENCO PPCL PPCL GSECL MSPGCL TH

57 Pragati CCPP GT- I 1 58 ST-2 59 Hazira CCPP Extn GT+ST 60 Khaperkheda TPS Expn 61 Santaldih TPP Extn Ph-II 62 63 64 65 66 67 68 69 70 Mundra TPP Ph-II Chujachen JSW Ratnagiri TPP Jallipa-Kapurdi TPP Malana-II Budhil 5 6 1 2 1 2 2 3 5 6 1

GT-1 250.00 ST-2 250.00 GT+ST 351.00 TH 500.00 250.00 35.00 35.00 50.00 50.00 49.50 300.00 135.00 135.00

WBPDCL TH PRIVATE SECTOR LANCO HY LANCO Everest PC Everest PC GatiJSW Energy(Ratnagiri)ltd Raj West Power ltd(JSW) Raj West Power ltd(JSW)

HY HY HY HY TH TH TH TH

Adani Power ltd Sub Total

IVTH QUARTER (JANUARY-MARCH 2011)71 72 73 74 75 76 77 78 79 80 81 82 83 Simhadri STPP Extn Maithon RB TPP Durgapur Steel TPS Farakka STPS-III Kudankulam Koteshwar Teesta Low Dam-III Chamera-III Uri-II 1 1 2 2 1 2 3 4 3 1 2 6 1 HP J&K J&K Uttranchal WB WB WB WB AP Jharkhand WB WB TN CENTRAL SECTOR NHPC HY NHPC NHPC THDC NHPC NHPC NHPC NHPC NTPC DVC DVC NTPC NPC HY HY HY HY HY HY HY TH TH TH TH 77.00 60.00 60.00 100.00 33.00 33.00 33.00 33.00 500.00 525.00 500.00 500.00 Mar,11 Feb,11 Mar,11 Mar,11 Jan,11 Jan,11 Feb,11 Feb,11 Jan,11 Jan,11 Mar,11 Feb,11 Mar,11

Nucl. 1000.00

ENERGY SAVED IS ENERGY PRODUCED

STATE SECTOR 84 85 86 87 88 89 90 91 92 93 94 95 Paricha Extn Udupi TPP JSW Ratnagiri TPP Jallipa-Kapurdi TPP Anpara-C Priyadarshini Jurala Nagarjuna Sagar TR Pulichintala Pipavav CCPP Bhusawal TPS Expn Harduaganj Extn 6 1 1 Block-1 4 8 9 6 2 4 7 1 AP AP AP Gujarat Maharashtra UP UP UP Karnatka Maharashtra Rajasthan UP APGENCO APGENCO APGENCO GSECL MSPGCL UPRVUNL UPRVUNL HY HY HY TH TH TH TH 39.00 25.00 30.00 351.00 500.00 250.00 250.00 250.00 507.50 300.00 135.00 600.00 6691.50 21441.20 0.00 9730.50 Feb,11 Mac,11 Mar,11 Feb,11 Mar,11 Jan,11 Mar,11 Jan,11 Jan,11 Jan,11 Mar,11 Jan,11

UPRVUNL TH PRIVATE SECTOR UPCLJSW Energy(Ratnagiri)ltd Raj West Power ltd(JSW) Lanco Anpara Power

TH TH TH TH

Sub Total Grand Total

ENERGY SAVED IS ENERGY PRODUCED

TARGETTED GENERATION CAPACITY ADDITION DURING 2010-11

Wardha Warora (Pvt)WPCL, Maharashtra Unit-1 , 135 MW

Jallipa Kapurdi(Pvt)RWPL(JSW), Rajasthan Unit-3 , 135 MW

Sterlite (Pvt)Sterlite Energy, Orissa Unit-2 , 600 MW

JSW Ratnagiri (Pvt)JSW Energy, Maharashtra Unit-2 , 300 MW

Mundra TPP-I (Pvt)Adani Power, Gujarat Unit-4, 330 MW

Jallipa Kapurdi(Pvt)RWPL(JSW), Rajasthan Unit-7, 135 MW

Wardha Warora (Pvt)WPCL, Maharashtra Unit-2 , 135 MW

Rithala CCPPNDPL, DELHI (Pvt.) GT- 2, 35.75 MW Rithala CCPP NDPL, DELHI (Pvt.) GT- 1, 35.75 MW

Jallipa Kapurdi(Pvt)RWPL(JSW), Rajasthan

Anpara-C (Pvt)Lanco Power Ltd, U.P. Unit-1, 600 MW

Harduaganj ExtnUPRVUNL, U.P. (SS) Unit-9, 250 MW

Unit-4 , 135 MW Sterlite (Pvt) Sterlite Energy, Orissa Unit-1 , 600 MWRithala CCPP(NDPL)

Konaseema CCPPKGPL, A.P. (Pvt.) ST , 165 MW

Jallipa Kapurdi(Pvt)RWPL(JSW), Rajasthan Unit-2 , 135 MW

Jallipa Kapurdi(Pvt)RWPL(JSW), Rajasthan Unit-6, 135 MW

JSW Ratnagiri (Pvt)JSW Energy, Maharashtra Unit-4 , 300 MW

Bhusawal Extn (SS)MSPGCL, Maharashtra Unit-4, 500 MW

Rosa (Pvt)Relience Energy, U.P. Unit-2 , 300 MW

JSW Ratnagiri (Pvt)JSW Energy, Maharashtra Unit-1 , 300 MW

Raichur (KPCL)Karnataka(SS) Unit-8 , 250MW

JSW Ratnagiri (Pvt)JSW Energy, Maharashtra Unit-3 , 300 MW Khaperkheda Extn.(SS) MSPGCL, Maharashtra Unit-5, 500 MW

Mundra TPP-II(Pvt)Adani Power, Gujarat Unit-1 , 660 MW

Hazira CCPP Extn.GSECL, Gujarat, (SS) GT+ST, 351 MW Pragati CCGT-III(PPCL) Delhi (SS) ST-2, 250 MW Pragati CCPP GT-I(PPCL) Delhi (SS) GT-1, 250 MW

Udupi (Pvt)UPCL, Karnataka Unit-2, 507.5 MW

Durgapur Steel TPSDVC, W.B. (CS) Unit-2, 500 MW

DELHI (Pvt.) ST, 36.5 MW Parichha Extn UPRVUNL, U.P. (SS) Unit-5, 250 MW Udupi (Pvt) UPCL, Karnataka Unit-1, 507.5 MW Kakatiya APGENCO A.P. (SS) Unit-1, 500 MW Mejia Extn DVC,W.B. (CS) Unit-1, 500 MW NCP Project St-II NTPC, U.P. (CS) Unit-6, 490 MW Allain DuhanganADHPL, H.P. (Pvt.) Pragati CCGT-III(PPCL)

Surat Lignite TPP ExtnGIPCL Gujarat (SS)

Mundra TPP-I(Pvt)Adani Power, Gujarat Unit-3 , 330 MW

Rajiv GandhiHPGCL, Haryana(SS) Unit-2 , 600 MW

Jallipa Kapurdi(Pvt)RWPL(JSW), Rajasthan Unit-5 , 135 MW

Parichha ExtnUPRVUNL, U.P. (SS) Unit-6, 250 MW

Pipavav CCPPGSECL, Gujarat (SS) Block-1, 351 MW

PulichintalaAPGENCO, A.P. (SS)

Unit-4, 125 MWSurat Lignite TPP ExtnGIPCL Gujarat (SS)

Lanco Kondaplli-IILanco (Pvt), A.P. ST, 133 MW Pragati CCGT-III(PPCL) Delhi (SS) GT-1 , 250 MW

Pragati CCGT-IIIPPCL, Delhi (SS) GT-2, 250 MW

Korba STPP (NTPC)Chhattisgarh(CS) Unit-7, 500 MW

Santaldih Extn Ph-IIWPBDCL, W.B.(SS) Unit-6, 250 MW

Harduaganj ExtnUPRVUNL, U.P. (SS) Unit-8, 250 MW

Farakka Ph-IIINTPC, W.B. (CS) Unit-6, 500 MW

Unit-1 , 30 MW Nagarjunasagar TRAPGENCO, A.P.(SS)

Delhi (SS) ST-1, 250 MWPragati CCGT-III(PPCL)

Unit-3, 125 MWChhabra (RRVUNL)Rajasthan(SS) Unit- 2, 250 MW

Lakwa WT (APGCL)ASSAM (SS) ST Unit , 37.2 MW

Chujachen(Gati)Sikkim(Pvt.)

Rayalseema TPP St-IIIAPGENCO, A.P., (SS) Unit-5, 210 MW

Durgapur Steel TPSDVC, W.B. (CS) Unit-1, 500 MW

Maithon RB TPPDVC, Jharkhand (CS) Unit-1, 525 MW

Priyadarshni JuralaAPGENCO A.P. (SS)

Unit-1, 25 MW Koteshwar(THDC)Uttra Khand (CS)

Delhi (SS) GT-3, 250 MW Baamura GT Extn TSECL, Tripura (SS) Unit-5 , 21 MW Barsingsar Lignite NLC, Rajasthan (CS) Unit-2 , 125 MW Mejia Extn DVC,W.B. (CS) Unit-2, 500 MW Indra GandhiAPCPL, Haryana (CS)

Unit-2, 49.5 MWMalana-II (Everest PC) H.P.(Pvt.)

Barsingsar LigniteNLC, Rajasthan (CS)

Myntdu MeSEBMeghalaya(SS)

Allain DuhanganADHPL, H.P. (Pvt.)

Nayveli TPS- IINLC, . (CS) Unit-1, 250 MW

Kodarma TPPDVC, Jharkhand (cs) Unit-1, 500 MW

Simadari ExtnNTPC,A.P. (CS) Unit-3, 500 MW

Unit-6, 39 MW Uri-II (NHPC)J & K (CS)

Unit-2, 100 MW Uri-II (NHPC)J & K (CS)

Unit-1 , 125 MW Kuttiyadi Addl ExtnKSEB, Kerala (SS)

Unit-1, 42 MW Priyadarshni JuralaAPGENCO A.P. (SS)

Unit- 1, 96 MW Sewa-II(NHPC)J&K (CS)

Unit-1, 50 MW Budhil (LANCO)H.P.(Pvt.)

Malana-II (Everest PC)H.P.(Pvt.)

Koteshwar(THDC)Uttra Khand (CS)

Teesta Low Dam-IIINHPC, W.B.(CS)

Unit-1, 60 MW Teesta Low Dam-IIINHPC, W.B.(CS)

Unit-2, 60 MW Chamera-III (NHPC)J & K (CS)

Unit-2, 50 MW Kuttiyadi Addl ExtnKSEB, Kerala (SS)

Unit-4, 39 MW Sewa-II(NHPC)J&K (CS)

Unit-2, 40 MW Sewa-II(NHPC)J&K (CS)

Unit-1, 500 MW

Myntdu MeSEBMeghalaya(SS)

Chujachen(Gati)Sikkim(Pvt.)

Unit-1, 35 MW Priyadarshni JuralaAPGENCO A.P. (SS)

Unit-2, 50 MW Budhil (LANCO)H.P.(Pvt.)

Unit-1, 100 MW Kaiga (NPC)Karnataka(CS)

Unit-2, 33 MW Teesta Low Dam-IIINHPC, W.B.(CS)

Unit-4, 33 MW Teesta Low Dam-IIINHPC, W.B.(CS)

Unit-1, 77 MW Kundakulam(NPC)Tamil Nadu(CS)

Unit-1, 50 MW APRIL

Unit-1, 40 MW MAY

Unit-3, 40 MW JUNE

Unit- 2, 96 MW JULY

Unit-2, 42 MW AUGUST

Unit-1, 49.5 MW SEPTEMBER

Unit-5, 39 MW OCTOBER

Unit-2, 35 MW NOVEMBER

Unit- 4, 220 MW DECEMBER

Unit-1, 33 MW JANUARY

Unit-3, 33 MW FEBFRUARY

Unit-1, 1000 MW MARCH

1st QUARTER (APRIL 2010---JUNE 2010)ACHIEVEM. UP TO Current Month THERMAL HYDRO NUCLEAR RES* TOTAL 8 Thermal Units No. of Units 5 3 CENTRAL

2nd QUARTER (JULY 2010---SEPTEMBER 2010)STATE Cap. in MW 2115.00 120.00 No. of Units 9 4 Cap. in MW 2331.00 178.00

3rd QUARTER (OCTOBER 2010---DECEMBER 2010)PRIVATE No. of Units 16 2 Cap. in MW 4794.50 192.00 No. of Units 30 9 0 TOTAL

4th QUARTER (JANUARY 2011---MARCH 2011)Cap. in MW 9240.50 490.00 0.00 9730.5 Unit Commissioned

2235 Hydro Units

13

2509

18 Wind Energy

4986.5

39 Nuclear Units

* RES - Reneawable Energy Source

16. POWER CUTS ON INDUSTRIES DURING DECEMBER.10

State/Region Northern Region Chandigarh Delhi Haryana HP J&K

Energy Cut

Demand cut

No Notified Power Cut No Notified Power Cut 0 to 250 MW cut on HT/LT industries for different hours on different days. 0.15 MU/day on HT/LT industries on different days.No demand cut. But there is 3 hrs (from 18:30 hrs to 21:30 hrs.)peak hrs. restrictions on HT/LT industries. 0.875 MU/day on HT/LT industries on different days. No Cuts on essentail loads like Hospitals, Defence, PHE(Water Supplies), Irrigation etc. and on domestic,commercial and mixed load feeders that have 100% consumer metering ; 9 Hrs and 30 minutes domestic,commercial and mixed load feeders with partial or no consumer metering ; 3 hours to 8 hours,depending on system peak load demands and system constraints on Industrial Consumers in Organised Industrial Estates. 600 MW cut on HT/LT industries. Restriction timings 3 hrs. (from 1800 to 2100 hrs.). One weekly off day on CAT-II and two weekly off day on arc/induction furnaces from 04-12-10 to 14-12-10. No Notified Power Cut No Notified Power Cut 0 to 3.01 MU/day on HT/LT industries on different days. 0 to 70 MW cut on HT/LT industries for different hours on different days.

Punjab0.92 to 1.80 MU/day on HT/LT industries

Rajasthan Uttar Pradesh Uttarakhand

Western Region Chattisgarh Nil Nil Gujarat All industries are allowed to run their units on all days of week and if they want to avail staggered holiday, then they willhave to stagger on notified day only and cannot avail as per their choice. All industries are required to keep their recess timings staggered.

Madhya Pradesh Nil Maharashtra Goa Southern Region Andhra PradeshNil Nil

Nil Nil Nil

Nil. However, there was load shedding of upto 662 MW (Total 0.91 MU for the month).

Karnataka Kerala Tamil Nadu

Nil; However, there was load shedding upto 1000 MW (Total 46.16 MU for the month) Nil; However, there was load shedding upto 500 MW (Total 3.09 MU for the month)

Nil; However, there was load shedding upto 988 MW during peak hours (Total 312.08 MU for the month)

Puducherry Eastern Region Bihar Jharkhand DVC Orissa West Bengal

Nil; However, there was load shedding of upto 40 MW (Total 0.32 MU for the month)

No Notified Cuts / Restrictions No Notified Cuts / Restrictions Power cut to HT industries : NIL Power cut to LT industries : NIL No Statutory Cut Power cut on HT industries is NIL.

Note:- Although some states have reported "No Notified Power Cuts", load shedding/restrictions are imposed on industries on day to day basis depending upon availability of power vis--vis requirement.

ENERGY SAVED IS ENERGY PRODUCED

17. POWER SUPPLY TO AGRICULTURAL SECTOR DURING DECEMBER.10

State Region Northern Region Chandigarh Delhi Haryana HP J&K Punjab Rajasthan Uttar Pradesh Uttarakhand Western Region Chattisgarh Gujarat Madhya Pradesh Maharashtra Goa Southern Region Andhra Pradesh Karnataka Kerala Tamil Nadu Puducherry Eastern Region Bihar Jharkhand Orissa West BengalAbout 18 hrs About 20 hrs 24 hrs. Average about 23 hrs Three Phase Supply : 07 hrs/day . Three Phase Supply : 18 hrs/day 24 hrs./ day 24 hrs. / day Three Phase Supply : 8 hrs / day 24 hrs. / day Three Phase Supply : 7.51 hrs/day Three Phase Supply : 6.45 hrs/day Three Phase Supply : 09.00 hrs/day Three Phase Supply : 19.11 hrs/day

Average Hours of Supply

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture. No supply during rest of 16 hours. Jyotigram Yojana 24 hrs. Three Phase Supply: 10:30 hrs /day Single phase Supply: 00:00 hrs./day

Three Phase Supply : 18 hrs/day No restriction

Single phase Supply : 20 hrs/day

Three Phase/ Single Phase Supply : 06 hrs /day No Restrictions Three Phase Supply : 9 hrs/day No Restrictions Single Phase Supply : 15 hrs/day

No Supply : 12 hrs. / day

ENERGY SAVED IS ENERGY PRODUCED

18. Power Supply Position(Provisional)State / System / Region

DECEMBER.10Requirement ( MU ) Availability ( MU ) Surplus / Deficit (-) ( MU ) (%) Requirement ( MU )

(Figures in net MU) APRIL'10-DECEMBER.10Availability ( MU ) Surplus / Deficit (-) ( MU ) (%)

Chandigarh Delhi Haryana Himachal Pradesh Jammu & Kashmir Punjab Rajasthan Uttar Pradesh Uttarakhand Northern Region Chattisgarh Gujarat Madhya Pradesh Maharashtra Daman & DiuDadar Nagar Haveli

Goa Western Region Andhra Pradesh Karnataka Kerala Tamil Nadu Puducherry Lakshadweep # Southern Region Bihar DVC Jharkhand OrissaWest Bengal Sikkim Andaman- Nicobar#

Eastern Region Arunachal Pradesh Assam Manipur Meghalaya Mizoram Nagaland Tripura N. Eastern Region All India

109 1,817 2,927 690 1,200 3,175 4,256 6,468 848 21,490 800 6,387 5,090 10,721 182 361 254 23,795 5,949 4,307 1,493 5,919 163 2 17,831 1,232 1,261 552 1,742 2,612 34 20 7,433 46 418 49 144 34 53 70 814 71,363

109 1,815 2,757 561 982 3,054 4,256 5,544 807 19,885 795 5,849 3,911 9,060 164 361 251 20,391 5,922 4,245 1,483 5,582 162 2 17,394 947 1,258 526 1,738 2,588 34 15 7,091 39 404 45 132 30 50 68 768 65,529

0 -2 -170 -129 -218 -121 0 -924 -41 -1,605 -5 -538 -1,179 -1,661 -18 0 -3 -3,404 -27 -62 -10 -337 -1 0 -437 -285 -3 -26 -4 -24 0 -5 -342 -7 -14 -4 -12 -4 -3 -2 -46 -5,834

0.0 -0.1 -5.8 -18.7 -18.2 -3.8 0.0 -14.3 -4.8 -7.5 -0.6 -8.4 -23.2 -15.5 -9.9 0.0 -1.2 -14.3 -0.5 -1.4 -0.7 -5.7 -0.6 0 -2.5 -23.1 -0.2 -4.7 -0.2 -0.9 0.0 -25 -4.6 -15.2 -3.3 -8.2 -8.3 -11.8 -5.7 -2.9 -5.7 -8.2

1,187 20,518 26,571 5,623 10,101 35,729 32,241 57,173 7,296 196,439 7,589 53,129 33,773 93,608 1,616 3,294 2,352 195,361 57,375 35,370 13,237 59,508 1,607 18 167,097 9,792 12,326 4,602 16,747 28,044 259 180 71,770 380 4,172 425 1,152 264 445 676 7,514 638,181

1,187 20,458 24,901 5,399 7,556 33,454 31,920 48,234 6,818 179,927 7,458 49,792 27,114 77,568 1,488 3,291 2,306 169,017 55,212 32,336 13,067 55,778 1,528 18 157,921 8,422 11,288 4,469 16,690 27,446 259 135 68,574 318 3,881 378 989 222 396 602 6,786 582,225

0 -60 -1,670 -224 -2,545 -2,275 -321 -8,939 -478 -16,512 -131 -3,337 -6,659 -16,040 -128 -3 -46 -26,344 -2,163 -3,034 -170 -3,730 -79 0 -9,176 -1,370 -1,038 -133 -57 -598 0 -45 -3,196 -62 -291 -47 -163 -42 -49 -74 -728 -55,956

0.0 -0.3 -6.3 -4.0 -25.2 -6.4 -1.0 -15.6 -6.6 -8.4 -1.7 -6.3 -19.7 -17.1 -7.9 -0.1 -2.0 -13.5 -3.8 -8.6 -1.3 -6.3 -4.9 0 -5.5 -14.0 -8.4 -2.9 -0.3 -2.1 0.0 -25.0 -4.5 -16.3 -7.0 -11.1 -14.1 -15.9 -11.0 -10.9 -9.7 -8.8

# Lakshadweep and A & N Islands stand- alone systems, power supply position of these,does not form part of regional requiremene and availability

ENERGY SAVED IS ENERGY PRODUCED

Peak Demand / Peak Met (Provisional)( Figures in net MW )

State / System / Region

DECEMBER.10Peak Demand ( MW ) Peak Met ( MW ) Surplus / Deficit (-) ( MW ) (%) Peak Demand ( MW )

APRIL'10-DECEMBER.10Peak Met ( MW ) Surplus / Deficit (-) ( MW ) (%)

Chandigarh Delhi Haryana Himachal Pradesh Jammu & Kashmir Punjab Rajasthan Uttar Pradesh Uttarakhand Northern Region Chattisgarh Gujarat Madhya Pradesh Maharashtra Daman & DiuDadar Nagar Haveli

Goa Western Region Andhra Pradesh Karnataka Kerala Tamil Nadu Puducherry Lakshadweep # Southern Region Bihar DVC Jharkhand Orissa West Bengal SikkimAndaman- Nicobar#

Eastern Region Arunachal Pradesh Assam Manipur Meghalaya Mizoram Nagaland Tripura N -Eastern Region All India

197 3,471 5,570 1,250 1,800 5,489 6,651 10,299 1,472 34,570 2,521 9,908 8,690 18,861 274 515 481 39,621 9,943 7,798 3,042 10,301 284 6 29,022 2,023 1,932 860 3,157 4,832 91 40 12,520 100 848 109 253 76 100 180 1,676 117,409

197 3,471 4,768 1,187 1,320 5,285 6,651 8,584 1,289 30,881 2,499 9,056 7,175 15,125 249 515 445 32,711 9,683 7,634 2,914 9,640 277 6 28,057 1,373 1,926 860 3,157 4,832 90 32 11,882 85 829 104 225 70 110 178 1,529 105,060

0 0 -802 -63 -480 -204 0 -1,715 -183 -3,689 -22 -852 -1,515 -3,736 -25 0 -36 -6,910 -260 -164 -128 -661 -7 0 -965 -650 -6 0 0 0 -1 -8 -638 -15 -19 -5 -28 -6 10 -2 -147 -12,349

0.0 0.0 -14.4 -5.0 -26.7 -3.7 0.0 -16.7 -12.4 -10.7 -0.9 -8.6 -17.4 -19.8 -9.1 0.0 -7.5 -17.4 -2.6 -2.1 -4.2 -6.4 -2.5 0 -3.3 -32.1 -0.3 0.0 0.0 0.0 -1.1 -20 -5.1 -15.0 -2.2 -4.6 -11.1 -7.9 10.0 -1.1 -8.8 -10.5

301 4,810 6,142 1,250 2,250 9,399 6,821 10,731 1,494 37,431 2,913 10,786 8,690 19,766 353 594 544 39,621 12,018 7,798 3,052 11,728 319 6 32,214 2,073 2,059 1,012 3,505 6,162 91 40 13,767 101 971 118 281 76 118 220 1,913 119,437

301 4,739 5,574 1,187 1,503 7,938 6,651 10,672 1,420 34,101 2,759 9,947 7,650 15,402 328 594 453 32,763 10,428 7,634 2,916 10,048 300 6 29,054 1,659 2,046 1,012 3,468 6,112 90 32 13,085 85 937 105 225 70 110 197 1,560 107,286

0 -71 -568 -63 -747 -1,461 -170 -59 -74 -3,330 -154 -839 -1,040 -4,364 -25 0 -91 -6,858 -1,590 -164 -136 -1,680 -19 0 -3,160 -414 -13 0 -37 -50 -1 -8 -682 -16 -34 -13 -56 -6 -8 -23 -353 -12,151

0.0 -1.5 -9.2 -5.0 -33.2 -15.5 -2.5 -0.5 -5.0 -8.9 -5.3 -7.8 -12.0 -22.1 -7.1 0.0 -16.7 -17.3 -13.2 -2.1 -4.5 -14.3 -6.0 0 -9.8 -20.0 -0.6 0.0 -1.1 -0.8 -1.1 -20 -5.0 -15.8 -3.5 -11.0 -19.9 -7.9 -6.8 -10.5 -18.5 -10.2

# Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability

ENERGY SAVED IS ENERGY PRODUCED

19. Actual Power Supply Position (Previous Month)(Figures in net MU) November,10State / System / Region Requirement ( MU ) Availability ( MU ) Surplus / Deficit (-) ( MU ) (%)

Apr 10-Nov. 10Requirement Availability Surplus / Deficit (-) ( MU ) ( MU ) ( MU )

(%)

96 Delhi 1,605 Haryana 2,537 Himachal Pradesh 608 Jammu & Kashmir 1,168 Punjab 2,750 Rajasthan 3,476 Uttar Pradesh 5,726 Uttaranchal 757 Northern Region 18,723 Chattisgarh 716 Gujarat 5,388 Madhya Pradesh 4,472 Maharashtra 9,328 Daman & Diu 178 Dadar Nagar Haveli 364 Goa 256 Western Region 20,702 Andhra Pradesh 5,518 Karnataka 3,448 Kerala 1,456 Tamil Nadu 5,888 Puducherry 159 Lakshadweep # 2 Southern Region 16,469 Bihar 1,127 DVC 1,325 Jharkhand 534 Orissa 1,827 West Bengal 2,652 Sikkim 37 Andaman- Nicobar # 20 Eastern Region 7,502 Arunachal Pradesh 46 Assam 431 Manipur 50 Meghalaya 134 Mizoram 30 Nagaland 45 Tripura 61 N. Eastern Region 797 All India 64,193Chandigarh

96 1,604 2,441 607 876 2,693 3,476 5,032 746 17,571 711 5,030 3,452 8,455 160 364 253 18,425 5,515 3,355 1,451 5,601 159 2 16,081 1,000 1,283 521 1,833 2,658 37 15 7,332 38 419 46 121 26 41 59 750 60,159

0 -1 -96 -1 -292 -57 0 -694 -11 -1,152 -5 -358 -1,020 -873 -18 0 -3 -2,277 -3 -93 -5 -287 0 0 -388 -127 -42 -13 6 6 0 -5 -170 -8 -12 -4 -13 -4 -4 -2 -47 -4,034

0.0 -0.1 -3.8 -0.2 -25.0 -2.1 0.0 -12.1 -1.5 -6.2 -0.7 -6.6 -22.8 -9.4 -10.1 0.0 -1.2 -11.0 -0.1 -2.7 -0.3 -4.9 0.0 0 -2.4 -11.3 -3.2 -2.4 0.3 0.2 0.0 -25 -2.3 -17.4 -2.8 -8.0 -9.7 -13.3 -8.9 -3.3 -5.9 -6.3

1,078 18,701 23,644 4,933 8,901 32,554 27,985 50,705 6,448 174,949 6,789 46,742 28,683 82,887 1,434 2,933 2,098 171,566 51,426 31,063 11,744 53,589 1,444 16 149,266 8,560 11,065 4,050 15,005 25,432 225 160 64,337 334 3,754 376 1,008 230 392 606 6,700 566,818

1,078 18,643 22,144 4,838 6,574 30,400 27,664 42,690 6,011 160,042 6,663 43,943 23,203 68,508 1,324 2,930 2,055 148,626 49,290 28,091 11,584 50,196 1,366 16 140,527 7,475 10,030 3,943 14,952 24,858 225 120 61,483 279 3,477 333 857 192 346 534 6,018 516,696

0 -58 -1,500 -95 -2,327 -2,154 -321 -8,015 -437 -14,907 -126 -2,799 -5,480 -14,379 -110 -3 -43 -22,940 -2,136 -2,972 -160 -3,393 -78 0 -8,739 -1,085 -1,035 -107 -53 -574 0 -40 -2,854 -55 -277 -43 -151 -38 -46 -72 -682 -50,122

0.0 -0.3 -6.3 -1.9 -26.1 -6.6 -1.1 -15.8 -6.8 -8.5 -1.9 -6.0 -19.1 -17.3 -7.7 -0.1 -2.0 -13.4 -4.2 -9.6 -1.4 -6.3 -5.4 0 -5.9 -12.7 -9.4 -2.6 -0.4 -2.3 0.0 -25.0 -4.4 -16.5 -7.4 -11.4 -15.0 -16.5 -11.7 -11.9 -10.2 -8.8

# Lakshadweep, A&N Islands stand-alone system,power supply position does not form part of regional requirement & availability

ENERGY SAVED IS ENERGY PRODUCED

Actual Peak Demand / Peak Met (Previous Month)State / System / Region

November,10Peak Demand ( MW ) Peak Met ( MW ) Surplus / Deficit (-) ( MW ) (%) Peak Demand ( MW )

Apr 10-Nov. 10Peak Met Surplus / Deficit (-) ( MW ) ( MW ) (%)

Chandigarh 197 Delhi 3,234 Haryana 4,817 Himachal Pradesh 1,159 Jammu & Kashmir 2,250 Punjab 5,440 Rajasthan 6,361 Uttar Pradesh 10,672 Uttaranchal 1,390 Northern Region 31,764 Chattisgarh 2,292 Gujarat 10,228 Madhya Pradesh 7,813 Maharashtra 17,846 Daman & Diu 278 Dadar Nagar Haveli 520 Goa 473 Western Region 38,102 Andhra Pradesh 9,176 Karnataka 6,739 Kerala 2,901 Tamil Nadu 10,151 Puducherry 284 Lakshadweep # 6 Southern Region 28,002 Bihar 1,946 DVC 1,934 Jharkhand 871 Orissa 3,505 West Bengal 5,618 Sikkim 86 Andaman- Nicobar# 40 Eastern Region 13,235 Arunachal Pradesh 101 Assam 962 Manipur 110 Meghalaya 253 Mizoram 76 Nagaland 110 Tripura 185 N -Eastern Region 1,797 All India 112,900

197 3,231 4,637 1,157 1,461 4,840 6,361 10,672 1,286 30,894 2,281 9,250 7,650 14,386 253 520 443 32,156 9,081 6,605 2,817 9,158 282 6 26,974 1,624 1,934 871 3,468 5,531 86 32 12,846 77 909 102 215 61 91 185 1,559 104,429

0 -3 -180 -2 -789 -600 0 0 -104 -870 -11 -978 -163 -3,460 -25 0 -30 -5,946 -95 -134 -84 -993 -2 0 -1,028 -322 0 0 -37 -87 0 -8 -389 -24 -53 -8 -38 -15 -19 0 -238 -8,471

0.0 -0.1 -3.7 -0.2 -35.1 -11.0 0.0 0.0 -7.5 -2.7 -0.5 -9.6 -2.1 -19.4 -9.0 0.0 -6.3 -15.6 -1.0 -2.0 -2.9 -9.8 -0.7 0 -3.7 -16.5 0.0 0.0 -1.1 -1.5 0.0 -20 -2.9 -23.8 -5.5 -7.3 -15.0 -19.7 -17.3 0.0 -13.2 -7.5

301 4,810 6,142 1,164 2,250 9,399 6,821 10,731 1,494 37,431 2,913 10,786 7,813 19,766 353 594 544 39,560 12,018 7,642 3,052 11,728 319 6 32,214 2,073 2,059 1,012 3,505 6,162 86 40 13,767 101 971 118 281 76 118 220 1,913 119,437

301 4,739 5,574 1,157 1,503 7,938 6,361 10,672 1,420 34,101 2,759 9,947 7,650 15,402 328 594 453 32,763 10,428 6,627 2,916 10,048 300 6 29,054 1,659 2,046 1,012 3,468 6,112 86 32 13,085 84 937 105 215 61 102 197 1,560 107,286

0 -71 -568 -7 -747 -1,461 -460 -59 -74 -3,330 -154 -839 -163 -4,364 -25 0 -91 -6,797 -1,590 -1,015 -136 -1,680 -19 0 -3,160 -414 -13 0 -37 -50 0 -8 -682 -17 -34 -13 -66 -15 -16 -23 -353 -12,151

0.0 -1.5 -9.2 -0.6 -33.2 -15.5 -6.7 -0.5 -5.0 -8.9 -5.3 -7.8 -2.1 -22.1 -7.1 0.0 -16.7 -17.2 -13.2 -13.3 -4.5 -14.3 -6.0 0 -9.8 -20.0 -0.6 0.0 -1.1 -0.8 0.0 -20 -5.0 -16.8 -3.5 -11.0 -23.5 -19.7 -13.6 -10.5 -18.5 -10.2

# Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability

ENERGY SAVED IS ENERGY PRODUCED

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN NORTHERN REGION INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES

State

Ownership Sector Coal 385.00 0.00 2908.96 3293.96 3410.00 0.00 402.99 3812.99 0.00 0.00 118.30 118.30 0.00 0.00 263.70 263.70 2630.00 0.00 578.19 3208.19 3615.00 270.00 774.48 4659.48 4072.00 600.00 2589.84 7261.84 0.00 0.00 261.26 261.26 0.00 0.00 27.09 27.09 713.19 14112.00 870.00 8638.00 23620.00

Modewise breakup Thermal Gas 800.40 71.50 207.61 1079.51 25.00 0.00 535.29 560.29 0.00 0.00 61.88 61.88 175.00 0.00 129.14 304.14 25.00 0.00 263.92 288.92 443.80 0.00 221.23 665.03 0.00 0.00 549.97 549.97 0.00 0.00 69.35 69.35 0.00 0.00 15.32 15.32 290.35 1469.20 71.50 2344.06 3884.76 Diesel 0.00 0.00 0.00 0.00 3.92 0.00 0.00 3.92 0.13 0.00 0.00 0.13 8.94 0.00 0.00 8.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.99 0.00 0.00 12.99 Total Nuclear Thermal 1185.40 0.00 71.50 0.00 3116.57 122.08 4373.47 122.08 3438.92 0.00 0.00 0.00 938.28 109.16 4377.20 109.16 0.13 0.00 0.00 0.00 180.18 34.08 180.31 34.08 183.94 0.00 0.00 0.00 392.84 77.00 576.78 77.00 2655.00 0.00 0.00 0.00 842.11 208.04 3497.11 208.04 4058.80 0.00 270.00 0.00 995.71 573.00 5324.51 573.00 4072.00 0.00 600.00 0.00 3139.81 335.72 7811.81 335.72 0.00 0.00 0.00 0.00 330.61 22.28 330.61 22.28 0.00 0.00 0.00 0.00 42.41 8.84 42.41 8.84 1003.54 129.80 15594.19 0.00 941.50 0.00 10982.06 1620.00 27517.75 1620.00

Hydro (Renewable) 0.00 0.00 597.62 597.62 884.51 0.00 450.17 1334.68 393.60 578.00 760.34 1731.94 780.00 0.00 723.53 1503.53 2230.23 0.00 742.66 2972.89 987.96 0.00 479.84 1467.80 524.10 0.00 1100.32 1624.42 1252.15 400.00 272.03 1924.18 0.00 0.00 47.74 47.74 417.95 7052.55 978.00 5592.20 13622.75

(As on 31-12-10 ) RES** Grand Total (MNRE) 0.00 1.05 0.00 1.05 70.10 35.80 0.00 105.90 337.82 0.00 0.00 337.82 129.33 0.00 0.00 129.33 222.55 73.08 0.00 295.63 30.25 1132.20 0.00 1162.45 25.10 587.08 0.00 612.18 132.92 0.05 0.00 132.97 0.00 0.00 0.00 0.00 0.00 948.07 1829.25 0.00 2777.32 1185.40 72.55 3836.27 5094.22 4393.53 35.80 1497.61 5926.94 731.55 578.00 974.60 2284.15 1093.27 0.00 1193.37 2286.64 5107.78 73.08 1792.81 6973.67 5077.01 1402.20 2048.55 8527.76 4621.20 1187.08 4575.85 10384.13 1385.07 400.05 624.92 2410.04 0.00 0.00 98.99 98.99 1551.29 23594.81 3748.75 18194.26 45537.82

State Private Central Sub-Total Haryana State Private Central Sub-Total Himachal State Private Central Sub-Total Jammu State Private & Kashmir Central Sub-Total State Punjab Private Central Sub-Total Rajasthan State Private Central Sub-Total State Uttar Pradesh Private Central Sub-Total UttranchalState Private Central Sub-Total State Chandigarh Private Central Sub-Total Central - Unallocated State Total Northern Private Central Region Grand Total Delhi

ENERGY SAVED IS ENERGY PRODUCED

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN WESTERN REGION INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES (As on 31-12-10 ) RES** Grand Total (MNRE) 0.05 30.00 0.00 30.05 0.00 0.00 0.00 0.00 29.90 1821.14 0.00 1851.04 11.76 232.60 0.00 244.36 19.05 199.90 0.00 218.95 257.73 2316.15 0.00 2573.88 0.00 0.00 0.00 0.00 0.00 318.49 4599.79 0.00 4918.28 0.05 78.00 308.83 386.88 0.00 0.00 32.62 32.62 6151.90 7028.84 2612.48 15793.22 4522.92 232.60 3603.02 8358.54 2199.05 1799.90 851.52 4850.47 11109.57 5713.15 5452.12 22274.84 0.00 0.00 60.60 60.60 1450.40 23983.49 14852.49 14371.59 53207.57

State

Ownership Sector State Private Central Sub-Total Coal 0.00 0.00 283.03 283.03 0.00 0.00 21.04 21.04 4440.00 2630.00 1628.89 8698.89 2807.50 0.00 1552.60 4360.10 2060.00 1600.00 804.00 4464.00 7295.00 2770.00 2138.05 12203.05 0.00 0.00 25.04 25.04 1025.35 16602.50 7000.00 7478.00 31080.50

Goa

Modewise breakup Thermal Gas Diesel 0.00 0.00 48.00 0.00 0.00 0.00 48.00 0.00 0.00 0.00 4.20 4.20 892.72 2577.50 424.27 3894.49 0.00 0.00 257.18 257.18 0.00 0.00 0.00 0.00 672.00 180.00 2623.93 3475.93 0.00 0.00 27.10 27.10 196.91 1564.72 2805.50 3533.59 7903.81 0.00 0.00 0.00 0.00 17.28 0.20 0.00 17.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.28 0.20 0.00 17.48

Total Nuclear Thermal 0.00 0.00 48.00 0.00 283.03 25.80 331.03 25.80 0.00 0.00 25.24 25.24 5350.00 5207.70 2053.16 12610.86 2807.50 0.00 1809.78 4617.28 2060.00 1600.00 804.00 4464.00 7967.00 2950.00 4761.98 15678.98 0.00 0.00 52.14 52.14 1222.26 18184.50 9805.70 11011.59 39001.79 0.00 0.00 7.38 7.38 0.00 0.00 559.32 559.32 0.00 0.00 273.24 273.24 0.00 0.00 47.52 47.52 0.00 0.00 690.14 690.14 0.00 0.00 8.46 8.46 228.14 0.00 0.00 1840.00 1840.00

Hydro (Renewable) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 772.00 0.00 0.00 772.00 1703.66 0.00 1520.00 3223.66 120.00 0.00 0.00 120.00 2884.84 447.00 0.00 3331.84 0.00 0.00 0.00 0.00 0.00 5480.50 447.00 1520.00 7447.50

State Daman & Diu Private Central Sub-Total Gujarat State * Private Central Sub-Total State Private Central Sub-Total

Madhya Pradesh

State Chhatisgarh Private Central Sub-Total State Maharastra Private Central Sub-Total State Dadra & Nagar Private Haveli Central Sub-Total Central - Unallocated State Total western Private Central Region Grand Total

ENERGY SAVED IS ENERGY PRODUCED

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN SOUTHERN REGION INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES (As on 31-12-10 ) RES** Grand Total (MNRE) 190.83 530.76 0.00 721.59 594.55 1842.94 0.00 2437.49 142.83 0.03 0.00 142.86 85.55 5130.04 0.00 5215.59 0.00 0.00 0.00 0.00 0.00 0.03 0.00 0.03 0.00 1013.76 7503.79 0.00 8517.55 8478.86 3445.96 2591.66 14516.48 6542.27 3629.44 1268.03 11439.74 2258.93 195.87 1203.06 3657.86 5700.95 6294.80 2778.31 14774.06 0.00 0.00 100.17 100.17 32.50 0.03 223.29 255.82 1185.06 23013.51 13566.09 9349.58 45929.18

State

Ownership Sector State Private Central Sub-Total Coal 4592.50 0.00 2377.38 6969.88 2220.00 1460.00 1072.67 4752.67 0.00 0.00 765.38 765.38 2970.00 250.00 2299.81 5519.81 0.00 0.00 100.17 100.17 0.00 0.00 207.01 207.01 1067.58 9782.50 1710.00 7890.00 19382.50

Andhra Pradesh

Modewise breakup Thermal Gas Diesel 0.00 0.00 2878.40 36.80 0.00 0.00 2878.40 36.80 0.00 220.00 0.00 220.00 0.00 174.00 359.58 533.58 523.20 503.10 0.00 1026.30 0.00 0.00 0.00 0.00 32.50 0.00 0.00 32.50 0.00 555.70 3775.50 359.58 4690.78 127.92 106.50 0.00 234.42 234.60 21.84 0.00 256.44 0.00 411.66 0.00 411.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 362.52 576.80 0.00 939.32

Total Nuclear Thermal 4592.50 0.00 2915.20 0.00 2377.38 214.28 9885.08 214.28 2347.92 1786.50 1072.67 5207.09 234.60 195.84 1124.96 1555.40 3493.20 1164.76 2299.81 6957.77 0.00 0.00 100.17 100.17 32.50 0.00 207.01 239.51 1067.58 10700.72 6062.30 8249.58 25012.60 0.00 0.00 195.36 195.36 0.00 0.00 78.10 78.10 0.00 0.00 478.50 478.50 0.00 0.00 0.00 0.00 0.00 0.00 16.28 16.28 117.48 0.00 0.00 1100.00 1100.00

Hydro (Renewable) 3695.53 0.00 0.00 3695.53 3599.80 0.00 0.00 3599.80 1881.50 0.00 0.00 1881.50 2122.20 0.00 0.00 2122.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11299.03 0.00 0.00 11299.03

KarnatakaState Private Central Sub-Total Kerala State Private Central Sub-Total

State Tamil Nadu Private Central Sub-Total NLC State Private Central Sub-Total

State Pondicherry Private Central Sub-Total Central - Unallocated State Total Southern Private Central Region Grand Total

ENERGY SAVED IS ENERGY PRODUCED

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN EASTERN REGION INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES (As on 31-12-10 ) RES** Grand Total (MNRE) 54.60 9.50 0.00 64.10 4.05 0.00 0.00 4.05 143.40 17.15 0.00 160.55 0.00 0.00 0.00 0.00 64.30 4.30 0.00 68.60 47.11 0.00 0.00 47.11 0.00 313.46 30.95 0.00 344.41 584.60 9.50 1261.13 1855.23 1324.05 360.00 258.81 1942.86 6012.46 1358.67 774.26 8145.39 0.00 0.00 3986.36 3986.36 2546.22 1204.30 1513.11 5263.63 52.11 0.00 143.37 195.48 1280.16 10519.44 2932.47 9217.20 22669.11

State

Ownership Sector State Private Central Sub-Total Coal 530.00 0.00 1131.70 1661.70 1190.00 360.00 187.88 1737.88 4780.00 1341.38 634.96 6756.34 0.00 0.00 3703.10 3703.10 420.00 1200.00 1408.10 3028.10 0.00 0.00 68.10 68.10 1280.16 6920.00 2901.38 8414.00 18235.38

Bihar

Modewise breakup Thermal Gas Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00 100.00 0.00 0.00 90.00 90.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 0.00 90.00 190.00 0.00 0.00 0.00 0.00 12.06 0.14 0.00 12.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 0.00 0.00 5.00 0.00 17.06 0.14 0.00 17.20

Total Nuclear Thermal 530.00 0.00 0.00 0.00 1131.70 0.00 1661.70 0.00 1190.00 360.00 187.88 1737.88 4892.06 1341.52 634.96 6868.54 0.00 0.00 3793.10 3793.10 420.00 1200.00 1408.10 3028.10 5.00 0.00 68.10 73.10 1280.16 7037.06 2901.52 8504.00 18442.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Hydro (Renewable) 0.00 0.00 129.43 129.43 130.00 0.00 70.93 200.93 977.00 0.00 139.30 1116.30 0.00 0.00 193.26 193.26 2061.92 0.00 105.01 2166.93 0.00 0.00 75.27 75.27 0.00 3168.92 0.00 713.20 3882.12

JharkhandState Private Central Sub-Total State West Bengal Private Central Sub-Total DVC State Private Central Sub-Total State Private Central Sub-Total State Private Central Sub-Total Central - Unallocated State Private Central Grand Total

Orissa

Sikkim

Total Eastern Region

ENERGY SAVED IS ENERGY PRODUCED

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN NORTH-EASTERN REGION INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES (As on 31-12-10 ) RES** Grand Total (MNRE) 27.11 0.00 0.00 27.11 78.55 0.03 0.00 78.58 31.03 0.00 0.00 31.03 16.01 0.00 0.00 16.01 5.45 0.00 0.00 5.45 28.67 0.00 0.00 28.67 36.47 0.00 0.00 36.47 0.00 223.29 0.03 0.00 223.32 446.80 24.50 507.54 978.84 94.43 0.03 118.62 213.08 189.08 0.00 100.54 289.62 169.36 0.00 95.71 265.07 50.86 0.00 106.94 157.80 30.67 0.00 72.51 103.18 88.33 0.00 50.59 138.92 182.55 1069.53 24.53 1235.00 2329.06

State

Ownership Sector Coal 60.00 0.00 0.00 60.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 0.00 0.00 60.00

State Private Central Sub-Total Arunachal State Pradesh Private Central Sub-Total MeghalayaState Private Central Sub-Total Tripura State Private Central Sub-Total Manipur State Private Central Sub-Total Nagaland State Private Central Sub-Total Mizoram State Private Central Sub-Total Central - Unallocated State Total Private North- Eastern Central Region Grand Total Assam

Modewise breakup Thermal Gas Diesel 239.00 20.69 24.50 0.00 177.82 0.00 441.32 20.69 0.00 15.88 0.00 0.00 21.05 0.00 21.05 15.88 0.00 2.05 0.00 0.00 25.96 0.00 25.96 2.05 148.50 4.85 0.00 0.00 33.34 0.00 181.84 4.85 0.00 45.41 0.00 0.00 25.96 0.00 25.96 45.41 0.00 2.00 0.00 0.00 19.19 0.00 19.19 2.00 0.00 51.86 0.00 0.00 16.28 0.00 16.28 51.86 55.40 0.00 387.50 142.74 24.50 0.00 375.00 0.00 787.00 142.74

Total Nuclear Thermal 319.69 0.00 24.50 0.00 177.82 0.00 522.01 0.00 15.88 0.00 0.00 0.00 21.05 0.00 36.93 0.00 2.05 0.00 0.00 0.00 25.96 0.00 28.01 0.00 153.35 0.00 0.00 0.00 33.34 0.00 186.69 0.00 45.41 0.00 0.00 0.00 25.96 0.00 71.37 0.00 2.00 0.00 0.00 0.00 19.19 0.00 21.19 0.00 51.86 0.00 0.00 0.00 16.28 0.00 68.14 0.00 55.40 0.00 590.24 0.00 24.50 0.00 375.00 0.00 989.74 0.00

Hydro (Renewable) 100.00 0.00 329.72 429.72 0.00 0.00 97.57 97.57 156.00 0.00 74.58 230.58 0.00 0.00 62.37 62.37 0.00 0.00 80.98 80.98 0.00 0.00 53.32 53.32 0.00 0.00 34.31 34.31 127.15 256.00 0.00 860.00 1116.00

ENERGY SAVED IS ENERGY PRODUCED

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE ISLANDS (As on 31-12-10 ) RES** Grand Total (MNRE) 5.25 0.10 0.00 5.35 0.00 0.75 0.00 0.75 5.25 0.85 0.00 6.10 45.30 20.10 0.00 65.40 9.97 0.75 0.00 10.72 55.27 20.85 0.00 76.12

State

Ownership Sector Coal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Andaman State & Nicobar Private Central Sub-Total State lakshadweep Private Central Sub-Total State Total Private Islands Central Grand Total

Modewise breakup Thermal Gas Diesel 0.00 40.05 0.00 20.00 0.00 0.00 0.00 60.05 0.00 9.97 0.00 0.00 0.00 0.00 0.00 9.97 0.00 50.02 0.00 20.00 0.00 0.00 0.00 70.02

Total Nuclear Thermal 40.05 0.00 20.00 0.00 0.00 0.00 60.05 0.00 9.97 0.00 0.00 0.00 0.00 0.00 9.97 0.00 50.02 0.00 20.00 0.00 0.00 0.00 70.02 0.00

Hydro (Renewable) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

ENERGY SAVED IS ENERGY PRODUCED

20.

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS LOCATED IN THE REGIONS OF MAIN LAND AND ISLANDS Ownership Sector Coal 14112.00 870.00 8638.00 23620.00 16602.50 7000.00 7478.00 31080.50 9782.50 1710.00 7890.00 19382.50 6920.00 2901.38 8414.00 18235.38 60.00 0.00 0.00 60.00 0.00 0.00 0.00 0.00 47477.00 12481.38 32420.00 92378.38 (As on 31-12-10 ) Modewise breakup RES** Hydro Grand Total Thermal Total Nuclear (Renewable) (MNRE) Gas Diesel Thermal 1469.20 12.99 15594.19 0.00 7052.55 948.07 23594.81 71.50 0.00 941.50 0.00 978.00 1829.25 3748.75 2344.06 0.00 10982.06 1620.00 5592.20 0.00 18194.26 3884.76 12.99 27517.75 1620.00 13622.75 2777.32 45537.82 1564.72 17.28 18184.50 0.00 5480.50 318.49 23983.49 2805.50 0.20 9805.70 0.00 447.00 4599.79 14852.49 3533.59 0.00 11011.59 1840.00 1520.00 0.00 14371.59 7903.81 17.48 39001.79 1840.00 7447.50 4918.28 53207.57 555.70 362.52 10700.72 0.00 11299.03 1013.76 23013.51 3775.50 576.80 6062.30 0.00 0.00 7503.79 13566.09 359.58 0.00 8249.58 1100.00 0.00 0.00 9349.58 4690.78 939.32 25012.60 1100.00 11299.03 8517.55 45929.18 100.00 17.06 7037.06 0.00 3168.92 313.46 10519.44 0.00 0.14 2901.52 0.00 0.00 30.95 2932.47 90.00 0.00 8504.00 0.00 713.20 0.00 9217.20 190.00 17.20 18442.58 0.00 3882.12 344.41 22669.11 387.50 142.74 590.24 0.00 256.00 223.29 1069.53 24.50 0.00 24.50 0.00 0.00 0.03 24.53 375.00 0.00 375.00 0.00 860.00 0.00 1235.00 787.00 142.74 989.74 0.00 1116.00 223.32 2329.06 0.00 50.02 50.02 0.00 0.00 5.25 55.27 0.00 20.00 20.00 0.00 0.00 0.85 20.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 70.02 70.02 0.00 0.00 6.10 76.12 4077.12 602.61 52156.73 0.00 27257.00 2822.32 82236.05 6677.00 597.14 19755.52 0.00 1425.00 13964.66 35145.18 6702.23 0.00 39122.23 4560.00 8685.40 0.00 52367.63 17456.35 1199.75 111034.48 4560.00 37367.40 16786.98 169748.86

Region

Northern State Private Region Central Sub Total Western State Private Region Central Sub Total Southern State Private Region Central Sub Total Eastern State Private Region Central Sub Total State North Eastern Private Region Central Sub Total State Islands Private Central Sub Total State ALL INDIA Private Central Total

Note :

Renewable Energy Sources (RES) includes SHP, BG, BP, U&I, and Wind Energy SHP=Small Hydro Project, BG=Biomass Gasifier, BP=Biomass Power, U&I=Urban & Industrial Waste Power, RES=Renewable Energy Sources (i) The generation stations with installed capacity less than or equal to 25 MW are indicated under RES.(ii) The Shares of Sipat TPS(NTPC)are proposed shares.(iii) The proportionate distribution of shares in respect of Bhilai TPP (J V of Bhilai Steel and NTPC) has been done as per tentative allocation communicated by IRP Div viz 220 MW for NTPC out of 500 MW of Unit I &II the remaining 280 MW to SAIL-Chattisgarh (State Sector) iv) The installed capacity figures as on 30.06.2010 in respect of RES is based on statement dated 02.11.2010 from Ministry of Renewable Energy(MNRE) where cumulative Grid interactive power installed capacity has been indicated as 17174.60 MW. Reconciliation of installed capacity of Hydro capacity resulted in transfer of 135 MW from conventional to SHP-RES and retrieval of installed capacity of 67.20 from SHP-RES to conventional Hydro has resulted in net addition of 67.8 MW to SHP under RES. Also 30 MW of capacity in the nature of Waste Heat Recovery Power Plant at Goa Energy Private Limited under U&I category of RES Out of this installed capacity due to wind - (374.636 MW) and small hydro (110.79 MW) appearing in captive capacity has been deducted to arrive at installed capacity of utilities in respect of RES. (17174.60-485.43+67.8+30=16786.98) v) Units No 4,5&6 of Chandrapura TPS of DVC (3x120=360 MW) and Unit No 3 of Faridabad TPS of HPGCL (55 MW) have been retired. vi) Units No 1,2,3&4 of 60 MW each of Uran Gas Power Station of MAHAGENCO have been retired w.e.f 16.11.10 vii) 10% of the Installed capacity of Pragati CCGT which is indicated to be Merchant Power by IRP Div has been included in I/C of Delhi State Sector. viii)Figures at second place of decimal may not tally due to rounding off

Abbreviation:----

ENERGY SAVED IS ENERGY PRODUCED

RATE OF SALE OF POWER OF GENERATING STATIONS IN THE COUNTRY FOR THE YEAR 2008-09Name of Utility/Power Station Energy SourceCoal/Gas/ State where the unit is located Installed Rate of Sale of Capacity Power (Paise/Kwh) (MW)

CENTRAL SECTOR

NORTHERN REGIONHYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO PUNJAB PUNJAB PUNJAB 1325.00 990.00 396.00 $ $ $

BHAKRA BEAS MANAGEMENT BOARD BHAKRA H P S DEHAR H P S PONG H P S Total (BBMB) NHPC LTD. BAIRA SIUL HPS CHAMERA- I HPS CHAMERA- II HPS DHAULI GANGA HPS DULHASTI HPS SALAL HPS TANAKPUR HPS URI HPS Total (NHPC) NTPC LTD. ANTA CCPP AURAIYA CCPP BADARPUR TPS DADRI (NCTPP) DADRI CCPP FARIDABAD CCPP RIHAND STPS SINGRAULI STPS TANDA TPS UNCHAHAR TPS Total (NTPC) NUCLEAR POWER CORP. OF INDIA LTD. NARORA A.P.S. RAJASTHAN A.P.S. Total (NPCI) SATLUJ JAL VIDYUT NIGAM LTD. NATHPA JHAKRI HYDRO POWER STATION TEHRI HYDRO ELECTRIC DEVELOP. CORP. TEHRI ST-1 HPS

HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO

HIMACHAL PRADESH HIMACHAL PRADESH HIMACHAL PRADESH UTTARAKHAND JAMMU AND KASHMIR JAMMU AND KASHMIR UTTARAKHAND JAMMU AND KASHMIR

198.00 540.00 300.00 280.00 390.00 690.00 94.20 480.00

95 145 319 210 346 75 129 138 179 293 338 284 254 351 304 177 132 272 231 224 188 271 253 228

THERMAL-NATURAL GAS THERMAL-NATURAL GAS THERMAL-COAL THERMAL-COAL THERMAL-NATURAL GAS THERMAL-NATURAL GAS THERMAL-COAL THERMAL-COAL THERMAL-COAL THERMAL-COAL

RAJASTHAN UTTAR PRADESH DELHI UTTAR PRADESH UTTAR PRADESH HARYANA UTTAR PRADESH UTTAR PRADESH UTTAR PRADESH UTTAR PRADESH

419.33 663.36 705.00 840.00 829.78 431.59 2000.00 2000.00 440.00 1050.00

NUCLEAR-NUCLEAR NUCLEAR-NUCLEAR

UTTAR PRADESH RAJASTHAN

440.00 740.00

HYDRO-HYDRO

HIMACHAL PRADESH

1500.00

HYDRO-HYDRO

UTTARAKHAND

1000.00

404

STATEHARYANA POWER GEN. CORP. LTD. FARIDABAD TPS. PANIPAT TPS YAMUNA NAGAR TPS Sub Total Thermal(HPGCL) WESTERN YAMUNA CANAL HPS Sub HydroTotal (HPGCL) Total (HPGCL) HIMACHAL PRADESH STATE ELECTRICITY BOARD GIRI POWER HOUSE ANDHRA POWER HOUSE GUMMA POWER HOUSE BHABA POWER HOUSE /SANJAY POWER HOUSE NOGIL POWER HOUSE GHANVI POWER HOUSE BASSI POWER HOUSE BINWA POWER HOUSE GAJ POWER HOUSE BANER POWER HOUSE CHABA POWER HOUSE RUKTI POWER HOUSE RONGTONG POWER HOUSE CHAMBA POWER HOUSE SAI-II POWER HOUSE KILLAR POWER HOUSE HOLI POWER HOUSE THIROT POWER HOUSE KHAULI POWER HOUSE LARJI POWER HOUSE Total (HPSEB) INDRAPRASTHA POWER GEN. COMP. LTD. INDRAPRASTHA POWER STATION I. P. GAS TURBINE POWER STATION RAJGHAT POWER HOUSE Total (I. P. Power Gen. Co. Ltd.) PRAGATI POWER CORPORATION LTD. PRAGATI CCPP JAMMU & KASHMIR, POWER DEVELOPMENT DEPT. PAMPORE Sub Total Thermal (J&K) LOWER JHELUM THERMAL-COAL THERMAL-COAL THERMAL-COAL HYDRO-HYDRO HARYANA HARYANA HARYANA HARYANA 110.00 1360.00 600.00 62.40 448 313 302 315 106 106 306 N.A. N.A. N.A. N.A. N.A. N.A. N.A. N.A. N.A. N.A. N.A. N.A. N.A. N.A. N.A. N.A. N.A. N.A. N.A. N.A. 406 356 342 318 338 225 N.A. N.A. 76

HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO

HIMACHAL PRADESH HIMACHAL PRADESH HIMACHAL PRADESH HIMACHAL PRADESH HIMACHAL PRADESH HIMACHAL PRADESH HIMACHAL PRADESH HIMACHAL PRADESH HIMACHAL PRADESH HIMACHAL PRADESH HIMACHAL PRADESH HIMACHAL PRADESH HIMACHAL PRADESH HIMACHAL PRADESH HIMACHAL PRADESH HIMACHAL PRADESH HIMACHAL PRADESH HIMACHAL PRADESH HIMACHAL PRADESH HIMACHAL PRADESH

60.00 16.95 3.00 120.00 2.50 22.50 60.00 6.00 10.50 12.00 1.75 1.50 2.00 0.45 2.00 0.30 3.00 4.50 12.00 126.00 466.95 247.50 270.00 135.00

THERMAL-COAL THERMAL-GAS THERMAL-COAL

DELHI DELHI DELHI

THERMAL-NATURAL GAS THERMAL-DIESEL HYDRO

DELHI JAMMU & KASHMIR JAMMU & KASHMIR

330.40 175.00 175.00 105.00

ENERGY SAVED IS ENERGY PRODUCED

UPPER SINDH -I UPPER SINDH -II GANDHARBAL PAHALGAM KARNAH PH CHENANI I CHENANI I I CHENANI I II SEWA-III IQBAL MHP IGO MEREELLON SUMOOR MHP HUNDER BAZGO MACPACHOO HAFTAL Sub Total Hydro (J&K) Total (J&K) PUNJAB STATE ELECTRICITY BOARD G.N.D.T.P. BATHINDA G.G.S.S.T.P ROPAR G.H.T.P LEHRA MOHABAT Sub Total Thermal (PSEB) SHANAN HYDRO ELECTRIC PROJECT U.B.D.C.PATHANKOT ANANDPUR SAHIB MUKERIAN HYDEL MICRO HYDEL(NIDAMPUR +DODHAR +THUHI +ROHTI ) RANJIT SAGAR Dam (R.S.D). BHAKRA NANGAL COMPLEX (L. BANK & R. BANK ) BEAS & EXTN. Sub Total Hydro (PSEB) Total (PSEB) RAJASTHAN RAJYA VIDYUT UTPADAN NIGA. LTD. KOTA THERMAL POWER STATION SURATGARH THERMAL POWER STATION GIRAL LIGNITE POWER LTD. UNITE I & II RAMGARH GAS THERMAL POWER STATION DHOLPUR GAS THERMAL POWER STATION Sub Total Thermal (RRVUNL) MAHI HYDEL POWER STATION MINI MICRO HYDEL POWER STATION RANA PRATAP SAGAR POWER STATION JAWAHAR SAGAR POWER STATION Sub Total Hydro (RRVUNL) Total (RRVUNL) UTTAR PRADESH JAL VIDYUT NIGAM LIMITED E.Y.CANAL KHARA HPS MATATILLA HPS OBRA HPS RIHAND HPS SHEETLA HPS U.G.CANAL HPS Total (UPJVNL) UTTAR PRADESH RAJYA VIDYUT UTP. N. LTD. ANPARA TPS HARDUAGANJ TPS OBRA TPS PANKI TPS PARICHHA TPS Total (UPRVUNL) UTTARAKHAND JAL VIDYUT NIGAM LIMITED CHIBRO (YAMUNA) HPS CHILLA HPS DHAKRANI HPS DHALIPUR HPS KHATIMA HPS KHODRI HPS KULHAL HPS MANERI BHALI - I HPS MANERI BHALI - II HPS RAMGANGA HPS Total (UTTARAKHAND JVNL)

HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO

JAMMU & KASHMIR JAMMU & KASHMIR JAMMU & KASHMIR JAMMU & KASHMIR JAMMU & KASHMIR JAMMU & KASHMIR JAMMU & KASHMIR JAMMU & KASHMIR JAMMU & KASHMIR JAMMU & KASHMIR JAMMU & KASHMIR JAMMU & KASHMIR JAMMU & KASHMIR JAMMU & KASHMIR JAMMU & KASHMIR JAMMU & KASHMIR

33.90 105.00 15.00 3.00 2.00 23.30 2.00 7.50 9.00 3.75 3.00 0.10 0.40 0.30 0.75 1.00

76 163 76 180 76 76 76 176 266 76 143 76 76 76 188 133 102 102 279 231 324 129 277 297 279 119 429 229 265 225 277 92 92 43 62 54 43 229 70 169 298 214 183 307 202 36 38 39 46 38 47 40 65 273 51 98

THERMAL-COAL THERMAL-COAL THERMAL-COAL HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO

PUNJAB PUNJAB PUNJAB HIMACHAL PRADESH PUNJAB PUNJAB PUNJAB PUNJAB PUNJAB PUNJAB HIMACHAL PRADESH

440.00 1260.00 420.00 110.00 91.35 134.00 207.00 4.90 600.00 684.00 573.00

THERMAL-COAL THERMAL-COAL THERMAL-COAL THERMAL-GAS THERMAL-GAS HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO

RAJASTHAN RAJASTHAN RAJASTHAN RAJASTHAN RAJASTHAN RAJASTHAN RAJASTHAN RAJASTHAN RAJASTHAN

1045.00 1250.00 250.00 110.50 330.00 2985.50 140.00 23.85 172.00 99.00

HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO

UTTAR PRADESH UTTAR PRADESH UTTAR PRADESH UTTAR PRADESH UTTAR PRADESH UTTAR PRADESH UTTAR PRADESH

5.00 72.00 30.60 99.00 300.00 3.60 15.60

THERMAL-COAL THERMAL-COAL THERMAL-COAL THERMAL-COAL THERMAL-COAL

UTTAR PRADESH UTTAR PRADESH UTTAR PRADESH UTTAR PRADESH UTTAR PRADESH

1630.00 220.00 1372.00 210.00 640.00

HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO

UTTARAKHAND UTTARAKHAND UTTARAKHAND UTTARAKHAND UTTARAKHAND UTTARAKHAND UTTARAKHAND UTTARAKHAND UTTARAKHAND UTTARAKHAND

240.00 144.00 33.75 51.00 41.40 120.00 30.00 90.00 304.00 264.00

PRIVATEJAI PRAKASH HYDRO POWER LTD. BASPA-II HEP JAI PRAKASH POWER VENTURE LTD. VISHNU PRAYAG HPS MALANA POWER CORPORATION LTD. MALANA HPS HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HIMACHAL PRADESH UTTARAKHAND HIMACHAL PRADESH 300.00 800.00 86.00 281 243 624

WESTERN REGIONCENTRALNHDC LTD. INDIRA SAGAR HPS HYDRO-HYDRO MADHYA PRADESH 1000.00 355

ENERGY SAVED IS ENERGY PRODUCED

OMKARESHWAR HPS Total (NHDC LTD.) NTPC LIMITED. GANDHAR CCPP KAWAS CCPP KORBA STPS SIPAT STPS VINDHYACHAL STPS Total (NTPC LTD.) NUCLEAR POWER CORP. OF INDIA LIMITED KAKRAPARA TARAPUR Total (NPCI LTD.) RATNAGIRI GAS AND POWER PVT. LTD. RGPPL, ANJANVEL

HYDRO-HYDRO

MADHYA PRADESH

520.00

349 353 464 634 99 155 177 202 214 206 207

THERMAL-NATURAL GAS THERMAL-NATURAL GAS THERMAL-COAL THERMAL-COAL THERMAL-COAL

GUJARAT GUJARAT CHHATTISGARH CHHATTISGARH MADHYA PRADESH

657.39 656.20 2100.00 1000.00 3260.00

NUCLEAR-NUCLEAR NUCLEAR-NUCLEAR

GUJARAT MAHARASHTRA

440.00 1400.00

THERMAL-NATURAL GAS

MAHARASHTRA

1300.00

325

STATECHHATTISGARH STATE POWER GEN. CORP. LTD. GANGREL HEP HASDEOBANGO HPS MINI HYDEL SIKASAR HPS Sub Total Hy(CSPGCL) KORBA EAST V KORBA-II KORBA-WEST TPS CO-GEN, KAWARDHA Sub Total Thermal(CSPGCL) Total (CSPGCL) GUJARAT STATE ELECTRICITY CORP. LTD. DHUVARAN CCPP DHUVARAN TPS GANDHI NAGAR TPS KUTCH LIG. TPS SIKKA REP. TPS UKAI TPS UTRAN CCPP WANAKBORI TPS Sub Total Thermal(GSECL) KADANA HPS UKAI HPS Sub Total Hydro (GSECL) Total (GSECL) M. P. POWER GENERATING CORP. LIMITED BANSAGAR-III + BANSAGAR-II+TONS HPS BARGI HPS GANDHI SAGAR HPS SANJAY GANDHI HPS MADHIKHERA HPS PENCH HPS JHINNA HPS RAJGHAT HPS Sub Total Hydro (MPGCL) AMARKANTAK TPS SANJAY GANDHI TPS SATPURA TPS Sub Total thermal (MPGCL) Total (MPGCL) MAHARASHTRA STATE POWER GEN. COM. LTD. BHUSAWAL TPS CHANDRAPUR(MAHARASHTRA) STPS KHAPARKHEDA TPS- II KORADI TPS NASIK TPS NEW PARLI TPS PARAS EXP. PARAS TPS PARLI TPS URAN CCPP URAN WHP SubTotal Thermal (MSPGCL) KOYANA SMALL HYDRO SubTotal Hydro (MSPGCL) Total (MSPGCL) SARDAR SAROVAR NARMADA N. LTD. S SAROVAR RBPH HPS S SAROVAR CH HPS Total Hydro (SSNNL) HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO THERMAL-COAL THERMAL-COAL THERMAL-COAL THERMAL-BUGAS CHHATTISGARH CHHATTISGARH CHHATTISGARH CHHATTISGARH CHHATTISGARH CHHATTISGARH CHHATTISGARH CHHATTISGARH 10.00 120.00 0.85 7.00 500.00 440.00 840.00 6.00 1786.00 108 513 643 276 243 360 195 357 227 273 780 57 164 271 131 25 124 101 309 86 382 189 124 161 159 162 161 154 248 177 203 190 259 278 289 289 278 190 190 211 42 42 42 197 205 205 205

THERMAL-NATURAL GAS THERMAL-COAL THERMAL-COAL THERMAL-COAL THERMAL-COAL THERMAL-COAL THERMAL-NATURAL GAS THERMAL-COAL HYDRO-HYDRO HYDRO-HYDRO

GUJARAT GUJARAT GUJARAT GUJARAT GUJARAT GUJARAT GUJARAT GUJARAT GUJARAT GUJARAT

218.62 220.00 870.00 290.00 240.00 850.00 144.00 1470.00 240.00 305.00

HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO THERMAL-COAL THERMAL-COAL THERMAL-COAL

MADHYA PRADESH MADHYA PRADESH MADHYA PRADESH MADHYA PRADESH MADHYA PRADESH MADHYA PRADESH MADHYA PRADESH MADHYA PRADESH MADHYA PRADESH MADHYA PRADESH MADHYA PRADESH

405.00 90.00 115.00 20.00 60.00 160.00 20.00 45.00 290.00 1340.00 1142.50

THERMAL-COAL THERMAL-COAL THERMAL-COAL THERMAL-COAL THERMAL-COAL THERMAL-COAL THERMAL-COAL THERMAL-COAL THERMAL-COAL THERMAL-NATURAL GAS THERMAL-NATURAL GAS HYDRO-HYDRO HYDRO-HYDRO

MAHARASHTRA MAHARASHTRA MAHARASHTRA MAHARASHTRA MAHARASHTRA MAHARASHTRA MAHARASHTRA MAHARASHTRA MAHARASHTRA MAHARASHTRA MAHARASHTRA MAHARASHTRA MAHARASHTRA

475.00 2340.00 840.00 1040.00 880.00 250.00 250.00 55.00 670.00 912.00 240.00 1920.00 424.00

HYDRO-HYDRO HYDRO-HYDRO

GUJARAT GUJARAT

1200.00 250.00

PRIVATEAHMEDABAD ELECTRIC COMPANY (AECO) TORR POWER SAB. VATWA CCPP Total Hydro (AECO) THERMAL-COAL THERMAL-NATURAL GAS GUJARAT GUJARAT 340.00 100.00 460 460 460

ENERGY SAVED IS ENERGY PRODUCED

ESSAR POWER LTD. ESSAR POWER, HAZIRA GOA ENERGY PRIVATE LTD. GOA ENERGY GOA SPONGE & POWER LTD. SONVORDEM DIV. -VII GUJARAT INDUSTRIES POWER COM. LTD. BARODA CCPP GIPCL. GT IMP SURAT LIG. TPS Total Th.(GUJ. INDUSTRIES POWER COM. LTD.) GUJARAT PEGUTHAN ENERGY CORP. PVT. LTD. PEGUTHAN CCPP RELIANCE INFRASTRUCTURE LTD. RINFRA-GOA RINFRA-MAHARASHTRA Total (RELIANCE INFRASTRUCTURE LTD.) TATA HY.POWER COM.LTD.+TATA POWER CORP. LICENSED AREA(IN MUMBAI CITY) #

THERMAL-GAS THERMAL-GAS

GUJARAT GOA

515.00 30.00

205 240

THERMAL-COAL THERMAL-NATURAL GAS THERMAL-NATURAL GAS THERMAL-COAL

GOA GUJARAT GUJARAT GUJARAT

12.00 160.00 145.00 250.00

235 367 420 203 313 581 960 211.16 267 544

THERMAL-NATURAL GAS THERMAL-N THERMAL-COAL

GUJARAT GOA MAHARASHTRA

655.00 48.00 500.00

HYDRO+THERMAL

MAHARASHTRA

1777.00

SOUTHERNCENTRALNEYVELI LIGNITE CORP. LTD. NEYVELI ( EXP.) TPS NEYVELI TPS- I NEYVELI TPS-II Total (NEYVELI LIGNITE CORP. LTD.) NTPC LIMITED. R. GANDHI CCPP (Liq.) RAMAGUNDEM STPS SIMHADRI Total (NTPC LIMITED.) NUCLEAR POWER CORP. OF INDIA LTD. KAIGA MADRAS A.P.S. Total (NPCIL) THERMAL-COAL THERMAL-COAL THERMAL-COAL TAMIL NADU TAMIL NADU TAMIL NADU 420.00 600.00 1470.00 232 197 171 190 807 178 221 231 297 188 258

THERMAL-NATURAL GAS THERMAL-COAL THERMAL-COAL

KERALA ANDHRA PRADESH ANDHRA PRADESH

359.58 2600.00 1000.00

NUCLEAR-NUCLEAR NUCLEAR-NUCLEAR

KARNATAKA TAMIL NADU

660.00 440.00

STATEANDHRA PRADESH GAS POWER CORP. LTD. GAS TURBO POWER STATION STAGE - I GAS TURBO POWER STATION STAGE -I I Total (A. P. GAS POWER CORP LTD.) THERMAL-GAS THERMAL-GAS ANDHRA PRADESH ANDHRA PRADESH 100.00 272.00 211 140 162 162 321 285 842 310 221 13 273 68 99 151 36 36 123 21 65 13 96

ANDHRA PRADESH POWER GEN.CORP. LTD.VIJAWADA THERMAL POWER STATION (Dr. NTTPS) RAYALASEEMA THERMAL POWER PROJECT-I RAYALASEEMA THERMAL POWER PROJECT-II KOTHAGUDEM THERMAL POWER STATION ( O & M KOTHAGUDEM THERMAL POWER STATION (KTPS-V RAMAGUNDEM THERMAL POWER STATION Sub Total Thermal (A. P. POWER GEN. CORP. LTD.) SRISAILAM RIGHT BANK HES SRISAILAM LEBT BANK HES NAGARJUNASAGAR UPPER SILERU LOWER SILERU DONKARAI PENNA AHOBILAM POCHAPAD SINGUR NIZAMSAGAR PEDDAPALLI CHETTIPETA PALERU MACHKUND (AP Share) TUNGABHADRA DAM (AP Share) Sub Total Hydro (A. P. POWER GEN. CORP. LTD.) Total (A. P. POWER GEN. CORP. LTD.) KARNATAKA POWER CORP. LTD. BELLARY TPS RAICHUR TPS YELHANKA (DG) Sub Total Thermal (KPCL) ALMATTI DPH HPS BHADRA HPS GERUSUPPA HPS GHAT PRABHA HPS JOG HPS KADRA HPS KALINADI HPS KALINADI SUPA HPS KODASALI HPS LIGANAMAKKI HPS MUNIRABAD HPS SHARAVATHY HPS SIVASAMUNDRUM HPS THERMAL-COAL THERMAL-COAL THERMAL-COAL THERMAL-COAL THERMAL-COAL THERMAL-COAL HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO TH/HY THERMAL-COAL THERMAL-COAL THERMAL-DIESEL HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO HYDRO-HYDRO ANDHRA PRADESH ANDHRA PRADESH ANDHRA PRADESH ANDHRA PRADESH ANDHRA PRADESH ANDHRA PRADESH ANDHRA PRADESH ANDHRA PRADESH ANDHRA PRADESH ANDHRA PRADESH ANDHRA PRADESH ANDHRA PRADESH ANDHRA PRADESH ANDHRA PRADESH ANDHRA PRADESH ANDHRA PRADESH ANDHRA PRADESH ANDHRA PRADESH ANDHRA PRADESH ANDHRA PRADESH ANDHRA PRADESH ANDHRA PRADESH KARNATAKA KARNATAKA KARNATAKA KARNATAKA KARNATAKA KARNATAKA KARNATAKA KARNATAKA KARNATAKA KARNATAKA KARNATAKA KARNATAKA KARNATAKA KARNATAKA KARNATAKA KARNATAKA 500.00 1470.00 127.92 290.00 39.20 240.00 32.00 139.20 150.00 855.00 100.00 120.00 55.00 28.00 1035.00 42.00 1260.00 420.00 420.00 720.00 500.00 62.50 770.00 900.00 965.60 240.00 460.00 25.00 20.00 27.00 15.00 10.00 9.16 1.00 2.00 84.00 57.60

ENERGY SAVED IS ENERGY PRODUCED

VARAHI HPS Sub Total Hydro(KPCL) Total (KPCL) KERALA STATE ELECTRICITY BOARD CHEMBUKADAVU HPS. IDAMALAYAR HPS. IDUKKI HPS. KAKKAD HPS. KALLADA HPS. KUTTIYADI HPS. KUTTIYADI ADDL. EXTN. KUTTIYADI TAIL RACE LOWER PERIYAR HPS. MADHUPATTY HPS. MALAMPUZHA HPS. MALANKARA HPS. NARIAMANGLAM HPS NARIMANGLAM EXT HPS. PALLIVASAL HPS. PANNIAR HPS. PEPPARA HPS. PORINGALKUTTU HPS. PORINGALKUTTU LBC HPS. SABARIGIRI HPS. SENGULAM HPS. SHOLAYAR HPS. URMI HPS. Sub Total Hydro(KSEB) BRAM