r ÂCe-O/VfPi.'SN6DAr tbeJt;tAS PtZIOt:l D6""'6I:11' To Bulletin 52-37 DC-lO SC 812 This page transmits ~evision 2 for DC-10 Service Bulletin 52-37 to incorporate the following changes: NOTE: This revision constitutes a complete reissue. Reason for Revision: To incorporate the requirements of ADA7797"B" and "C" change advance E.O.ls and to add one op~rator and five aircraft to Service Bulletin Effectivity. Additional work is required by this revision. Pages 1 and 2: Page 3: " Page 4: Page 5: Assigned aircraft listed in original Service Bulletin Effectivity to Group 1. Added five aircraft to Service Bulletin Effectivity under Group II. Added Group 1 heading to original Description and added Group II heading and Description. Added Group 1 heading to original Manpowerand revised original Manpowerdata. Added Group II and Manpowerdata. Added Group 1 heading to original Weight and Balance. Added Group II heading and Weight and Balance data. AddedADA7797"B" and "C" change advance E.O.ls to References. Added Group I heading to original Accomplishment Instructions. AddedADA7797"B" and "C" change advance LO.ls to paragraph 2.B. Added Group II heading and Accomplishment Instructions. "1 Revision Sequence Original Date Revision 1 Revision 2 JJP July 3/72 August 5/72 August 25/72 ;. July 3/72 Revision"2 August 25/72 Bulletin 52-37

Upload: others

Post on 23-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ÂCe-O/VfPi.'SN6DAr · Bulletin 52-37 DC-lO SC 812 This page transmits ~evision 2 for DC-10Service Bulletin 52-37 to incorporate the following changes: NOTE: This revision constitutes

r

ÂCe-O/VfPi.'SN6DArtbeJt;tAS PtZIOt:l

D6""'6I:11'

ToBulletin 52-37

DC-lO SC 812

This page transmits ~evision 2 for DC-10Service Bulletin 52-37 to incorporatethe following changes:

NOTE: This revision constitutes a complete reissue.

Reason for Revision: To incorporate the requirements of ADA7797"B" and "C"change advance E.O.ls and to add one op~rator and fiveaircraft to Service Bulletin Effectivity. Additionalwork is required by this revision.

Pages 1and 2:

Page 3:

" Page 4:

Page 5:

Assigned aircraft listed in original Service Bulletin Effectivityto Group 1.

Added five aircraft to Service Bulletin Effectivity under Group II.

Added Group 1 heading to original Description and added Group II headingand Description.

Added Group 1 heading to original Manpowerand revised originalManpowerdata.

Added Group II and Manpowerdata.

Added Group 1 heading to original Weight and Balance.

Added Group II heading and Weight and Balance data.

Added ADA7797"B" and "C" change advance E.O.ls to References.

Added Group I heading to original Accomplishment Instructions.

Added ADA7797"B" and "C" change advance LO.ls to paragraph 2.B.

Added Group II heading and Accomplishment Instructions.

"1

Revision Sequence

Original DateRevision 1Revision 2

JJP

July 3/72August 5/72August 25/72

;.

July 3/72

Revision"2 August 25/72

Bulletin 52-37

Page 2: ÂCe-O/VfPi.'SN6DAr · Bulletin 52-37 DC-lO SC 812 This page transmits ~evision 2 for DC-10Service Bulletin 52-37 to incorporate the following changes: NOTE: This revision constitutes

DOUGLAS A'RCRAFT COMPANV 0'/MCDONNELL DOUGL~

~ rDlCORPORA'rlON

gjU;;0 0 l ,'::;::::';::.,~':=

SERVICE BULLETINBULLETIN 52-37

DC-lO SC 812

DOORS- Cargo - Modify And Adjust Door Mechanism Assembly.

NOTE

This Service Bulletin is issued as arecord type change. Engineering drawingsare furnished in lieu of illustrations anddetailed modification data.

1. Planning Information:

A. Effectivity:

(1) Aircraft Affected:

Model DC-10, Series 10

Operator Factory Serial No.

Group 1

46502 thru 46515

1

AA

*Mfr's Fuselage No.Qty of KitsCZZ0812-501

14

5

5

4, 6, 8, 10, 11, 15, 1517, 25 thru 27, 32,35, 39, 42, and 45

Ju1y 3112 Bu11etin 52-37

Revision 2 August 25/72 Page 1 of 6

CO 46900 thru 46904

NA 46700 thru 4670346706

UA 46600 thru 46614

3, 5, 7,9j 12, 13,20 thru 24, 30, 31,and 37

34, 40, 41, 43, and44

14, 16, 18, and 1938

Group II (No Kits Required)

AA 46500 146516 thru 46518 48, 49, and 51

LT 46905 47

Page 3: ÂCe-O/VfPi.'SN6DAr · Bulletin 52-37 DC-lO SC 812 This page transmits ~evision 2 for DC-10Service Bulletin 52-37 to incorporate the following changes: NOTE: This revision constitutes

1

1

{-:\/MCDONNE DOUOLA~ SERVICEBULLETIN

Affected aircraft other than those listed above will be modifiedprior to delivery or included in a subsequent revision to thisService Bulletin.

*Manufacturer's fuselage numbers are applicâble to affected aircraftat time of Service Bulletin issue and are for reference only.

(2) Spares Affected:

Spare Part No.

ADA3659-1ADA3668-1ADA3668-501

Key Word

Collar AssyShimShim

B. Reason:

The load required to close the vent door without the lockpinsengaged is within the capability of the cargo handlers. Whenthe vent door handle is closed and the lockpins are not engaged,the lockpin tube will deflect and contact the lockpin limitswitch striker, giving a false door closed, latched, and lockedindication. Readjusting the lockpin tube assembly to prevent thevent door handle from being forced to the closed position when thelockpins are not engaged properly will provide a more positive andreliable cargo door closed, latched, and locked system.

C. Description:

This modification accomplishes the following:

Group 1

(1) Replaces strike plate and adjusts pins and switches on the forward,center, and aft cargo doors.

(2) Installs support and plate on aft cargo door.

Group II

Adjusts pins and switches and vent door mechanism on the forward, center,and aft cargo doors.

D. Compliance:

Recommended.

E. Approval:

This Service Bulletin is FAAapproved.

Bulletin 52-37

Page 2

July 3/72

Revision 2 August 25/72

Page 4: ÂCe-O/VfPi.'SN6DAr · Bulletin 52-37 DC-lO SC 812 This page transmits ~evision 2 for DC-10Service Bulletin 52-37 to incorporate the following changes: NOTE: This revision constitutes

,..-MCDONNELLDOUO~~ SERVICEBULLETIN

F. Manpower:

This modification maybe accomplished in the following approximateman-hours or elapsed hours per aircraft.

Man-Hours

Work Phases

Gain AccessModify (Aircraft)Close Up

Total Man-Hours

Total Elapsed Hours

G. Material - Cost and Availability:

(1) Aircraft:

Operators with aircraft listed under paragraph I.A.(I) shouldsubmit a lino charge Il purchase order for service change kitsin the quantities shown.

The purchase order must specify this Service Bulletin number andonly parts listed herein.

Operators will be advised of delivery schedule upon receipt ofpurchase order. Direct purchase order to:

Douglas Aircraft CompanyP.O. Box 1771Long Beach, California 90801Attn: Manager, Warranty 7-21

A lino charge" purchase order for kits under the provisions ofthis bulletin must be received not later than 90 days afterthe issue date noted on page 1. Any purchase order receivedafter the 90-day period will be processed on a charge basis.

(2) Spares:

Replacement parts will be supplied for spares purchased from theDouglas Aircraft Companyand now in operator's possession. Anadditional lino charge Il purchase order should be submittedreferencing this Service Bulletin number, the original sparespurchase order, and listing replacement parts required.Availabi1ity of replacement parts 1s the same as indicated inparagraph 1.G.(I)~

July 3/72

Revision 2 August 25/72

Bulletin 52-37

page 3

Group1 II

1.5 1.57.7 3.0

.1.:.?. 1.5

10.7 6.0

3.5 3.0

Page 5: ÂCe-O/VfPi.'SN6DAr · Bulletin 52-37 DC-lO SC 812 This page transmits ~evision 2 for DC-10Service Bulletin 52-37 to incorporate the following changes: NOTE: This revision constitutes

1

IfIfCDONNEU.DOUGI.~ SERVICEBULLETIN

H. Tooling - Price and Availability:

None.

1. Weight and Balance:

Group 1

This modification will increase the weight of the aircraft at approximatelystation 1830.0, as follows:

(1) Mfr's Empty Weight (MEW)Increase

(2) MomentChange (MEW)

(3) Index Unit Change (MEW)

1

Group II

None.

+0.1 LB

+183 IN.-LB

o

J. References:(1) Data used in preparation of this Service Bulletin:

1

Data Identification

ADA7797ADA7797CMMChapter 52

Change

NewA, B, and C

Type. of DataRework DrawingAdvance E.O.ComponentMaintenance Manual

Data Identification

(2) Data supplied in support of this Service Bulletin:

Change

NewA, B, and C1

ADA7797ADA7797

Type of Data

Rework DrawingAdvance E.O.

NOTE: One reproducible and two copies of thedrawing and advance E.O.'s will be furnishedto each affected operator.

K. Publications Affected:

The modification outlined in this Service Bulletin affects the followingDACDC-1Daircraft publications.

Publication

ComponentMaintenance ManualIllustrated Parts Catalog

Bulletin 52-37

Page 4

Chapter and/or Section

52-31 and 52-3352-31, 52-32, and 52-33

July 3/72

Revision 2 August 25/72

Page 6: ÂCe-O/VfPi.'SN6DAr · Bulletin 52-37 DC-lO SC 812 This page transmits ~evision 2 for DC-10Service Bulletin 52-37 to incorporate the following changes: NOTE: This revision constitutes

SERVICEBULLETIN

2. AccomplishmentInstructions:

CAUTION: STATICALLY GROUND THE AIRCRAFT.

NOTE: Instructions are identical for forward,center, and aft cargo door assemblies,except as noted.

1 Group 1

A. Removeand retain door liner and attaching parts.

B. Aft cargo door only - Install plate, support, jumper, and attachingparts. (See drawing ADA7797,sheets 1, 3, and 5.)

C. Replace striker and adjust pins and switches. (See drawing ADA7797,sheets 1 through 5, and ADA7797liA", "BIlt and "C" change advance E.O. 1s. )1

D. Reinstall door liner and attaching parts.

Group II

A. Removeand retain door liner and attaching parts.

B. Adjust pins, switches, and vent door mechanism. (See drawing ADA7797,sheets 1 through 5, and ADA7797"A", "B", and "C" change advance E.O.'s.)

C. Reinstall door liner and attaching parts.

July 3/72 Bulletin 52-37

Revision 2 August 25/72 Page 5

Page 7: ÂCe-O/VfPi.'SN6DAr · Bulletin 52-37 DC-lO SC 812 This page transmits ~evision 2 for DC-10Service Bulletin 52-37 to incorporate the following changes: NOTE: This revision constitutes
Page 8: ÂCe-O/VfPi.'SN6DAr · Bulletin 52-37 DC-lO SC 812 This page transmits ~evision 2 for DC-10Service Bulletin 52-37 to incorporate the following changes: NOTE: This revision constitutes

/

/tIICDONNBI..I..DOUCl~~ SERVICEBULLETIN

3. Material Information:

A. The basis for the following material data is per aircraft.

(1) Parts furnished in service change kit.

B. The basis for the following materi al data is per spares.

(1) Discard spare shims and order replacement parts as indicatedin paragraph 3.A.(1).

(2) Discard spare ADA3659-1collar assembly and order ADA7797-3striker as a replacement part.

JJP

July 3/72 Bulletin 52-37

Revision 2 August 25/72 Page 6

Qty Kit Instructions-New Part No. CZZ0812-501 Key Word Old Part No. Disposition

ADA7773-1 3 ShimADA7773-501 30 Shim ADA3668-1 DiscardADA7773-503 3 Shim ADA3668-501 DiscardADA7797-3 3 Striker ADA3659-1 DiscardADA7797-5 1 Support (Collar Assy)ADA7797-7 1 PlateMS20426AD3-7 18 RivetMS21042L3 4 NutMS21075L08 6 NutplateMS25083-2BB4 1 JumperMS25281R2 1 ClampNAS1252-10L 10 WasherNAS5602-12 6 ScrewNAS6103U8 1 ScrewNAS6403U13 3 ScrewNAS6403U5 3 ScrewRMF9421-3 3 Nutplate

(2) Parts to be modified by the operator. Reidentification is atoperatorls option.

New Part No. Key Word Old Part No.

None 1 Tube ADA7313-1None 1 Tube ADA7350-1None 1 Tube ADA7350-501None 1 Tube ADA7403-501

Page 9: ÂCe-O/VfPi.'SN6DAr · Bulletin 52-37 DC-lO SC 812 This page transmits ~evision 2 for DC-10Service Bulletin 52-37 to incorporate the following changes: NOTE: This revision constitutes