EPANET Introduction/Workshop Example problems
Network Design Principles Introduction to Project
Outline
![Page 3: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/3.jpg)
Install Example 1 – Flow between two reservoirs Example 2 – Three reservoir (branched) Example 3 – Two reservoir, 4 pipes (loop) Example 4 – Lifting with a pump
Workshop
![Page 4: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/4.jpg)
Sketch a layout on paper Identify pipe diameters; length; roughness
values Identify node elevations; demands Supply reservoir (or tank); identify reservoir
pool elevation Identify pumps; pump curve in problem units
Model Preparation
![Page 5: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/5.jpg)
Example 2 – Flow between two reservoirsExample 1
![Page 6: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/6.jpg)
Example 2 – Three reservoir (branched)Example 2
![Page 7: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/7.jpg)
Example 3 – Two reservoir, 4 pipes (loop)Example 3
![Page 8: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/8.jpg)
Example 4 – Lifting with a pumpExample 4
![Page 9: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/9.jpg)
Water Supply System Includes water supply Treatment Facilities Pumping facilities Transmission lines Local distribution network
Network Design Principles
![Page 10: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/10.jpg)
Distribution network - Consists of items designed to convey potable water at adequate pressures and discharges Pipes Fittings Valves Other appurtenances
Water Supply system
![Page 11: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/11.jpg)
Who? Personnel within the water company Engineers / Consultants
Design parameters and regulations? State board of health Local city/county health departments EPA, AWWA, ANSI
DESIGN
![Page 12: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/12.jpg)
Pressure
Velocity
Age
Chlorine concentration
Fire Flow
DESIGN REQUIREMENTS
![Page 13: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/13.jpg)
Pressures Must be high enough to..
overcome head losses in the system. But not too high to...
prevent damage to fittings and other appurtenances.
Pressure Zones – Set pressurized areas (min and max) within the system by storage, boosters, or pressure control valves. Can also be due to varying pipe size and topography May be generated to ensure reliability in meeting fluctuation demands.
System pressures are adapted to requirements. Hilly areas – booster pumping Minimum pressures vary state to state Established by the state’s Health Department / other agency Fire Marshall may establish additional requirements.
Pressure
![Page 14: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/14.jpg)
Fire Flow Parameters Each municipality establishes own parameters based on local cond. Insurance Services Offices (ISO) - Most used
“Guide for Determination of Required Fire Flow” Recommends criteria for
Establishing insurance rates Classifying mun. with reference to their fire defenses and physical cond.
Q = required fire flow in gpmC = coefficient related to the type of constructionA = total floor area in ft2 (excludes basements)
Fire flow
![Page 15: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/15.jpg)
Hydraulic Characteristics Pressures and discharges are a functions of HC Length Size Condition of pipe
Service Characteristics Demand as it relates to:
Present and projected population Economic base Fire flow Climate
Water supply system
![Page 16: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/16.jpg)
Water utility company …who is responsible for the water quality and
operation of the distribution system.
Companies exist in two forms public entity that
..“exists for the health, safety, and welfare of the public” privately owned utility that ..provides water for profit
WATER utility
![Page 17: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/17.jpg)
Water supply system Gravity
Dependable Source of supply must be located well above the city High-pressure demand for fire-fighting may require pumper
trucks
Pump Least Desirable Pressures vary substantially with variations in flow Provides no reserve if power failure
Pump with Storage Most common Water supplied at approximately uniform rate Flow in excess of consumption stored in elevated tanks
![Page 18: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/18.jpg)
Pipe System
Primary Mains (Arterial Mains) Form basic structure of the system Carry flow from pumping station to elevated
storage tanks Carry flow from elevated storage tanks to
service areas Laid out in interlocking loops Mains not more than 1 km (3000 ft) apart
Valved at intervals of not more than 1.5 km (1 mile) Smaller lines connecting to them are valved
![Page 19: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/19.jpg)
Pipe System
Secondary Lines Form smaller loops within the primary main
system Run from one primary line to another
Spacings of 2 to 4 blocks Provide large amounts of water for fire fighting
with out excessive pressure loss
![Page 20: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/20.jpg)
Pipe System
Small distribution lines Form a grid over the entire service area Supply water to every user and fire hydrants –
Connected to primary, secondary, or other small mains at both ends Valved so the system can be shut down for repairs Size may be dictated by fire flow except in residential
areas with very large lots
![Page 21: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/21.jpg)
Water source (Main Supply)• Lake• River• Aquifer
Treatment Facility• Treats and disinfects water• Meet water quality standards• Potable water
Transmission Lines• Convey water from
source – treatment facility facility – network
Pumping Facilities• Provide energy to
move water
Intermediate Storage Facilities• Stabilize line
pressures• Reserve for
peak demand periods
• Provide storage for fire flow req.
Distribution Lines• Convey water from
storage – service areas• Looped(grid) and Branched
Layouts
Appurtenances• Fire Hydrants.
Valves, auxiliary pumps, fittings
Water SUPPLY system
![Page 22: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/22.jpg)
Water Use Systems
Spatial and temporal distribution in support of human habitation Water supply/treatment/distribution Waste water collection/treatment/discharge
Capacity is based on POPULATION served hydraulic dominated designs
![Page 23: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/23.jpg)
Water Use AND DEMAND
Water Use Consumptive
Municipal Agricultural Industrial Mining
Non-consumptive Hydropower Transportation Recreation
Water Demand Quantity that consumers use per unit of time Ex: Mgpd Depends on population, climate, industry and economic factors
![Page 24: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/24.jpg)
Water DEMAND Residential
Single-family, multi-family (apartments) Water for drinking, landscape, swimming, fires, street
cleaning, etc. Usually two demand peaks (morning and evening)
Commercial Motels, hotels, offices, shopping centers Usually less peak demand and less varied than
residential
Industrial Chemical plants, food processing plants, mines Water for fabrication, cooling, petroleum refining, etc. Water use depends on type of industr.
![Page 25: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/25.jpg)
Assigning Demand
Assign demand using network models (links and nodes)
Network models contain nodes that represent a multitude of actual connections.
While conceptually possible to model to every single connection,it is discouraged because Model is hard to maintain Small errors may go unnoticed The operation of any single connection is not well known.
![Page 26: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/26.jpg)
Network Types
Branch No circulation Has terminals and dead-ends
Water in dead-ends is stagnant Disinfection residual Corrosion
![Page 27: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/27.jpg)
Network Types
Grid/Loop Furnishes supply from more than one direction
Water circulates Disinfection is more effective. Water “age” in system is younger (fresher).
In case of water main break, fewer people are inconvenienced
![Page 28: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/28.jpg)
Network Types Loop vs. Branch during network failure
Every link in a branch system is a single point of failure that isolates all downstream nodes.
Not with loop, only main supply line is failed
![Page 29: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/29.jpg)
Semester design project is to conceptual design a water distribution system and a storm water sewer system for a small residential development Hydraulic analysis for both systems to
demonstrate that the systems will supply/convey as sufficient capacity
Project
![Page 30: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/30.jpg)
Demand estimation is used to determine how much water a system is likely to use (for sizing reservoirs and tanks
Flow rate estimation (a plumber’s perspective) is used to determine how much capacity a system should be able to provide
Estimating Flow Rate
![Page 31: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/31.jpg)
How Much Water Can You Actually Get? Flow Rates are measured in gallons per minute (gpm). For our purposes, we will talk about the amount of
water that you can get through a pipe at a velocity of 8 feet per second (a standard velocity used to engineer a plumbing system).
Plumbing diameter will limit the flow rate you can get – the larger the pipe, the more water you can get. A home with 1″ plumbing can use substantially more water than a home with 3/4″ plumbing.
How Much Water ?
Meter to house
Inside home
![Page 32: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/32.jpg)
1. Think about the maximum number of fixtures and appliances you might operate at the same time.
2. Look at the chart to see how many gallons per minute each device requires.
3. Add up the flow rates for all the devices you selected.
You just figured out the PEAK FLOW RATE that you need.
Now, think about your continual water use, or water use that may run for more than 10 minutes. Add up the fixtures again, and you just calculated your SERVICE FLOW RATE.
How Much Needed? (1)
![Page 33: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/33.jpg)
http://extension.psu.edu/natural-resources/water/drinking-water/best-practices/water-system-planning-estimating-water-use
How Much Needed? (2)
![Page 34: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/34.jpg)
Estimate need per connection to size the system; Run a hydraulic model at these values to size
pipes Estimate demand to evaluate how the
system is likely to perform in terms of pressure zones and such Run a hydraulic model at these values to check
pressures – no fire flow Run a hydraulic model with fire flow to check
minimum pressures
Using the estimate
![Page 35: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/35.jpg)
Several readings on server will be useful:
Readings
![Page 36: CE 3372 Water Systems Design Lecture 006: Introduction to US EPA-NET](https://reader036.vdocuments.us/reader036/viewer/2022062315/5697c0011a28abf838cc2267/html5/thumbnails/36.jpg)
Pumps Review how to size How to simulate in EPANET NPSH considerations
Next Time