cdm_cea
TRANSCRIPT
-
8/11/2019 CDM_CEA
1/14
Presentation onPresentation on
CLEANCLEAN
DEVELOPMENTDEVELOPMENTMECHANISMMECHANISM
ByBy
Central Electricity AuthorCentral Electricity Author
IndoIndoGerman Energy ForumGerman Energy Forum20th DECEMBER,2007
-
8/11/2019 CDM_CEA
2/14
IndoIndo--German Energy ProgrGerman Energy Progra
(IGEN)(IGEN)
MOU signed between Ministry
Power and GTZ in October 20
Major Activities under IGEN a
a) Support services for implementation
Conservation Act (BEE)
b) Improvement in the availability and ePower Plants (CEA)
c) Clean Development Mechanism in thSector (CEA and BEE)
-
8/11/2019 CDM_CEA
3/14
Improvement in the availability andof power Plants
Mapping of thermal power statio- Target of 85 thermal station (then existed)
- Data collected for 30 Thermal units (28 thermal pow
- Report and maps are under finalization for these un
Establishment of Energy Efficien
power station- 35 No. stations have established the cell.
Establish Energy Audit methodoaccredited Energy Auditors for P
plants- Two German consultant are yet to be posted
under IGEN
-
8/11/2019 CDM_CEA
4/14
-
8/11/2019 CDM_CEA
5/14
IndiaIndias Positions Position
No obligation to reduce emissions
Per capita Carbon di-oxide emissionamongst the lowest in the world.
Country per capita CO2 emission in
(tonnes of CO2/annum) India 1.2
USA 20.6
U.K 9.8
China 3.8 World 4.5
Source: UNDP Human Development report 2007/08
-
8/11/2019 CDM_CEA
6/14
Average Emissions from Average Emissions from
sectorsector
With continuous Effort of Governmentemission rate is reducing indicating lacommitment
Weighted average emissions rate (tCO2/M2006-07 --- 0.80 (Provisional)
2005-06 --- 0.82
2004-05 --- 0.84
2002-03 --- 0.85
CDM projects already registered usingBaseline Emission factors.
-
8/11/2019 CDM_CEA
7/14
Indian ScenarioIndian Scenario--CDMCDM
India - High potential of Carbon credits
Baseline Carbon di-oxide emissions fro
sector already in place- First CDM coun
Wide spectrum of projects with different
Dynamic, Transparent & Speedy proceIndian DNA (NCDMA) for Host Country A
Vast Technical Human Resource
Strong Industrial Base
-
8/11/2019 CDM_CEA
8/14
Status of Clean DevelopmenStatus of Clean Developmen
Mechanism Project (CDM) inMechanism Project (CDM) in
1.National CDM Authority already givencountry Approvals to more than 700
2.296 Indian CDM projects already regiCDM Executive Board out of World Tprojects (35%)
3.Main Projects: Waste heat recovery, S
Hydro, Biomass based Power GeneraPower and Energy Efficiency improveIndustries like cement etc.
-
8/11/2019 CDM_CEA
9/14
Potential CDM projects in PowePotential CDM projects in Powe
Renovation & Modernization of old pow
Energy Efficiency Improvement
Demand Side Management
Reduction in Transmission and Distrib
-
8/11/2019 CDM_CEA
10/14
Likely Projects in Pipeline foLikely Projects in Pipeline fo(in Power Sector)(in Power Sector)
North Karanpura( 3 * 660MW) of NTPC bSupercritical technology- Methodology ap
CDM EB with certain modifications(July 2country approval in August 2006
R & M of Badarpur Thermal Power StatioNTPC Methodology under finalization by
Lohari Nagpala Hydro 600MW and Tapo
Vishnugad Hydro 520MW of NTPC Hostapproval accorded in Jan 07 and May 07 Design Document under preparation
-
8/11/2019 CDM_CEA
11/14
Likely Projects in Pipeline foLikely Projects in Pipeline fo(in Power Sector)(in Power Sector) (Cont..)(Cont..)
Nimoo-Bazgo hydro 45 MW and ChutakHydro of NHPC Host country approval tAugust 2007. PDD under preparation
Ganguwal Power House and Bhakra Lef
Power House of BBMB ,uprating of capaccountry approval awaited
10 Nos of projects identified under Renoand Modernisation of thermal power statio
various state utilities for CDM benefits
Vishnugad Pipalkoti 440MW Hydro of TH
under preparation
-
8/11/2019 CDM_CEA
12/14
INDOINDO--GERMAN COOPERATGERMAN COOPERAT(Areas for Further Cooperation)(Areas for Further Cooperation)
Establishment of a separate CO2 emission BDatabase for supercritical projects as per CDM
methodology.
Assistance in introducing the following cuttintechnology available in Germany for Efficiency
improvements and Benefits under CDM :- Online combustion optimization equipment
- Online airflow /unburnt carbon in fly ash measurem- Online Pulverized coal flow measurement
Preparation of Detailed Project Reports for R
activities including Efficiency improvement foKolaghat and Bokaro coal based thermal unitseach) with Kfw Loan assistance and preparatiomap for availing CDM Benefits
-
8/11/2019 CDM_CEA
13/14
INDOINDO--GERMAN COOPERAGERMAN COOPERAT(Areas for Further Cooperation Con(Areas for Further Cooperation Con
Assistance in preparing Project Documents (PDD) for Energy Effiprojects in Power plants subsequ
thermal mapping exercise for avaiCDM Benefits.
CDM capacity Building for the Pplants by way of Workshops/SemiPlant/ State/Region level.
-
8/11/2019 CDM_CEA
14/14